CN204676586U - A kind of suction barrel shape transmission line foundation - Google Patents

A kind of suction barrel shape transmission line foundation Download PDF

Info

Publication number
CN204676586U
CN204676586U CN201520239286.9U CN201520239286U CN204676586U CN 204676586 U CN204676586 U CN 204676586U CN 201520239286 U CN201520239286 U CN 201520239286U CN 204676586 U CN204676586 U CN 204676586U
Authority
CN
China
Prior art keywords
steel drum
transmission line
foundation
shallow water
water area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520239286.9U
Other languages
Chinese (zh)
Inventor
张盈哲
刘燕平
龚坚刚
孙永军
王淑红
章李刚
王靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huayun Electric Power Engineering Design Consulting Co., Ltd.
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520239286.9U priority Critical patent/CN204676586U/en
Application granted granted Critical
Publication of CN204676586U publication Critical patent/CN204676586U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the suction barrel shape transmission line foundation of a kind of shallow water area power transmission tower.At the transmission line of electricity in shallow water area, adopt current foundation pattern, construct more complicated on the one hand and there is environmental issue, the expense in cofferdam considerably increases the cost on basis on the other hand.Of the present utility modelly to be characterised in that, it is made up of bottom steel drum and upper reinforcement concrete bearing platform, the lower openings of steel drum, the top seal of steel drum forms a horizontal top, described horizontal top is reserved with at least three crab-bolts and an aspirating hole, between described steel drum and reinforced concrete pile cap, utilizes crab-bolt reliably to connect.The utility model provides the foundation pattern of a kind of easy construction and environmental protection, is applicable to the power transmission tower in shallow water area, solves the power transmission tower foundation construction inconvenience and the problem of environmental protection not that are in shallow water area.

Description

A kind of suction barrel shape transmission line foundation
Technical field
The utility model relates to the suction barrel shape transmission line foundation of a kind of shallow water area power transmission tower, is applicable to the shaft tower that basic role power is of moderate size.
Background technology
Be positioned at the transmission tower on shallow water area (the shallow water pool etc.), according to its basic role power size and geological condition, normal adopt the base forms such as board-like, rigidity and castinplace pile.
When adopting board-like, rigid foundation, need to excavate the soil body, large cofferdam certainly will be needed, have certain destruction to the ecology in pool.When adopting bored concrete pile foundation, due to the construction of drilling machine, need equally to carry out cofferdam, the mud simultaneously in work progress is also a threat to the environment in pool, place.Therefore at the transmission line of electricity in shallow water area, adopt current foundation pattern, construct more complicated on the one hand and there is environmental issue, the expense in cofferdam considerably increases the cost on basis on the other hand.
Utility model content
Technical problem to be solved in the utility model is the defect overcoming the existence of above-mentioned prior art, there is provided a kind of suction barrel shape transmission line foundation being applicable to shallow water area power transmission tower, to solve the power transmission tower foundation construction inconvenience and the problem of environmental protection not that are in shallow water area.
For this reason, the utility model adopts following technical scheme: a kind of suction barrel shape transmission line foundation, it is characterized in that, it is made up of bottom steel drum and upper reinforcement concrete bearing platform, the lower openings of steel drum, the top seal of steel drum forms a horizontal top, described horizontal top is reserved with at least three crab-bolts and an aspirating hole, utilizes crab-bolt reliably to connect between described steel drum and reinforced concrete pile cap.
First by steel drum hoisted in position during construction, it sinks down into certain depth at Gravitative Loads, then the water utilizing water pump to be extracted out in steel drum by aspirating hole is gentle, making to form negative pressure in steel drum is pressed in soil by steel drum, until steel drum cavity is filled up by soil, follow-uply build top cushion cap (now aspirating hole is by Concrete Filled) again.Reserved crab-bolt is utilized reliably to connect between steel drum and upper reinforcement concrete bearing platform.Main load parts based on described steel drum, provide foundation bearing capacity by the frictional force of bucket wall and the subgrade reaction of horizontal top bottom.
Further, the bottom of described reinforced concrete pile cap is up-small and down-big taper type, and top basic stand column is cylindrical.
Further, the external diameter bottom described reinforced concrete pile cap is consistent with the external diameter of steel drum.
The beneficial effect that the utility model has is as follows: the utility model provides the foundation pattern of a kind of easy construction and environmental protection, is applicable to the power transmission tower in shallow water area, solves the power transmission tower foundation construction inconvenience and the problem of environmental protection not that are in shallow water area.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the top view of Fig. 1.
Fig. 3-5 is work progress schematic diagram of the present utility model.
1-steel drum, 2-reinforced concrete pile cap, 3-horizontal top, 4-crab-bolt.
Detailed description of the invention
Below in conjunction with specification drawings and specific embodiments, the utility model is described in further detail.
Suction barrel shape transmission line foundation as shown in Figure 1-2, it is made up of bottom steel drum 1 and upper reinforcement concrete bearing platform 2, the lower openings of steel drum 1, the top seal of steel drum 1 forms horizontal top 3, horizontal top 3 is reserved with multiple crab-bolt 4 and an aspirating hole (not drawing in figure), between described steel drum 1 and reinforced concrete pile cap 2, utilizes crab-bolt 4 reliably to connect.
The bottom of described reinforced concrete pile cap 2 is up-small and down-big taper type, and top basic stand column is cylindrical.External diameter bottom reinforced concrete pile cap 2 is consistent with the external diameter of steel drum 1.
One. basic constructional design
(1) size design
The size design of suction bucket base, mainly comprise determine steel drum bucket footpath, height and thickness.
The size in bucket footpath directly affects the size of suction function area, and namely determine the size of down force in sinking watching, therefore first bucket footpath will ensure that the heavy of steel drum passes through.In addition, the size in bucket footpath also concerns foundation bearing capacity, therefore should meet basic role power during design.The height of bucket determines the side friction power on basis, and first it should pull out by basis, and pressing force is determined, but side friction power is also related to the problem of sinking feasibility simultaneously.Therefore, in the deterministic process of bucket footpath and height dimension, need the sinking that considers can the factor of property and basic supporting capacity.The wall thickness of steel drum, is determined by himself strength checking.
(2) negative pressure sinks to checking
Suction bucket base needs the penetration resistance overcome to be made up of the frictional resistance between sidewall and the soil body and end resistance in sinking installation process.
Suction bucket base must ensure that downward negative pressure suffered by it is greater than penetration resistance with deadweight sum, and only have when meeting this condition, suction basis could sink to be passed through until precalculated position.
k st≥1.05
k st=(N k+G 1k-F fw,k)/F fk
In formula
K stfor subsidence factor;
N kdownward suction (negative pressure) suffered by bucket, N;
G 1kfor steel drum deadweight standard value, N;
F fw, kfor the uplift pressure standard value of water in sinking watching, N;
F fkbucket wall medial and lateral side friction standard value sum, N.
(3) foundation bearing capacity
(a) upper and low approximations
When bucket base pulling out inefficacy, the soil body Chang Huiyu bucket in bucket together on pull out.The upper and low approximations on suction bucket basis, considers the main side friction and the basis deadweight that rely on bucket outer wall.
B () presses down bearing capacity
The bearing capacity that presses down of suction bucket base considers the side friction of the inside and outside wall of bucket and the subgrade reaction of bucket top board bottom.
Two. construction sequence
(1) steel drum prefabricated (horizontal top has reserved crab-bolt and aspirating hole), is shown in Fig. 3;
(2) steel drum hoisted in position;
(3) steel drum deadweight is sunk, and builds top watertight shutter, sees Fig. 4;
(4) water extracting bucket out heavy is gentle, and steel drum negative pressure is sunk, and sees Fig. 5;
(5) top cushion cap is built.

Claims (3)

1. a suction barrel shape transmission line foundation, it is characterized in that, it is made up of bottom steel drum (1) and upper reinforcement concrete bearing platform (2), the lower openings of steel drum (1), the top seal of steel drum (1) forms a horizontal top (3), described horizontal top (3) is reserved with at least three crab-bolts (4) and an aspirating hole, between described steel drum (1) and reinforced concrete pile cap (2), utilizes crab-bolt (4) reliably to connect.
2. suction barrel shape transmission line foundation according to claim 1, is characterized in that, the bottom of described reinforced concrete pile cap (2) is up-small and down-big taper type, and top basic stand column is cylindrical.
3. suction barrel shape transmission line foundation according to claim 1, is characterized in that, the external diameter of described reinforced concrete pile cap (2) bottom is consistent with the external diameter of steel drum (1).
CN201520239286.9U 2015-04-20 2015-04-20 A kind of suction barrel shape transmission line foundation Active CN204676586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520239286.9U CN204676586U (en) 2015-04-20 2015-04-20 A kind of suction barrel shape transmission line foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520239286.9U CN204676586U (en) 2015-04-20 2015-04-20 A kind of suction barrel shape transmission line foundation

Publications (1)

Publication Number Publication Date
CN204676586U true CN204676586U (en) 2015-09-30

Family

ID=54176291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520239286.9U Active CN204676586U (en) 2015-04-20 2015-04-20 A kind of suction barrel shape transmission line foundation

Country Status (1)

Country Link
CN (1) CN204676586U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332387A (en) * 2015-11-25 2016-02-17 国网浙江省电力公司 Large transmission tower suction type barrel-shaped foundation structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332387A (en) * 2015-11-25 2016-02-17 国网浙江省电力公司 Large transmission tower suction type barrel-shaped foundation structure and construction method

Similar Documents

Publication Publication Date Title
CN104563148B (en) building pile foundation construction method
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN102912797A (en) Foundation pit supporting method with precipitation function
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN210797617U (en) Pile barrel composite truss type offshore wind turbine foundation
CN201144418Y (en) Special guide sleeve for hydraulic pressure raising and lining
CN202881958U (en) Foundation pit supporting structure with water falling function
CN204676585U (en) A kind of transmission line of electricity open caisson Screw Anchor composite foundation
CN204676586U (en) A kind of suction barrel shape transmission line foundation
CN102383431A (en) Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile)
CN202144598U (en) Sunk type underground structure
CN105649073A (en) Static root drilling type construction method for planting piles
CN103741705B (en) Two-layer barrel cover suction type bucket stake composite foundation and construction method
CN205688454U (en) Power transmission tower resistance to plucking well foundation
CN106555399A (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN111456075A (en) Pile barrel composite truss type offshore wind turbine foundation and construction process thereof
CN201943064U (en) Drainage tubular pile
CN201502065U (en) Anchor rod joint excavation compound basis
CN203613541U (en) Driving device for vertical pipe sinking in shallow sea reclamation area
CN201874006U (en) Intubating grouting base of transmission line iron tower
CN201151920Y (en) Floating-resistant ground pit structure
CN106088087B (en) A kind of embedding rock single pile bitubular construction auxiliary device and its construction method
CN103821137A (en) Construction method and device for long auger drilling, rock embedding, bottom expanding and press-casting pile
CN207295773U (en) A kind of underground trough-shaped body anti-floating construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Zhejiang economic and Technical Research Institute of Zhejiang Electric Co., Ltd.

Patentee after: State Grid Zhejiang Electric Power Company Economic Technical Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: Zhejiang Zhedian Economic Technology Research Institute

Patentee before: State Grid Zhejiang Electric Power Company Economic Technical Institute

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Zhejiang Huayun Electric Power Engineering Design Consulting Co., Ltd.

Patentee after: State Grid Zhejiang Electric Power Company Economic Technical Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: Zhejiang economic and Technical Research Institute of Zhejiang Electric Co., Ltd.

Patentee before: State Grid Zhejiang Electric Power Company Economic Technical Institute