CN204773036U - Green concrete construction equipment - Google Patents
Green concrete construction equipment Download PDFInfo
- Publication number
- CN204773036U CN204773036U CN201520510586.6U CN201520510586U CN204773036U CN 204773036 U CN204773036 U CN 204773036U CN 201520510586 U CN201520510586 U CN 201520510586U CN 204773036 U CN204773036 U CN 204773036U
- Authority
- CN
- China
- Prior art keywords
- discharge port
- concrete
- conveyor
- pipeline
- crushed stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 238000009826 distribution Methods 0.000 claims abstract description 41
- 239000004575 stone Substances 0.000 claims abstract description 34
- 238000005086 pumping Methods 0.000 claims abstract description 23
- 238000003860 storage Methods 0.000 claims abstract description 18
- 239000000463 material Substances 0.000 abstract description 8
- 238000003756 stirring Methods 0.000 abstract description 5
- 239000000203 mixture Substances 0.000 abstract description 4
- 238000010348 incorporation Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000004568 cement Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000018044 dehydration Effects 0.000 description 1
- 238000006297 dehydration reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及混凝土施工设备,用于在浇筑工作面向商品混凝土中加5%~25%的碎石而形成绿色混凝土施工。 The utility model relates to concrete construction equipment, which is used for adding 5% to 25% crushed stones to commercial concrete in pouring work to form green concrete construction.
背景技术 Background technique
本实用新型所涉及的绿色混凝土是指在建筑工程施工过程中,向商品混凝土内加入其体积为5%~25%的碎石并搅拌均匀而制备的新型混凝土。绿色混凝土中由于用成本低廉的碎石代替了部分胶凝材料,因而具有以下突出优点:(1)节省水泥5%~25%,降低工程造价。(2)抑制混凝土因水灰比过高而失水所引起的收缩开裂。(3)体积稳定性好,减小混凝土在凝结过程中的收缩现象。(4)混凝土的各项力学性能得到了提高和改善,其抗压强度能够提高20%~30%。(5)增加了混凝土密实度,提高了混凝土结构耐久性,(6)大量节约水泥,节约了煤炭能源,减少了碳排放,符合国家环保政策,因此称之为绿色混凝土。 The green concrete involved in the utility model refers to a new type of concrete prepared by adding crushed stones with a volume of 5% to 25% into commercial concrete and stirring evenly during the construction process of the construction project. In green concrete, part of the cementitious material is replaced by low-cost gravel, so it has the following outstanding advantages: (1) Save 5% to 25% of cement and reduce the construction cost. (2) Inhibit shrinkage and cracking of concrete caused by dehydration due to excessive water-cement ratio. (3) Good volume stability, reducing the shrinkage of concrete during the setting process. (4) Various mechanical properties of concrete have been improved and improved, and its compressive strength can be increased by 20% to 30%. (5) It increases the density of concrete and improves the durability of concrete structure. (6) It saves a lot of cement, saves coal energy, reduces carbon emissions, and is in line with the national environmental protection policy, so it is called green concrete.
虽然绿色混凝土具有以上诸多优点,但是由于施工非常困难,影响其应用和推广。一方面,绿色混凝土碎石含量过高,碎石会在搅拌过程中吸收水分,导致混凝土流动性小,塌落度低,普通混凝土地泵无法将绿色混凝土泵送到足够的高度。另一方面,外加碎石的掺入量不易控制,掺入的碎石与商品混凝土易因搅拌不均而发生混凝土质量问题,因而其应用与发展受到了极大的限制。 Although green concrete has many advantages above, its application and popularization are affected due to the difficulty of construction. On the one hand, the gravel content of green concrete is too high, and the gravel will absorb water during the mixing process, resulting in low concrete fluidity and low slump, and ordinary concrete floor pumps cannot pump green concrete to a sufficient height. On the other hand, the amount of added crushed stone is not easy to control, and the mixed crushed stone and commercial concrete are prone to concrete quality problems due to uneven mixing, so its application and development are greatly restricted.
发明内容 Contents of the invention
本实用新型的目的是,利用本实用新型所涉及的绿色混凝土施工设备,实现绿色混凝土的泵送自动化施工。在不影响商品混凝土优越的泵送性能的同时在浇筑现场形成绿色混凝土并连续浇筑,发挥绿色混凝土的优势。 The purpose of the utility model is to realize the automatic pumping construction of the green concrete by using the green concrete construction equipment involved in the utility model. Green concrete is formed at the pouring site and poured continuously without affecting the superior pumping performance of ready-made concrete, giving full play to the advantages of green concrete.
本实用新型的绿色混凝土施工设备,由商品混凝土泵送管道、一次螺旋搅拌输送机、碎石分布装置和新型布料机构成;碎石分布装置由碎石储料仓、电动投料控制器、强制性搅拌机构成;商品混凝土泵送管道出料口与强制性搅拌机进料口相连,碎石储料仓出料口设置电动投料控制器,碎石储料仓出料口与强制性搅拌机进料口上部连通,强制性搅拌机出料口对应设置着一次螺旋搅拌输送机的进料口;新型布料机由布料机和设置在布料机上的二次螺旋搅拌输送机构成,二次螺旋搅拌输送机出料口与布料机的布料管道连通;一次螺旋搅拌输送机出料口与二次螺旋搅拌输送机的进料口相连。 The green concrete construction equipment of the utility model is composed of a commercial concrete pumping pipeline, a primary screw mixing conveyor, a crushed stone distribution device and a new type of material distribution device; the crushed stone distribution device is composed of a crushed stone storage bin, an electric feeding controller, a mandatory The composition of the mixer; the outlet of the commercial concrete pumping pipeline is connected to the inlet of the compulsory mixer, the outlet of the crushed stone storage bin is equipped with an electric feeding controller, and the outlet of the crushed stone storage bin is connected to the upper part of the inlet of the compulsory mixer Connected, the discharge port of the compulsory mixer is corresponding to the feed port of the primary screw agitating conveyor; the new distribution machine is composed of a distribution machine and a secondary screw agitating conveyor installed on the distribution machine, and the discharge port of the secondary screw agitating conveyor It is connected with the distributing pipeline of the distributing machine; the outlet of the primary screw agitating conveyor is connected with the inlet of the secondary screw agitating conveyor.
绿色混凝土施工设备的特征在于:泵送的商品混凝土泵送管道出料口与强制性搅拌机进料口相连;碎石储料仓出料口设置电动投料控制器,碎石储料仓出料口与强制性搅拌机进料口上部连通;在强制性搅拌机出料口对应设置着一次螺旋搅拌输送机的进料口,一次螺旋搅拌输送机出料口与二次螺旋搅拌输送机出料口相连。二次螺旋搅拌输送机出料口与安装在布料机上的布料管道连通,布料管道可以是一部分固定布料管道和一部分可移动布料管道连接,也可以是可移动布料管道连接。可移动布料管道包括钢管道和橡胶波纹软管。在强制性搅拌机出料口对应设置着一次螺旋搅拌输送机的进料口,优选是强制性搅拌机出料口设置在一次螺旋搅拌输送机进料口上方,一次螺旋搅拌输送机进料口设置衔接漏斗。一次螺旋搅拌输送机的进料口通过设置的衔接漏斗与强制性搅拌机出料口对应设置,衔接漏斗在下方承接强制性搅拌机出料口出来的绿色混凝土,更便于一次螺旋搅拌输送机现场安装和与二次螺旋搅拌输送机衔接安装。 The green concrete construction equipment is characterized in that: the outlet of the pumped commercial concrete pumping pipeline is connected to the inlet of the compulsory mixer; the outlet of the crushed stone storage bin is equipped with an electric feeding controller, and the outlet of the crushed stone storage bin It is connected with the upper part of the feed port of the compulsory mixer; the feed port of the primary screw agitating conveyor is correspondingly arranged at the discharge port of the compulsory agitator, and the discharge port of the primary screw agitating conveyor is connected with the discharge port of the secondary screw agitating conveyor. The discharge port of the secondary screw agitating conveyor is connected with the distribution pipeline installed on the distribution machine. The distribution pipeline can be connected by a part of fixed distribution pipeline and a part of movable distribution pipeline, or can be connected by a movable distribution pipeline. Removable cloth pipes include steel pipes and rubber corrugated hoses. The feed port of the primary screw agitating conveyor is correspondingly arranged at the discharge port of the compulsory mixer. funnel. The feed port of the primary screw mixing conveyor is set correspondingly to the discharge port of the compulsory mixer through the set connecting funnel, and the connecting funnel is below to undertake the green concrete coming out of the discharge port of the compulsory mixer, which is more convenient for the on-site installation and installation of the primary screw mixing conveyor. It is connected and installed with the secondary screw mixing conveyor.
商品混凝土泵送管道可以是商品混凝土地泵输送管道的一部分,也可以是设置在本实用新型绿色混凝土施工设备上的独立的部分管道,这样的商品混凝土泵送管道一端为出料口并连接在强制性搅拌机进料口,混凝土泵送管道另一端为与商品混凝土地泵输送管道连接的接口。这样更有利与商品混凝土地泵输送管道的衔接,而不必对商品混凝土地泵输送管道提出特殊要求和改造。 The commercial concrete pumping pipeline can be a part of the commercial concrete pumping pipeline, or it can be an independent partial pipeline arranged on the green concrete construction equipment of the present invention. One end of such a commercial concrete pumping pipeline is a discharge port and is connected to the The feed port of the compulsory mixer, the other end of the concrete pumping pipeline is the interface connected with the commercial concrete ground pumping pipeline. This is more conducive to the connection with the commercial concrete floor pump delivery pipeline, without having to put forward special requirements and modifications to the commercial concrete floor pump delivery pipeline.
碎石储料仓选择放置于强制性搅拌机上方,碎石储料仓出料口设置在强制性搅拌机进料口上部与其相连通。设置在碎石储料仓出料口的电动投料控制器由插板及连接的伸缩机电驱动控制装置构成。 The crushed stone storage bin is placed above the compulsory mixer, and the discharge port of the crushed stone storage bin is set on the upper part of the forced mixer feed port to communicate with it. The electric feeding controller arranged at the discharge port of the crushed stone storage bin is composed of a plug-in plate and a connected telescopic electromechanical drive control device.
商品混凝土泵送管道下端与商品混凝土地泵输送管道连接。商品混凝土通过此管道进入本实用新型所涉及的绿色混凝土施工设备。应用本实用新型的设备能够实现绿色混凝土的自动化施工,在不改变原有商品混凝土可泵送性基础上,能够实现碎石的可控制掺入。经过强制性搅拌机搅拌,并经过一次、二次螺旋搅拌输送机的搅拌,使绿色混凝土搅拌均匀,具有可工作性。 The lower end of the commercial concrete pumping pipeline is connected with the commercial concrete floor pump delivery pipeline. Commercial concrete enters the green concrete construction equipment involved in the utility model through this pipeline. Applying the equipment of the utility model can realize the automatic construction of green concrete, and can realize the controllable mixing of gravel without changing the pumpability of the original commercial concrete. The green concrete is evenly mixed and has workability after being stirred by a compulsory mixer and by the primary and secondary screw conveyors.
本实用新型所涉及的绿色混凝土施工设备还具有以下优点: The green concrete construction equipment involved in the utility model also has the following advantages:
1不影响可泵送性。本实用新型所涉及的绿色混凝土施工设备可以将商品混凝土与碎石于浇筑工作面上进行自动化拌合施工,而不是在地面上进行拌合,故而外掺碎石对混凝土的可泵送性没有任何影响,使用普通混凝土地泵即可完成施工。 1 Does not affect pumpability. The green concrete construction equipment involved in the utility model can automatically mix commercial concrete and crushed stones on the pouring work surface instead of mixing on the ground, so the pumpability of concrete mixed with crushed stones is not good. If there is any impact, the construction can be completed by using ordinary concrete ground pumps.
2碎石掺入量方便控制。通过控制电动投料控制器的开口大小可以控制碎石的流量,从而控制碎石的掺入量。绿色混凝土中碎石的掺入量一般为5%~25%。 2 The amount of gravel mixed is convenient to control. By controlling the opening size of the electric feeding controller, the flow of crushed stone can be controlled, thereby controlling the amount of crushed stone mixed. The amount of gravel mixed in green concrete is generally 5% to 25%.
3拌合充分。绿色混凝土在本实用新型所涉及的绿色混凝土施工设备中历经三次搅拌过程。首先碎石与商品混凝土在强制性搅拌机中进行充分拌合,搅拌均匀后,绿色混凝土依次进入一次螺旋搅拌输送机、二次螺旋搅拌输送机中进行搅拌,螺旋搅拌输送机的螺旋叶片在电机扭矩的驱动下进行转动;一次螺旋搅拌输送机、二次螺旋搅拌输送机一方面可以输送混凝土,另一方面,混凝土在其内部不停地翻转,形成边输送边搅拌的作用。混凝土在以上所述的强制性搅拌机搅拌,一次螺旋搅拌输送机搅拌、二次螺旋搅拌输送机搅拌的工序下会被充分均匀地拌合,有利于绿色混凝土施工质量的保证。 3 Mix well. The green concrete has gone through three mixing processes in the green concrete construction equipment involved in the utility model. Firstly, the crushed stone and commercial concrete are fully mixed in the compulsory mixer. After the mixing is uniform, the green concrete enters the primary screw mixing conveyor and the secondary screw mixing conveyor for mixing. Driven to rotate; the primary screw mixing conveyor and the secondary screw mixing conveyor can transport concrete on the one hand, and on the other hand, the concrete is constantly turned inside, forming the effect of mixing while transporting. Concrete will be fully and evenly mixed under the above-mentioned compulsory mixer mixing, primary screw mixing conveyor mixing, and secondary screw mixing conveyor mixing, which is conducive to the guarantee of green concrete construction quality.
4清理方便。施工即将停止时,关闭混凝土地泵,同时关闭电动投料控制器,则强制性搅拌机将不再有混凝土及碎石的供应,残留的绿色混凝土在强制性搅拌机的推力及螺旋搅拌输送机的推动作用下进入新型布料机进行最后的浇筑,整个装置内部料体自动清空,不会有残留,方便清理。 4. Easy to clean. When the construction is about to stop, turn off the concrete ground pump and turn off the electric feeding controller at the same time, then the compulsory mixer will no longer have the supply of concrete and gravel, and the remaining green concrete will be driven by the thrust of the compulsory mixer and the screw conveyor. It enters the new distribution machine for final pouring, and the material body inside the whole device is automatically emptied without residue, which is convenient for cleaning.
本实用新型所涉及的绿色混凝土施工设备是一套为绿色混凝土泵送施工所设计的自动化设备,能够将绿色混凝土由实验室转移到实际工程中。 The green concrete construction equipment involved in the utility model is a set of automatic equipment designed for green concrete pumping construction, which can transfer the green concrete from a laboratory to an actual project.
附图说明 Description of drawings
图1为绿色混凝土施工设备设置在高层建筑施工现场的示意图;其中1为商品混凝土罐车,2为混凝土地泵,3为商品混凝土地泵输送管道,A为绿色混凝土施工设备(见图2)。 Figure 1 is a schematic diagram of green concrete construction equipment installed on a high-rise building construction site; 1 is a commercial concrete tank truck, 2 is a concrete ground pump, 3 is a commercial concrete ground pump delivery pipeline, and A is green concrete construction equipment (see Figure 2).
图2为绿色混凝土施工设备(也是图1中的A节点放大图);其中4为商品混凝土泵送管道,5为电动投料控制器,6为碎石储料仓,7为强制性搅拌机,8为衔接漏斗,9为一次螺旋搅拌输送机,10为二次螺旋搅拌输送机,11为布料机支架,12为布料机悬臂,13为布料机配重,14为布料机中可移动布料管道中的钢管道,15为布料机中可移动布料管道中的橡胶波纹软管。 Figure 2 is the green concrete construction equipment (also an enlarged view of node A in Figure 1); among them, 4 is the commercial concrete pumping pipeline, 5 is the electric feeding controller, 6 is the crushed stone storage bin, 7 is the compulsory mixer, 8 9 is the primary screw agitating conveyor, 10 is the secondary screw agitating conveyor, 11 is the support of the distribution machine, 12 is the cantilever of the distribution machine, 13 is the counterweight of the distribution machine, and 14 is the movable distribution pipe in the distribution machine. Steel pipeline, 15 is the rubber corrugated hose in the movable distribution pipeline in the cloth machine.
具体实施方式 Detailed ways
本实用新型所涉及的绿色混凝土施工设备如图2所示,由商品混凝土泵送管道4、一次螺旋搅拌输送机9、碎石分布装置、及新型布料机构成。其中碎石分布装置由碎石储料仓6、电动投料控制器5、强制性搅拌机7、衔接漏斗8构成。其中新型布料机由布料机和设置在布料机上的二次螺旋搅拌输送机10构成,布料机由布料机支架11,布料机悬臂12,布料机配重13,布料机可移动布料管道构成。其中布料机可移动布料管道由钢管道14和橡胶波纹软管15构成。 The green concrete construction equipment involved in the utility model is shown in Fig. 2, and is made up of commercial concrete pumping pipeline 4, primary screw mixing conveyor 9, crushed stone distributing device, and new type distributing machine. Wherein the gravel distribution device is composed of a gravel storage bin 6, an electric feeding controller 5, a compulsory mixer 7, and a connecting funnel 8. Among them, the new distribution machine is composed of a distribution machine and a secondary screw agitating conveyor 10 arranged on the distribution machine. The distribution machine is composed of a distribution machine bracket 11, a distribution machine cantilever 12, a distribution machine counterweight 13, and a movable distribution pipeline of the distribution machine. Wherein the distributing machine movable distributing pipeline is made of steel pipeline 14 and rubber corrugated hose 15.
混凝土泵送管道4出料口与强制性搅拌机7进料口相连;碎石储料仓6出料口设置电动投料控制器5,碎石储料仓出料口与强制性搅拌机7进料口上部连通;在强制性搅拌机7出料口对应设置一次螺旋搅拌输送机9,一次螺旋搅拌输送机9出料口与二次螺旋搅拌输送机10进料口相连。二次螺旋搅拌输送机10设置在布料机悬臂12上,二次螺旋搅拌输送机10出料口向下与可移动布料管道由钢管道14上端连通,构成了新型布料机。 The discharge port 4 of the concrete pumping pipeline is connected with the feed port 7 of the compulsory mixer; The upper part is connected; a primary screw agitating conveyor 9 is correspondingly arranged at the discharge port of the compulsory mixer 7, and the discharge port of the primary screw agitating conveyor 9 is connected with the feed port of the secondary screw agitating conveyor 10. The secondary screw agitating conveyor 10 is arranged on the cantilever 12 of the distributing machine, and the outlet of the secondary screw agitating conveyor 10 is connected downward with the movable distributing pipeline by the upper end of the steel pipeline 14, forming a new type of distributing machine.
利用混凝土地泵2将商品混凝土经由商品混凝土泵送管道4输送到强制性搅拌机7中,碎石储料仓6中的碎石也通过电动投料控制器5的控制落入到强制性搅拌机7中。二者在强制性搅拌机7中充分拌合均匀。电动投料控制器5能够控制绿色混凝土中碎石的掺入量,电动投料控制器5开口越大,碎石的流入量越多,绿色混凝土中碎石的含量也就越大。充分拌合的绿色混凝土由强制性搅拌机7的出料口流入到衔接漏斗8中,再由衔接漏斗8进入一次螺旋搅拌输送机9。一次螺旋搅拌输送机9内部的螺旋叶片在电机的旋转扭矩下保持一定的速度进行转动,一次螺旋搅拌输送机叶片的转动会对绿色混凝土产生向上的推动效果,同时对绿色混凝土也有一定的翻转拌合作用,使其更加均匀和亲和。绿色混凝土在一次螺旋搅拌输送机9的推动作用下,从其出料口进入二次螺旋搅拌输送机10进料口及内部进行第二次搅拌输送,然后再进入可移动布料管道,进行布料浇筑。利用新型布料机的可移动布料管道中的钢管道14的转动和橡胶波纹软管15的伸缩,进行浇筑施工作业。施工即将停止时,关闭混凝土地泵2,同时关闭电动投料控制器5,则不再有商品混凝土和碎石供应到强制性搅拌机7中。残留的绿色混凝土在强制性搅拌机7的推力及一次、二次螺旋搅拌输送机9,10的推动作用下进入新型布料机的可移动布料管道并自动流出,进行最后的绿色混凝土布料及浇筑,整个装置内部混凝土料体自动清空,不会有残留。 The commercial concrete is delivered to the compulsory mixer 7 through the commercial concrete pumping pipeline 4 by using the concrete ground pump 2, and the gravel in the crushed stone storage bin 6 also falls into the compulsory mixer 7 through the control of the electric feeding controller 5 . The two are fully mixed evenly in the compulsory mixer 7. The electric feeding controller 5 can control the mixing amount of gravel in the green concrete. The larger the opening of the electric feeding controller 5, the more the inflow of crushed stone, and the greater the content of crushed stone in the green concrete. The fully mixed green concrete flows into the connecting funnel 8 from the discharge port of the compulsory mixer 7, and then enters the primary screw mixing conveyor 9 through the connecting funnel 8. The spiral blades inside the screw mixer 9 rotate at a certain speed under the rotation torque of the motor, and the rotation of the blades of the screw mixer 9 will push the green concrete upwards, and at the same time, the green concrete will also have a certain turning and mixing effect. Cooperate to make it more homogeneous and intimate. Under the push of the primary screw mixing conveyor 9, the green concrete enters the feed port of the secondary screw mixing conveyor 10 from its discharge port and the interior for the second mixing and conveying, and then enters the movable distribution pipeline for distribution pouring . Utilize the rotation of the steel pipeline 14 in the movable distributing pipeline of the novel distributing machine and the expansion and contraction of the rubber corrugated hose 15 to carry out pouring construction work. When the construction was about to stop, the concrete floor pump 2 was closed, and the electric feeding controller 5 was closed simultaneously, so that commercial concrete and crushed stones would no longer be supplied to the compulsory mixer 7. Under the thrust of the compulsory mixer 7 and the push of the primary and secondary screw mixing conveyors 9 and 10, the remaining green concrete enters the movable distribution pipe of the new distribution machine and flows out automatically for the final green concrete distribution and pouring. The concrete body inside the device is automatically emptied without residue.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520510586.6U CN204773036U (en) | 2015-07-15 | 2015-07-15 | Green concrete construction equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520510586.6U CN204773036U (en) | 2015-07-15 | 2015-07-15 | Green concrete construction equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204773036U true CN204773036U (en) | 2015-11-18 |
Family
ID=54513160
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520510586.6U Withdrawn - After Issue CN204773036U (en) | 2015-07-15 | 2015-07-15 | Green concrete construction equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204773036U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104942998A (en) * | 2015-07-15 | 2015-09-30 | 贾金青 | A kind of green concrete construction equipment and construction method |
-
2015
- 2015-07-15 CN CN201520510586.6U patent/CN204773036U/en not_active Withdrawn - After Issue
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104942998A (en) * | 2015-07-15 | 2015-09-30 | 贾金青 | A kind of green concrete construction equipment and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104942998B (en) | A kind of green concrete construction equipment and construction method | |
| CN204819956U (en) | Emulsified asphalt - cement can be produced and concrete mixing plant of rubble is stabilized | |
| CN202462619U (en) | Pouring mixer for producing aerated concrete block | |
| CN106738322A (en) | Concrete mixing device for road construction | |
| CN105034168A (en) | Mortar stirring device | |
| CN202388619U (en) | Mortar mixer | |
| CN205021813U (en) | Premixed bucket suitable for concrete mineral admixture | |
| CN205343456U (en) | Integrated multifunctional movable construction equipment | |
| CN204773036U (en) | Green concrete construction equipment | |
| CN207344848U (en) | A kind of concrete central mix plant | |
| CN215241802U (en) | Cement compounding filling device of highway construction | |
| CN206510206U (en) | A kind of silt for building mixes equipment | |
| CN212383643U (en) | Grinding aid preparation facilities for cement manufacture | |
| CN210414974U (en) | An automatic cement slurry mixing system | |
| CN202498640U (en) | Movable premixed dry-mixed mortar production device | |
| CN211104765U (en) | Concrete sand mixing device | |
| CN107127889B (en) | A kind of concrete central mix plant | |
| CN211440589U (en) | Concrete water-reducing agent agitated vessel | |
| CN211194470U (en) | A kind of concrete pouring blanking anti-separation device | |
| CN211306841U (en) | A agitating unit for building engineering | |
| CN209466458U (en) | A kind of pulping device of environmental protection and energy saving dry-mixed mortar | |
| CN221850658U (en) | A device for preparing ready-mixed concrete | |
| CN208179963U (en) | A kind of concrete automatic blending stirring spraying system | |
| CN105643807A (en) | Preparation system and method for high-performance concrete | |
| CN208179952U (en) | A kind of concrete automatic recipe maker |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20151118 Effective date of abandoning: 20170616 |
|
| AV01 | Patent right actively abandoned |