CN204696556U - A kind of 10kV bypass cable is built on stilts laid street device - Google Patents

A kind of 10kV bypass cable is built on stilts laid street device Download PDF

Info

Publication number
CN204696556U
CN204696556U CN201520339401.XU CN201520339401U CN204696556U CN 204696556 U CN204696556 U CN 204696556U CN 201520339401 U CN201520339401 U CN 201520339401U CN 204696556 U CN204696556 U CN 204696556U
Authority
CN
China
Prior art keywords
support
roller
shaft
traction
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520339401.XU
Other languages
Chinese (zh)
Inventor
何建军
章立
苏梓铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201520339401.XU priority Critical patent/CN204696556U/en
Priority to CN201520657030.XU priority patent/CN205159900U/en
Application granted granted Critical
Publication of CN204696556U publication Critical patent/CN204696556U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

本实用新型提供一种10kV旁路电缆架空铺设过街装置,包括结构相同的第一支承组件的第二支承组件、2个杆上导入支架、支撑绳、若干个移动滑车、移动滑车连接牵引绳和2个红外测距报警器;第一支承组件包括底座、升降杆和驱动器;2个杆上导入支架在2个升降杆的上端分别各设置1个;支撑绳穿过2个杆上导入支架用于支撑各移动滑车;移动滑车用于支承需要过街的旁路电缆过街并可在移动滑车连接牵引绳的牵引下依托支撑绳左右滑动;2个红外测距报警器在2个升降杆的顶端分别各固定安装1个且安装方向相反。本实用新型结构简单,成本较低,便于携带,使用方便,适用性强,可提高供电部门抢修效率、保障作业安全。

The utility model provides a 10kV bypass cable overhead laying device for crossing the street, which includes the second support assembly of the first support assembly with the same structure, two lead-in brackets on the pole, support ropes, several moving blocks, and the moving blocks are connected with traction ropes and 2 infrared distance measuring alarms; the first support assembly includes a base, a lifting rod and a driver; 2 guide brackets on the rods are respectively provided at the upper ends of the 2 lifting rods; the support rope is used to pass through the 2 rods and guide the brackets It is used to support each mobile trolley; the mobile trolley is used to support the bypass cables that need to cross the street and can slide left and right by the support rope under the traction of the mobile trolley connected to the traction rope; the two infrared distance measuring alarms are on the top of the two lifting rods respectively. One is fixedly installed and the installation direction is opposite. The utility model has the advantages of simple structure, low cost, portability, convenient use and strong applicability, which can improve the repair efficiency of the power supply department and ensure operation safety.

Description

一种10kV旁路电缆架空铺设过街装置A 10kV bypass cable overhead laying device for crossing the street

技术领域 technical field

本实用新型涉及配电旁路作业技术领域,具体涉及一种10kV旁路电缆架空铺设过街装置。 The utility model relates to the technical field of power distribution bypass operation, in particular to a street-crossing device for overhead laying of 10kV bypass cables.

背景技术 Background technique

旁路电缆架空铺设过街支架是开展供电部门开展旁路作业的常用工具之一,主要用于旁路作业时将旁路电缆铺设过街。目前常见的架空敷设过街支架操作不便,现场安装工作繁琐,对作业人员操作技能要求较高,且不能自动升降,影响旁路作业的效率。如授权公告号为CN203747342U的中国专利文献,其公开了一种可调式移动电缆架空支撑装置,该装置依靠人力调整电缆所需支撑的高度,且电缆架空部分都需要人力托举,费时费力,不能有效适应供电抢修时旁路电缆架空铺设过街的实际需要。依靠电动工具进行旁路电缆架空铺设检修的装置目前也见研究,如申请公布号为CN103762520A的中国专利文献,其公开了一种用于10kV配电线路旁路作业的电动移动平台,其虽然能够实现自动升降,但其在实施将电缆过街时却不方便,而且结构相对复杂,成本较高。 The bypass cable overhead laying bracket is one of the commonly used tools for the power supply department to carry out bypass operations. It is mainly used for laying bypass cables across the street during bypass operations. At present, the common overhead laying support for crossing the street is inconvenient to operate, and the on-site installation work is cumbersome. It requires high operating skills of the operators, and it cannot be automatically raised and lowered, which affects the efficiency of the bypass operation. For example, the Chinese patent document whose authorized announcement number is CN203747342U discloses an adjustable mobile cable overhead support device. It can effectively meet the actual needs of overhead laying of bypass cables to cross the street during emergency repair of power supply. The device that relies on power tools to carry out overhead laying and maintenance of bypass cables is also currently being researched, such as the Chinese patent document whose application publication number is CN103762520A, which discloses a kind of electric mobile platform for 10kV distribution line bypass operation, although it can Realize automatic lifting, but it is inconvenient when carrying out cable crossing the street, and structure is relatively complicated, and cost is higher.

此外,实际操作过程中,由于旁路电缆需要架空铺设过街,施工中难免会有车辆从架起的旁路电缆下通过,如有超高车辆靠近通过时,容易将架空电缆挂断或拉开,易发生危险,因而施工过程中需要有效地对超高车辆接近进行监测预警,以确保旁路作业的安全,而目前常见的旁路电缆架空铺设装置尚不具备此类功能。 In addition, in the actual operation process, since the bypass cable needs to be laid overhead to cross the street, it is inevitable that vehicles will pass under the erected bypass cable during construction. If a super-high vehicle passes close by, it is easy to hang up or pull away the overhead cable , is prone to danger, so it is necessary to effectively monitor and warn the approach of super-high vehicles during the construction process to ensure the safety of bypass operations, but the current common bypass cable overhead laying devices do not have such functions.

实用新型内容 Utility model content

本实用新型的目的是:提供一种结构简单、成本较低、便于携带、操作方便且能有效监测超高车辆靠近以保障作业安全的10kV旁路电缆架空铺设过街装置。 The purpose of this utility model is to provide a 10kV bypass cable overhead laying street crossing device with simple structure, low cost, easy to carry, easy to operate, and can effectively monitor the approach of super-high vehicles to ensure safe operation.

本实用新型的技术方案是:本实用新型的10kV旁路电缆架空铺设过街装置,其结构特点是:包括第一支承组件、第二支承组件、杆上导入支架、支撑绳、移动滑车、移动滑车连接牵引绳和红外测距报警器; The technical solution of the utility model is: the 10kV bypass cable overhead laying street crossing device of the utility model, its structural characteristics are: including the first support assembly, the second support assembly, the guide bracket on the pole, the support rope, the moving block, the moving block Connect the traction rope and infrared distance measuring alarm;

上述的第一支承组件包括底座、升降杆和驱动器;升降杆和驱动器设置在底座上;驱动器与升降杆传动连接; The above-mentioned first support assembly includes a base, a lifting rod and a driver; the lifting rod and the driver are arranged on the base; the driver is connected to the lifting rod in transmission;

第二支承组件的结构与第一支承组件相同;使用时,第二支承组件和第一支承组件分设在街道两边; The structure of the second support assembly is the same as that of the first support assembly; when in use, the second support assembly and the first support assembly are separately located on both sides of the street;

杆上导入支架设有相同的2个,该2个杆上导入支架在第一支承组件的升降杆的上端和第二支承组件的升降杆的上端分别各设置1个; There are two same lead-in brackets on the rod, and the two lead-in brackets on the rod are respectively provided with one at the upper end of the lifting rod of the first support assembly and at the upper end of the lifting rod of the second support assembly;

支撑绳使用时穿过2个杆上导入支架并由2个杆上导入支架支撑;支撑绳的两端与地面固定可靠连接; When the support rope is used, it passes through two poles and is guided into the bracket and is supported by the two poles leading into the bracket; both ends of the support rope are fixed and reliable connected to the ground;

移动滑车在支撑绳上间隔均匀设置;各移动滑车通过移动滑车连接牵引绳相互连接并可在移动滑车连接牵引绳的牵引下在支撑绳上左右移动;使用时,各移动滑车用于支承需要过街的旁路电缆过街; The moving blocks are evenly spaced on the supporting rope; each moving block is connected to each other through the moving block connecting the traction rope and can move left and right on the supporting rope under the traction of the moving block connected to the pulling rope; The bypass cable crosses the street;

红外测距报警器设有2个;该2个红外测距报警器在第一支承组件的升降杆的顶端和第二支承组件的升降杆的顶端分别各固定安装1个,且该2个红外测距报警器的安装方向相反。 There are 2 infrared ranging alarms; the 2 infrared ranging alarms are respectively fixedly installed on the top of the lifting rod of the first supporting assembly and the top of the lifting rod of the second supporting assembly, and the 2 infrared ranging The installation direction of the distance measuring alarm is opposite.

进一步的方案是:上述的第一支承组件的底座包括固定架和调节手轮;固定架由2根支撑梁和1根安装梁组成;2根支撑梁平行设置;安装梁由其两端与2根支撑梁的中部固定连接;安装梁的中部上端设有安装法兰;调节手轮设有4个,该4个调节手轮在固定架的2根支撑梁的端部分别各设置1个;上述的升降杆由其下端通过固定架的安装梁中部上端的安装法兰固定安装在安装梁上;驱动器固定安装在固定架的安装梁上;升降杆在驱动器的驱动下可自动向上伸出或向下收缩;驱动器为电动液压驱动机构或电动气压驱动机构。 A further solution is: the base of the above-mentioned first support assembly includes a fixed frame and an adjustment handwheel; the fixed frame is composed of 2 supporting beams and 1 mounting beam; 2 supporting beams are arranged in parallel; The middle part of the root support beam is fixedly connected; the upper end of the middle part of the installation beam is provided with a mounting flange; there are 4 adjustment handwheels, and the 4 adjustment handwheels are respectively provided at the ends of the two support beams of the fixed frame; The above-mentioned lifting rod is fixedly installed on the mounting beam by its lower end through the mounting flange at the upper end of the middle part of the mounting beam of the fixing frame; the driver is fixedly installed on the mounting beam of the fixing frame; Contract downward; the driver is an electro-hydraulic drive mechanism or an electro-pneumatic drive mechanism.

进一步的方案是:上述的杆上导入支架包括连接盘、连接臂、挂臂和挂环;连接臂的后端与连接盘的上端固定连接;连接臂的前端与挂臂的上端中部固定连接;挂臂为开口向下的槽体件;挂环为半圆环件,挂环固定设置在挂臂的槽体内;挂环设有3至6个,各挂环在挂臂的槽体内左右向均匀设置;杆上导入支架通过连接盘与升降杆的上端固定连接且连接臂向前伸出。 A further solution is: the above-mentioned lead-in bracket on the rod includes a connecting plate, a connecting arm, a hanging arm and a hanging ring; the rear end of the connecting arm is fixedly connected to the upper end of the connecting plate; the front end of the connecting arm is fixedly connected to the middle part of the upper end of the hanging arm; The hanging arm is a groove body with the opening downward; the hanging ring is a semi-circular piece, and the hanging ring is fixed in the groove of the hanging arm; there are 3 to 6 hanging rings, and each hanging ring is in the groove of the hanging arm. Evenly arranged; the lead-in bracket on the rod is fixedly connected with the upper end of the lifting rod through the connecting plate and the connecting arm protrudes forward.

进一步的方案是:上述的移动滑车包括滚轮组件、旋转支撑拨叉、旋转轴、牵引组件、电缆悬挂组件和弹簧自锁机构; A further solution is: the above-mentioned mobile tackle includes a roller assembly, a rotating support shift fork, a rotating shaft, a traction assembly, a cable suspension assembly and a spring self-locking mechanism;

滚轮组件包括滚轮、滚轮转轴和滚轮固定板;滚轮和滚轮转轴分别各设有2个;滚轮固定板分前后位置平行设置2块,该2块滚轮固定板由分设在左右两侧的各1个滚轮转轴相连接;滚轮安装在滚轮转轴上并可依托滚轮转轴转动;滚轮固定板的外侧设有弧形凸起; The roller assembly includes a roller, a roller shaft and a roller fixing plate; there are two rollers and two roller shafts respectively; two roller fixing plates are arranged in parallel at the front and rear positions, and the two roller fixing plates are respectively arranged on the left and right sides. The roller shafts are connected; the rollers are installed on the roller shafts and can rotate by relying on the roller shafts; the outer side of the roller fixing plate is provided with arc-shaped protrusions;

旋转支撑拨叉为一体件,旋转支撑拨叉由轴心部和拨叉爪组成;轴心部为圆柱体件,其中心设有轴孔;拨叉爪设有8个以上,各拨叉爪由其内端部与轴心部一体连接;各拨叉爪的外端部上设置有与滚轮固定板的弧形凸起相配合的弧形卡槽;各拨叉爪在轴心部上周向均匀设置;旋转支撑拨叉设有相同的2个,该2个旋转支撑拨叉分前后镜像设置,且位于前后2块滚轮固定板的外侧;该2个旋转支撑拨叉与旋转轴固定连接,并可依托旋转轴转动; The rotary support fork is one piece, and the rotary support fork is composed of the shaft center and the fork claw; the shaft center is a cylindrical part with a shaft hole in the center; there are more than 8 shift fork claws, each fork claw The inner end is integrally connected with the shaft center; the outer end of each fork claw is provided with an arc-shaped slot matching the arc-shaped protrusion of the roller fixing plate; each shift fork claw is on the shaft center The two rotating support forks are set in a uniform direction; the two rotating support forks are set in front and rear mirror images, and are located on the outside of the front and rear two roller fixing plates; the two rotating support forks are fixedly connected to the rotating shaft , and can rotate on the axis of rotation;

牵引组件包括支架和牵引板;支架为由2块竖板和一块横板构成的整体呈U型的一体件;支架由其2块竖板的上部与旋转轴的两端固定连接;牵引板为水平设置的板体件,牵引板的左右两侧分别各设有1个牵引连接孔;牵引板固定安装在支架的底板上且位于支架的底板下方;牵引板与支架的底板垂直相接; The traction assembly includes a bracket and a traction plate; the bracket is a U-shaped integral piece composed of two vertical plates and a horizontal plate; the support is fixedly connected with the two ends of the rotating shaft by the upper part of the two vertical plates; the traction plate is As for the plate body set horizontally, one traction connection hole is respectively provided on the left and right sides of the traction plate; the traction plate is fixedly installed on the bottom plate of the support and is located below the bottom plate of the support; the traction plate is vertically connected to the bottom plate of the support;

电缆悬挂组件包括固定曲吊臂、旋转曲吊臂、吊臂转轴、电缆放置辊和电缆护板;固定曲吊臂的上端与旋转轴的后端固定连接;固定曲吊臂的下端与吊臂转轴的后端固定连接;旋转曲吊臂的上端与旋转轴的前端咬合;旋转曲吊臂的下端与吊臂转轴的前端可转动地相连接;电缆放置辊套接在吊臂转轴上且可依托吊臂转轴转动;电缆护板设有相同的2块,该2块电缆护板分别固定设置在吊臂转轴的前后两端且位于旋转曲吊臂和吊臂转轴的内侧; The cable suspension assembly includes a fixed curved boom, a rotating curved boom, a boom shaft, a cable placement roller and a cable guard; the upper end of the fixed curved boom is fixedly connected to the rear end of the rotating shaft; the lower end of the fixed curved boom is connected to the boom The rear end of the rotating shaft is fixedly connected; the upper end of the rotating curved boom engages with the front end of the rotating shaft; the lower end of the rotating curved boom is rotatably connected with the front end of the rotating shaft of the boom; the cable placement roller is sleeved on the rotating shaft of the boom and can Relying on the boom shaft to rotate; the cable guards are provided with the same two pieces, and the two cable guards are respectively fixed at the front and rear ends of the boom shaft and located inside the swivel boom and the boom shaft;

弹簧自锁机构包括拉柄和弹簧;拉柄可活动地安装在旋转轴的前端,弹簧套接在旋转轴的前端部位上且设置在拉柄内;拉柄依靠弹簧的弹力将旋转曲吊臂的上端与旋转轴的前端咬合处锁紧。 The spring self-locking mechanism includes a handle and a spring; the handle is movably installed on the front end of the rotating shaft, and the spring is sleeved on the front end of the rotating shaft and arranged in the handle; the handle relies on the elastic force of the spring to rotate the curved boom The upper end of the upper end is locked with the front end of the rotating shaft.

进一步的方案是:上述的支撑绳为高强度纤维材质的直径10mm的绳。 A further solution is: the above-mentioned support rope is a rope with a diameter of 10mm made of high-strength fiber material.

进一步的方案还有:上述的红外测距报警器为HB-T001Q3型号的红外测距报警器。 Further scheme also has: above-mentioned infrared range-finding alarm is the infrared range-finding alarm of HB-T001Q3 model.

本实用新型具有积极的效果:(1)本实用新型的10kV旁路电缆架空铺设过街装置,结构简单,成本较低,易于推广。(2)本实用新型的10kV旁路电缆架空铺设过街装置,主要组件易于分拆和现场组装,便于携带,适于供电部门户外抢修作业之用,适用性强。(3)本实用新型的10kV旁路电缆架空铺设过街装置,使用方便,可有效缩短过街旁路电缆的架设时间,提高抢修效率。(4)本实用新型的10kV旁路电缆架空铺设过街装置,通过设置2个红外测距报警器,可有效防止作业过程中因街道通行的超高车辆在行驶过程中不注意时将支设完毕正在施工过程中的过街旁路电缆挂断或拉开引起的危险事故,提高供电部门旁路作业安全。 The utility model has positive effects: (1) The 10kV bypass cable overhead laying street crossing device of the utility model has simple structure, low cost and is easy to popularize. (2) The 10kV bypass cable overhead laying device for crossing the street of the utility model has main components that are easy to disassemble and assemble on site, and is easy to carry. It is suitable for outdoor repair work by the power supply department and has strong applicability. (3) The 10kV bypass cable overhead laying crossing device of the utility model is easy to use, can effectively shorten the erection time of the bypass cable across the street, and improve the repair efficiency. (4) The 10kV bypass cable overhead laying street crossing device of the present utility model can effectively prevent the superhigh vehicles passing through the street from completing the support during the operation process by setting two infrared ranging alarms. Dangerous accidents caused by hanging or pulling the bypass cable across the street during construction, improving the safety of bypass operations in the power supply department.

附图说明 Description of drawings

图1为本实用新型的结构示意图,图中还示意性地显示了其使用时与旁路电缆的配合关系; Fig. 1 is a structural schematic diagram of the present utility model, and also schematically shows its cooperation relationship with the bypass cable when in use;

图2为图1中的支承组件的结构示意图; Fig. 2 is a schematic structural view of the support assembly in Fig. 1;

图3为图1中的杆上导入支架的结构示意图,图中还显示了其与支撑绳的配合关系; Fig. 3 is a schematic structural view of the lead-in bracket on the rod in Fig. 1, and the matching relationship with the support rope is also shown in the figure;

图4为图1中的移动滑车的结构示意图; Fig. 4 is the structural representation of the mobile block in Fig. 1;

图5为图4的左视图; Fig. 5 is the left view of Fig. 4;

图6为图1中的移动滑车的立体结构示意图。 Fig. 6 is a schematic perspective view of the three-dimensional structure of the mobile tackle in Fig. 1 .

上述附图中的附图标记如下: The reference signs in the above-mentioned accompanying drawings are as follows:

第一支承组件1,底座11,固定架11-1,调节手轮11-2,升降杆12,驱动器13, The first support assembly 1, the base 11, the fixed frame 11-1, the adjustment hand wheel 11-2, the lifting rod 12, the driver 13,

第二支承组件2, second support assembly 2,

杆上导入支架3,连接盘31,连接臂32,挂臂33,挂环34, Import bracket 3 on the rod, connecting plate 31, connecting arm 32, hanging arm 33, hanging ring 34,

支撑绳4, support rope 4,

移动滑车5,滚轮组件51,滚轮51-1,滚轮转轴51-2,滚轮固定板51-3;旋转支撑拨叉52;旋转轴53;牵引组件54,支架54-1,牵引板54-2;电缆悬挂组件55,固定曲吊臂55-1,旋转曲吊臂55-2,吊臂转轴55-3,电缆放置辊55-4,电缆护板55-5;弹簧自锁机构56,拉柄56-1,弹簧56-2; Mobile block 5, roller assembly 51, roller 51-1, roller shaft 51-2, roller fixed plate 51-3; rotating support shift fork 52; rotating shaft 53; traction assembly 54, bracket 54-1, traction plate 54-2 ; Cable suspension assembly 55, fixed curved boom 55-1, rotating curved boom 55-2, boom rotating shaft 55-3, cable placement roller 55-4, cable guard plate 55-5; spring self-locking mechanism 56, pull handle 56-1, spring 56-2;

移动滑车连接牵引绳6; Mobile tackle connects traction rope 6;

红外测距报警器7; Infrared ranging alarm 7;

旁路电缆8。 Bypass cable 8.

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本实用新型作进一步详细的说明。 Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail.

(实施例1) (Example 1)

见图1,本实施例的10kV旁路电缆架空铺设过街装置,主要由第一支承组件1、第二支承组件2、杆上导入支架3、支撑绳4、移动滑车5、移动滑车连接牵引绳6和红外测距报警器7组成。 See Fig. 1, the 10kV bypass cable overhead laying street crossing device of this embodiment is mainly composed of the first supporting assembly 1, the second supporting assembly 2, the guide bracket 3 on the pole, the supporting rope 4, the moving block 5, and the moving block connecting the traction rope 6 and infrared ranging alarm 7 to form.

参见图2,第一支承组件1主要由底座11、升降杆12和驱动器13组成。 Referring to FIG. 2 , the first support assembly 1 is mainly composed of a base 11 , a lifting rod 12 and a driver 13 .

底座11主要由固定架11-1和调节手轮11-2组成。固定架11-1由2根支撑梁和1根安装梁组成,2根支撑梁平行设置;安装梁由其两端与2根支撑梁的中部固定连接;安装梁的中部上端设有安装法兰;调节手轮11-2设有4个,该4个调节手轮11-2在固定架11-1的2根支撑梁的端部分别各设置1个,使用时,通过4个调节手轮11-2使得底座11在街道地面上可方便地实现调平。 The base 11 is mainly composed of a fixed frame 11-1 and an adjustment hand wheel 11-2. The fixed frame 11-1 is composed of 2 support beams and 1 installation beam, and the 2 support beams are arranged in parallel; the two ends of the installation beam are fixedly connected with the middle parts of the 2 support beams; the upper middle part of the installation beam is provided with a mounting flange ; There are 4 adjustment handwheels 11-2, and the 4 adjustment handwheels 11-2 are respectively provided with 1 at the ends of the 2 support beams of the fixed frame 11-1. When in use, the 4 adjustment handwheels 11-2 enables the base 11 to be easily leveled on the street surface.

升降杆12由其下端通过固定架11-1的安装梁中部上端的安装法兰固定安装在安装梁上;驱动器13固定安装在固定架11-1的安装梁上;驱动器13与升降杆12传动连接;升降杆12在驱动器13的驱动下,可自动向上伸出或向下收缩。驱动器13采用电动液压驱动机构,也可采用电动气压驱动机构。 The lifting rod 12 is fixedly installed on the mounting beam by its lower end through the mounting flange at the upper end of the mounting beam middle part of the fixing frame 11-1; the driver 13 is fixedly installed on the mounting beam of the fixing frame 11-1; the driver 13 and the lifting rod 12 drive Connection; the elevating rod 12 is driven by the driver 13 and can automatically extend upwards or shrink downwards. Driver 13 adopts electro-hydraulic drive mechanism, also can adopt electro-pneumatic drive mechanism.

第二支承组件2的结构与第一支承组件1相同,使用时,第二支承组件2和第一支承组件1分设在街道两边。 The structure of the second support assembly 2 is the same as that of the first support assembly 1, and when in use, the second support assembly 2 and the first support assembly 1 are separately arranged on both sides of the street.

参见图3,杆上导入支架3主要由连接盘31、连接臂32、挂臂33和挂环34组成。连接臂32的后端与连接盘31的上端固定连接;连接臂32的前端通过连接螺栓与挂臂33的上端中部固定连接;挂臂33为开口向下的槽体件;挂环34为半圆环件,挂环34固定设置在挂臂33的槽体内;挂环34设有3至6个,各挂环34在挂臂33的槽体内左右向均匀设置。杆上导入支架3通过连接盘31固定安装在升降杆12的上端,且连接臂32向前伸出。杆上导入支架3用于支承和悬挂支撑绳4。 Referring to FIG. 3 , the lead-in bracket 3 on the rod is mainly composed of a connecting plate 31 , a connecting arm 32 , a hanging arm 33 and a hanging ring 34 . The rear end of connecting arm 32 is fixedly connected with the upper end of connecting plate 31; the front end of connecting arm 32 is fixedly connected with the upper middle part of hanging arm 33 by connecting bolt; Circular member, hanging ring 34 is fixedly arranged in the groove body of hanging arm 33; The guide bracket 3 on the rod is fixedly installed on the upper end of the elevating rod 12 through the connecting plate 31, and the connecting arm 32 protrudes forward. The guide bracket 3 is used to support and hang the support rope 4 on the rod.

杆上导入支架3设有相同的2个,该2个杆上导入支架3在第一支承组件1和第二支承组件2上分别各设置1个。 The same two on-rod guide brackets 3 are provided, and one of each of the two on-rod guide brackets 3 is provided on the first support assembly 1 and the second support assembly 2 .

支撑绳4的材质为高强度纤维,具有较好的抗拉强度且耐用、耐磨、简易轻便。本实施例中,支撑绳4的直径优选10mm。支撑绳4使用时穿过2个杆上导入支架3的挂环34,用于支撑移动滑车5和放置在移动滑车5上的旁路电缆8一起在支撑绳4上移动。 The support rope 4 is made of high-strength fiber, which has good tensile strength and is durable, wear-resistant, simple and lightweight. In this embodiment, the diameter of the support rope 4 is preferably 10mm. The support rope 4 passes the link 34 of the import support 3 on the 2 bars during use, and is used to support the mobile tackle 5 and the bypass cable 8 placed on the mobile tackle 5 to move on the support rope 4 together.

参见图4至图6,移动滑车5主要由滚轮组件51、旋转支撑拨叉52、旋转轴53、牵引组件54、电缆悬挂组件55和弹簧自锁机构56组成。 4 to 6, the mobile block 5 is mainly composed of a roller assembly 51, a rotating support fork 52, a rotating shaft 53, a traction assembly 54, a cable suspension assembly 55 and a spring self-locking mechanism 56.

滚轮组件51主要由滚轮51-1、滚轮转轴51-2和滚轮固定板51-3组成;滚轮51-1安装在滚轮转轴51-2上并可依托滚轮转轴51-2转动;滚轮51-1和滚轮转轴51-2分别各设有2个;滚轮固定板51-3分前后位置平行设置2块,该2块滚轮固定板51-3由分设在左右两侧的各1个滚轮转轴51-2相连接,从而使得2个滚轮51-1位于2块滚轮固定板51-3之间且分设在左右两侧;滚轮固定板51-3的外侧设有弧形凸起。 The roller assembly 51 is mainly composed of a roller 51-1, a roller rotating shaft 51-2 and a roller fixing plate 51-3; the roller 51-1 is installed on the roller rotating shaft 51-2 and can rotate by relying on the roller rotating shaft 51-2; the roller 51-1 and the roller rotating shaft 51-2 are respectively provided with 2; the roller fixing plate 51-3 is divided into two parallel positions, and the 2 roller fixing plates 51-3 are respectively provided with 1 roller rotating shaft 51-3 on the left and right sides. 2 are connected, so that the two rollers 51-1 are located between the two roller fixing plates 51-3 and are respectively arranged on the left and right sides; the outer side of the roller fixing plates 51-3 is provided with arc-shaped protrusions.

旋转支撑拨叉52为一体件,旋转支撑拨叉52由轴心部和拨叉爪组成;轴心部为圆柱体件,其中心设有轴孔;拨叉爪设有8个或8个以上,各拨叉爪由其内端部与轴心部一体连接;各拨叉爪的外端部上设置有与滚轮固定板51-3的弧形凸起相配合的弧形卡槽;各拨叉爪在轴心部上周向均匀设置。 The rotary support shift fork 52 is one piece, and the rotary support shift fork 52 is composed of a shaft center and a shift fork claw; the shaft center is a cylindrical part with a shaft hole in the center; the shift fork claw is provided with 8 or more , each fork claw is connected integrally with the shaft center by its inner end; each fork claw is provided with an arc-shaped slot matching the arc-shaped protrusion of the roller fixing plate 51-3 on the outer end of each fork claw; each dial The fork claws are evenly arranged in the circumferential direction of the shaft center.

旋转支撑拨叉52设有相同的2个,该2个旋转支撑拨叉52分前后镜像设置,且位于前后2块滚轮固定板51-3的外侧;该2个旋转支撑拨叉52与旋转轴53固定连接,并可依托旋转轴53转动; The rotating support shifting fork 52 is provided with identical 2, and these 2 rotating supporting shifting forks 52 points front and back mirror image settings, and are positioned at the outer side of 2 front and rear roller fixing plates 51-3; 53 is fixedly connected, and can rotate by relying on the rotating shaft 53;

牵引组件54主要由支架54-1和牵引板54-2组成;支架54-1整体呈U型,支架54-1由2块竖板和一块横板一体组成;支架54-1由其2块竖板的上部固定在旋转轴53的两端上;牵引板54-2为水平设置的板体件,牵引板54-2的左右两侧分别各设有1个牵引连接孔;牵引板54-2固定安装在支架54-1的底板上且位于支架54-1的底板下方;牵引板54-2与支架54-1的底板垂直相接。 The traction assembly 54 is mainly composed of a bracket 54-1 and a traction plate 54-2; the bracket 54-1 is U-shaped as a whole, and the bracket 54-1 is composed of two vertical plates and a horizontal plate; the bracket 54-1 is composed of two The upper part of the vertical plate is fixed on the two ends of the rotating shaft 53; the traction plate 54-2 is a plate body part arranged horizontally, and the left and right sides of the traction plate 54-2 are respectively provided with a traction connecting hole; the traction plate 54- 2. Fixedly installed on the bottom plate of the bracket 54-1 and located below the bottom plate of the bracket 54-1; the traction plate 54-2 is vertically connected with the bottom plate of the bracket 54-1.

电缆悬挂组件55主要由固定曲吊臂55-1、旋转曲吊臂55-2、吊臂转轴55-3、电缆放置辊55-4和电缆护板55-5组成。固定曲吊臂55-1的上端与旋转轴53的后端固定连接;固定曲吊臂55-1的下端与吊臂转轴55-3的后端固定连接;旋转曲吊臂55-2的上端设有U形咬合口,旋转曲吊臂55-2的U形咬合口与旋转轴53的前端咬合;旋转曲吊臂55-2的下端与吊臂转轴55-3的前端可转动地相连接;电缆放置辊55-4套接在吊臂转轴55-3上且可依托吊臂转轴55-3转动;电缆护板55-5设有相同的2块,该2块电缆护板55-5分别固定设置在吊臂转轴55-3的前后两端且位于旋转曲吊臂55-2和吊臂转轴55-3的内侧。 The cable suspension assembly 55 mainly consists of a fixed curved boom 55-1, a rotary curved boom 55-2, a boom rotating shaft 55-3, a cable placement roller 55-4 and a cable guard 55-5. The upper end of the fixed curved boom 55-1 is fixedly connected with the rear end of the rotating shaft 53; the lower end of the fixed curved boom 55-1 is fixedly connected with the rear end of the boom rotating shaft 55-3; the upper end of the rotary curved boom 55-2 A U-shaped occlusal opening is provided, and the U-shaped occlusal opening of the revolving curved boom 55-2 engages with the front end of the rotating shaft 53; the lower end of the revolving curved boom 55-2 is rotatably connected with the front end of the boom rotating shaft 55-3 ; The cable placement roller 55-4 is socketed on the boom shaft 55-3 and can rotate by relying on the boom shaft 55-3; the cable guard 55-5 is provided with the same two pieces, and the two cable guards 55-5 They are respectively fixedly arranged at the front and rear ends of the boom rotating shaft 55-3 and are located at the inner side of the swivel curved boom 55-2 and the boom rotating shaft 55-3.

弹簧自锁机构56由拉柄56-1和弹簧56-2组成;拉柄56-1为中空的圆柱体件,拉柄56-1可活动地安装在旋转轴53的前端,弹簧56-2套接在旋转轴53的前端部位上且设置在拉柄56-1内;当旋转曲吊臂55-2的U形咬合口与旋转轴53的前端咬合时,拉柄56-1依靠弹簧56-2的弹力锁住旋转曲吊臂55-2的上端;当需要将旁路电缆8装上移动滑车5上时,工作人员将拉柄56-1往后拉动,再将旋转曲吊臂55-2的U形咬合口与旋转轴53分开,将旋转曲吊臂55-2往下转动,即可方便地将旁路电缆8放在电缆放置辊55-4上,再以相反的动作使得旋转曲吊臂55-2的上端固定在旋转轴53上。 Spring self-locking mechanism 56 is made up of pull handle 56-1 and spring 56-2; Pull handle 56-1 is a hollow cylinder part, and pull handle 56-1 is movably installed on the front end of rotating shaft 53, and spring 56-2 Socketed on the front end of the rotating shaft 53 and set in the pull handle 56-1; when the U-shaped occlusal mouth of the rotating curved boom 55-2 engages with the front end of the rotating shaft 53, the pull handle 56-1 relies on the spring 56 The elastic force of -2 locks the upper end of the swivel boom 55-2; The U-shaped occlusal opening of -2 is separated from the rotating shaft 53, and the rotating curved boom 55-2 is rotated downward, so that the bypass cable 8 can be placed on the cable placement roller 55-4 conveniently, and then the opposite action is used to make the The upper end of the swivel boom 55 - 2 is fixed on the rotating shaft 53 .

仍见图1,移动滑车5的数量根据需要设置;本实施例中,移动滑车5在支撑绳4上每间隔2米设置1个。各移动滑车5相互之间利用其牵引组件54 的牵引板54-2的左右两侧的牵引连接孔通过移动滑车连接牵引绳6相互连接;且移动滑车连接牵引绳6的左端和右端均可由地面操作人员操控。 Still see Fig. 1, the quantity of moving block 5 is set according to need; In the present embodiment, moving block 5 is provided with 1 every 2 meters on support rope 4. Each mobile tackle 5 utilizes the traction connection holes on the left and right sides of the traction plate 54-2 of its traction assembly 54 to be connected to each other by the mobile tackle to connect the traction rope 6; Operator control.

移动滑车5用于支承旁路电缆8过街及施工时悬挑旁路电缆8。 The mobile tackle 5 is used to support the bypass cable 8 to cross the street and suspend the bypass cable 8 during construction.

红外测距报警器7设有2个,该2个红外测距报警器7在第一支承组件1的升降杆12的顶端和第二支承组件2的升降杆的顶端分别各固定安装1个,安装方向相反;使用时,红外测距报警器7用于监测过街的超高车辆,防止超高车辆在行驶过程中不注意时将支设完毕正在施工过程中的过街旁路电缆8挂断或拉开而发生危险;该2个红外测距报警器7中的一个用于监测前方来车,另一个用于监测后方来车;当红外测距报警器7监测到超高车辆的高度达到其自身所处的高度且处于设定的预警距离时,红外测距报警器7即行报警,提醒工作人员作相应处理。本实施例中,红外测距报警器7优选采用HB-T001Q3型号的红外测距报警器。 Infrared ranging alarm 7 is provided with 2, and these 2 infrared ranging alarms 7 are respectively fixedly installed on the top of the elevating rod 12 of the first supporting assembly 1 and the top of the elevating rod of the second supporting assembly 2, The installation direction is opposite; during use, the infrared distance measuring alarm 7 is used to monitor the super-high vehicle crossing the street, preventing the super-high vehicle from hanging up the street-crossing bypass cable 8 under construction when the super-high vehicle is not paying attention in the driving process. Pull away to cause danger; One of the 2 infrared range-finding alarms 7 is used to monitor the vehicle ahead, and the other is used to monitor the rear vehicle; when the infrared range-finding alarm 7 detects that the height of the super-high vehicle reaches its When the height of oneself is in and the warning distance is set, the infrared ranging alarm 7 will give an alarm immediately, reminding the staff to do corresponding processing. In this embodiment, the infrared distance measuring alarm 7 preferably adopts the infrared distance measuring alarm of the HB-T001Q3 model.

本实施例的旁路电缆架空敷设过街装置,其作业中的使用过程简述如下: The bypass cable overhead laying street crossing device of this embodiment, the use process in its operation is briefly described as follows:

作业人员首先将第一支承组件1和第二支承组件2分设在需要进行跨街作业的街道两旁并调平定位;将2个杆上导入支架3和2个红外测距报警器7分别固定安装在第一支承组件1的升降杆12的上端和第二支承组件2的升降杆的上端;将支撑绳4的右端和移动滑车连接牵引绳6的右端分别穿过2个杆上导入支架3的挂环34后向右继续伸出;启动第一支承组件1的驱动器13和第二支承组件2的驱动器,驱动升降杆上升到预定高度;在支撑绳4上放置移动滑车5;将需要过街的旁路电缆8置于各移动滑车5的电缆放置辊55-4上;再将支撑绳4的两端与地面固定可靠连接;然后,操作人员通过人力或机械向右拉动移动滑车连接牵引绳6,带动各移动滑车5在支撑绳4上从左向右滚动,当移动滑车5运行至杆上导入支架3处时,由于移动滑车5的旋转支撑拨叉52结构上是绕旋转轴53进行旋转,当移动滑车5向前移动同时,其旋转支撑拨叉52与杆上导入支架3的挂环34接触时,旋转支撑拨叉52顺时针方向转动,从而避开杆上导入支架3上的挂环34继续向右运动,从而由移动滑车5运载旁路电缆8悬空过街,最后即可进行旁路作用;作业过程中2个红外测距报警器7分别监测前方和后方超高车辆。作业完毕后以相反的顺序回收本装置。 The operator first separates the first support assembly 1 and the second support assembly 2 on both sides of the street where the cross-street operation is required, and levels and positions them; the two poles are introduced into the bracket 3 and the two infrared distance measuring alarms 7 are fixed and installed respectively. On the upper end of the elevating rod 12 of the first support assembly 1 and the upper end of the elevating rod of the second support assembly 2; the right end of the support rope 4 and the right end of the mobile pulley connected to the traction rope 6 are passed through the two bars and introduced into the support 3 respectively. Continue to stretch out to the right behind the hanging ring 34; Start the driver 13 of the first support assembly 1 and the driver of the second support assembly 2, drive the lifting rod to rise to a predetermined height; Place the mobile tackle 5 on the support rope 4; Will need to cross the street The bypass cable 8 is placed on the cable placement roller 55-4 of each mobile block 5; then the two ends of the support rope 4 are fixed and reliably connected to the ground; then, the operator pulls the mobile block to the right by manpower or machinery to connect the traction rope 6 , to drive each moving block 5 to roll from left to right on the support rope 4, when the moving block 5 moves to the bar and guides the bracket 3, because the rotating support shift fork 52 of the moving block 5 is structurally rotated around the rotating shaft 53 , when the moving trolley 5 moves forward, when its rotary support fork 52 is in contact with the hanging ring 34 of the guide bracket 3 on the rod, the rotary support switch 52 rotates clockwise, thereby avoiding the guide ring 34 of the guide bracket 3 on the bar. The ring 34 continues to move to the right, so that the bypass cable 8 carried by the mobile tackle 5 is suspended to cross the street, and finally the bypass function can be performed; during the operation, two infrared distance measuring alarms 7 monitor the front and rear super-high vehicles respectively. Recycle the unit in reverse order after work is complete.

以上实施例是对本实用新型的具体实施方式的说明,而非对本实用新型的限制,有关技术领域的技术人员在不脱离本实用新型的精神和范围的情况下,还可以做出各种变换和变化而得到相对应的等同的技术方案,因此所有等同的技术方案均应该归入本实用新型的专利保护范围。 The above embodiments are descriptions of specific implementations of the present utility model, rather than limitations of the present utility model. Those skilled in the art can also make various transformations and changes without departing from the spirit and scope of the present utility model. Changes to obtain corresponding equivalent technical solutions, so all equivalent technical solutions should be included in the patent protection scope of the present utility model.

Claims (6)

1.种10kV旁路电缆架空铺设过街装置,其特征在于:包括第一支承组件(1)、第二支承组件(2)、杆上导入支架(3)、支撑绳(4)、移动滑车(5)、移动滑车连接牵引绳(6)和红外测距报警器(7); 1. A 10kV bypass cable overhead laying street crossing device, characterized in that it includes the first support assembly (1), the second support assembly (2), the lead-in bracket (3) on the pole, the support rope (4), and the moving block (5), the mobile block is connected to the traction rope (6) and the infrared distance measuring alarm (7); 所述的第一支承组件(1)包括底座(11)、升降杆(12)和驱动器(13);升降杆(12)和驱动器(13)设置在底座(11)上;驱动器(13)与升降杆(12)传动连接; The first supporting assembly (1) includes a base (11), a lifting rod (12) and a driver (13); the lifting rod (12) and the driver (13) are arranged on the base (11); the driver (13) and Lifting rod (12) transmission connection; 第二支承组件(2)的结构与第一支承组件(1)相同;使用时,第二支承组件(2)和第一支承组件(1)分设在街道两边; The structure of the second support assembly (2) is the same as that of the first support assembly (1); when in use, the second support assembly (2) and the first support assembly (1) are separately arranged on both sides of the street; 杆上导入支架(3)设有相同的2个,该2个杆上导入支架(3)在第一支承组件(1)的升降杆(12)的上端和第二支承组件(2)的升降杆的上端分别各设置1个; There are two same guide brackets (3) on the rod, and the two guide brackets (3) are on the upper end of the lifting rod (12) of the first support assembly (1) and the lifting of the second support assembly (2). Each of the upper ends of the rods is respectively provided with one; 支撑绳(4)使用时穿过2个杆上导入支架(3)并由2个杆上导入支架(3)支撑;支撑绳(4)的两端与地面固定可靠连接; When the support rope (4) is in use, it passes through the guide brackets (3) on the two poles and is supported by the guide brackets (3) on the two poles; the two ends of the support rope (4) are fixed and reliable connected to the ground; 移动滑车(5)在支撑绳(4)上间隔均匀设置;各移动滑车(5)通过移动滑车连接牵引绳(6)相互连接并可在移动滑车连接牵引绳(6)的牵引下在支撑绳(4)上左右移动;使用时,各移动滑车(5)用于支承需要过街的旁路电缆过街; The mobile blocks (5) are evenly spaced on the support rope (4); each mobile block (5) is connected to each other through the mobile block to connect the traction rope (6) and can be pulled by the support rope under the traction of the mobile block to connect the traction rope (6). (4) Move up and down; when in use, each moving block (5) is used to support the bypass cables that need to cross the street; 红外测距报警器(7)设有2个;该2个红外测距报警器(7)在第一支承组件(1)的升降杆(12)的顶端和第二支承组件(2)的升降杆的顶端分别各固定安装1个,且该2个红外测距报警器(7)的安装方向相反。 There are 2 infrared ranging alarms (7); the 2 infrared ranging alarms (7) are on the top of the lifting rod (12) of the first support assembly (1) and the lifting of the second support assembly (2) One is respectively fixedly installed on the top of the bar, and the installation directions of the two infrared distance measuring alarms (7) are opposite. 2.根据权利要求1所述的10kV旁路电缆架空铺设过街装置,其特征在于:所述的第一支承组件(1)的底座(11)包括固定架(11-1)和调节手轮(11-2);固定架(11-1)由2根支撑梁和1根安装梁组成;2根支撑梁平行设置;安装梁由其两端与2根支撑梁的中部固定连接;安装梁的中部上端设有安装法兰;调节手轮(11-2)设有4个,该4个调节手轮(11-2)在固定架(11-1)的2根支撑梁的端部分别各设置1个;所述的升降杆(12)由其下端通过固定架(11-1)的安装梁中部上端的安装法兰固定安装在安装梁上;驱动器(13)固定安装在固定架(11-1)的安装梁上;升降杆(12)在驱动器(13)的驱动下可自动向上伸出或向下收缩;驱动器(13)为电动液压驱动机构或电动气压驱动机构。 2. The 10kV bypass cable overhead laying street crossing device according to claim 1, characterized in that: the base (11) of the first support assembly (1) includes a fixing frame (11-1) and an adjustment hand wheel ( 11-2); the fixed frame (11-1) is composed of 2 support beams and 1 installation beam; the 2 support beams are arranged in parallel; the installation beam is fixedly connected with the middle part of the 2 support beams by its two ends; the installation beam The upper end of the middle part is provided with a mounting flange; there are 4 adjustment handwheels (11-2), and the 4 adjustment handwheels (11-2) are respectively located at the ends of the 2 support beams of the fixed frame (11-1). Set 1; the lower end of the lifting rod (12) is fixed on the installation beam through the installation flange at the upper end of the middle part of the installation beam of the fixed frame (11-1); the driver (13) is fixedly installed on the fixed frame (11-1) -1) on the mounting beam; the elevating rod (12) can automatically extend upward or shrink downward under the drive of the driver (13); the driver (13) is an electro-hydraulic drive mechanism or an electro-pneumatic drive mechanism. 3.根据权利要求1所述的10kV旁路电缆架空铺设过街装置,其特征在于:所述的杆上导入支架(3)包括连接盘(31)、连接臂(32)、挂臂(33)和挂环(34);连接臂(32)的后端与连接盘(31)的上端固定连接;连接臂(32)的前端与挂臂(33)的上端中部固定连接;挂臂(33)为开口向下的槽体件;挂环(34)为半圆环件,挂环(34)固定设置在挂臂(33)的槽体内;挂环(34)设有3至6个,各挂环(34)在挂臂(33)的槽体内左右向均匀设置;杆上导入支架(3)通过连接盘(31)与升降杆(12)的上端固定连接且连接臂(32)向前伸出。 3. The 10kV bypass cable aerial laying device for crossing the street according to claim 1, characterized in that: the guide bracket (3) on the pole includes a connecting plate (31), a connecting arm (32), and a hanging arm (33) and the hanging ring (34); the rear end of the connecting arm (32) is fixedly connected with the upper end of the connecting plate (31); the front end of the connecting arm (32) is fixedly connected with the middle part of the upper end of the connecting arm (33); the connecting arm (33) It is a groove body part with the opening downward; the hanging ring (34) is a semicircular ring, and the hanging ring (34) is fixedly arranged in the groove body of the hanging arm (33); the hanging ring (34) is provided with 3 to 6 pieces, each The hanging ring (34) is evenly arranged left and right in the groove of the hanging arm (33); stick out. 4.根据权利要求1所述的10kV旁路电缆架空铺设过街装置,其特征在于:所述的移动滑车(5)包括滚轮组件(51)、旋转支撑拨叉(52)、旋转轴(53)、牵引组件(54)、电缆悬挂组件(55)和弹簧自锁机构(56); 4. The 10kV bypass cable overhead laying street crossing device according to claim 1, characterized in that: the moving block (5) includes a roller assembly (51), a rotating support fork (52), a rotating shaft (53) , traction assembly (54), cable suspension assembly (55) and spring self-locking mechanism (56); 滚轮组件(51)包括滚轮(51-1)、滚轮转轴(51-2)和滚轮固定板(51-3);滚轮(51-1)和滚轮转轴(51-2)分别各设有2个;滚轮固定板(51-3)分前后位置平行设置2块,该2块滚轮固定板(51-3)由分设在左右两侧的各1个滚轮转轴(51-2)相连接;滚轮(51-1)安装在滚轮转轴(51-2)上并可依托滚轮转轴(51-2)转动;滚轮固定板(51-3)的外侧设有弧形凸起; The roller assembly (51) includes a roller (51-1), a roller shaft (51-2) and a roller fixing plate (51-3); the roller (51-1) and the roller shaft (51-2) are respectively provided with two ; Roller fixed plates (51-3) are divided into 2 pieces in parallel at the front and rear positions, and the 2 roller fixed plates (51-3) are connected by 1 roller shaft (51-2) respectively located on the left and right sides; the rollers ( 51-1) It is installed on the roller shaft (51-2) and can rotate by relying on the roller shaft (51-2); the outer side of the roller fixing plate (51-3) is provided with an arc-shaped protrusion; 旋转支撑拨叉(52)为一体件,旋转支撑拨叉(52)由轴心部和拨叉爪组成;轴心部为圆柱体件,其中心设有轴孔;拨叉爪设有8个以上,各拨叉爪由其内端部与轴心部一体连接;各拨叉爪的外端部上设置有与滚轮固定板(51-3)的弧形凸起相配合的弧形卡槽;各拨叉爪在轴心部上周向均匀设置;旋转支撑拨叉(52)设有相同的2个,该2个旋转支撑拨叉(52)分前后镜像设置,且位于前后2块滚轮固定板(51-3)的外侧;该2个旋转支撑拨叉(52)与旋转轴(53)固定连接,并可依托旋转轴(53)转动; The rotary support shift fork (52) is one piece, and the rotary support shift fork (52) is composed of a shaft center and a shift fork claw; the shaft center is a cylindrical part with a shaft hole in the center; Above, each fork claw is integrally connected with the shaft center by its inner end; the outer end of each fork claw is provided with an arc-shaped slot matching the arc-shaped protrusion of the roller fixing plate (51-3) ;The fork claws are evenly arranged in the circumferential direction of the shaft center; the same two rotary support forks (52) are provided, and the two rotary support forks (52) are set in front and rear mirror images, and are located on two front and rear rollers The outer side of the fixed plate (51-3); the two rotating support forks (52) are fixedly connected to the rotating shaft (53), and can rotate by relying on the rotating shaft (53); 牵引组件(54)包括支架(54-1)和牵引板(54-2);支架(54-1)为由2块竖板和一块横板构成的整体呈U型的一体件;支架(54-1)由其2块竖板的上部与旋转轴(53)的两端固定连接;牵引板(54-2)为水平设置的板体件,牵引板(54-2)的左右两侧分别各设有1个牵引连接孔;牵引板(54-2)固定安装在支架(54-1)的底板上且位于支架(54-1)的底板下方;牵引板(54-2)与支架(54-1)的底板垂直相接; The traction assembly (54) includes a bracket (54-1) and a traction plate (54-2); the bracket (54-1) is a U-shaped integral piece composed of 2 vertical plates and a horizontal plate; the bracket (54 -1) The upper parts of the two vertical plates are fixedly connected to the two ends of the rotating shaft (53); Each is provided with a traction connection hole; the traction plate (54-2) is fixedly installed on the bottom plate of the bracket (54-1) and is located below the bottom plate of the bracket (54-1); the traction plate (54-2) and the bracket ( 54-1) the bottom plates are vertically connected; 电缆悬挂组件(55)包括固定曲吊臂(55-1)、旋转曲吊臂(55-2)、吊臂转轴(55-3)、电缆放置辊(55-4)和电缆护板(55-5);固定曲吊臂(55-1)的上端与旋转轴(53)的后端固定连接;固定曲吊臂(55-1)的下端与吊臂转轴(55-3)的后端固定连接;旋转曲吊臂(55-2)的上端与旋转轴(53)的前端咬合;旋转曲吊臂(55-2)的下端与吊臂转轴(55-3)的前端可转动地相连接;电缆放置辊(55-4)套接在吊臂转轴(55-3)上且可依托吊臂转轴(55-3)转动;电缆护板(55-5)设有相同的2块,该2块电缆护板(55-5)分别固定设置在吊臂转轴(55-3)的前后两端且位于旋转曲吊臂(55-2)和吊臂转轴(55-3)的内侧; The cable suspension assembly (55) includes a fixed curved boom (55-1), a rotating curved boom (55-2), a boom shaft (55-3), a cable placement roller (55-4) and a cable guard (55 -5); the upper end of the fixed curved boom (55-1) is fixedly connected to the rear end of the rotating shaft (53); the lower end of the fixed curved boom (55-1) is connected to the rear end of the boom rotating shaft (55-3) Fixedly connected; the upper end of the swivel curved boom (55-2) is engaged with the front end of the rotary shaft (53); the lower end of the swivel curved boom (55-2) is rotatably connected to the front end of the boom shaft (55-3) connection; the cable placement roller (55-4) is sleeved on the boom shaft (55-3) and can rotate depending on the boom shaft (55-3); the cable guard (55-5) is provided with the same two pieces, The two cable guards (55-5) are respectively fixedly arranged at the front and rear ends of the boom shaft (55-3) and are located on the inside of the swivel boom (55-2) and the boom shaft (55-3); 弹簧自锁机构(56)包括拉柄(56-1)和弹簧(56-2);拉柄(56-1)可活动地安装在旋转轴(53)的前端,弹簧(56-2)套接在旋转轴(53)的前端部位上且设置在拉柄(56-1)内;拉柄(56-1)依靠弹簧(56-2)的弹力将旋转曲吊臂(55-2)的上端与旋转轴(53)的前端咬合处锁紧。 Spring self-locking mechanism (56) comprises pull handle (56-1) and spring (56-2); Pull handle (56-1) is movably installed in the front end of rotating shaft (53), and spring (56-2) sets Connected to the front end of the rotating shaft (53) and set in the handle (56-1); the handle (56-1) will rotate the crank arm (55-2) by the elastic force of the spring (56-2). The upper end and the front end of the rotating shaft (53) are locked. 5.根据权利要求1所述的10kV旁路电缆架空铺设过街装置,其特征在于:所述的支撑绳(4)为高强度纤维材质的直径10mm的绳。 5. The 10kV bypass cable overhead laying street crossing device according to claim 1, characterized in that: the support rope (4) is a rope made of high-strength fiber material with a diameter of 10mm. 6.根据权利要求1所述的10kV旁路电缆架空铺设过街装置,其特征在于:所述的红外测距报警器(7)为HB-T001Q3型号的红外测距报警器。 6. The 10kV bypass cable overhead laying street crossing device according to claim 1, characterized in that: the infrared distance measuring alarm (7) is an infrared distance measuring alarm of HB-T001Q3 type.
CN201520339401.XU 2015-05-22 2015-05-22 A kind of 10kV bypass cable is built on stilts laid street device Expired - Fee Related CN204696556U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201520339401.XU CN204696556U (en) 2015-05-22 2015-05-22 A kind of 10kV bypass cable is built on stilts laid street device
CN201520657030.XU CN205159900U (en) 2015-05-22 2015-05-22 A portable 10kV bypass cable overhead laying device for crossing the street

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520339401.XU CN204696556U (en) 2015-05-22 2015-05-22 A kind of 10kV bypass cable is built on stilts laid street device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201520657030.XU Division CN205159900U (en) 2015-05-22 2015-05-22 A portable 10kV bypass cable overhead laying device for crossing the street

Publications (1)

Publication Number Publication Date
CN204696556U true CN204696556U (en) 2015-10-07

Family

ID=54236809

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201520339401.XU Expired - Fee Related CN204696556U (en) 2015-05-22 2015-05-22 A kind of 10kV bypass cable is built on stilts laid street device
CN201520657030.XU Expired - Fee Related CN205159900U (en) 2015-05-22 2015-05-22 A portable 10kV bypass cable overhead laying device for crossing the street

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201520657030.XU Expired - Fee Related CN205159900U (en) 2015-05-22 2015-05-22 A portable 10kV bypass cable overhead laying device for crossing the street

Country Status (1)

Country Link
CN (2) CN204696556U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868398A (en) * 2015-05-22 2015-08-26 江苏省电力公司常州供电公司 10KV bypass cable overhead laying street crossing apparatus

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107437782B (en) * 2016-12-31 2018-11-23 泰兴市赛尔新能源科技有限公司 A kind of adjustable electric power wire passing device of freedom
CN107017583B (en) * 2017-05-31 2019-03-01 广州供电局有限公司 Cable cross street laying apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868398A (en) * 2015-05-22 2015-08-26 江苏省电力公司常州供电公司 10KV bypass cable overhead laying street crossing apparatus
CN104868398B (en) * 2015-05-22 2017-10-17 国网江苏省电力公司常州供电公司 The built on stilts laying street crossing device of 10KV bypass cables

Also Published As

Publication number Publication date
CN205159900U (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN104868398B (en) The built on stilts laying street crossing device of 10KV bypass cables
CN206014102U (en) A kind of cable unwinding device
CN204696556U (en) A kind of 10kV bypass cable is built on stilts laid street device
CN111478230A (en) Cable laying equipment for urban rail transit
CN207160712U (en) A kind of vehicle moving crossing frame for reducing wire abrasion
CN203998708U (en) A kind of simple and easy controller switching equipment lifting appliance
CN211083849U (en) Liftable street lamp
CN202897871U (en) Miniaturized cranes for construction
CN206635781U (en) Slope construction Worm-gear type self-balancing operating platform
CN204940111U (en) A kind of bridge detecting device
CN207209809U (en) Special overhead crane
CN204237458U (en) The laborsaving lifting utensil of a kind of electrical equipment
CN205429673U (en) Cable draw gear
CN203445577U (en) Cable drum rapid wire releaser
CN212011936U (en) Cable laying equipment for urban rail transit
CN105645291A (en) Mechanical equipment hoisting frame and hoisting method
CN108952550B (en) A climbing delivery ladder for power grid
CN208107885U (en) Lamps and lanterns maintenance system at the top of rotary easy broken rod
CN108035530B (en) Oil tank inner wall construction hanging basket
CN106429879A (en) Equipment hoisting device used on telegraph pole
CN106451206B (en) Transmission line of electricity self-crawling type failure eliminating device
CN211992719U (en) Installation device of street lamp
CN204879819U (en) Easily change street lamp
CN208472681U (en) Surface low road movable overhaul platform in a kind of power station
CN111555181B (en) A bow-shaped line detection obstacle-clearing platform and its use method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

CF01 Termination of patent right due to non-payment of annual fee