CN204716251U - Circular orbit formula multifunctional rock drilling trolley - Google Patents

Circular orbit formula multifunctional rock drilling trolley Download PDF

Info

Publication number
CN204716251U
CN204716251U CN201520390642.7U CN201520390642U CN204716251U CN 204716251 U CN204716251 U CN 204716251U CN 201520390642 U CN201520390642 U CN 201520390642U CN 204716251 U CN204716251 U CN 204716251U
Authority
CN
China
Prior art keywords
door frame
circular orbit
rock drilling
rig
formula multifunctional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520390642.7U
Other languages
Chinese (zh)
Inventor
李龙
刘俊生
冯强
唐娅玲
陈国瑞
徐军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Machinery Research and Design Institute Co Ltd
Original Assignee
China Railway Engineering Machinery Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Machinery Research and Design Institute Co Ltd filed Critical China Railway Engineering Machinery Research and Design Institute Co Ltd
Priority to CN201520390642.7U priority Critical patent/CN204716251U/en
Application granted granted Critical
Publication of CN204716251U publication Critical patent/CN204716251U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of circular orbit formula multifunctional rock drilling trolley, at least comprise crawler unit, door frame, ring rail system and hydraulic drill rig, described crawler unit forms four-point supporting chassis in the both sides of door frame, described ring rail system is installed on the front end of door frame and support hydraulic pressure rig supplies device with vertical, also include the operating platform vertically moved along door frame, the utility model effectively improves reliability and the continuity of construction operation, adapt to the tunneling boring in tunnel and benching tunnelling method job execution, the country rock situation construction of in tunnel line 80% can be completed, crawler unit can realize turning to of high efficient and flexible and Balance route, adapt to construction operation environment severe in tunnel, operating platform provides job platform for operating personnel approach the construction such as face measurement line and filling explosive, the vertical device that supplies auxiliary construction personnel can complete the erection of steel arch-shelf and the laying of steel mesh, effectively raise vertical for operating efficiency, alleviate the labour intensity of constructor.

Description

Circular orbit formula multifunctional rock drilling trolley
Technical field
The utility model relates to the field of tunnel construction machinery equipment, is specifically related to a kind of circular orbit formula multifunctional rock drilling trolley containing boring, vertical steelframe and linked network function, is mainly used in railway, highway, single line, the excavation of double track tunnel and supporting.
Background technology
At present, in the mountain tunnel construction of China, mechanization degree is generally not high, and a complete set of equipment and the technology of tunnel machineization construction are all not mature enough and perfect, rely on to a great extent and manually complete.Especially on the working procedures such as brill blast hole drilling, bolthole and vertical steelframe, linked network, need a large amount of artificial participation operations, labor strength is large, efficiency of construction is low, and in recent years because human cost constantly increases, cause the constructing tunnel engineering method adopting a large amount of manual work not possess cost advantage.In tunnel, construction environment is severe simultaneously, and potential safety hazard is large, and in China under the overall situation of production safety pay attention to day by day, the safety requirements of relevant department to constructing tunnel operation also improves constantly.Therefore, no matter be from economic benefit, or social benefit is considered, improve tunnel machineization construction complete set technology, improving mechanization degree will be the mainstream development trend of constructing tunnel.
For this reason, designer of the present utility model is because above-mentioned defect, and by concentrating on studies and designing, comprehensive experience and the achievement being engaged in related industry for a long time for many years, research and design goes out a kind of circular orbit formula multifunctional rock drilling trolley, to overcome above-mentioned defect.
Utility model content
The technical problems to be solved in the utility model is: for constructing tunnel operation provides a kind of circular orbit formula jumbo, this chassis integrates blast hole drilling, bores the several functions such as bolthole and vertical steelframe, linked network, the construction operation of tunnel excavation and preliminary bracing is made to realize mechanization, significantly decrease manual operation amount, reduce labour intensity, while minimizing potential safety hazard, improve efficiency of construction.
For solving the problem, the utility model discloses a kind of circular orbit formula multifunctional rock drilling trolley, at least comprising crawler unit, door frame, ring rail system and hydraulic drill rig, it is characterized in that:
The both sides that described crawler unit is arranged in door frame form four-point supporting chassis, and described ring rail system is installed on the front end of door frame and support hydraulic pressure rig;
Described door frame at least comprises upper frame, top rail and lower transverse beam, described upper upper frame is arranged at the top of top rail, described lower transverse beam is arranged at lower end, described ring rail system comprises ring rail frame and multiple rig driven unit, two circular orbits be arranged in parallel before and after described ring rail frame comprises, two circular orbit tops are provided with gear ring, described rig driven unit comprises driving box and rig mount pad, described driving box comprises casing, drive source, motor speed reducer, pinion and power transmission shaft, described pinion is two and is engaged in the gear ring of circular orbit respectively, wherein a pinion is connected to drive source by motor speed reducer, described casing front end is connected to rig mount pad with fixed hydraulic rig by junction plate.
Wherein: described crawler unit comprises crawler belt traveling assembly, described crawler belt traveling assembly is articulated with the lower end of base, the upper end of described base is provided with steering, and the upper end of described steering is connected with column assembly, and described column assembly is connected to lower transverse beam by a column up-down oil cylinder.
Wherein: described steering comprises single-revolution and supports and steering cylinder, the inner side of described revolving support extends internally a junction part, and steering cylinder is arranged at the bottom surface of described connecting portion and lower transverse beam.
Wherein: be also provided with extension between described top rail and lower transverse beam to adapt to different tunnel cross-sections.
Wherein: also include vertical for device, it comprises electric block and vertical for driving box, and on described vertical two circular orbits being positioned at described ring rail frame for driving box and can annularly rail moving, the described vertical upper end for driving box be provided with electric block.
Wherein: the described vertical front end for driving box is provided with mount pad, and described mount pad is articulated with the rear end of outer sleeve, and inner sleeve is telescopic to be arranged in outer sleeve, the pulley connecting shackle that described electric hoist wire rope is arranged by upper limb on front side of inner sleeve and front end.
Wherein: the lower edge of described outer sleeve is connected to the expansion link end of pitching oil cylinder, the cylinder body of described pitching oil cylinder is articulated with mount pad, the lower edge of described inner sleeve is connected to the expansion link end of telescopic oil cylinder, and the cylinder body of described telescopic oil cylinder is articulated with the lower edge of outer sleeve.
Wherein: also include the operating platform vertically moved along door frame, the inner side of described door frame can be provided with the support component vertically moved for operating platform, described operating platform comprises upper door frame, outer cylindrical body, inner cylinder and running mechanism, described outer cylindrical body is many of even numbers and is placed in both sides, described upper door frame is arc and is connected to the top of the corresponding outer cylindrical body in both sides, described inner cylinder is sleeved on outer cylindrical body inside and can stretches downwards, the lower end of described inner cylinder is provided with running mechanism, and the rear end of described operating platform is connected with driving assembly.
Wherein: the side of described operating platform be provided with folding at least one flexiblely to walk on stage.
Wherein: between at least one inner cylinder and outer cylindrical body, be provided with telescopic oil cylinder.
Known by said structure, the digging mode of manual work traditional in constructing tunnel is changed into more advanced and efficient hydraulic gate excavation by circular orbit formula multifunctional rock drilling trolley of the present utility model, effectively improves reliability and the continuity of construction operation.Adopt liftable agent structure, adapt to the tunneling boring in tunnel and benching tunnelling method job execution, the country rock situation construction of in tunnel line 80% can be completed.Chassis carries track drive and level(l)ing device, can realize turning to and Balance route of high efficient and flexible, adapts to construction operation environment severe in tunnel.Chassis is equipped with telescopic support platform, provides job platform for operating personnel approach the construction such as face measurement line and filling explosive.The vertical steelframe that chassis is equipped with and mesh paving device auxiliary construction personnel can complete the erection of steel arch-shelf and the laying of steel mesh, effectively raise vertical for operating efficiency, alleviate the labour intensity of constructor.
In sum, do mechanization operation is adopted to replace originally needing the operating type of a large amount of hand labor in multiple operations such as the excavation of multifunctional rock drilling trolley in constructing tunnel, vertical confession, linked network, while having significantly improved efficiency of construction, decrease construction number, significantly reduce security risk.
Detailed content of the present utility model obtains by explanation described later and institute's accompanying drawing.
Accompanying drawing explanation
Fig. 1 shows the overall schematic of circular orbit formula multifunctional rock drilling trolley of the present utility model.
Fig. 2 shows elevation of the present utility model.
Fig. 3 shows the utility model crawler unit front view.
Fig. 4 shows the utility model crawler unit top view.
Fig. 5 shows the front view of the utility model tunneling boring construction door frame.
Fig. 6 shows the utility model tunneling boring construction door frame left view.
Fig. 7 shows the utility model benching tunnelling method construction door frame front view.
Fig. 8 shows the utility model benching tunnelling method construction door frame left view.
Fig. 9 shows the utility model ring rail system front view.
Fig. 9 A show A-A in Fig. 9 to schematic diagram.
Figure 10 shows the utility model ring rail system left view.
It is vertical for structure drawing of device that Figure 11 shows the utility model.
Figure 12 shows the utility model platform structure front view.
Figure 13 shows the utility model platform structure left view.
Reference numeral:
1, crawler unit; 2, door frame; 3, ring rail system; 4, hydraulic drill rig; 5, vertical for device; 6, operating platform; 1-1, column up-down oil cylinder; 1-2, column assembly; 1-3, steering; 1-4, base; 1-5, crawler belt traveling assembly; 2-1, upper upper frame; 2-2, top rail; 2-3, extension; 2-4, lower transverse beam; 2-5, horizontal-associate; 3-1, driving box; 3-2, rig mount pad; 3-3, ring rail frame; 3-4, motor reducer; 3-5, pinion; 3-6, power transmission shaft; 3-7 junction plate; 5-1, electric block; 5-2, driving box; 5-3, mount pad; 5-4, outer sleeve; 5-5, inner sleeve; 5-6, pitching oil cylinder; 5-7, telescopic oil cylinder; 6-1, upper door frame; 6-2, outer cylindrical body; 6-3, inner cylinder; 6-4, running mechanism; 6-5, platform horizontal-associate; 6-6, driving assembly; 6-7, flexible to walk on stage.
Detailed description of the invention
See Fig. 1 and 2, show circular orbit formula multifunctional rock drilling trolley of the present utility model.
Described circular orbit formula multifunctional rock drilling trolley comprises crawler unit 1, door frame 2, ring rail system 3, hydraulic drill rig 4, stands for the parts such as device 5 and operating platform 6.
Described crawler unit 1 is walking and the bracing or strutting arrangement of chassis, it is divided into front and back two type according to chassis front portion is different from back support power, every type two cover is arranged in the both sides of door frame 2, form four-point supporting chassis, often overlap crawler belt and independently lifting and steering mechanism are housed, can realize various ways to turn to, described ring rail system 3 is installed on the front end of door frame 2 and support hydraulic pressure rig 4 supplies device 5 with vertical, and described operating platform 6 is arranged in door frame 2 to provide operating surface.
See Fig. 1, 2, 5-8, described door frame 2 is the subjective basis structure of whole chassis, respectively with crawler unit 1, ring rail system 3 and operating platform 6 connect, it at least comprises upper frame 2-1, top rail 2-2, lower transverse beam 2-4, the parts such as horizontal-associate 2-5, described upper upper frame 2-1 is arranged at the top of top rail 2-2, described lower transverse beam 2-4 is arranged at lower end and connects each crawler unit 1, described horizontal-associate 2-5 connects top rail 2-2 or the lower transverse beam 2-4 of both sides, wherein, for providing the requirement of different operating height, also extension 2-3 can be provided with between described top rail 2-2 and lower transverse beam 2-4, the height of described extension 2-3 can be arranged as required, see Fig. 6-7, show the state that extension 2-3 is not set, Fig. 5 shows the state installing extension 2-3 additional, optionally, horizontal-associate 2-5 also can be set between the extension 2-3 of both sides to improve support strength, thus, this door frame 2 is installation foundation of whole system, also be its location base, this door frame 2 reduces complete machine height to adapt to different tunnel cross-sections by dismounting extension.
As Fig. 3, shown in Fig. 4, described crawler unit 1 comprises crawler belt traveling assembly 1-5, described crawler belt traveling assembly 1-5 comprises crawler belt out of shape and is positioned at driven wheel and the driven gear of front and back position, described driven wheel is connected to driver element, be provided with multiple servo-actuated pinion between described driven wheel and driven gear and support pinion, described crawler belt traveling assembly 1-5 is articulated with the lower end of base 1-4, the upper end of described base 1-4 is provided with steering 1-3, the upper end of described steering 1-3 is connected with the telescopic column assembly 1-2 be located in lower transverse beam 2-4, described column assembly 1-2 is hollow and is connected to lower transverse beam 2-4 by a column up-down oil cylinder 1-1, described steering 1-3 comprises single-revolution and supports and steering cylinder, inner side inwardly (as shown in Figure 4) extension a junction part of described revolving support, steering cylinder is arranged at the bottom surface of described link and lower transverse beam 2-4.
Wherein, all adopt between column up-down oil cylinder 1-1 and column assembly 1-2 and lower transverse beam 2-4 bearing pin and bearing hinged, bolt is adopted to be fixedly connected with between column assembly 1-2 and the revolving support of steering 1-3, the revolving support of steering 1-3 adopts bolt to be fixedly connected with between base 1-4, adopt between base 1-4 and crawler belt traveling assembly 1-5 bearing pin and bearing hinged.Can relative sliding be done between the impetus lower pillar stand assembly 1-2 and the lower transverse beam 2-4 of chassis door frame of column up-down oil cylinder 1-1, drive chassis door frame to carry out well-balanced adjustment.Under the impetus of steering 1-3 steering cylinder, base 1-4 can rotate relative to door frame 2 with crawler belt traveling assembly 1-5, realizes chassis complete machine and turns to.
See Fig. 1, 2, 9, 9A and 10, described ring rail system 3 is arranged on chassis door frame 2 front end, it can comprise ring rail frame 3-3 and multiple rig driven unit, two circular orbits be arranged in parallel before and after described ring rail frame 3-3 can comprise, multiple rig driven unit is arranged at intervals between two circular orbits, two circular orbits are relatively set with annular guide channel and top is provided with gear ring, described rig driven unit comprises driving box 3-1 and rig mount pad 3-2, described driving box 3-1 is arranged on two circular orbits, it comprises casing, drive source, motor speed reducer 3-4, pinion 3-5 and power transmission shaft 3-6, the both sides, lower end of described casing can be provided with the guide rail stretching into annular guide channel, to realize leading accurately and avoid to depart from, described pinion 3-5 is two and is engaged in the gear ring of circular orbit respectively, two pinion 3-5 are connected by power transmission shaft 3-6, wherein a pinion 3-5 is connected to drive source by motor speed reducer 3-4, described casing front end is connected to rig mount pad 3-2 with fixed hydraulic rig by junction plate 3-7, thus, by the driving of drive source, the engagement of pinion 3-5 relative gear rings rotates, realize hydraulic drill rig 4 annularly rail moving.
Wherein, driving box 3-1 in ring rail system 3 and with bolts between rig mount pad 3-2 and motor reducer 3-4, with bolts between ring rail frame 3-3 and the upper upper frame 2-1 of door frame 2, the output being arranged on pinion 3-5 one end in driving box 3-1 casing and motor reducer 3-4 is with bolts, and the other end and power transmission shaft 3-6 are socketed.On pinion 3-5 and ring rail frame 3-3 bull gear engagement under, being arranged on that hydraulic gate on driving box 3-1 drives through motor reducer 3-4 can angle that annularly orbit rotation is certain, can be bored the borehole beaten and face is arranged ringwise by multiple hydraulic drill rig 4 that can adjust position on anchor ring easily.
Described hydraulic drill rig 4 is the operating mechanism of whole chassis, it can comprise hydraulic gate, forward beam, drill boom etc., described drill boom can comprise jib lubbing mechanism and deflection mechanism, realize adjustable luffing up and down and deflect, and the beat of forward beam and revolution, realize diverse location, the borehole of different angles and the brill of bolthole and beat.
See Figure 11, the described vertical device 5 that supplies auxiliary construction personnel can complete the erection of steel arch-shelf and the laying of steel mesh, it can be more than one and is arranged on two circular orbits of described ring rail frame 3-1, it can comprise electric block 5-1, vertical for driving box 5-2, mount pad 5-3, outer sleeve 5-4, inner sleeve 5-5 etc., the described vertical driving box 3-1 of rig driven unit in the structure of driving box 5-2 and ring rail system 3 that supplies is similar, also casing is comprised, drive source, motor speed reducer, pinion and power transmission shaft, described pinion is two and is engaged in the gear ring of circular orbit respectively, two pinions are connected by power transmission shaft, wherein a pinion is connected to drive source by motor speed reducer, thus, by the driving of drive source, the engagement of pinion relative gear rings rotates, realize vertical for driving box 5-2 annularly rail moving.
The described vertical upper end for driving box 5-2 is provided with electric block 5-1, front end is provided with mount pad 5-3, described mount pad 5-3 is articulated with the rear end of outer sleeve 5-4, inner sleeve 5-5 is telescopic to be arranged in outer sleeve 5-4, the lower edge of described outer sleeve 5-4 is connected to the expansion link end of pitching oil cylinder 5-6, the cylinder body of described pitching oil cylinder 5-6 is articulated with mount pad 5-3, the lower edge of described inner sleeve 5-5 is connected to the expansion link end of telescopic oil cylinder 5-7, the cylinder body of described telescopic oil cylinder 5-7 is articulated with the lower edge of outer sleeve 5-4, the pulley that the wire rope of described electric hoist 5-1 is arranged by upper limb on front side of inner sleeve 5-5 and front end is connected an executive component, see Figure 11, this executive component can be the suspension hook hanging and lift steel arch-shelf or steel mesh.
Thus, with bolts between mount pad 5-3 and vertical confession driving box 5-2, be connected with adopting bearing pin and hinged-support between outer sleeve 5-4.For suit can relative sliding between outer sleeve 5-4 and inner sleeve 5-5, pitching oil cylinder 5-6 two ends adopt bearing pin and hinged-support to be connected with mount pad 5-3, outer sleeve 5-4 respectively, and amplitude oil cylinder 5-7 two ends adopt bearing pin and hinged-support to be connected with inner sleeve 5-5, outer sleeve 5-4 respectively.The pre-splicing steel arch-shelf installed hangs to door frame 2 top by electric block 5-1, pitching oil cylinder 5-6 and amplitude oil cylinder 5-7 drive vertical for device 5 pitching, flexible after steel arch-shelf is lifted to tunnel top.
See Figure 12-13, described operating platform 6 can vertically move along door frame 2, the inner side of described door frame 2 can be provided with the support component vertically moved for operating platform 6, described operating platform 6 can comprise upper door frame 6-1, outer cylindrical body 6-2, inner cylinder 6-3, running mechanism 6-4 and platform horizontal-associate 6-5, described outer cylindrical body 6-2 is many of even numbers and is symmetrically placed in both sides, described upper door frame 6-1 is arc and is connected to the top of the corresponding outer cylindrical body 6-2 in both sides, described inner cylinder 6-3 is sleeved on outer cylindrical body 6-2 inside and can stretches downwards, optionally, telescopic oil cylinder is provided with between at least one inner cylinder 6-3 and outer cylindrical body 6-2, the lower end of described inner cylinder 6-3 is provided with mechanism 6-4 out of shape, optionally, described mechanism 6-4 out of shape comprises out of shape wheel and connecting rod, platform horizontal-associate 6-5 is provided with to improve support strength between the inner cylinder 6-3 of side, the rear end of described operating platform 6 is connected with and drives assembly 6-6, described driving assembly 6-6 can comprise driving wheel and drive motors, optionally, described drive motors is connected to driving wheel by reducer, the side of described operating platform 6 is provided with at least one flexible 6-7 that walks on stage folding, to provide the operating surface of operating personnel.
Thus, can approach face for operating personnel after operating platform puts in place and measure line, operating platform 6 can be used as the rear portion counterweight of chassis after shrinking and putting in place.With bolts between upper door frame 6-1 and outer cylindrical body 6-2, the flexible 6-7 that walks on stage turns over for bolt is connected also can roll over between outer cylindrical body 6-2, inner cylinder 6-3.Platform 6 can stretch out do vertical shift and make the flexible 6-7 that walks on stage approach face operation under door frame 2 inner track supports, upper door frame 6-1, outer cylindrical body 6-2 and flexible walk on stage 6-7 can under the impetus of oil cylinder jacking certain altitude, convenient construction personnel are in tunnel ceiling regions operation.And operating platform 6 can return to door frame 2 afterbody with the weight of balanced hydraulic rig, improve chassis riding stability.
Known by foregoing description, the utility model has the advantage of:
1, door frame is sectionally assembled structure, by simple dismounting adjustable complete machine height, adapts to the tunneling boring in tunnel and requirement for height different to chassis complete machine during benching tunnelling method construction operation respectively.
2, the crawler travel balancer of adjustable vehicle frame level, the discrepancy in elevation of energy auto-compensation four support levels when constructing in out-of-flatness ground in tunnel, ensure that chassis door frame is horizontal, and realize the horizontal centering of chassis door frame by independently steering, for the boring location of hammer drill provides benchmark, be conducive to the rapid contraposition of hydraulic drill rig.
3, can arrange several hydraulic drill rigs, realize comprehensive covering of face when tunneling boring and benching tunnelling method construction, non-blind area, without dead angle.
4, vertical for device by ground in advance assembled good steel arch-shelf sling and be lifted to tunnel roof, greatly can alleviate labor intensity of operating staff and improve vertical for supporting operating efficiency.
5, operating platform can vertically move, and can approach face and measure line, shrink the rear portion counterweight that can be used as chassis after putting in place after platform stretches out and puts in place for operating personnel.
It is evident that, above description and record be only citing instead of in order to limit disclosure of the present utility model, application or use.Although described in an embodiment and be described in the drawings embodiment, but the utility model do not limit by accompanying drawing example and describe in an embodiment as the optimal mode thought at present to implement the specific examples of instruction of the present utility model, scope of the present utility model will comprise any embodiment of manual and the appended claim fallen into above.

Claims (10)

1. a circular orbit formula multifunctional rock drilling trolley, at least comprises crawler unit, door frame, ring rail system and hydraulic drill rig, it is characterized in that:
The both sides that described crawler unit is arranged in door frame form four-point supporting chassis, and described ring rail system is installed on the front end of door frame and support hydraulic pressure rig;
Described door frame at least comprises upper frame, top rail and lower transverse beam, described upper upper frame is arranged at the top of top rail, described lower transverse beam is arranged at lower end, described ring rail system comprises ring rail frame and multiple rig driven unit, two circular orbits be arranged in parallel before and after described ring rail frame comprises, two circular orbit tops are provided with gear ring, described rig driven unit comprises driving box and rig mount pad, described driving box comprises casing, drive source, motor speed reducer, pinion and power transmission shaft, described pinion is two and is engaged in the gear ring of circular orbit respectively, wherein a pinion is connected to drive source by motor speed reducer, described casing front end is connected to rig mount pad with fixed hydraulic rig by junction plate.
2. circular orbit formula multifunctional rock drilling trolley as claimed in claim 1, it is characterized in that: described crawler unit comprises crawler belt traveling assembly, described crawler belt traveling assembly is articulated with the lower end of base, the upper end of described base is provided with steering, the upper end of described steering is connected with column assembly, and described column assembly is connected to lower transverse beam by a column up-down oil cylinder.
3. circular orbit formula multifunctional rock drilling trolley as claimed in claim 2, it is characterized in that: described steering comprises revolving support and steering cylinder, the inner side of described revolving support extends internally a junction, and steering cylinder is arranged at the bottom surface of described connecting portion and lower transverse beam.
4. circular orbit formula multifunctional rock drilling trolley as claimed in claim 2, is characterized in that: be also provided with extension between described top rail and lower transverse beam to adapt to different tunnel cross-sections.
5. circular orbit formula multifunctional rock drilling trolley as claimed in claim 1 or 2 or 3 or 4, it is characterized in that: also include vertical for device, it comprises electric block and stands for driving box, on described vertical two circular orbits being positioned at described ring rail frame for driving box and can annularly rail moving, the described vertical upper end for driving box be provided with electric block.
6. circular orbit formula multifunctional rock drilling trolley as claimed in claim 5, it is characterized in that: the described vertical front end for driving box is provided with mount pad, described mount pad is articulated with the rear end of outer sleeve, inner sleeve is telescopic to be arranged in outer sleeve, the pulley connecting shackle that described electric hoist wire rope is arranged by upper limb on front side of inner sleeve and front end.
7. circular orbit formula multifunctional rock drilling trolley as claimed in claim 6, it is characterized in that: the lower edge of described outer sleeve is connected to the expansion link end of pitching oil cylinder, the cylinder body of described pitching oil cylinder is articulated with mount pad, the lower edge of described inner sleeve is connected to the expansion link end of telescopic oil cylinder, and the cylinder body of described telescopic oil cylinder is articulated with the lower edge of outer sleeve.
8. as claim 1-4, arbitrary described circular orbit formula multifunctional rock drilling trolley in 6-7, it is characterized in that: also include the operating platform vertically moved along door frame, the inner side of described door frame can be provided with the support component vertically moved for operating platform, described operating platform comprises upper door frame, outer cylindrical body, inner cylinder and running mechanism, described outer cylindrical body is many of even numbers and is placed in both sides, described upper door frame is arc and is connected to the top of the corresponding outer cylindrical body in both sides, described inner cylinder is sleeved on outer cylindrical body inside and can stretches downwards, the lower end of described inner cylinder is provided with mechanism out of shape, the rear end of described operating platform is connected with driving assembly.
9. circular orbit formula multifunctional rock drilling trolley as claimed in claim 8, is characterized in that: the side of described operating platform be provided with folding at least one flexiblely to walk on stage.
10. circular orbit formula multifunctional rock drilling trolley as claimed in claim 8, is characterized in that: be provided with telescopic oil cylinder between at least one inner cylinder and outer cylindrical body.
CN201520390642.7U 2015-06-09 2015-06-09 Circular orbit formula multifunctional rock drilling trolley Expired - Fee Related CN204716251U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520390642.7U CN204716251U (en) 2015-06-09 2015-06-09 Circular orbit formula multifunctional rock drilling trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520390642.7U CN204716251U (en) 2015-06-09 2015-06-09 Circular orbit formula multifunctional rock drilling trolley

Publications (1)

Publication Number Publication Date
CN204716251U true CN204716251U (en) 2015-10-21

Family

ID=54315254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520390642.7U Expired - Fee Related CN204716251U (en) 2015-06-09 2015-06-09 Circular orbit formula multifunctional rock drilling trolley

Country Status (1)

Country Link
CN (1) CN204716251U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895578A (en) * 2015-06-09 2015-09-09 中铁工程机械研究设计院有限公司 Circular-rail multifunctional drill jumbo system
CN106223853A (en) * 2016-08-24 2016-12-14 孟玲 A kind of multi-angle high flexibility boring machine
CN106247803A (en) * 2016-08-31 2016-12-21 山河智能装备股份有限公司 A kind of multiple degrees of freedom mineral hot furnace tap-hole opening and sealing unit widened the view based on cutting type
CN106677807A (en) * 2016-12-29 2017-05-17 中国人民解放军63926部队 Folding steel arch frame and installation method thereof
CN108286431A (en) * 2017-01-10 2018-07-17 重庆宝爵机械设备有限公司 A kind of Multifunction construction equipment for drill+blast tunnel construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895578A (en) * 2015-06-09 2015-09-09 中铁工程机械研究设计院有限公司 Circular-rail multifunctional drill jumbo system
CN106223853A (en) * 2016-08-24 2016-12-14 孟玲 A kind of multi-angle high flexibility boring machine
CN106247803A (en) * 2016-08-31 2016-12-21 山河智能装备股份有限公司 A kind of multiple degrees of freedom mineral hot furnace tap-hole opening and sealing unit widened the view based on cutting type
CN106677807A (en) * 2016-12-29 2017-05-17 中国人民解放军63926部队 Folding steel arch frame and installation method thereof
CN108286431A (en) * 2017-01-10 2018-07-17 重庆宝爵机械设备有限公司 A kind of Multifunction construction equipment for drill+blast tunnel construction

Similar Documents

Publication Publication Date Title
CN104895578B (en) Circular-rail multifunctional drill jumbo system
CN204716251U (en) Circular orbit formula multifunctional rock drilling trolley
CN205977245U (en) Road multifunctional machinery ization tunnel supporting platform truck
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN106437511B (en) A kind of modular multi-function drill jumbo system
CN102900362A (en) Narrow-machine-body full-hydraulic bolt and anchor cable drill carriage for coal mine tunnel
CN104695984A (en) Multifunctional tunnel construction trolley
CN105587328B (en) One kind suspension mining multi-arm roofboltier of beam type
CN112360340A (en) Automatic anchor rod drill carriage
CN107060749A (en) Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN106379839B (en) A kind of modularization gate-type multifunctional rock drilling trolley job platform and method
CN201433762Y (en) Novel advance support mechanical boring machine
CN211342765U (en) Multifunctional impact type hydraulic drill carriage suitable for rock roadway working face construction
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN102874691B (en) Coal mine fully-mechanized mining the middle pan of scraper conveyor hanging apparatus
CN204627622U (en) The multi-functional construction trolley in a kind of tunnel
CN204703761U (en) A kind of tunnel construction trolley
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN206845182U (en) A kind of multifunctional tunnel repair machine
CN101845952A (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN204716132U (en) Gantry type multifunctional rock drilling trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20180609

CF01 Termination of patent right due to non-payment of annual fee