CN204662273U - A kind of packaged type continuous beam closure section construction mould - Google Patents

A kind of packaged type continuous beam closure section construction mould Download PDF

Info

Publication number
CN204662273U
CN204662273U CN201520317587.9U CN201520317587U CN204662273U CN 204662273 U CN204662273 U CN 204662273U CN 201520317587 U CN201520317587 U CN 201520317587U CN 204662273 U CN204662273 U CN 204662273U
Authority
CN
China
Prior art keywords
walking
mold
construction
utility
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520317587.9U
Other languages
Chinese (zh)
Inventor
谭祥国
何开伟
廖泽源
谭兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 4th Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201520317587.9U priority Critical patent/CN204662273U/en
Application granted granted Critical
Publication of CN204662273U publication Critical patent/CN204662273U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the realm of building construction, particularly a kind of portable outstanding filling closure mould.The purpose of this utility model is to overcome the problem that in prior art, construction cost is high, potential safety hazard is large, provides a kind of closure section construction mould.The technical solution adopted in the utility model is, a kind of packaged type continuous beam closure section construction mould, comprise guard system, running gear, template system and suspension system, described running gear is arranged on the top of described template system, described guard system is arranged on the top of described template system, and described suspension system is arranged on the top of described running gear.

Description

一种可移动式连续梁合龙段施工模具A movable continuous beam closing section construction mold

技术领域technical field

本实用新型属于建筑施工领域,特别涉及一种移动式悬灌合龙模具。The utility model belongs to the field of building construction, in particular to a mobile hanging irrigation mold.

背景技术Background technique

连续梁传统的合龙施工中,合龙段施工防护一般采用防护棚架或者挂篮底模平台作为合龙施工防护措施。然而采用防护棚架,施工成本高,并会对交通带来不便;采用挂篮底模平台,在有高度限制的情况下存在很大的安全隐患。In the traditional closing construction of continuous beams, the construction protection of the closing section generally adopts protective scaffolding or hanging basket bottom formwork platform as the closing construction protection measures. However, the use of protective scaffolding has high construction costs and will cause inconvenience to traffic; the use of hanging basket bottom form platforms has great potential safety hazards under the condition of height restrictions.

实用新型内容Utility model content

本实用新型的目的是在于克服现有技术中安全隐患大的问题,提供一种合龙段施工模具。The purpose of the utility model is to overcome the problem of large potential safety hazards in the prior art, and provide a construction mold for the closure section.

为了达到上述目的,本实用新型采用的技术方案为:一种可移动式连续梁合龙段施工模具,包括防护系统、行走系统、模板系统以及悬吊系统,所述行走系统安装在所述模板系统的上方,所述的防护系统设置在所述的模板系统的上方,所述的悬吊系统设置在所述的行走系统的上方,所述的模板系统包括底模平台、设置在底模平台上的外模以及设置在外模外侧的外模支架,所述的防护系统包括设置在底模系统中底模平台的电动葫芦、设置在底模平台两侧的防护栏以及设置在底模平台和防护栏上的绝缘板。In order to achieve the above object, the technical solution adopted by the utility model is: a movable continuous beam closing section construction mold, including a protection system, a walking system, a formwork system and a suspension system, and the walking system is installed on the formwork system above, the protection system is set above the formwork system, the suspension system is set above the walking system, the formwork system includes a bottom form platform, and is set on the bottom form platform The outer mold and the outer mold support arranged outside the outer mold, the protection system includes the electric hoist arranged on the bottom mold platform in the bottom mold system, the guardrails arranged on both sides of the bottom mold platform and the protective fences arranged on the bottom mold platform and the protective Insulated panels on the bar.

作为本实用新型的优选方案:所述的外模上方设置有行走系统,所述的行走系统包括设置在桥墩上的走行轨道、设在走行轨道上的行走小车、设置在行走小车上方的上纵梁。As a preferred solution of the present utility model: a walking system is arranged above the outer mold, and the walking system includes a walking track arranged on the bridge pier, a walking trolley arranged on the walking track, and an upper longitudinal carriage arranged above the walking trolley. beam.

作为本实用新型的优选方案:所述的悬吊系统包括设置在行走系统中上纵梁上的上横梁、上横梁上设置的吊点支座、以及用于连接吊点支座和模板系统中底模平台的连接柱以及设置在底模平台底部的电动葫芦。As a preferred solution of the present utility model: the suspension system includes an upper crossbeam arranged on the upper longitudinal beam in the walking system, a lifting point support arranged on the upper crossbeam, and a support for connecting the hanging point support and the formwork system The connecting column of the bottom mold platform and the electric hoist arranged at the bottom of the bottom mold platform.

作为本实用新型的优选方案:所述的悬吊系统中的电动葫芦的另一端连接在防护系统中的上横梁上。As a preferred solution of the present utility model: the other end of the electric hoist in the suspension system is connected to the upper beam in the protection system.

作为本实用新型的优选方案:所述的行走系统中的行走小车一端设置有走行电动机构,所述的走行轨道的一端设置有挡板。As a preferred solution of the present utility model: one end of the traveling trolley in the traveling system is provided with a traveling electric mechanism, and one end of the traveling track is provided with a baffle.

与现有技术相比,本实用新型的有益效果:本实用新型可移动式连续梁合龙段施工模具中的防护系统为半封闭体系,有减少了接触网静电及施工物体坠落等安全隐患。在行走系统的牵引下合龙模具移动速度均匀,合龙段施工天窗时间明显缩短,提高了工作效率。本实用新型合龙模具中各个系统为可拆卸设计,可多次利用,节约工程成本。Compared with the prior art, the utility model has the beneficial effects: the protection system in the construction mold of the movable continuous beam closing section of the utility model is a semi-closed system, which reduces safety hazards such as static electricity in the catenary and falling construction objects. Under the traction of the walking system, the moving speed of the closing mold is uniform, and the construction time of the skylight in the closing section is obviously shortened, and the work efficiency is improved. Each system in the utility model closing dragon mold is detachable design, can be used many times, saves engineering cost.

附图说明Description of drawings

图1为本实用新型的侧视图。Fig. 1 is a side view of the utility model.

图2为本实用新型的正视图。Fig. 2 is the front view of the utility model.

图3为本实用新型行走系统的示意图。Fig. 3 is a schematic diagram of the utility model walking system.

图4为本实用新型模板系统的示意图。Fig. 4 is a schematic diagram of the formwork system of the present invention.

附图说明:1、底模平台,2、外模,3、外模支架,4、走行轨道,5、桥墩,6、行走小车,7、上纵梁,8、上横梁,9、吊点支座,10、连接柱,11、电动葫芦,12、防护栏,13、绝缘板,14、挡板,15、走行电动机构,16底纵梁。Description of drawings: 1. Bottom form platform, 2. Outer formwork, 3. Outer formwork support, 4. Traveling track, 5. Bridge pier, 6. Traveling trolley, 7. Upper longitudinal beam, 8. Upper beam, 9. Lifting point Support, 10, connecting column, 11, electric hoist, 12, protective fence, 13, insulating plate, 14, baffle plate, 15, running electric mechanism, 16 bottom longitudinal beam.

具体实施方式Detailed ways

下面结合附图,对本实用新型作详细的说明。Below in conjunction with accompanying drawing, the utility model is described in detail.

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

如图1、图4所示,本实用新型包括防护系统、行走系统、模板系统以及悬吊系统,行走系统安装在模板系统的上方,防护系统设置在模板系统的上方,悬吊系统设置在行走系统的上方。本实用新型中模板系统包括底模平台1、设置在平台上的外模2以及设置在外模2外侧的外模支架3。底模平台1上设置有底纵梁16用于支撑外模2和外模支架3,模板系统中的外模2在桥墩5外侧,与桥墩5贴合,外模2外侧设置有外模支架3,不仅能支撑外模2,还能在浇注合龙段混凝土时,起到固定外模2的作用,保证合龙段的施工质量,同时底模平台1的设计还能有效防止高空坠落和物体打击的发生,保证施工安全。As shown in Figure 1 and Figure 4, the utility model includes a protection system, a walking system, a template system and a suspension system. The walking system is installed above the template system, the protection system is arranged above the template system, and the suspension system is arranged on the the top of the system. The formwork system in the utility model includes a bottom mold platform 1 , an outer mold 2 arranged on the platform, and an outer mold support 3 arranged outside the outer mold 2 . The bottom formwork platform 1 is provided with a bottom longitudinal beam 16 for supporting the outer formwork 2 and the outer formwork bracket 3. The outer formwork 2 in the formwork system is outside the bridge pier 5 and is attached to the pier 5. The outer formwork 2 is provided with an outer formwork support 3. It can not only support the outer form 2, but also play a role in fixing the outer form 2 when pouring the concrete of the closing section to ensure the construction quality of the closing section. At the same time, the design of the bottom form platform 1 can effectively prevent falling from high altitude and objects hitting occurrence, to ensure construction safety.

如图1、图2、图3所示,本实用新型中的行走系统包括设置在桥墩5上的走行轨道4、设在走行轨道4上的行走小车6、设置在行走小车6上方的上纵梁7,设置在行车小车6一端走行电动机构15以及设置在走行轨道4一端的挡板14。行走系统中的走行轨道4沿道路方向铺设,为整个模具的移动提供便利,同时也避免因行走小车6直接与桥墩5接触,防止在施工过程中行走小车6对桥墩5路面的破坏。行走系统中的设置在行走小车6上方的上纵梁7,为本实用新型中悬吊系统提供安装位置,用以承载悬吊系统。设置在行走小车6一端的走行电动机构15,在工作状态时,牵引行走小车6沿走行轨道4移动,从而带动整个模具移动,设置在走行轨道4一端的挡板14,其目的是限制走形小车6的移动,避免了因误操作而导致走行小车6脱离走行轨道4状况的发生,保证行走系统安全运行,从而保证了整个模具的正常使用。As shown in Fig. 1, Fig. 2 and Fig. 3, the walking system in the utility model includes the traveling track 4 arranged on the bridge pier 5, the traveling trolley 6 arranged on the traveling rail 4, the upper longitudinal carriage arranged above the traveling trolley 6 The beam 7 is arranged at one end of the trolley 6 and the traveling electric mechanism 15 and the baffle plate 14 arranged at one end of the traveling track 4 . The running track 4 in the walking system is laid along the road direction, which provides convenience for the movement of the entire mold, and also avoids the direct contact of the walking trolley 6 with the bridge pier 5, preventing the walking trolley 6 from damaging the road surface of the bridge pier 5 during the construction process. The upper longitudinal beam 7 arranged on the top of the walking trolley 6 in the walking system provides an installation location for the suspension system in the utility model to carry the suspension system. The traveling electric mechanism 15 arranged at one end of the traveling trolley 6, in the working state, pulls the traveling trolley 6 to move along the traveling track 4, thereby driving the entire mold to move, and the baffle plate 14 arranged at one end of the traveling trolley 4, its purpose is to limit deformation The movement of the trolley 6 avoids the occurrence of the situation that the traveling trolley 6 is detached from the running track 4 due to misoperation, and ensures the safe operation of the traveling system, thereby ensuring the normal use of the entire mold.

如图1、图2所示,本实用新型中的悬吊系统包括设置在行走系统中上纵梁7上的上横梁8,设置在上横梁8上的吊点支座9以及用于连接吊点支座9和模板系统中底模平台1的连接柱10,本实用新型中悬吊系统用于连接行走系统和模板系统,使模板系统随行走系统中行走小车6沿走行轨道4的移动而移动,同时也起固定模板系统的作用。悬吊系统中设置在底模平台1底部的电动葫芦11,电动葫芦11的另一端连接在防护系统中上横梁8上,其目的是吊装底模平台1,使外模2与桥墩5贴合。当外模2与桥墩5贴合后,使用连接柱10将模板系统和行走系统固定连接,保证施工的有序进行,同时电动葫芦11起到一定的起到对底模系统保险防护的作用,保证了施工安全。As shown in Figure 1 and Figure 2, the suspension system in the utility model includes an upper beam 8 arranged on the upper longitudinal beam 7 in the walking system, a lifting point support 9 arranged on the upper beam 8 and a The point support 9 and the connecting column 10 of the bottom mold platform 1 in the formwork system, the suspension system in the utility model is used to connect the walking system and the formwork system, so that the formwork system moves along the traveling track 4 with the walking trolley 6 in the walking system. Mobile, but also acts as a fixed formwork system. The electric hoist 11 installed at the bottom of the base form platform 1 in the suspension system, the other end of the electric hoist 11 is connected to the upper beam 8 in the protection system, the purpose of which is to hoist the base form platform 1 so that the outer form 2 and the pier 5 fit together . After the outer formwork 2 is attached to the pier 5, the formwork system and the walking system are fixedly connected using the connecting column 10 to ensure the orderly progress of the construction. At the same time, the electric hoist 11 plays a certain role in protecting the bottom formwork system. The construction safety is guaranteed.

如图1、图2所示,本实用新型中的防护系统包括设置在底模平台1两侧的防护栏12以及设置在底模平台1和防护栏12上的绝缘板13,进一步减少高空坠落和物体打击现象的发生,绝缘板13的设计有效防止触电事故的发生,降低了合龙施工的风险,提高了安全性。As shown in Fig. 1 and Fig. 2, the protection system in the utility model includes guardrails 12 arranged on both sides of the bottom mold platform 1 and insulating plates 13 arranged on the bottom mold platform 1 and the guardrails 12, further reducing falling from heights The occurrence of impact phenomenon with objects, the design of insulating plate 13 effectively prevents the occurrence of electric shock accidents, reduces the risk of closing construction, and improves safety.

Claims (5)

1.一种可移动式连续梁合龙段施工模具,包括防护系统、行走系统、模板系统以及悬吊系统,所述行走系统安装在所述模板系统的上方,所述的防护系统设置在所述的模板系统的上方,所述的悬吊系统设置在所述的行走系统的上方,所述的模板系统包括底模平台(1)、设置在底模平台(1)上的外模(2)以及设置在外模(2)外侧的外模支架(3),所述的防护系统包括设置在底模系统中底模平台(1)的电动葫芦(11)、设置在底模平台(1)两侧的防护栏(12)以及设置在底模平台(1)和防护栏(12)上的绝缘板(13)。1. A construction mold for movable continuous beam closing section, comprising a protection system, a walking system, a formwork system and a suspension system, the walking system is installed above the formwork system, and the protection system is arranged on the Above the template system, the suspension system is arranged above the walking system, and the template system includes a bottom mold platform (1), an outer mold (2) arranged on the bottom mold platform (1) And the outer mold support (3) that is arranged on the outer side of the outer mold (2), the described protection system includes the electric hoist (11) that is arranged on the bottom mold platform (1) in the bottom mold system, and is arranged on the two sides of the bottom mold platform (1). Side guardrails (12) and insulating plates (13) arranged on the bottom mold platform (1) and the guardrails (12). 2.根据权利要求1所述的可移动式连续梁合龙段施工模具,其特征在于:所述的外模(2)上方设置有行走系统,所述的行走系统包括设置在桥墩(5)上的走行轨道(4)、设置在走行轨道(4)上的行走小车(6)、设置在行走小车(6)上方的上纵梁(7)。2. The construction mold for the movable continuous beam closing section according to claim 1, characterized in that: a walking system is arranged above the outer mold (2), and the walking system includes The walking track (4), the walking dolly (6) arranged on the walking track (4), the upper longitudinal beam (7) arranged on the walking dolly (6) top. 3.根据权利要求1或2所述的可移动式连续梁合龙段施工模具,其特征在于:所述的悬吊系统包括设置在行走系统中上纵梁(7)上的上横梁(8)、上横梁(8)上设置的吊点支座(9)、用于连接吊点支座(9)和模板系统中底模平台(1)的连接柱(10)、设置在底模平台(1)底部的电动葫芦(11)。3. The construction mold for movable continuous beam closing section according to claim 1 or 2, characterized in that: the suspension system includes an upper beam (8) arranged on the upper longitudinal beam (7) in the walking system , the lifting point support (9) provided on the upper crossbeam (8), the connecting column (10) for connecting the lifting point support (9) and the bottom mold platform (1) in the formwork system, and the bottom mold platform ( 1) Electric hoist (11) at the bottom. 4.根据权利要求3所述的可移动式连续梁合龙段施工模具,其特征在于:所述的悬吊系统中的电动葫芦(11)的另一端连接在防护系统中的上横梁(8)上。4. The construction mold for movable continuous beam closing section according to claim 3, characterized in that: the other end of the electric hoist (11) in the suspension system is connected to the upper beam (8) in the protection system superior. 5.根据权利要求2所述的可移动式连续梁合龙段施工模具,其特征在于:所述的行走系统中的行走小车(6)一端设置有走行电动机构(15),所述的走行轨道(4)的一端设置有挡板(14)。5. The construction mold for the movable continuous beam closing section according to claim 2, characterized in that: one end of the traveling trolley (6) in the traveling system is provided with a traveling electric mechanism (15), and the traveling track One end of (4) is provided with baffle plate (14).
CN201520317587.9U 2015-05-15 2015-05-15 A kind of packaged type continuous beam closure section construction mould Expired - Fee Related CN204662273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520317587.9U CN204662273U (en) 2015-05-15 2015-05-15 A kind of packaged type continuous beam closure section construction mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520317587.9U CN204662273U (en) 2015-05-15 2015-05-15 A kind of packaged type continuous beam closure section construction mould

Publications (1)

Publication Number Publication Date
CN204662273U true CN204662273U (en) 2015-09-23

Family

ID=54132674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520317587.9U Expired - Fee Related CN204662273U (en) 2015-05-15 2015-05-15 A kind of packaged type continuous beam closure section construction mould

Country Status (1)

Country Link
CN (1) CN204662273U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603882A (en) * 2016-02-29 2016-05-25 中交第一公路工程局有限公司 Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method
CN106149568A (en) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 A kind of device for the outside construction of box beam chamber and construction method
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN109052138A (en) * 2018-06-25 2018-12-21 上海建工集团股份有限公司 Bidirectional movable template handling apparatus and its construction method
CN115748468A (en) * 2022-11-09 2023-03-07 宁波市政工程建设集团股份有限公司 Integral assembling method for bridge steel structure sections based on aerial section assembling
CN117211196A (en) * 2023-09-18 2023-12-12 中铁十九局集团第六工程有限公司 A rotating continuous beam suspended lightweight pseudo-shaped external formwork mid-span closure construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603882A (en) * 2016-02-29 2016-05-25 中交第一公路工程局有限公司 Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method
CN105603882B (en) * 2016-02-29 2017-05-10 中交第一公路工程局有限公司 A construction method and structure for closing the mid-span of catenary non-stop continuous beam
CN106149568A (en) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 A kind of device for the outside construction of box beam chamber and construction method
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN109052138A (en) * 2018-06-25 2018-12-21 上海建工集团股份有限公司 Bidirectional movable template handling apparatus and its construction method
CN115748468A (en) * 2022-11-09 2023-03-07 宁波市政工程建设集团股份有限公司 Integral assembling method for bridge steel structure sections based on aerial section assembling
CN117211196A (en) * 2023-09-18 2023-12-12 中铁十九局集团第六工程有限公司 A rotating continuous beam suspended lightweight pseudo-shaped external formwork mid-span closure construction method

Similar Documents

Publication Publication Date Title
CN103015325B (en) Construction method of cast-in-place concrete crash barrier with eaves
CN205152788U (en) But telescopic bridge testing platform of antihunting
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN203451070U (en) Movable type gantry
CN106012824A (en) Movable bridge anti-collision guardrail construction operation trolley
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
CN104110002B (en) A kind of method for changing steel truss girder bridge floorings
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN101864969A (en) Segment caulking and hand hole blocking trolley for large-diameter shield tunnel
CN106400700A (en) Double-line cantilever type bridge formation machine
CN105603882B (en) A construction method and structure for closing the mid-span of catenary non-stop continuous beam
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN102587678A (en) Device for slipping node of steel structure
CN205348009U (en) Hanging flower basket device of bridge construction
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN107161869A (en) A simple cantilever crane for high-speed railway shutters
CN203334186U (en) A wheel type device for cable-stayed bridge floor press anchoring
CN201933423U (en) Movable type protecting canopy frame
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN209353221U (en) A kind of packaged type cantilever job platform for the construction of side guardrail
CN211110746U (en) Slope moving platform hoisting device
CN206940276U (en) A simple cantilever crane for high-speed railway shutters
CN203546596U (en) Box girder anti-falling beam stop block mounting frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160118

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU SECOND ENGINEERING CO.,LTD.

CU03 Publication of corrected utility model

Correction item: Patentee|Address|Patentee

Correct: CHINA RAILWAY ERJU Co.,Ltd.|610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan|China Railway Erju Co., Ltd.

False: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.|Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Number: 06

Volume: 32

ERR Gazette correction
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160321

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20180730

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

CF01 Termination of patent right due to non-payment of annual fee