CN204776086U - Duplex position vacuum packaging machine construct - Google Patents
Duplex position vacuum packaging machine construct Download PDFInfo
- Publication number
- CN204776086U CN204776086U CN201520387532.5U CN201520387532U CN204776086U CN 204776086 U CN204776086 U CN 204776086U CN 201520387532 U CN201520387532 U CN 201520387532U CN 204776086 U CN204776086 U CN 204776086U
- Authority
- CN
- China
- Prior art keywords
- filling
- shaping
- clamping
- packaging
- packaging bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Container Filling Or Packaging Operations (AREA)
- Auxiliary Devices For And Details Of Packaging Control (AREA)
Abstract
本实用新型公开了一种双工位真空包装机构,用于物料批量真空包装,其包括机架、灌装组件、定量秤、第一及第二整形部、第一及第二封口组件、第一及第二出料装置、导轴、导轨和PLC工控,机架下部设有封装驱动部,两旁侧为出料位,上部设有灌装驱动部及水平方向的导轴,导轴中部上方设有定量秤,所述灌装组件位于导轴处,其包括第一及第二夹灌部、灌装平台,当灌装平台在导轴上滑移时能同时进行包装袋灌装,第一、二整形部和第一、二出料装置分组固定于导轨滑块处,任一组内整形部和出料装置的间距均与灌装、出料的机构平移距离匹配,本实用新型在灌装组件上实现双工位设计,经结构匹配,使本产品的灌装、整形、封口、出料动作连续进行,提升了效率。
The utility model discloses a double-station vacuum packaging mechanism, which is used for bulk vacuum packaging of materials, which comprises a frame, a filling assembly, a quantitative scale, a first and a second shaping part, a first and a second sealing assembly, a second The first and second discharge devices, guide shafts, guide rails and PLC industrial control, the lower part of the frame is equipped with a packaging drive part, the sides are discharge positions, the upper part is equipped with a filling drive part and a guide shaft in the horizontal direction, and the middle part of the guide shaft is above A quantitative scale is provided, and the filling assembly is located at the guide shaft, which includes first and second clamping filling parts and a filling platform. When the filling platform slides on the guide shaft, the packaging bag can be filled at the same time. The first and second shaping parts and the first and second discharging devices are grouped and fixed at the slider of the guide rail. The distance between the shaping part and the discharging device in any group matches the translational distance of the filling and discharging mechanism. The double-station design is realized on the filling component. After structural matching, the filling, shaping, sealing and discharging actions of this product can be carried out continuously, which improves the efficiency.
Description
技术领域 technical field
本实用新型涉及机械领域,尤其是一种双工位真空包装机构。 The utility model relates to the mechanical field, in particular to a double-station vacuum packaging mechanism.
背景技术 Background technique
真空包装机是食品包装中的常用机械,为提升包装效率,国内已有采用双工位设计的真空包装机产品出现,但这些包装机通常采用单工位的夹袋灌装装置与双工位真空整形装置的组合,工作过程中夹袋灌装装置需移至灌装口的工位,才能进行放料灌装,然后灌装成型后通过真空室的移动来出料,故灌装过程、出料耗时影响整体工艺总耗时,包装速度一般。 Vacuum packaging machine is a commonly used machine in food packaging. In order to improve packaging efficiency, vacuum packaging machine products with double-station design have appeared in China, but these packaging machines usually use single-station bag filling device and double-station The combination of the vacuum shaping device, the bag filling device needs to be moved to the station of the filling port during the working process, so that the material can be discharged and filled, and then the material is discharged through the movement of the vacuum chamber after filling and forming, so the filling process, The time consumption of discharging materials affects the total time consumption of the overall process, and the packaging speed is average.
发明内容 Contents of the invention
本实用新型提出一种双工位真空包装机构,通过对灌装装置的改进,提升了真空包装机构的工作效率。 The utility model proposes a double-station vacuum packaging mechanism, through the improvement of the filling device, the working efficiency of the vacuum packaging mechanism is improved.
本实用新型采用以下方案。 The utility model adopts following scheme.
一种双工位真空包装机构,用于物料的批量真空包装,其包括机架、灌装组件、定量秤、第一及第二整形部、第一及第二封口组件、第一及第二出料装置、导轴、导轨、封装驱动部、灌装驱动部和PLC工控。 A double-station vacuum packaging mechanism for batch vacuum packaging of materials, which includes a frame, a filling assembly, a quantitative scale, a first and a second shaping section, a first and a second sealing assembly, a first and a second Discharging device, guide shaft, guide rail, packaging drive unit, filling drive unit and PLC industrial control.
所述机架下部设有封装驱动部,两旁侧为出料位,上部设有灌装驱动部及水平方向的导轴,导轴中部上方设有定量秤,导轴两端下方分设第一及第二导轨,两导轨上对应设置第一及第二滑块,两滑块在封装驱动部的驱动下沿导轨滑移,第一整形部和第一出料装置固定于第一滑块两端,第二整形部和第二出料装置固定于第二滑块两端,所述封口组件固定于机架两侧,所述封口组件与对应整形部初始位置之间的距离,封口组件与同侧出料位之间的距离,与滑块上的整形部与出料装置的间距相同,当滑块运载整形部使其停于整形部初始位置时,滑块上的出料装置位于封口组件处,当滑块运载整形部使其停于封口组件处时,滑块上的出料装置位于出料位处。 The lower part of the frame is provided with a packaging driving part, the two sides are the discharge positions, the upper part is provided with a filling driving part and a guide shaft in the horizontal direction, a quantitative scale is provided above the middle part of the guide shaft, and a first and a bottom are respectively provided under the two ends of the guide shaft. The second guide rail, the first and second sliders are correspondingly arranged on the two guide rails, the two sliders slide along the guide rails driven by the packaging driving part, the first shaping part and the first discharge device are fixed at both ends of the first slider , the second shaping part and the second discharge device are fixed on both ends of the second slider, the sealing assembly is fixed on both sides of the frame, the distance between the sealing assembly and the initial position of the corresponding shaping part, the sealing assembly and the same The distance between the side discharge positions is the same as the distance between the shaping part on the slider and the discharge device. When the slider carries the shaping part to stop at the initial position of the shaping part, the discharging device on the slider is located at the sealing assembly When the slider carries the shaping part to stop at the sealing assembly, the discharge device on the slider is located at the discharge position.
所述灌装组件位于导轴处,其包括第一及第二夹灌部、灌装平台,灌装平台滑置于导轴上,在灌装驱动部驱动下往复滑移,两夹灌部按导轴方向固定于灌装平台处;所述定量秤的下方为置中工位,第一整形部和第二整形部其初始位置与置中工位的间距均为L,所述灌装平台所固定的第一夹灌部和第二夹灌部之间的距离也为L,当任一夹灌部位于定量秤下方的置中工位时,另一夹灌部位于与之对应的整形部初始位置上方。 The filling assembly is located at the guide shaft, which includes first and second clamping filling parts and a filling platform. The filling platform is slid on the guide shaft and reciprocally slides under the drive of the filling driving part. The two clamping filling parts It is fixed on the filling platform according to the direction of the guide shaft; the centering station is below the quantitative scale, and the distance between the initial position of the first shaping part and the second shaping part and the centering station is L, and the filling The distance between the first clamping irrigation part and the second clamping irrigation part fixed by the platform is also L. When any clamping irrigation part is located at the central station below the quantitative scale, the other clamping irrigation part is located at the corresponding Above the initial position of the plastic part.
所述夹灌部设有承载物料的过渡斗,过渡斗下设出料口,出料口处设有包装袋夹具,当灌装平台在导轴上滑移时,装有物料的过渡斗把物料灌入夹具上的包装袋内。 The clamping and filling part is provided with a transition hopper for carrying materials, and a discharge port is provided under the transition hopper, and a packaging bag fixture is provided at the discharge port. When the filling platform slides on the guide shaft, the transition hopper with the material The material is poured into the packaging bag on the fixture.
所述PLC工控连接至定量秤、封装驱动部、灌装驱动部、灌装组件、整形部、封口组件和出料装置,控制定量秤向灌装组件输料,控制封装驱动部驱动滑块,控制灌装驱动部驱动灌装平台,控制灌装组件向包装袋灌料,控制整形部对包装袋整形,控制封口组件对包装袋封口,控制出料装置输出包装成品。 The PLC industrial control is connected to the quantitative scale, the packaging driving part, the filling driving part, the filling component, the shaping part, the sealing component and the discharge device, controls the quantitative scale to feed the filling component, controls the packaging driving part to drive the slider, Control the filling drive unit to drive the filling platform, control the filling component to fill the packaging bag, control the shaping unit to shape the packaging bag, control the sealing component to seal the packaging bag, and control the discharge device to output the packaged product.
在工控PLC控制下,当夹灌部位于定量秤下方,且夹灌部的包装袋夹具上夹持有包装袋时,已计量足额物料的定量秤把物料填充入夹灌部的过渡斗内,接料完成的夹灌部向对应的整形部移动,在移动的同时,定量秤重新备料,过渡斗内的物料灌入包装袋内。 Under the control of the industrial control PLC, when the filling part is located under the quantitative scale and the packaging bag is clamped on the packaging bag fixture of the filling part, the quantitative scale that has measured the full amount of material will fill the material into the transition hopper of the filling part , the clamping and filling part that has finished receiving the material moves to the corresponding shaping part. While moving, the quantitative scale prepares the material again, and the material in the transition hopper is poured into the packaging bag.
在工控PLC控制下,当携有包装袋的夹灌部位于与之对应的整形部上方时,夹灌部把灌有物料的包装袋放入整形部内;当整形部对包装袋整形时,整形部经滑块运载,移至封口组件处对包装袋进行真空封口,当整形和真空封口完成后,包装袋被封口组件夹持于封口组件处,滑块运载整形部离开封口组件,回移至初始位置,同时带动相对应的出料装置到达封口部件处接收已成品的含物料包装袋,当滑块再次运载整形部至封口部件时,出料装置被滑块同步运至出料位送出成品。 Under the control of industrial control PLC, when the clamping and filling part carrying the packaging bag is located above the corresponding shaping part, the clamping and filling part puts the packaging bag filled with materials into the shaping part; when the shaping part shapes the packaging bag, the shaping part The part is carried by the slider and moved to the sealing assembly to vacuum seal the packaging bag. After the shaping and vacuum sealing are completed, the packaging bag is clamped by the sealing assembly at the sealing assembly. The slider carries the shaping part away from the sealing assembly and moves back to At the initial position, at the same time drive the corresponding discharge device to the sealing part to receive the finished product-containing packaging bag. When the slider carries the shaping part to the sealing part again, the discharge device is synchronously transported to the discharge position by the slider to deliver the finished product .
所述出料位处设有出料滑板。 The discharge position is provided with a discharge slide.
所述机架上部、下部均固定有气缸,所述封装驱动部由机架下部气缸驱动,所述灌装驱动部由机架上部气缸驱动。 Cylinders are fixed on the upper and lower parts of the frame, the packaging driving part is driven by the cylinder at the lower part of the frame, and the filling driving part is driven by the cylinder at the upper part of the frame.
所述导轴两端设有导轴固定块,导轴固定块经紧固件固定于机架上。 Both ends of the guide shaft are provided with guide shaft fixing blocks, and the guide shaft fixing blocks are fixed on the frame through fasteners.
装有物料的过渡斗以物料自身重力把物料灌入夹具上的包装袋内。 The transition hopper filled with materials pours the materials into the packaging bag on the fixture by the gravity of the materials themselves.
在工控PLC控制下,第一夹灌部、第一整形部、第一封口组件和第一出料装置对物料的包装步骤,与第二夹灌部、第二整形部、第二封口组件和第二出料装置对物料的包装步骤相同,当第一夹灌部位于定量秤下方时,第一夹灌部、第一整形部和第一出料装置对物料的包装包括以下几步骤: Under the control of the industrial control PLC, the packaging steps of the materials by the first filling part, the first shaping part, the first sealing component and the first discharge device, and the second filling part, the second shaping part, the second sealing part and the The packaging steps of the second discharging device are the same. When the first clamping and filling part is located under the quantitative scale, the packaging of the materials by the first clamping and filling part, the first shaping part and the first discharging device includes the following steps:
A、使定量秤计量足额物料,在定量秤下方的夹灌部处,通过包装袋夹具在其夹灌部出料口处装夹包装袋,触发PLC控制信号,定量秤把物料填充至夹灌部的过渡斗内。 A. Make the quantitative scale measure the full amount of material. At the clamp filling part under the quantitative scale, clamp the packaging bag at the outlet of the clamp filling part through the packaging bag clamp, trigger the PLC control signal, and the quantitative scale fills the material to the clamp. In the transition bucket of the irrigation department.
B、当定量秤内物料投放完毕,触发PLC控制信号,灌装驱动部驱动灌装平台向第一整形部移动,运载第一夹灌部至第一整形部上方,同时运载第二夹灌部至定量秤下方,在运载过程中,定量秤备料,第一夹灌部过渡斗中的物料在自重作用下灌入其夹具上的包装袋内。 B. When the material in the quantitative scale is put in, the PLC control signal is triggered, and the filling driving part drives the filling platform to move to the first shaping part, and carries the first clamping filling part to the top of the first shaping part, and at the same time carries the second clamping filling part To the bottom of the quantitative scale, during the carrying process, the quantitative scale prepares the material, and the material in the transition bucket of the first clamping irrigation part is poured into the packaging bag on the clamp under the action of its own weight.
C、当第一夹灌部位于第一整形部上方时,第二夹灌部被载至定量秤下方,当第二夹灌部夹有包装袋后,定量秤即开始向第二夹灌部的过渡斗内填充物料。 C. When the first clamping filling part is above the first shaping part, the second clamping filling part is loaded under the quantitative scale, and when the second clamping filling part clamps the packaging bag, the quantitative scale starts to pour The transition bucket is filled with materials.
D、包装袋填充完成的第一夹灌部把包装袋放入第一整形部,第一整形部开始对包装袋整形,同时封装驱动部驱动滑块运载第一整形部向第一封口组件移动,当定量秤对第二夹灌部过渡斗的物料填充完成后,灌装平台运载第二夹灌部向第二整形部移动,移动过程中第二夹灌部进行灌装作业,灌装平台同时带动第一夹灌部返回定量秤下方。 D. After the packaging bag is filled, the first filling part puts the packaging bag into the first shaping part, and the first shaping part starts to shape the packaging bag. At the same time, the packaging driving part drives the slider to carry the first shaping part to the first sealing component. , when the quantitative scale fills the material in the transition hopper of the second clamping filling part, the filling platform carries the second clamping filling part to move to the second shaping part. During the movement, the second clamping filling part performs filling operations, and the filling platform At the same time, it drives the first clamp irrigation part to return to the bottom of the quantitative scale.
E、第一整形部移动至第一封口组件处,第一封口组件对包装袋封口,整形封口后的包装袋被第一封口组件夹持定位于第一封口组件处,然后第一整形部在第一滑块运载下返回初始位置。 E. The first shaping part moves to the first sealing component, the first sealing component seals the packaging bag, and the packaging bag after shaping and sealing is clamped and positioned at the first sealing component by the first sealing component, and then the first shaping part The first slider returns to the initial position under load.
F、当第一整形部被第一滑块运载返回初始位置时,第一滑块上固定的第一出料装置被同步运输至第一封口组件处,第一封口组件放开其夹持的已灌装整形封口完成的包装袋,使其落入第一出料装置内。 F. When the first shaping part is carried back to the initial position by the first slider, the first discharge device fixed on the first slider is transported to the first sealing assembly synchronously, and the first sealing assembly releases its grip The packaging bags that have been filled, shaped and sealed are dropped into the first discharge device.
G、当第一整形部接收新的灌好物料的包装袋,并在第一滑块的运载下移动至第一封口组件处时,第一出料装置被第一滑块同步移动至出料位送出成品。 G. When the first shaping part receives a new packaging bag filled with materials and moves to the first sealing component under the carrying of the first slider, the first discharge device is moved synchronously to the discharge by the first slider The finished product is delivered.
本实用新型灌装组件位于机架上部的导轴处,其包括与第一及第二夹灌部、灌装平台,灌装平台滑置于导轴上,由灌装驱动部驱动下往复滑移,两夹灌部按导轴方向固定于灌装平台处;所述定量秤的下方为置中工位,第一整形部和第二整形部其初始位置与置中工位的间距均为长度L,所述灌装平台所固定的第一夹灌部和第二夹灌部之间的距离也为L,当任一夹灌部位于定量秤下方的置中工位时,另一夹灌部位于与之对应的整形部初始位置上方,这样的设计在灌装机构上实现了双工位设计,而且采用了合理的尺寸结构提升了灌装工位的转换效率,当两夹灌部中的一个在移向整形部时,另一夹灌部向定量秤处移动,提升了机构效率。 The filling assembly of the utility model is located at the guide shaft on the upper part of the frame, and it includes the first and second filling parts and the filling platform. The two filling parts are fixed on the filling platform according to the direction of the guide shaft; the centering station is below the quantitative scale, and the distance between the initial position of the first shaping part and the second shaping part and the centering station is Length L, the distance between the first clamping filling part and the second clamping filling part fixed by the filling platform is also L, when any clamping filling part is located at the central station below the quantitative scale, the other clamping filling part The filling part is located above the initial position of the corresponding shaping part. This design realizes the double-station design on the filling mechanism, and adopts a reasonable size structure to improve the conversion efficiency of the filling station. When the two clamping filling parts When one of them moves to the shaping part, the other clamping part moves to the quantitative scale, which improves the efficiency of the mechanism.
本实用新型中,当两夹灌部中的任何一个在移向整形部时,定量秤均开始备料,这提升了备料工序的效率,因为当夹灌部中的一个在移向整形部时,另一夹灌部也移向定量秤,当夹灌部到位后,定量秤的物料便已接近或达到定量,可以向夹灌部投放。 In the utility model, when any one of the two clamping and filling parts is moving to the shaping part, the quantitative scale all starts to prepare materials, which improves the efficiency of the material preparation process, because when one of the clamping and filling parts is moving to the shaping part, The other clamping irrigation part also moves to the quantitative scale. When the clamping irrigation part is in place, the material of the quantitative scale is close to or reaches the fixed amount, and can be put into the clamping irrigation part.
本实用新型的夹灌部处设有过渡斗,这使得夹灌部在向整形部移动时,能持续向包装袋内灌装物料,不仅提升了灌装效率,而且使得物料灌装的缓冲期得以延长,减弱了灌装冲击力,使包装袋不易在灌装过程中破裂。 The utility model is equipped with a transition bucket at the clamping filling part, which enables the clamping filling part to continuously fill materials into the packaging bag when it moves to the shaping part, which not only improves the filling efficiency, but also makes the buffer period of material filling It can be extended, which weakens the filling impact and makes the packaging bag not easy to break during the filling process.
本实用新型中,在对包装袋整形封口的工序中,包装袋整形封口完成后,包装袋由封口组件夹持固定,封口组件与对应整形部初始位置之间的距离,封口组件与同侧出料位之间的距离,与滑块上的整形部与出料装置的间距相同,因此整形部由滑块运载移至整形部件初始位置时,出料装置则由同一滑块运载移入封口组件下方位置以接收成品,当整形部接收另一灌好的包装袋,移回封口组件位置时,出料装置则移至出料位处放出成品,这样的方式提升了出料的效率。 In the utility model, in the process of shaping and sealing the packaging bag, after the shaping and sealing of the packaging bag is completed, the packaging bag is clamped and fixed by the sealing component. The distance between material levels is the same as the distance between the shaping part on the slider and the discharge device, so when the shaping part is carried by the slider to the initial position of the shaping part, the discharge device is carried by the same slider and moved under the sealing assembly position to receive the finished product, when the shaping part receives another filled packaging bag and moves back to the position of the sealing assembly, the discharge device moves to the discharge position to release the finished product, which improves the efficiency of discharge.
本实用新型中,机架上部的灌装平台和机架下部的滑块均由气缸驱动来往复滑移,这样的方式具备很高的定位精度,且中间传动环节少,不易因机件配合问题而产生误差,适合本实用新型的夹灌部、整形部、出料装置处通过运载平台(灌装平台、滑块)而实现的双工位设计。 In the utility model, the filling platform on the upper part of the frame and the slide block on the lower part of the frame are both driven by the cylinder to slide back and forth. This method has high positioning accuracy, and there are few intermediate transmission links, so it is not easy to cause problems with the coordination of parts. However, errors are generated, which is suitable for the double station design realized by the carrying platform (filling platform, slide block) at the clamping filling part, shaping part and discharging device of the present invention.
本实用新型中,整形部、出料装置和夹灌部均在同一直线上移动,结构简单,易于维护。 In the utility model, the shaping part, the discharge device and the clamping and filling part all move on the same straight line, and the structure is simple and easy to maintain.
本实用新型中,出料位处设有出料滑板,使包装好的成品在输出时,不会因从高处跌落而破损,提升了工序质量。 In the utility model, a discharge slide plate is provided at the discharge position, so that the packaged finished product will not be damaged due to falling from a high place when it is output, and the process quality is improved.
附图说明 Description of drawings
下面结合附图对本实用新型进一步说明; Below in conjunction with accompanying drawing, the utility model is further described;
附图1是本实用新型所述一种双工位真空包装机构的示意图; Accompanying drawing 1 is the schematic diagram of a kind of double station vacuum packaging mechanism described in the utility model;
图中:1-第一夹灌部,2-第二夹灌部,3-定量秤,4-过渡斗,5-第一整形部,6-第二整形部,7-第一封口组件,8-第二封口组件,9-第一出料装置,10-第二出料装置,11-导轴,12-第一导轨,13第二导轨,14-第一滑块,15-第二滑块,16-置中工位,17-机架上部气缸,18-机架下部气缸,19-导轴固定块,20-出料位,21-出料滑板,22-整形部初始位置,23-灌装平台,24-出料口,25-包装袋夹具,26-包装袋。 In the figure: 1-the first clamping and filling part, 2-the second clamping and filling part, 3-quantitative scale, 4-transition bucket, 5-the first shaping part, 6-the second shaping part, 7-the first sealing component, 8-Second sealing assembly, 9-First discharge device, 10-Second discharge device, 11-Guide shaft, 12-First guide rail, 13 Second guide rail, 14-First slider, 15-Second Slider, 16-Central station, 17-Cylinder on the upper part of the frame, 18-Cylinder on the lower part of the frame, 19-Guide shaft fixed block, 20-Outlet position, 21-Outfeed slide, 22-Initial position of shaping part, 23-filling platform, 24-outlet, 25-bag fixture, 26-bag.
具体实施方式 Detailed ways
如图1所示,一种双工位真空包装机构,用于物料的批量真空包装,其包括机架、灌装组件、定量秤3、第一及第二整形部5和6、第一及第二封口组件7和8、第一及第二出料装置9和10、导轴11、导轨12及13、封装驱动部、灌装驱动部和PLC工控。 As shown in Figure 1, a double-station vacuum packaging mechanism is used for batch vacuum packaging of materials, which includes a frame, a filling assembly, a quantitative scale 3, the first and second shaping parts 5 and 6, the first and The second sealing components 7 and 8, the first and second discharge devices 9 and 10, the guide shaft 11, the guide rails 12 and 13, the packaging driving part, the filling driving part and the PLC industrial control.
所述机架下部设有封装驱动部,两旁侧为出料位20,上部设有灌装驱动部及水平方向的导轴11,导轴11中部上方设有定量秤3,导轴11两端下方分设第一及第二导轨12和13,两导轨上对应设置第一及第二滑块14和15,两滑块在封装驱动部的驱动下沿导轨12、13滑移,第一整形部5和第一出料装置9固定于第一滑块14两端,第二整形部6和第二出料装置10固定于第二滑块15两端,所述封口组件7、8固定于机架两侧,所述封口组件7、8与对应整形部初始位置22之间的距离,封口组件7、8与同侧出料位20之间的距离,与滑块上的整形部与出料装置的间距相同,当滑块运载整形部5、6使其停于整形部初始位置22时,滑块上的出料装置9、10位于封口组件7、8处,当滑块运载整形部5、6使其停于封口组件7、8处时,滑块上的出料装置9、10位于出料位20处。 The lower part of the frame is provided with an encapsulation driving part, the two sides are discharge positions 20, the upper part is provided with a filling driving part and a guide shaft 11 in the horizontal direction, a quantitative scale 3 is arranged above the middle part of the guide shaft 11, and the two ends of the guide shaft 11 are The first and second guide rails 12 and 13 are arranged below, and the first and second sliders 14 and 15 are correspondingly arranged on the two guide rails. The two sliders slide along the guide rails 12 and 13 under the drive of the packaging driving part, and the first shaping part 5 and the first discharge device 9 are fixed on the two ends of the first slider 14, the second shaping part 6 and the second discharge device 10 are fixed on the two ends of the second slider 15, and the sealing components 7, 8 are fixed on the machine On both sides of the frame, the distance between the sealing components 7, 8 and the initial position 22 of the corresponding shaping part, the distance between the sealing components 7, 8 and the discharge position 20 on the same side, and the shaping part and the discharge position on the slider The spacing of the devices is the same, when the slider carries the shaping parts 5, 6 to stop at the initial position 22 of the shaping part, the discharge devices 9, 10 on the slider are located at the sealing components 7, 8, and when the sliding block carries the shaping parts 5 , 6 When it stops at the sealing assembly 7, 8, the discharge devices 9, 10 on the slider are located at the discharge position 20.
所述灌装组件位于导轴11处,其包括第一及第二夹灌部1和2、灌装平台23,灌装平台23滑置于导轴11上,在灌装驱动部驱动下往复滑移,两夹灌部1、2按导轴11方向固定于灌装平台23处;所述定量秤3的下方为置中工位16,第一整形部5和第二整形部6其初始位置22与置中工位16的间距均为L,所述灌装平台所固定的第一夹灌部和第二夹灌部之间的距离也为L,当任一夹灌部位于定量秤3下方的置中工位16时,另一夹灌部位于与之对应的整形部初始位置22上方。 The filling assembly is located at the guide shaft 11, which includes first and second clamping filling parts 1 and 2, and a filling platform 23. The filling platform 23 is slid on the guide shaft 11 and reciprocates driven by the filling driving part. Sliding, the two clamping filling parts 1 and 2 are fixed on the filling platform 23 according to the direction of the guide shaft 11; The distance between the position 22 and the centering station 16 is L, and the distance between the first clamping filling part and the second clamping filling part fixed by the filling platform is also L. When any clamping filling part is located on the quantitative scale 3, when the centering station 16 is placed below, the other clamping and filling part is located above the initial position 22 of the corresponding shaping part.
所述夹灌部设有承载物料的过渡斗4,过渡斗4下设出料口24,出料口处设有包装袋夹具25,当灌装平台23在导轴11上滑移时,装有物料的过渡斗4把物料灌入夹具25上的包装袋内。 The filling part is provided with a transition hopper 4 for carrying materials, and a discharge port 24 is provided under the transition hopper 4, and a packaging bag clamp 25 is provided at the discharge port. When the filling platform 23 slides on the guide shaft 11, the loading Material is poured into the packaging bag on the fixture 25 by the transition bucket 4 of material.
所述PLC工控连接至定量秤3、封装驱动部、灌装驱动部、灌装组件、整形部5和6、封口组件7及8和出料装置9及10,控制定量秤3向灌装组件输料,控制封装驱动部驱动滑块14、15,控制灌装驱动部驱动灌装平台23,控制灌装组件向包装袋灌料,控制整形部5、6对包装袋整形,控制封口组件7、8对包装袋封口,控制出料装置9、10输出包装成品。 The PLC industrial control is connected to the quantitative scale 3, the packaging driving part, the filling driving part, the filling component, the shaping part 5 and 6, the sealing component 7 and 8 and the discharge device 9 and 10, and controls the quantitative scale 3 to the filling component Material conveying, controlling the packaging driving part to drive the sliders 14, 15, controlling the filling driving part to drive the filling platform 23, controlling the filling component to fill the packaging bag, controlling the shaping part 5 and 6 to reshape the packaging bag, and controlling the sealing component 7 , 8 pairs of packaging bags are sealed, and the output device 9, 10 is controlled to output the packaged product.
在工控PLC控制下,当夹灌部位于定量秤下方,且夹灌部的包装袋夹具25上夹持有包装袋26时,已计量足额物料的定量秤3把物料填充入夹灌部的过渡斗4内,接料完成的夹灌部向对应的整形部移动,在移动的同时,定量秤3重新备料,过渡斗4内的物料灌入包装袋内。 Under the control of the industrial control PLC, when the filling part is located below the quantitative scale, and the packaging bag 26 is clamped on the packaging bag fixture 25 of the filling part, the quantitative scale 3 that has measured the full amount of material fills the material into the filling part of the filling part. In the transition hopper 4, the clamping and filling part that has received the material moves to the corresponding shaping part. While moving, the quantitative scale 3 prepares the material again, and the material in the transition hopper 4 is poured into the packaging bag.
在工控PLC控制下,当携有包装袋的夹灌部位于与之对应的整形部上方时,夹灌部把灌有物料的包装袋26放入整形部内;当整形部对包装袋整形时,整形部经滑块运载,移至封口组件处对包装袋进行真空封口,当整形和真空封口完成后,包装袋被封口组件夹持于封口组件处,滑块运载整形部离开封口组件,回移至初始位置,同时带动相对应的出料装置到达封口部件处接收已成品的含物料包装袋,当滑块再次运载整形部至封口部件时,出料装置被滑块同步运至出料位送出成品。 Under the control of the industrial control PLC, when the filling section carrying the packaging bag is located above the corresponding shaping section, the filling section puts the packaging bag 26 filled with materials into the shaping section; when the shaping section shapes the packaging bag, The shaping part is carried by the slider, and moves to the sealing assembly to vacuum seal the packaging bag. After the shaping and vacuum sealing are completed, the packaging bag is held by the sealing assembly at the sealing assembly, and the sliding block carries the shaping part away from the sealing assembly and moves back to the initial position, and at the same time drive the corresponding discharge device to the sealing part to receive the finished material-containing packaging bag. When the slider carries the shaping part to the sealing part again, the discharge device is synchronously transported to the discharge position by the slider and sent out finished product.
所述出料位24处设有出料滑板21。 A discharge slide 21 is provided at the discharge position 24 .
所述机架上部、下部均固定有气缸17、18,所述封装驱动部由机架下部气缸18驱动,所述灌装驱动部由机架上部气缸17驱动。 Cylinders 17 and 18 are fixed on the upper and lower parts of the frame, the packaging driving part is driven by the cylinder 18 at the lower part of the frame, and the filling driving part is driven by the cylinder 17 at the upper part of the frame.
所述导轴11两端设有导轴固定块19,导轴固定块19经紧固件固定于机架上。 The two ends of the guide shaft 11 are provided with guide shaft fixing blocks 19, and the guide shaft fixing blocks 19 are fixed on the frame through fasteners.
装有物料的过渡斗4以物料自身重力把物料灌入夹具25上的包装袋内。 The transition bucket 4 that material is housed pours material in the packaging bag on the fixture 25 with material self gravity.
在工控PLC控制下,第一夹灌部1、第一整形部5、第一封口组件7和第一出料装置9对物料的包装步骤,与第二夹灌部2、第二整形部6、第二封口组件8和第二出料装置10对物料的包装步骤相同,当第一夹灌部1位于定量秤3下方时,第一夹灌部1、第一整形部5和第一出料装置9对物料的包装包括以下几步骤: Under the control of the industrial control PLC, the packaging steps of the first filling part 1, the first shaping part 5, the first sealing assembly 7 and the first discharge device 9 are compared with the second filling part 2 and the second shaping part 6. , the packaging steps of the second sealing assembly 8 and the second discharge device 10 are the same. The packing of material by feeding device 9 comprises the following steps:
A、使定量秤3计量足额物料,在定量秤3下方的第一夹灌部1处,通过包装袋夹具25在其夹灌部出料口24处装夹包装袋,触发PLC控制信号,定量秤3把物料填充至第一夹灌部1的过渡斗4内。 A. The quantitative scale 3 is used to measure the full amount of material, and the packing bag is clamped at the outlet 24 of the clamping filling part through the packaging bag clamp 25 at the first clamping filling part 1 below the quantitative weighing scale 3, and the PLC control signal is triggered. The quantitative scale 3 fills the material into the transition hopper 4 of the first irrigation part 1 .
B、当定量秤3内物料投放完毕,触发PLC控制信号,灌装驱动部驱动灌装平台23向第一整形部5移动,运载第一夹灌部1至第一整形部5上方,同时运载第二夹灌部2至定量秤3下方,在运载过程中,定量秤3备料,第一夹灌部1过渡斗4中的物料在自重作用下灌入其夹具25上的包装袋内。 B. When the material in the quantitative scale 3 is put in, the PLC control signal is triggered, and the filling driving part drives the filling platform 23 to move to the first shaping part 5, and carries the first clamping filling part 1 to the top of the first shaping part 5, and simultaneously carries The second clamping irrigation part 2 is below the quantitative scale 3. During the carrying process, the quantitative scale 3 prepares materials, and the material in the first clamping irrigation part 1 transition bucket 4 is poured into the packaging bag on its clamp 25 under the action of its own weight.
C、当第一夹灌部1位于第一整形部5上方时,第二夹灌部2被载至定量秤3下方,当第二夹灌部2夹有包装袋后,定量秤3即开始向第二夹灌部的过渡斗内填充物料。 C. When the first clamping irrigation part 1 is located above the first shaping part 5, the second clamping irrigation part 2 is loaded below the quantitative scale 3, and when the second clamping irrigation part 2 clamps the packaging bag, the quantitative scale 3 starts Fill material into the transition bucket of the second irrigation section.
D、包装袋填充完成的第一夹灌部1把充有物料的包装袋放入第一整形部5,第一整形部5开始对包装袋整形,同时封装驱动部驱动第一滑块14运载第一整形部5向第一封口组件7移动,当定量秤3对第二夹灌部2过渡斗4的物料填充完成后,灌装平台23运载第二夹灌部2向第二整形部6移动,移动过程中第二夹灌部2进行灌装作业,灌装平台23同时带动第一夹灌部1返回定量秤3下方。 D. After the packaging bag is filled, the first filling section 1 puts the packaging bag filled with materials into the first shaping section 5, and the first shaping section 5 starts to shape the packaging bag, and at the same time, the packaging driving section drives the first slider 14 to carry The first shaping part 5 moves to the first sealing assembly 7, and when the quantitative scale 3 fills the material in the transition bucket 4 of the second filling part 2, the filling platform 23 carries the second filling part 2 to the second shaping part 6 Moving, during the moving process, the second clamping filling part 2 performs the filling operation, and the filling platform 23 drives the first clamping filling part 1 to return to the bottom of the quantitative scale 3 at the same time.
E、第一整形部5移动至第一封口组件7处,第一封口组件7对包装袋封口,整形封口后的包装袋被第一封口组件7夹持定位于第一封口组件7处,然后第一整形部5在第一滑块14运载下返回初始位置22。 E, the first shaping part 5 moves to the first sealing assembly 7, the first sealing assembly 7 seals the packaging bag, and the packaging bag after shaping and sealing is clamped and positioned at the first sealing assembly 7 by the first sealing assembly 7, and then The first shaping part 5 returns to the initial position 22 under the load of the first slider 14 .
F、当第一整形部5被第一滑块14运载返回初始位置时,第一滑块14上固定的第一出料装置9被同步运输至第一封口组件7处,第一封口组件7放开其夹持的已灌装整形封口完成的包装袋,使其落入第一出料装置9内。 F. When the first shaping part 5 is carried back to the initial position by the first slider 14, the first discharge device 9 fixed on the first slider 14 is transported to the first sealing assembly 7 synchronously, and the first sealing assembly 7 Let go of the package bag that has been filled, reshaped and sealed, so that it falls into the first discharge device 9 .
G、当第一整形部5接收新的灌好物料的包装袋,并在第一滑块14的运载下移动至第一封口组件7处时,第一出料装置9被第一滑块14同步移动至出料位20送出成品。 G. When the first shaping part 5 receives a new packaging bag filled with materials and moves to the first sealing assembly 7 under the carrying of the first slider 14, the first discharge device 9 is moved by the first slider 14 Synchronously move to the discharge position 20 to send out the finished product.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520387532.5U CN204776086U (en) | 2015-06-08 | 2015-06-08 | Duplex position vacuum packaging machine construct |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520387532.5U CN204776086U (en) | 2015-06-08 | 2015-06-08 | Duplex position vacuum packaging machine construct |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204776086U true CN204776086U (en) | 2015-11-18 |
Family
ID=54516188
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520387532.5U Expired - Lifetime CN204776086U (en) | 2015-06-08 | 2015-06-08 | Duplex position vacuum packaging machine construct |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204776086U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104859871A (en) * | 2015-06-08 | 2015-08-26 | 漳州佳龙科技股份有限公司 | Double-station vacuum packaging mechanism capable of achieving continuous operation |
| CN106672299A (en) * | 2017-03-03 | 2017-05-17 | 曹淅 | Double-station vacuum packaging mechanism capable of continuously operating |
-
2015
- 2015-06-08 CN CN201520387532.5U patent/CN204776086U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104859871A (en) * | 2015-06-08 | 2015-08-26 | 漳州佳龙科技股份有限公司 | Double-station vacuum packaging mechanism capable of achieving continuous operation |
| CN106672299A (en) * | 2017-03-03 | 2017-05-17 | 曹淅 | Double-station vacuum packaging mechanism capable of continuously operating |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104859871B (en) | A kind of double-position vacuum package mechanism worked continuously | |
| CN103112608B (en) | Pouch-packaged product-collecting and quantitatively filling system and the package packing machine containing this system | |
| CN105173143B (en) | A kind of double-position vacuum package mechanism of rapid shaping and its technique | |
| CN106347765B (en) | A kind of automatic medicine packing device | |
| CN104960679A (en) | Full-automatic vertical spiral feeding packing machine | |
| CN206456609U (en) | A kind of vacuum shaping packing machine | |
| CN111137509A (en) | Flour processing is with closing device in bags | |
| CN110356603A (en) | A kind of bagging equipment and working method thereof | |
| CN103183134A (en) | Tightened bag compacting mechanism for loose powdered materials with low bulk density | |
| US11801961B2 (en) | Twin-tube bag forming, filling and sealing machine comprising metering device and transfer system | |
| CN106184842A (en) | A quantitative filling device for barium sulfate crystal assembly line | |
| CN204548549U (en) | A kind of full automatic weighing bottle placer | |
| CN204096107U (en) | A kind of package packing machine of accurate measurement high-speed canning | |
| CN206218324U (en) | A kind of automatic medicine packing device | |
| CN106184905B (en) | Press mouth-inflation type Barium sulfate crystals quantitative filling device | |
| CN103482153B (en) | A kind of disposable sanitary articles high-speed packaging machine | |
| CN105835222A (en) | Full-automatic refractory material production line | |
| CN202147855U (en) | Irregular bulk material weighting automatic packaging machine | |
| CN204688454U (en) | The filling device synchronously carried out with shaping of a kind of packaging bag | |
| CN205770525U (en) | A kind of automatic modulation assembly line | |
| CN206013013U (en) | A kind of Barium sulfate crystals streamline quantitative filling device | |
| CN209852679U (en) | Secondary bagging machine | |
| CN204688532U (en) | The package mechanism that a kind of shaping, sealing, discharging are synchronously carried out | |
| CN208134686U (en) | Weight-loss type automatic packaging machine | |
| CN206013028U (en) | A kind of automatic bottle filling device of canned food |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |