CN204737660U - Two roof beam electric block - Google Patents

Two roof beam electric block Download PDF

Info

Publication number
CN204737660U
CN204737660U CN201520329284.9U CN201520329284U CN204737660U CN 204737660 U CN204737660 U CN 204737660U CN 201520329284 U CN201520329284 U CN 201520329284U CN 204737660 U CN204737660 U CN 204737660U
Authority
CN
China
Prior art keywords
capstan winch
speed governing
rotating shaft
load
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520329284.9U
Other languages
Chinese (zh)
Inventor
徐娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongyuan Lingkong Lifting Equipment Co Ltd
Original Assignee
Henan Zhongyuan Lingkong Lifting Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongyuan Lingkong Lifting Equipment Co Ltd filed Critical Henan Zhongyuan Lingkong Lifting Equipment Co Ltd
Priority to CN201520329284.9U priority Critical patent/CN204737660U/en
Application granted granted Critical
Publication of CN204737660U publication Critical patent/CN204737660U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a two roof beam electric block, including pressure boost capstan winch, pivot, bearing crossbeam and fixed lever, the pressure boost capstan winch is connected with lifting hook, the pivot is connected with the hawser dish, the pivot top is provided with the work pilot lamp, the bearing crossbeam is connected with the capstan winch, the capstan winch is connected with the locator, the locator below is provided with the speed governing panel, fixed lever is connected with the motor, the fixed lever below is provided with the speed governing capstan winch, the speed governing capstan winch is connected with the tripod. Beneficial effect: using two joist supports heavy, but having increased the bearing and hang the thing upper limit, can accurate settlement hang thing speed, easy operation can tightly press the heavy object on the lifting hook, has increased the measure of stability.

Description

A kind of double beams electric hoist
Technical field
The utility model belongs to electric block mechanical field, is specifically related to a kind of double beams electric hoist.
Background technology
electric block is a kind of hoisting device for elevator machinery, and in Bridges in Our Country, road, mechanical field all has a wide range of applications market, is also the core part of elevator machinery.And along with the rapid development of China's economy in recent years, all trades and professions are all in fast development, electric block also proposes higher performance requriements thereupon, and the electric block of China is all generally single-beam at present, have maximum lifting power less than normal, cannot reach the requirement of some high lifting power work, hoisting speed cannot regulate and control, staff's experience can only be relied on to carry out work, the shortcoming of complicated operation.
Utility model content
The purpose of this utility model is just to provide a kind of double beams electric hoist to solve the problem.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of double beams electric hoist, comprise supercharging capstan winch, rotating shaft, load bearing cross beam and connection lever, described supercharging capstan winch is connected with load hook, described rotating shaft is connected with hawser dish, relay indicating light is provided with above described rotating shaft, described load bearing cross beam is connected with capstan winch, described capstan winch is connected with steady arm, speed governing panel is provided with below described steady arm, described connection lever is connected with electrical motor, be provided with speed governing capstan winch below described connection lever, described speed governing capstan winch is connected with tripod.
In said structure, at described speed governing panel setting working parameter, start described electrical motor, drive described rotating shaft by the hawser on described hawser dish by driving described load hook to carry out lifting work through described supercharging capstan winch after the speed governing of described speed governing capstan winch, and weight pressure is shared by two described load bearing cross beams.
Hang thing ability to improve its load-bearing further, described supercharging capstan winch is connected with described load hook, and described rotating shaft is connected with described hawser dish.
Hang thing ability to improve its load-bearing further, described rotating shaft is connected with described relay indicating light, and described load bearing cross beam is connected with described capstan winch.
Hang thing ability to improve its load-bearing further, described capstan winch is connected with described steady arm, and described steady arm is connected with described speed governing panel, and described connection lever is connected with described electrical motor.
Hang thing ability to improve its load-bearing further, described connection lever is connected with described speed governing capstan winch, and described speed governing capstan winch is connected with described tripod.
Beneficial effect: use twin beams load-bearing, increase and load-bearing can hang the thing upper limit, accurately can set and hang thing speed, simple to operate, can weights be pressed on suspension hook, add degree of stability.
Accompanying drawing explanation
Fig. 1 is the front view of a kind of double beams electric hoist described in the utility model.
Fig. 2 is the left view of a kind of double beams electric hoist described in the utility model.
1, load hook; 2, supercharging capstan winch; 3, hawser dish; 4, rotating shaft; 5, relay indicating light; 6, load bearing cross beam; 7, capstan winch; 8, steady arm; 9, speed governing panel; 10, electrical motor; 11, lever is connected; 12, speed governing capstan winch; 13, tripod.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As Figure 1-Figure 2, a kind of double beams electric hoist, comprise supercharging capstan winch 2, rotating shaft 4, load bearing cross beam 6 be connected lever 11, supercharging capstan winch 2 is connected with load hook 1, goods tightly can be fixed and sling, rotating shaft 4 is connected with hawser dish 3, hawser can be driven to rotate, pull goods, relay indicating light 5 is provided with above rotating shaft 4, can display working condition, load bearing cross beam 6 is connected with capstan winch 7, cargo weight can be shared, promote maximum gross, capstan winch 7 is connected with steady arm 8, location can be provided for hawser, increase work efficiency, speed governing panel 9 is provided with below steady arm 8, pull-up speed can be set, easy and simple to handle, connect lever 11 to be connected with electrical motor 10, connect below lever 11 and be provided with speed governing capstan winch 12, loading weight can be shared, thing speed is hung in adjustment, speed governing capstan winch 12 is connected with tripod 13, fixation is provided.
In said structure, working parameter is set at speed governing panel 9, actuating motor 10, drives rotating shaft 4 by the hawser on hawser dish 3 by driving load hook to carry out lifting work through supercharging capstan winch 2 after speed governing capstan winch 12 speed governing, and is shared by two load bearing cross beams 6 by weight pressure.
Thing ability is hung in order to improve its load-bearing further, supercharging capstan winch 2 is connected with load hook 1, goods tightly can be fixed and sling, rotating shaft 4 is connected with hawser dish 3, hawser can be driven to rotate, pull goods, rotating shaft 4 is connected with relay indicating light 5, can display working condition, load bearing cross beam 6 is connected with capstan winch 7, cargo weight can be shared, promote maximum gross, capstan winch 7 is connected with steady arm 8, location can be provided for hawser, increase work efficiency, steady arm 8 is connected with speed governing panel 9, pull-up speed can be set, easy and simple to handle, connect lever 11 to be connected with electrical motor 10, connect lever 11 to be connected with speed governing capstan winch 12, loading weight can be shared, thing speed is hung in adjustment, speed governing capstan winch 12 is connected with tripod 13, fixation is provided.
More than show and describe groundwork of the present utility model, principal character and advantage.The technical personnel of the industry should be understood; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and specification sheets just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and effect thing thereof.

Claims (5)

1. a double beams electric hoist, comprise supercharging capstan winch, rotating shaft, load bearing cross beam and connection lever, it is characterized in that: described supercharging capstan winch is connected with load hook, described rotating shaft is connected with hawser dish, relay indicating light is provided with above described rotating shaft, described load bearing cross beam is connected with capstan winch, described capstan winch is connected with steady arm, speed governing panel is provided with below described steady arm, described connection lever is connected with electrical motor, be provided with speed governing capstan winch below described connection lever, described speed governing capstan winch is connected with tripod.
2. a kind of double beams electric hoist according to claim 1, is characterized in that: described supercharging capstan winch is connected with described load hook, and described rotating shaft is connected with described hawser dish.
3. a kind of double beams electric hoist according to claim 1, it is characterized in that: described rotating shaft is connected with described relay indicating light, described load bearing cross beam is connected with described capstan winch.
4. a kind of double beams electric hoist according to claim 1, it is characterized in that: described capstan winch is connected with described steady arm, described steady arm is connected with described speed governing panel, described connection lever is connected with described electrical motor.
5. a kind of double beams electric hoist according to claim 1, is characterized in that: described connection lever is connected with described speed governing capstan winch, and described speed governing capstan winch is connected with described tripod.
CN201520329284.9U 2015-05-21 2015-05-21 Two roof beam electric block Expired - Fee Related CN204737660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520329284.9U CN204737660U (en) 2015-05-21 2015-05-21 Two roof beam electric block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520329284.9U CN204737660U (en) 2015-05-21 2015-05-21 Two roof beam electric block

Publications (1)

Publication Number Publication Date
CN204737660U true CN204737660U (en) 2015-11-04

Family

ID=54419405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520329284.9U Expired - Fee Related CN204737660U (en) 2015-05-21 2015-05-21 Two roof beam electric block

Country Status (1)

Country Link
CN (1) CN204737660U (en)

Similar Documents

Publication Publication Date Title
CN201288030Y (en) Balanced type energy conservation crane
CN202988612U (en) Flat arm type tower crane
CN205099211U (en) Hoist anti -swing device
CN205873746U (en) Stable hoisting machine
CN204689441U (en) A kind of electric hoist double-girder hoisting crane
CN204847922U (en) Hoist lifting rope swing stop gear
CN206970045U (en) A kind of construction hanging device
CN204737660U (en) Two roof beam electric block
CN102864770A (en) Efficient dynamic compaction machine
CN202558578U (en) Dedicated manually operated lifting device for support
CN204823891U (en) Portable crane's telescopic tower
CN208308309U (en) A kind of crane load protective device
CN204454262U (en) A kind of folding arm suspension hook group
CN205772880U (en) A kind of hanging balancing formula hoist crab
CN204873603U (en) Wheel crane
CN205187648U (en) Fast to hoist structure for case
CN201882828U (en) Crane provided with split rotary supporting device
CN204823958U (en) Single armed frame high pedestal jib crane plays to rise framework
CN204897257U (en) Roll over arm -type lorry crane operating mechanism
CN203284098U (en) Disassembled and assembled part self-lifting device for tower crane
CN102745598B (en) Tower crane
CN206521208U (en) A kind of stacked lifting hook crane for being applied to use in workshop
CN205275081U (en) High -power lifting machine for building
CN203295025U (en) Clamping tool for hoisting single H beam
CN106744360A (en) The derrick crane that a kind of counterweight can easily be accommodated

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151104

Termination date: 20170521

CF01 Termination of patent right due to non-payment of annual fee