Synchronous installation mechanism of slide rail Download PDFInfo
- Publication number
- CN204747966U CN204747966U CN201520405470.6U CN201520405470U CN204747966U CN 204747966 U CN204747966 U CN 204747966U CN 201520405470 U CN201520405470 U CN 201520405470U CN 204747966 U CN204747966 U CN 204747966U
- Authority
- CN
- China
- Prior art keywords
- slide
- trough
- installing
- cylinder
- rail
- Prior art date
Links
- 230000001360 synchronised Effects 0.000 title claims abstract description 17
- 238000009434 installation Methods 0.000 title abstract description 12
- 239000011049 pearl Substances 0.000 claims abstract description 33
- 239000000945 fillers Substances 0.000 claims abstract description 9
- 239000000446 fuels Substances 0.000 claims abstract description 9
- 238000004519 manufacturing process Methods 0.000 abstract description 9
- 230000000694 effects Effects 0.000 abstract description 2
- 239000003925 fat Substances 0.000 abstract 3
- 239000000463 materials Substances 0.000 abstract 2
- 238000000034 methods Methods 0.000 description 14
- 239000003921 oils Substances 0.000 description 4
- 238000006073 displacement reactions Methods 0.000 description 2
- 230000001737 promoting Effects 0.000 description 1
Abstract
Description
Technical field
The utility model relates to one and is exclusively used in slide rail erection unit technical field, specifically the synchronous installing mechanism of a kind of slide rail.
Background technology
Along with manufacturing develop rapidly, trend is in automation especially for following manufacturing industry, and in the process of manufacture of product, in order to put forward same operating efficiency and work quality, manually-operated part can be more fewer, until eliminate.
Existingly be not exclusively used in the automation erection unit that slide rail uses on the market, main staff clamping oiling and the staff of relying on is installed, and cannot coordinate existing automated production equipment, there is production efficiency and have much room for improvement.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, provides the synchronous installing mechanism of slide rail that a kind of installation rate is fast and production efficiency is high.
The utility model is achieved in that the synchronous installing mechanism of a kind of slide rail, comprise for pearl mechanism, installing mechanism, oiling mechanism and enter pearl core rod, support is comprised for pearl mechanism, and support is provided with conduit, conduit with enter pearl core rod and be connected, installing mechanism is provided with oiling mechanism, installing mechanism comprises trough, and trough is provided with the pusher slide block that can slide along trough, trough side is also provided with splicing slide block, enters pearl core rod and is positioned at trough; Oiling mechanism comprises gripper shoe, and gripper shoe is provided with guide shaft, and guide shaft is provided with the slide unit fixed head that can slide along guide rail, slide unit fixed head is fixed with the second cylinder, and the second cylinder lower end is connected with lower skateboard, and lower skateboard is provided with fuel filler neck.
Be optimized according to technique scheme: be provided with lead between slide unit fixed head and lower skateboard, one end and the slide unit fixed head of lead are fixedly connected, and the other end and the lower skateboard of lead are fixedly connected; Enter in pearl core rod and be provided with locating dowel and four-cylinder, four-cylinder and locating dowel are fixedly connected.
Be optimized according to technique scheme: lower skateboard is fixedly connected with the 3rd cylinder, described fuel filler neck and the 3rd cylinders connect.
Be optimized according to technique scheme: slide unit fixed head is fixedly connected with cylinder connector and guiding slide respectively, and described guide shaft is through guiding slide, and cylinder connector is provided with connecting rod, and connecting rod one end is extended outside gripper shoe.
Be optimized according to technique scheme: splicing slide block one end is connected with the first cylinder.
Be optimized according to technique scheme: pusher slide block is also connected with connecting plate, and connecting plate is provided with screw rod, screw rod and connecting plate bolt, screw rod one end is fixedly connected with drive motors.
Be optimized according to technique scheme: be provided with frame plate below installing mechanism and oiling mechanism, frame plate is provided with the frame for fixing machine frame plate.
Be optimized according to technique scheme: trough is divided into middle rail trough and active rail trough, and described oiling mechanism is positioned at above active rail trough.
Be optimized according to technique scheme: active rail trough side is provided with stop block.
Be optimized according to technique scheme: described support is provided with can along the positioning seat of support oscilaltion.
The beneficial effects of the utility model are: utilize installing mechanism, oiling mechanism and enter pearl core rod, realizing automatic oiling, entering pearl and installation procedure three steps, solve staff and install weak point, play the fast and production efficiency advantages of higher of a kind of installation rate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of another angle of the present utility model.
Fig. 3 is the structural representation of oiling mechanism.
Fig. 4 is the structural representation of another angle of Fig. 3.
Fig. 5 is the A place partial enlargement structural representation of Fig. 1.
Fig. 6 is the B place partial enlargement structural representation of Fig. 2.
The icon of the following drawings illustrates:
Frame 1; Installing mechanism 2; Frame plate 201; First cylinder 202; Splicing slide block 203; Active rail 204; Pusher slide block 205; Connecting plate 206; Drive motors 207; Screw rod 208; Oiling mechanism 3; Gripper shoe 301; Slide unit fixed head 302; Guide shaft 303; Second cylinder 304; Lead 305; Lower skateboard 306; 3rd cylinder 307; Fuel filler neck 308; Cylinder connector 309; Sliding panel 310; Guiding slide 311; For pearl mechanism 4; Support 401; Conduit 402; Positioning seat 403; Enter pearl core rod 5; Four-cylinder 6.
Detailed description of the invention
Be described below in detail embodiment of the present utility model, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has element that is identical or similar functions from start to finish.Being exemplary below by the embodiment be described with reference to the drawings, only for explaining the utility model, and can not being interpreted as restriction of the present utility model.
Describe according to the synchronous installing mechanism of the slide rail of the utility model embodiment below with reference to Fig. 1 to Fig. 6, comprise for pearl mechanism 4, installing mechanism 2, oiling mechanism 3 and enter pearl core rod 5, comprise support 401 for pearl mechanism, and support 401 being provided with conduit 402; Conduit 402 with enter pearl core rod 5 and be connected, installing mechanism 2 is provided with oiling mechanism 3, and installing mechanism 2 comprises trough, and trough is provided with the pusher slide block 205 that can slide along trough, trough side is also provided with splicing slide block 203, enters pearl core rod 5 and is positioned at trough; Oiling mechanism 3 comprises gripper shoe 301, and gripper shoe 301 is provided with guide shaft 303, guide shaft 303 is provided with the slide unit fixed head 302 that can slide along guide rail 303, slide unit fixed head 302 is fixed with the second cylinder 304, second cylinder 304 lower end is connected with lower skateboard 306, and lower skateboard 306 is provided with fuel filler neck 308.In the course of the work, active rail 204 in fuel filler neck 308 pairs of troughs carries out oil spout, during pusher slide block 205 promotes, rail moves to active rail 204, when coming into pearl core rod 5, pearl nest position in locating dowel restriction on rail, carries out into pearl operation, when it is completed, locating dowel displacement is let pass, and in most relief, rail and pearl nest enter in active rail simultaneously and complete whole installation.There is the not high deficiency of operating efficiency in solution staff oiling and installation.
Be optimized according to technique scheme: between slide unit fixed head 302 and lower skateboard 309, be provided with lead 305, one end and the slide unit fixed head 302 of lead 305 are fixedly connected, the other end and the lower skateboard 309 of lead 305 are fixedly connected, lower skateboard 309 is fixedly connected with the 3rd cylinder 307, described fuel filler neck 308 is connected with the 3rd cylinder 307; Enter in pearl core rod 5 to be provided with locating dowel and four-cylinder 6, the four-cylinder 6 and locating dowel to be fixedly connected.Utilize the 3rd cylinder 307 to promote oil nozzle 308 to be shifted, oil nozzle 308 can realize tripartite's oil spout, plays oiling even results, is convenient to automatic suit further.
Be optimized according to technique scheme: slide unit fixed head 302 is fixedly connected with cylinder connector 309 and guiding slide 310 respectively, and described guide shaft 303 is through guiding slide 310, and cylinder connector 309 is provided with connecting rod, and connecting rod one end is extended outside gripper shoe 301.By promoting connecting rod, realizing slick and frivolous platform fixed head 302 and being shifted, even oiling is carried out to whole piece active rail 204.
Wherein splicing slide block 203 one end is connected with the first cylinder 202, utilizes the first cylinder 202 to promote splicing slide block 203 and clamps active rail, be convenient to carry out inunction process.Pusher slide block 205 is also connected with connecting plate 206, and connecting plate 206 is provided with screw rod 208, and screw rod 208 and connecting plate 206 bolt, screw rod 208 one end is fixedly connected with drive motors 207.Rotated by drive motors 207 drive screw 208, realize connecting plate 206 and be shifted, play rail displacement in promotion.In addition, be provided with frame plate 201 below installing mechanism 2 and oiling mechanism 3, frame plate 201 is provided with the frame 1 for fixing machine frame plate 201, and trough is divided into middle rail trough and active rail trough, and oiling mechanism 3 is positioned at above active rail trough.Be convenient to installing mechanism 2 and oiling mechanism 3 is fixed.Again, active rail trough side is provided with stop block, and stop block Main Function peaks at active rail 204 to be convenient to last whole slide rail and to close operation.The advantage such as Fast Installation and improving production efficiency is realized by above-mentioned structure.
In addition, partial structure is optimized: support 401 is provided with can along the positioning seat 403 of support 401 oscilaltion, regulates arrangement between conduit 402, is conducive to that pearl body is more smooth and easy to be transported to into pearl groove core 5 place.
These are only preferred embodiment of the present utility model, not in order to limit the utility model, all do within spirit of the present utility model and principle any amendment, equivalent to replace or improvement etc., all should be included within protection domain of the present utility model.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520405470.6U CN204747966U (en) | 2015-06-13 | 2015-06-13 | Synchronous installation mechanism of slide rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520405470.6U CN204747966U (en) | 2015-06-13 | 2015-06-13 | Synchronous installation mechanism of slide rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204747966U true CN204747966U (en) | 2015-11-11 |
Family
ID=54462720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520405470.6U CN204747966U (en) | 2015-06-13 | 2015-06-13 | Synchronous installation mechanism of slide rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204747966U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105880979A (en) * | 2016-06-29 | 2016-08-24 | 苏州市吴中区木渎华利模具加工店 | Four-site assembling device of automatic laminating machine for antenna terminal |
CN105880980A (en) * | 2016-06-29 | 2016-08-24 | 苏州市吴中区木渎华利模具加工店 | Reclaiming mechanism of antenna terminal automatic pressing machine |
CN105904208A (en) * | 2016-06-16 | 2016-08-31 | 苏州科技学院 | Sliding rail assembly line and sliding rail assembly method |
CN105921968A (en) * | 2016-06-17 | 2016-09-07 | 雄华机械(苏州)有限公司 | Device for installing snap spring in upper sliding rail |
CN105922004A (en) * | 2016-06-17 | 2016-09-07 | 雄华机械(苏州)有限公司 | Upper slide rail assembly equipment |
-
2015
- 2015-06-13 CN CN201520405470.6U patent/CN204747966U/en active IP Right Grant
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105904208A (en) * | 2016-06-16 | 2016-08-31 | 苏州科技学院 | Sliding rail assembly line and sliding rail assembly method |
CN105904208B (en) * | 2016-06-16 | 2018-01-09 | 苏州科技学院 | Slide rail assembly line and slide rail assembly method |
CN105921968A (en) * | 2016-06-17 | 2016-09-07 | 雄华机械(苏州)有限公司 | Device for installing snap spring in upper sliding rail |
CN105922004A (en) * | 2016-06-17 | 2016-09-07 | 雄华机械(苏州)有限公司 | Upper slide rail assembly equipment |
CN105880979A (en) * | 2016-06-29 | 2016-08-24 | 苏州市吴中区木渎华利模具加工店 | Four-site assembling device of automatic laminating machine for antenna terminal |
CN105880980A (en) * | 2016-06-29 | 2016-08-24 | 苏州市吴中区木渎华利模具加工店 | Reclaiming mechanism of antenna terminal automatic pressing machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204545769U (en) | The lever regulated mechanism of soldering tip | |
CN103753374B (en) | A kind of piston ring automatic opening trimming machine | |
CN204843798U (en) | Duplex position horizontal axis round platform grinding machine | |
CN102709782B (en) | Multifunctional full automatic wire ranging terminal pressing machine | |
CN202291621U (en) | Device for reducing tailings for automatic sawing machine | |
CN202825243U (en) | Pneumatic step displacement device | |
CN201109031Y (en) | Double-station moving platform | |
CN204868223U (en) | Multi -purpose anchor clamps | |
CN204450006U (en) | A kind of automation clamping device of convenient processing regular workpiece | |
CN201815863U (en) | Boring, drilling and milling three-station combined machine tool | |
CN201800418U (en) | 2D and 3D dual-purpose engraving machine | |
CN203045256U (en) | Assembling device of rotor stopping ring | |
CN203779167U (en) | Positioning device for cutting steel pipe | |
CN105196083B (en) | A kind of novel clamp for clasp nut end face milling | |
CN102601386A (en) | Numerically controlled doubled-headed lathe | |
CN105773314A (en) | Full-automatic multi-procedure synchronous machining composite numerical control machine tool | |
CN207139338U (en) | A kind of numerical control mill disk work piece holder for being used to process photoelectricity workpiece | |
CN203726142U (en) | Machine tool guide rail | |
CN201264099Y (en) | Device for processing lathe | |
CN203426773U (en) | Tubular product double-head chamfering machine | |
CN202143999U (en) | Automatic battery pole piece cutting and taking device | |
CN203485256U (en) | Novel full-automatic sheet material edge cutter | |
CN204504366U (en) | A kind of angle steel saw lathe | |
CN206366825U (en) | Fast braking formula saddle | |
CN205870117U (en) | A high pressure center play water machining center for high -speed drilling of aluminum alloy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model |