CN204663010U - A kind of easy device of platform reinforcing bar transport - Google Patents
A kind of easy device of platform reinforcing bar transport Download PDFInfo
- Publication number
- CN204663010U CN204663010U CN201520350238.7U CN201520350238U CN204663010U CN 204663010 U CN204663010 U CN 204663010U CN 201520350238 U CN201520350238 U CN 201520350238U CN 204663010 U CN204663010 U CN 204663010U
- Authority
- CN
- China
- Prior art keywords
- electric chain
- hanging basket
- platform
- chain hoist
- steel bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Escalators And Moving Walkways (AREA)
Abstract
本实用新型涉及一种平台钢筋运输的简易装置,包括三根工字钢、电动链式葫芦、两块钢板支座、吊篮、可滑动式滚轮,其特征在于:三根工字钢之间焊接成型,横向工字钢上安装可滑动式滚轮,可滑动式滚轮下方连接电动链式葫芦,电动链式葫芦的铰链末端焊接挂钩,挂钩上安装吊篮,两根竖向工字钢底部分别焊接一钢板支座。本实用新型可广泛应用于顶模平台上钢筋运输。通过底座上安装的滑轮将该装置移动至需要进行钢筋转运的地方,利用横向工字钢上的可滑动式滚轮将吊篮及电动链式葫芦移动至装置的一层,便于将钢筋放置在吊篮中,在利用滚轮将吊篮移动至装置中间,采用电动链式葫芦控制吊篮下放,进而完成将钢筋转运至平台所需层。
The utility model relates to a simple device for transporting steel bars on a platform, which comprises three I-beams, an electric chain hoist, two steel plate supports, a hanging basket and a slidable roller, and is characterized in that: three I-beams are welded into a Type, the slidable roller is installed on the horizontal I-beam, the electric chain hoist is connected under the slidable roller, the hinge end of the electric chain hoist is welded to the hook, the hanging basket is installed on the hook, and the bottom of the two vertical I-beams are welded separately A steel plate support. The utility model can be widely used in steel bar transportation on the top mold platform. Move the device to the place where steel bars need to be transferred through the pulleys installed on the base, and use the slidable rollers on the horizontal I-beam to move the hanging basket and electric chain hoist to the first floor of the device, so that the steel bars can be placed on the crane. In the basket, use the rollers to move the hanging basket to the middle of the device, and use the electric chain hoist to control the lowering of the hanging basket, and then complete the transfer of the steel bars to the required layer of the platform.
Description
技术领域technical field
本实用新型涉及一种平台钢筋运输的简易装置。The utility model relates to a simple device for transporting steel bars on a platform.
背景技术Background technique
目前采用顶模体系施工工艺的特点,在顶模平台上钢筋转运,不论是同层水平方向的转运,还是层与层之间垂直方向的转运,均采用人工搬运的方式,该种方式不仅浪费大量人工,而且一次转运量小,转运效率不高,因而导致采用传统的平台钢筋转运方式使得钢筋转运率低下,影响钢筋的安装绑扎速度。At present, due to the characteristics of the construction technology of the top formwork system, the transfer of steel bars on the top formwork platform, whether it is the horizontal transfer of the same layer or the vertical transfer between layers, is manually carried, which not only wastes A lot of labor, and the amount of one-time transfer is small, and the transfer efficiency is not high. As a result, the traditional platform steel bar transfer method makes the steel bar transfer rate low and affects the installation and binding speed of the steel bar.
发明内容Contents of the invention
本实用新型的目的提供一种平台钢筋运输的简易装置,可以一次性装载大量钢筋,能够在顶模平台上移动,解决了同层水平方向钢筋转运的问题,同时,利用装置的电动链式葫芦,可以将吊篮内的钢筋下放至钢筋施工作业层,解决了层与层之间垂直方向钢筋转运的难题,操作简便安全,节省时间。The purpose of this utility model is to provide a simple device for the transportation of steel bars on the platform, which can load a large number of steel bars at one time, and can move on the top mold platform, which solves the problem of steel bar transfer in the horizontal direction on the same floor. At the same time, the electric chain hoist of the device can be used , The steel bars in the hanging basket can be lowered to the steel bar construction work layer, which solves the problem of vertical steel bar transfer between layers, easy and safe operation, and saves time.
一种平台钢筋运输的简易装置,包括三根工字钢、电动链式葫芦、两块钢板支座、吊篮、可滑动式滚轮,其特征在于:三根工字钢之间焊接成型,横向工字钢上安装可滑动式滚轮,可滑动式滚轮下方连接电动链式葫芦,电动链式葫芦的铰链末端焊接挂钩,挂钩上安装吊篮,吊篮用于放置钢筋,两根竖向工字钢底部分别焊接一钢板支座。A simple device for transporting steel bars on a platform, including three I-beams, an electric chain hoist, two steel plate supports, a hanging basket, and slidable rollers. It is characterized in that: the three I-beams are welded into a type, a slidable roller is installed on the horizontal I-beam, and the electric chain hoist is connected to the bottom of the slidable roller. The hinge end of the electric chain hoist is welded with a hook, and a hanging basket is installed on the hook. A steel plate support is respectively welded to the bottom of the I-beam.
本实用新型还包括四个移动滑轮、四根插销,每二个移动滑轮安装一块钢板支座上,每个移动滑轮旁边焊接一根插销,且插销能锁定滑轮。The utility model also includes four movable pulleys and four bolts, and every two movable pulleys are installed on a steel plate support, and a latch is welded beside each movable pulley, and the latch can lock the pulley.
可滑动式滚轮安装在横向工字钢上,将工字钢作为滑动导轨。The slidable rollers are installed on the horizontal I-beam, and the I-beam is used as a sliding guide rail.
首先确定顶模平台上用于下放钢筋的孔洞尺寸,从而确定两根竖向工字钢之间的间距以及吊篮制作的尺寸。然后利用该装置钢板底座所安装的滑轮,可以使该装置在顶模平台上移动,同时横向工字钢上安装的滚轮可以将电动链式葫芦及吊篮在横向工字钢范围内移动,方便钢筋安放至吊篮内,所安装的电动链式葫芦则可以将吊篮内的钢筋下放至所需施工层。Firstly, determine the size of the hole on the top mold platform for lowering the steel bars, so as to determine the distance between the two vertical I-beams and the size of the hanging basket. Then, the pulley installed on the steel plate base of the device can be used to move the device on the top mold platform, and the rollers installed on the horizontal I-beam can move the electric chain hoist and the hanging basket within the range of the horizontal I-beam, which is convenient. The steel bars are placed in the hanging basket, and the installed electric chain hoist can lower the steel bars in the hanging basket to the required construction layer.
本实用新型可广泛应用于超高层施工中,采用顶模体系施工时的平台钢筋转运。通过制作该简易装置,利用钢板底座所安装的滑轮,可以使该装置在顶模平台上移动,同时横向工字钢上安装的滚轮可以将电动链式葫芦及吊篮在横向工字钢范围内移动,方便钢筋安放至吊篮内,所安装的电动链式葫芦则可以将吊篮内的钢筋下放至所需施工层。The utility model can be widely used in the construction of super high-rise buildings, and can be used for transporting steel bars on the platform when the top formwork system is used for construction. By making this simple device, the device can be moved on the top mold platform by using the pulley installed on the steel plate base, and the roller installed on the horizontal I-beam can move the electric chain hoist and the hanging basket within the range of the horizontal I-beam. It is convenient to move the steel bars into the hanging basket, and the installed electric chain hoist can lower the steel bars in the hanging basket to the required construction layer.
本实用新型解决了顶模平台上钢筋转运需要耗费大量人工的问题,利用该装置即可实现钢筋在顶模平台水平及竖向转运,该方法操作简便、实用、可以被广泛地应用。The utility model solves the problem that a large amount of manpower is required for steel bar transfer on the top formwork platform, and the horizontal and vertical transfer of steel bars on the top formwork platform can be realized by using the device. The method is easy to operate, practical and can be widely used.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
具体实施方式Detailed ways
下面结合附图对本实用新型进行详细说明:Below in conjunction with accompanying drawing, the utility model is described in detail:
如图1所示,本实用新型包括三根工字钢1、电动链式葫芦2、吊篮3、两块钢板底座4、四根插销5、四个移动滑轮6、可滑动式滚轮7组成,一种平台钢筋运输的简易装置,其特征在于:三根工字钢之间焊接成型,横向工字钢上安装可滑动式滚轮7,可滑动式滚轮7下方连接电动链式葫芦2,电动链式葫芦2的铰链末端焊接挂钩,挂钩上安装吊篮3,吊篮3用于放置钢筋,两根竖向工字钢1底部分别焊接一钢板支座4;每二个移动滑轮6安装一块钢板支座4上,每个移动滑轮6旁边焊接一根插销5,且插销5能锁定移动滑轮6。As shown in Figure 1, the utility model comprises three I-beams 1, an electric chain hoist 2, a hanging basket 3, two steel plate bases 4, four bolts 5, four moving pulleys 6, and a slidable roller 7. A simple device for transporting steel bars on a platform, characterized in that three I-beams are welded into Type, the slidable roller 7 is installed on the horizontal I-beam, the electric chain hoist 2 is connected to the bottom of the slidable roller 7, the hinge end of the electric chain hoist 2 is welded with a hook, and the hanging basket 3 is installed on the hook, and the hanging basket 3 is used for Place steel bars, weld a steel plate support 4 at the bottom of two vertical I-beams 1 respectively; install a steel plate support 4 on every two moving pulleys 6, weld a bolt 5 next to each moving pulley 6, and the bolt 5 can Lock mobile pulley 6.
滑轮移动6实现该装置在平台水平方向上移动,从而实现钢筋的水平转运,通过电动链式葫芦2实现该装置在顶模平台各层垂直方向上的钢筋转运。The pulley movement 6 realizes that the device moves in the horizontal direction of the platform, thereby realizing the horizontal transfer of the steel bars, and realizes the transfer of the steel bars of the device in the vertical direction of each layer of the top mold platform through the electric chain hoist 2 .
本实用新型加工方便,操作简单、实用,能较方便地转运平台钢筋,可以被广泛地应用。The utility model has the advantages of convenient processing, simple operation and practicality, can transfer platform steel bars more conveniently, and can be widely used.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520350238.7U CN204663010U (en) | 2015-05-27 | 2015-05-27 | A kind of easy device of platform reinforcing bar transport |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520350238.7U CN204663010U (en) | 2015-05-27 | 2015-05-27 | A kind of easy device of platform reinforcing bar transport |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204663010U true CN204663010U (en) | 2015-09-23 |
Family
ID=54133405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520350238.7U Expired - Lifetime CN204663010U (en) | 2015-05-27 | 2015-05-27 | A kind of easy device of platform reinforcing bar transport |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204663010U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112593713A (en) * | 2021-01-08 | 2021-04-02 | 上海箫墨装饰设计有限公司 | Material feeding unit that can put construction steel pipe one by one |
-
2015
- 2015-05-27 CN CN201520350238.7U patent/CN204663010U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112593713A (en) * | 2021-01-08 | 2021-04-02 | 上海箫墨装饰设计有限公司 | Material feeding unit that can put construction steel pipe one by one |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522997B (en) | A kind of construction trolley and construction method of tunnels and underground engineering middle arch rack | |
CN204899238U (en) | Unitized curtain wall plate hoist device | |
CN105133844A (en) | Building material transport equipment used in buildings | |
CN104310195A (en) | Hoisting cage for hoisting electromechanical device | |
CN203112447U (en) | Detachable type gantry groove orbit pipe transporting machine for mud-removing pipeline | |
CN203213622U (en) | Construction material handling equipment | |
CN108358090A (en) | Pipe tilting vehicle and control method thereof | |
CN204663010U (en) | A kind of easy device of platform reinforcing bar transport | |
CN204222825U (en) | A kind of hydraulic ram jacking apparatus for road-surface heating machine transition transport | |
CN106315407A (en) | Method for sliding dismounting of ultra-large type crane beam in narrow space | |
DE112014000114B4 (en) | Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same | |
CN206940278U (en) | A kind of O shapes gantry handling apparatus | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
CN204057696U (en) | A kind of gate type portal gantry | |
CN104060832B (en) | A kind of method and device improving discharging platform safety | |
CN110550544A (en) | Crane and method for lifting and carrying heavy object using same | |
CN204324743U (en) | A kind of transfer crane being applicable to the long shape article of handling | |
CN210682969U (en) | A light-weight and easy-to-disassemble cable trench cover lifting device | |
CN204237524U (en) | A kind of building ground conveying mechanism lifting truck | |
CN203755153U (en) | Simply supported plate bridge bottom plate maintenance construction moving operation platform | |
CN107792789A (en) | The mobile dress building machine of one kind | |
CN203960753U (en) | A kind of erecting device of prefabricated bridge | |
CN202017347U (en) | Externally-hung discharging platform device | |
CN102261051A (en) | Gantry for casting breast wall and construction process thereof | |
CN204416270U (en) | A kind of equipment level transport systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20150923 |