CN204678737U - A kind of fuel gas generation waste heat effective utilization system - Google Patents

A kind of fuel gas generation waste heat effective utilization system Download PDF

Info

Publication number
CN204678737U
CN204678737U CN201520317742.7U CN201520317742U CN204678737U CN 204678737 U CN204678737 U CN 204678737U CN 201520317742 U CN201520317742 U CN 201520317742U CN 204678737 U CN204678737 U CN 204678737U
Authority
CN
China
Prior art keywords
water
hot
cold
heat exchanger
jacket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520317742.7U
Other languages
Chinese (zh)
Inventor
杨竹
赵长福
和彬彬
杨玲
张珍
徐静静
张爱平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Distributed Energy Engineering & Technology Co ltd
China Huadian Engineering Group Co Ltd
Original Assignee
Huadian Distributed Energy Engineering & Technology Co Ltd
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Distributed Energy Engineering & Technology Co Ltd, China Huadian Engineering Group Co Ltd filed Critical Huadian Distributed Energy Engineering & Technology Co Ltd
Priority to CN201520317742.7U priority Critical patent/CN204678737U/en
Application granted granted Critical
Publication of CN204678737U publication Critical patent/CN204678737U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00—Adapting or protecting infrastructure or their operation
    • Y02A30/27—Relating to heating, ventilation or air conditioning [HVAC] technologies
    • Y02A30/274—Relating to heating, ventilation or air conditioning [HVAC] technologies using waste energy, e.g. from internal combustion engine
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/62—Absorption based systems
    • Y02B30/625—Absorption based systems combined with heat or power generation [CHP], e.g. trigeneration
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00—Road transport of goods or passengers
    • Y02T10/10—Internal combustion engine [ICE] based vehicles
    • Y02T10/12—Improving ICE efficiencies

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model discloses a kind of fuel gas generation waste heat effective utilization system, comprise gas internal combustion electric generator group (1) and fume hot-water type lithium cold Hot water units (2), gas internal combustion electric generator group (1) is connected with fume hot-water type lithium cold Hot water units (2) by pipeline, also comprise jacket water heat exchanger (3), middle cold-water heat exchanger (4) and domestic hot-water preheating water tank (11), jacket water heat exchanger (3) by pipeline respectively with gas internal combustion electric generator group (1), fume hot-water type lithium cold Hot water units (2) is connected with jacket water heat exchanger (3), middle cold-water heat exchanger (4) is connected with gas internal combustion electric generator group (1) and domestic hot-water preheating water tank (11) respectively by pipeline.Fuel gas generation technology and fume afterheat can be utilized technology, jacket water by the utility model, middle cold water utilizes together with combine with technique arrives, and Appropriate application generating waste-heat, makes the use of natural gas more efficient.

Description

A kind of fuel gas generation waste heat effective utilization system
Technical field
The utility model relates to a kind of fuel gas generation waste heat effective utilization system.
Background technology
Along with the acceleration of socio-economic development and urbanization process, the situation of China's central and east air combined pollution is increasingly serious, and outstanding behaviours takes place frequently in Megapolis severe haze phenomenons such as Jing-jin-ji region, the Yangtze River Delta and Pearl River Deltas.To this, the Party Central Committee, State Council pay much attention to, and put into effect a series of policies and measures, take a series of efficient action, put forth effort environmental protect air quality, conscientiously ensure body health of people.Wherein the most effective measure is that coal changes gas, and natural gas is as a kind of non-renewable energy resources, is also under-supply in China, needs a large amount of imports.
In order to solve energy shortage problem, how the efficiency utilization of natural gas is just brought into schedule.Also there is fuel gas generation technology in prior art, fume afterheat utilizes technology and jacket water, middle cold water utilize technology, to make up the energy requirements day by day increased.But also there is no at present a set ofly fuel gas generation technology, fume afterheat can be utilized technology and jacket water, middle cold water utilizes combine with technique to arrive comprehensive bootstrap system together.
Utility model content
The purpose of this utility model is, there is provided a kind of fuel gas generation waste heat effective utilization system, fuel gas generation technology and fume afterheat can be utilized technology by it, and jacket water, middle cold water utilize combine with technique to arrive together, Appropriate application fuel gas generation waste heat, makes the use of natural gas more efficient.
The technical solution of the utility model: a kind of fuel gas generation waste heat effective utilization system, comprise gas internal combustion electric generator group and fume hot-water type lithium cold Hot water units, gas internal combustion electric generator group is connected with fume hot-water type lithium cold Hot water units by pipeline, also comprise jacket water heat exchanger, middle cold-water heat exchanger and domestic hot-water preheating water tank, jacket water heat exchanger is connected with gas internal combustion electric generator group, fume hot-water type lithium cold Hot water units and jacket water heat exchanger respectively by pipeline; Middle cold-water heat exchanger is connected with gas internal combustion electric generator group and domestic hot-water preheating water tank respectively by pipeline.
In aforesaid fuel gas generation waste heat effective utilization system, also comprise jacket water cooling water tank and jacket water circulating pump, jacket water cooling water tank and the series connection of jacket water circulating pump are located on the connecting line of gas internal combustion electric generator group and fume hot-water type lithium cold Hot water units.
In aforesaid fuel gas generation waste heat effective utilization system, also comprise middle cold water cooling water tank and middle cold water circulation pump, middle cold water cooling water tank and middle circulating chilled water series connection of pumps are located on the connecting line of gas internal combustion electric generator group and middle cold-water heat exchanger.
In aforesaid fuel gas generation waste heat effective utilization system, the pipeline between domestic hot-water preheating water tank and jacket water heat exchanger is provided with triple valve A; Gas internal combustion electric generator group and the connecting pipe between fume hot-water type lithium cold Hot water units and jacket water heat exchanger are provided with triple valve B and triple valve C; Connecting pipe between gas internal combustion electric generator group and middle cold-water heat exchanger is provided with triple valve D.
In aforesaid fuel gas generation waste heat effective utilization system, the connecting pipe between domestic hot-water preheating water tank and jacket water heat exchanger is provided with electric two-way valve A and electric two-way valve B.
In aforesaid fuel gas generation waste heat effective utilization system, also comprise cold warm water pump and domestic hot-water's circulating pump, fume hot-water type lithium cold Hot water units is provided with cold warm water pipe, and cold warm water pump is located on cold warm water pipe; Jacket water heat exchanger is provided with domestic hot-water's pipe network, and domestic hot-water's circulating pump is located on domestic hot-water's pipe network.The effect of cold warm water pump carries to cold and hot user cold and hotly to provide power.The effect of domestic hot-water's circulating pump carries domestic hot-water to carry power to domestic hot-water user.
Compared with prior art, the utility model makes full use of the fume afterheat after fuel gas generation, jacket water waste heat and middle cold water waste heat, improves the UTILIZATION OF VESIDUAL HEAT IN after natural gas power efficiently, to meet efficient, the energy-saving run of distributed energy resource system comprehensively.
The utilization of jacket water waste heat, during the oepration at full load of oil-electric engine group, jacket water leaving water temperature is generally about 95 DEG C, and inflow temperature is about 80 DEG C, and the Inlet and outlet water temperature difference is about 15 DEG C.During refrigeration, jacket water enters preferentially produces required domestic hot-water by displacement heat exchanger, and redundance enters fume hot-water type lithium cold Hot water units cryogenerator; During heat supply, obtain hot water after carrying out heat exchange by jacket water plate type heat exchanger, for end heating.
The utilization of middle cold water, middle Cold water-out temperature is lower, is about 47 DEG C, and generally direct heat radiation by cooling water tank is recycled.This part of waste heat can be carried out maximum utilization by increasing domestic hot-water preheating water tank by native system.
Accompanying drawing explanation
Fig. 1 is system diagram of the present utility model.
Being labeled as in accompanying drawing: 1-gas internal combustion electric generator group, 2-fume hot-water type lithium cold Hot water units, 3-jacket water heat exchanger, cold-water heat exchanger in 4-, 5-jacket water cooling water tank, cold water cooling water tank in 6-, 7-jacket water circulating pump, cold water circulation pump in 8-, the cold warm water pump of 9-, 10-domestic hot-water circulating pump, 11-domestic hot-water preheating water tank, 12-triple valve A, 13-triple valve D, 14-triple valve B, 15-triple valve C, 16-electric two-way valve A, 17-electric two-way valve B, the cold warm water pipe of 18-, 19-domestic hot-water pipe network.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described.
Embodiment of the present utility model: as shown in Figure 1, a kind of fuel gas generation waste heat effective utilization system, comprise gas internal combustion electric generator group 1 and fume hot-water type lithium cold Hot water units 2, gas internal combustion electric generator group 1 is connected with fume hot-water type lithium cold Hot water units 2 by pipeline, also comprise jacket water heat exchanger 3, middle cold-water heat exchanger 4 and domestic hot-water preheating water tank 11, jacket water heat exchanger 3 is connected with gas internal combustion electric generator group 1, fume hot-water type lithium cold Hot water units 2 and jacket water heat exchanger 3 respectively by pipeline; Middle cold-water heat exchanger 4 is connected with gas internal combustion electric generator group 1 and domestic hot-water preheating water tank 11 respectively by pipeline.Also comprise cold warm water pump 9 and domestic hot-water's circulating pump 10, fume hot-water type lithium cold Hot water units 2 is provided with cold warm water pipe 18, and cold warm water pump 9 is located on cold warm water pipe 18; Jacket water heat exchanger 3 is provided with domestic hot-water's pipe network 19, and domestic hot-water's circulating pump 10 is located on domestic hot-water's pipe network 19.
Also comprise jacket water cooling water tank 5, jacket water circulating pump 7, middle cold water cooling water tank 6 and middle cold water circulation pump 8, jacket water cooling water tank 5 and jacket water circulating pump 7 series connection are located at gas internal combustion electric generator group 1 with on the connecting line of fume hot-water type lithium cold Hot water units 2.Middle cold water cooling water tank 6 and middle cold water circulation pump 8 series connection are located at gas internal combustion electric generator group 1 with on the connecting line of middle cold-water heat exchanger 4.
Pipeline between domestic hot-water preheating water tank 11 and jacket water heat exchanger 3 is provided with triple valve A12; Gas internal combustion electric generator group 1 and the connecting pipe between fume hot-water type lithium cold Hot water units 2 and jacket water heat exchanger 3 are provided with triple valve B14 and triple valve C15; Connecting pipe between gas internal combustion electric generator group 1 and middle cold-water heat exchanger 4 is provided with triple valve D13.Connecting pipe between domestic hot-water preheating water tank 11 and jacket water heat exchanger 3 is provided with electric two-way valve A16 and electric two-way valve B17.
Operation principle of the present utility model: different according to the operating condition of Various Seasonal system in actual motion.Summer/winter condition (only having refrigeration/heating and domestic hot-water's workload demand): natural gas enters the exhaust gas temperature after gas internal combustion electric generator group 1 generating generally at about 500 DEG C, the high-temperature generator that high-temperature flue gas enters fume hot-water type lithium cold Hot water units 2 carries out heat exchange refrigeration, the high temperature jacket water of about 90 DEG C is preferentially by supplying domestic hot-water after jacket water heat exchanger 3 heat exchange, and redundance enters the cryogenerator heat exchange refrigeration of fume hot-water type lithium cold Hot water units 2 as heat source water; Middle cold water preferentially gives domestic hot-water's moisturizing preheating as low-temperature heat source, after domestic hot-water preheating water tank 11 is full up, be dissipated to outdoor by middle preheating cold water water tank 6.Now triple valve A12 is to BC to being full-gear, and electric two-way valve A 16 and electric two-way valve B 17 is closed condition.As shown in Figure 1.
Conditioning in Transition Season operating mode (only having domestic hot-water's load): natural gas enters the exhaust gas temperature after gas internal combustion electric generator group 1 generating generally at about 500 DEG C, and the high-temperature generator that high-temperature flue gas enters fume hot-water type lithium cold Hot water units 2 carries out a heat exchange.The high temperature jacket water of about 90 DEG C is preferentially by supplying domestic hot-water after jacket water heat exchanger 3 heat exchange; Middle cold water preferentially gives domestic hot-water's moisturizing preheating as low-temperature heat source, after domestic hot-water preheating water tank 11 is full up, be dissipated to outdoor by middle preheating cold water water tank 6.Domestic hot-water's moisturizing, preferentially after domestic hot-water preheating water tank 11 preheats, first enters the heat exchange of jacket water heat exchanger 3 secondary side again and produces required domestic hot-water after the heat exchange of fume hot-water type lithium cold Hot water units 2 heats up.Now triple valve A12 is to AB to being full-gear, and electric two-way valve A 16 and electric two-way valve B 17 is full-gear.As shown in Figure 1.

Claims (6)

1. a fuel gas generation waste heat effective utilization system, comprise gas internal combustion electric generator group (1) and fume hot-water type lithium cold Hot water units (2), gas internal combustion electric generator group (1) is connected with fume hot-water type lithium cold Hot water units (2) by pipeline, it is characterized in that: also comprise jacket water heat exchanger (3), middle cold-water heat exchanger (4) and domestic hot-water preheating water tank (11), jacket water heat exchanger (3) by pipeline respectively with gas internal combustion electric generator group (1), fume hot-water type lithium cold Hot water units (2) is connected with jacket water heat exchanger (3), middle cold-water heat exchanger (4) is connected with gas internal combustion electric generator group (1) and domestic hot-water preheating water tank (11) respectively by pipeline.
2. fuel gas generation waste heat effective utilization system according to claim 1, it is characterized in that: also comprise jacket water cooling water tank (5) and jacket water circulating pump (7), jacket water cooling water tank (5) and jacket water circulating pump (7) series connection are located at gas internal combustion electric generator group (1) with on the connecting line of fume hot-water type lithium cold Hot water units (2).
3. fuel gas generation waste heat effective utilization system according to claim 2, it is characterized in that: also comprise middle cold water cooling water tank (6) and middle cold water circulation pump (8), middle cold water cooling water tank (6) and middle cold water circulation pump (8) series connection are located at gas internal combustion electric generator group (1) with on the connecting line of middle cold-water heat exchanger (4).
4. fuel gas generation waste heat effective utilization system according to claim 3, is characterized in that: the pipeline between domestic hot-water preheating water tank (11) and jacket water heat exchanger (3) is provided with triple valve A (12); Gas internal combustion electric generator group (1) and the connecting pipe between fume hot-water type lithium cold Hot water units (2) and jacket water heat exchanger (3) are provided with triple valve B (14) and triple valve C (15); Connecting pipe between gas internal combustion electric generator group (1) and middle cold-water heat exchanger (4) is provided with triple valve D (13).
5. fuel gas generation waste heat effective utilization system according to claim 4, is characterized in that: the connecting pipe between domestic hot-water preheating water tank (11) and jacket water heat exchanger (3) is provided with electric two-way valve A (16) and electric two-way valve B (17).
6. fuel gas generation waste heat effective utilization system according to claim 1, it is characterized in that: also comprise cold warm water pump (9) and domestic hot-water's circulating pump (10), fume hot-water type lithium cold Hot water units (2) is provided with cold warm water pipe (18), and cold warm water pump (9) is located on cold warm water pipe (18); Jacket water heat exchanger (3) is provided with domestic hot-water's pipe network (19), and domestic hot-water's circulating pump (10) is located on domestic hot-water's pipe network (19).
CN201520317742.7U 2015-05-15 2015-05-15 A kind of fuel gas generation waste heat effective utilization system Expired - Fee Related CN204678737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520317742.7U CN204678737U (en) 2015-05-15 2015-05-15 A kind of fuel gas generation waste heat effective utilization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520317742.7U CN204678737U (en) 2015-05-15 2015-05-15 A kind of fuel gas generation waste heat effective utilization system

Publications (1)

Publication Number Publication Date
CN204678737U true CN204678737U (en) 2015-09-30

Family

ID=54178422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520317742.7U Expired - Fee Related CN204678737U (en) 2015-05-15 2015-05-15 A kind of fuel gas generation waste heat effective utilization system

Country Status (1)

Country Link
CN (1) CN204678737U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448324A (en) * 2017-08-14 2017-12-08 新地能源工程技术有限公司 A kind of distributed energy device and technique
CN108468593A (en) * 2018-05-03 2018-08-31 中国华电科工集团有限公司 A kind of gas internal-combustion engine distributing-supplying-energy system with solar energy complementation
CN108489140A (en) * 2018-04-18 2018-09-04 远大空调有限公司 A kind of complete gas cold, heat electric shaft producting device
CN108827054A (en) * 2018-08-03 2018-11-16 湖南力宇新能源科技有限公司 Gas engine residual heat using device and system
CN112761809A (en) * 2020-12-28 2021-05-07 浙江浙能嘉兴发电有限公司 Gas internal combustion engine multi-connection heat recovery system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448324A (en) * 2017-08-14 2017-12-08 新地能源工程技术有限公司 A kind of distributed energy device and technique
CN108489140A (en) * 2018-04-18 2018-09-04 远大空调有限公司 A kind of complete gas cold, heat electric shaft producting device
CN108489140B (en) * 2018-04-18 2023-12-22 远大空调有限公司 Complete set of gas-fired cold and heat power cogeneration device
CN108468593A (en) * 2018-05-03 2018-08-31 中国华电科工集团有限公司 A kind of gas internal-combustion engine distributing-supplying-energy system with solar energy complementation
CN108468593B (en) * 2018-05-03 2024-06-25 中国华电科工集团有限公司 Distributed energy supply system of gas internal combustion engine complementary with solar energy
CN108827054A (en) * 2018-08-03 2018-11-16 湖南力宇新能源科技有限公司 Gas engine residual heat using device and system
CN112761809A (en) * 2020-12-28 2021-05-07 浙江浙能嘉兴发电有限公司 Gas internal combustion engine multi-connection heat recovery system

Similar Documents

Publication Publication Date Title
CN107514667A (en) The central heating system of steam power plant's cross-season heat-storage heat release is realized using electric heat pump
CN205299702U (en) Central heating system provides multiple forms of energy to complement each other
CN202007693U (en) Recovery device for low-temperature waste heat in power plant
CN204006255U (en) A kind of waste heat recovery central heating system
CN106679225B (en) Fuel cell and solar driven building multi-energy complementary system
CN103742964A (en) Waste heat recovery thermal power plant energy storage method and system
CN202253967U (en) Reclaimed water source heat pump and central heating complement each other according to energy clock heating system
CN103968598A (en) Large temperature difference centralized heating/cooling system
CN101846416B (en) System and method for realizing area combined cooling heat co-supply by cogeneration coupling heat pump
CN103673389B (en) Based on the cold-hot combined supply system of heat engine
CN108468593B (en) Distributed energy supply system of gas internal combustion engine complementary with solar energy
CN207111237U (en) A kind of distributed energy resource system applied to large-scale public construction
CN204783320U (en) Gas trigeminy supplies well cold water waste heat utilization system of system
CN204704011U (en) A kind of distributed energy fume afterheat deep exploitation system
CN205783986U (en) A kind of sewage source heat pump, solar energy optical-thermal and combustion gas trilogy supply coupled system
CN201463077U (en) Photoelectric complementary heating system
CN204404220U (en) Based on the distributed energy resource system of city biogas
CN206989299U (en) A kind of big temperature difference heat station system of combined type
CN102997362B (en) Novel combined energy supplying system
CN208671413U (en) Low temperature nuclear heating reactor combined cooling and heating device
CN207501486U (en) A kind of domestic freezing heating electricity combined supply system realized natural gas and solar energy and be combined
CN208347882U (en) A kind of SOFC fuel cell and internal combustion engine combustion gas distributed couplings system
CN203687654U (en) Industrial kiln stove waste heat utilizing system
CN103196225A (en) Waste heat recovery device with water-source heat pump
CN202692413U (en) System utilizing heat pump unit circulating water to heat natural gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Patentee after: CHINA HUADIAN ENGINEERING Co.,Ltd.

Patentee after: HUADIAN DISTRIBUTED ENERGY ENGINEERING & TECHNOLOGY Co.,Ltd.

Address before: 100160 Beijing, Fengtai District Automobile Museum Road, No. 6, Ying Kun century A block, floor 11

Patentee before: China Huadian Engineering (Group) Co.,Ltd.

Patentee before: HUADIAN DISTRIBUTED ENERGY ENGINEERING & TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930