CN204649874U - A kind of platform district line loss is abnormal checks instrument - Google Patents
A kind of platform district line loss is abnormal checks instrument Download PDFInfo
- Publication number
- CN204649874U CN204649874U CN201520393677.6U CN201520393677U CN204649874U CN 204649874 U CN204649874 U CN 204649874U CN 201520393677 U CN201520393677 U CN 201520393677U CN 204649874 U CN204649874 U CN 204649874U
- Authority
- CN
- China
- Prior art keywords
- line loss
- phase
- instrument
- branch
- current transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本实用新型主要公开了一种台区线损异常稽核仪,该稽核仪安装于台区的出线开关、分支表箱处,该稽核仪包括三相CT表、快装线夹及开合式电流互感器;所述快装线夹安装在出线开关、分支表箱处的断路器出线侧,用于采集电压;所述开合式电流互感器安装在出线开关、分支表箱处的断路器出线侧,用于采集电流;所述三相CT表与快装线夹及开合式电流互感器通过导线连接,所述的三相CT表设有将采集的电压及电流信息传输到主站系统的GPRS通信模块,通过台区线损稽核仪可以快速查找异常点,缩短判断时间,提高效率,提高台区线损的同业对标指标,挽回线损损耗的经济损失。
The utility model mainly discloses an inspection instrument for abnormal line loss in the station area. The inspection instrument is installed at the outlet switch and the branch meter box of the station area. The quick-loading clamp is installed on the outgoing line side of the circuit breaker at the outlet switch and the branch meter box for collecting voltage; the split current transformer is installed on the outgoing line side of the circuit breaker at the outlet switch and the branch meter box, Used to collect current; the three-phase CT meter is connected to the quick-installation clamp and the open-close current transformer through wires, and the three-phase CT meter is provided with GPRS communication to transmit the collected voltage and current information to the master station system The module can quickly find abnormal points through the line loss audit instrument in the station area, shorten the judgment time, improve efficiency, improve the benchmarking index of line loss in the station area, and recover the economic loss of line loss.
Description
技术领域technical field
本实用新型涉及一种台区线损异常稽核仪,主要应用于台区线路的线损排查。The utility model relates to an inspection instrument for abnormal line loss in a station area, which is mainly used for checking the line loss of a line in a station area.
背景技术Background technique
信息化、自动化、互动化是用电信息采集系统发展的方向。在采集全覆盖的基础上,线路上的线损数据采集是该发展方向中的重要目标,目前这类线损数据采集还存在盲点,特点是公变台区的分支线和用户的接户线还没有单独的采集器,无疑增加了台区线损异常处理的难度和时间。线损率是一项综合性技术经济指标,它的大小可以表示出供电企业的管理水平,并与其经济效益息息相关。线损率也是国家贯彻节能方针,考核供电企业的一项重要指标。而低压台区线损是指电压在10kV及以下的情况下造成的线损,它在电力系统的损耗中占有很大比重,由于不易察觉,且容易忽略,所以采取相应措施降低低压台区的损耗对于我国电网来讲,可以节省大量电能,具有很大的降损节电潜力,目前台区线损按照管理层面入手可以分为三类:1、理论线损;2、技术线损;3、管理线损。最容易出问题的地方有以下几个方面:Informatization, automation, and interaction are the development directions of the electricity consumption information collection system. On the basis of full coverage of the collection, line loss data collection on the line is an important goal in this development direction. At present, there are still blind spots in this type of line loss data collection, which is characterized by branch lines in public substation areas and user access lines There is no separate collector, which undoubtedly increases the difficulty and time of abnormal line loss handling in the station area. Line loss rate is a comprehensive technical and economic index, its size can indicate the management level of power supply enterprises, and is closely related to its economic benefits. The line loss rate is also an important index for the country to implement the energy-saving policy and evaluate the power supply enterprises. The line loss in the low-voltage station area refers to the line loss caused by the voltage of 10kV and below. It accounts for a large proportion of the loss of the power system. Since it is not easy to detect and is easy to ignore, corresponding measures are taken to reduce the loss of the low-voltage station area. For my country's power grid, loss can save a lot of electric energy and has great potential for loss reduction and power saving. At present, the line loss in the station area can be divided into three categories according to the management level: 1. Theoretical line loss; 2. Technical line loss; 3. , Management line loss. The most prone to problems are the following aspects:
(1)对于线损偏高的台区,电力部门难以采取有效的方式排查故障,因为范围较大,有可能是线路故障、有可能是计量设备异常等,需要投入大量人力物力,而绝大多数的人力排查工作均未产生直接价值;(1) For the station area with high line loss, it is difficult for the power department to take an effective way to troubleshoot the fault, because the scope is large, it may be a line fault, it may be an abnormal measurement equipment, etc., which requires a lot of manpower and material resources, and the vast majority Most of the human investigation work did not produce direct value;
(2)现有用电信息采集系统对于台区下分块、分段线损分析处于盲区,难以提供有效的手段协助缩小线损故障分析范围;(2) The existing power consumption information collection system is in a blind spot for block and segment line loss analysis under the station area, and it is difficult to provide effective means to assist in narrowing the scope of line loss fault analysis;
(3)台区线损偏高时,特别需要通过分块、分段的方式缩小排查范围,但目前技术手段不能有效支持。(3) When the line loss in the station area is high, it is especially necessary to reduce the scope of investigation by dividing into blocks and segments, but the current technical means cannot effectively support it.
实用新型内容Utility model content
本实用新型需要解决的技术问题是,提供一种台区线损异常稽核仪,通过台区线损稽核仪可以快速查找异常点,缩短判断时间,提高排查效率,提高台区线损的同业对标指标,挽回线损损耗的经济损失。The technical problem to be solved by the utility model is to provide a line loss abnormal inspection instrument for the station area, through which the abnormal point can be quickly found, the judgment time can be shortened, the investigation efficiency can be improved, and the line loss of the station area can be improved. Standard indicators, to restore the economic loss of line loss loss.
本实用新型的技术方案是:一种台区线损异常稽核仪,该稽核仪安装于台区的出线开关、分支表箱处,该稽核仪包括三相CT表、快装线夹及开合式电流互感器;所述快装线夹安装在出线开关、分支表箱处的断路器出线侧,用于采集电压;所述开合式电流互感器安装在出线开关、分支表箱处的断路器出线侧,用于采集电流;所述三相CT表与快装线夹及开合式电流互感器通过导线连接,所述的三相CT表设有将采集的电压及电流信息传输到主站系统的GPRS通信模块。The technical solution of the utility model is: an inspection instrument for abnormal line loss in the station area. The inspection instrument is installed at the outlet switch and the branch meter box of the station area. Current transformer; the fast-loading clamp is installed on the outgoing line side of the circuit breaker at the outlet switch and the branch meter box, and is used to collect voltage; the split current transformer is installed on the outgoing line of the circuit breaker at the outlet switch and the branch meter box side, used to collect current; the three-phase CT meter is connected to the quick-installation clamp and the open-close current transformer through wires, and the three-phase CT meter is provided with a device for transmitting the collected voltage and current information to the master station system GPRS communication module.
优选的,所述的稽核仪包括计表箱,所述的三相CT表设于计表箱内。Preferably, the auditor includes a meter box, and the three-phase CT meter is arranged in the meter box.
优选的,所述的计表箱设有上部储物格和下部储物格,三相CT表固定在上部储物格内,所述的快装线夹和开合式电流互感器在不使用时分别放置在两个下部储物格中。Preferably, the meter box is provided with an upper storage compartment and a lower storage compartment, the three-phase CT meter is fixed in the upper storage compartment, and the quick-loading clamp and the open-close current transformer are Separately placed in the two lower storage compartments.
优选的,所述的下部储物格与上部储物格之间的分隔板上设有方便导线通过的线槽,下部储物格侧壁或底壁设有供导线穿出用的通孔。Preferably, the partition plate between the lower storage compartment and the upper storage compartment is provided with wire slots for the passage of wires, and the side wall or bottom wall of the lower storage compartment is provided with through holes for wires to pass through. .
优选的,所述的计表箱背部设有圆弧形抱箍组件,抱箍组件包括固定于计表箱背部的固定板及活动板,固定板与活动板的横截面均为圆弧形。Preferably, the back of the meter box is provided with an arc-shaped hoop assembly. The hoop assembly includes a fixed plate and a movable plate fixed on the back of the meter box. The cross-sections of the fixed plate and the movable plate are both arc-shaped.
采用上述技术方案后,本实用新型具有如下优点:After adopting the technical scheme, the utility model has the following advantages:
采集数据与主站系统互通,缩小线损故障范围:通过在出线开关、分支表箱处安装相应的台区线损异常稽核仪,并利用GPRS通信模块远程到主站系统,结合主站系统上的线损管理系统缩小线损故障范围;还可以结合居民表计、公变总表的计量数据,进行分区块线损分析。The collected data communicates with the main station system to reduce the scope of line loss faults: by installing the corresponding station area line loss anomaly inspection instrument at the outlet switch and branch meter box, and using the GPRS communication module to remotely connect to the main station system, combined with the main station system The advanced line loss management system reduces the scope of line loss faults; it can also combine the metering data of residents' meters and public transformer meters to analyze line losses in sub-blocks.
提供可快速安装、拆卸的计量装置:传统在出线开关、分支表箱处安装计量装置,往往需要对线路进行断电处理,并安装相应的CT及计量表计,步骤复杂。而仅针对线损问题排查时,还需要快速的安装,问题排查后能够快速拆除且能够重复使用,本实用新型中的快装线夹和开合式电流互感器接入时并不需要断电处理,而且安装和拆除非常方便,安装拆除过程对出线开关、分支表箱不造成任何不良影响。Provide metering devices that can be quickly installed and disassembled: Traditionally, metering devices are installed at outlet switches and branch meter boxes, and it is often necessary to power off the line and install corresponding CTs and metering meters. The steps are complicated. But only for troubleshooting the problem of line loss, fast installation is also required. After the problem is checked, it can be quickly dismantled and reused. The quick-installation wire clip and the split current transformer in the utility model do not need to be powered off when they are connected. , and the installation and removal are very convenient, and the installation and removal process will not cause any adverse effects on the outlet switch and the branch meter box.
附图说明Description of drawings
附图1为本实用新型的安装位置示意图;Accompanying drawing 1 is the installation position schematic diagram of the present utility model;
附图2为本实用新型的与断路器的连接示意图;Accompanying drawing 2 is the connection schematic diagram of the utility model and circuit breaker;
附图3为本实用新型的三维结构示意图;Accompanying drawing 3 is the three-dimensional structural representation of the utility model;
附图4为本实用新型背部示意图;Accompanying drawing 4 is the schematic diagram of the back of the utility model;
附图5为某分支处采集的电量信息示意图。Figure 5 is a schematic diagram of the electricity information collected at a certain branch.
具体实施方式Detailed ways
下面结合附图对本实用新型的具体实施方式作进一步说明:The specific embodiment of the utility model will be further described below in conjunction with accompanying drawing:
如图1至图4所示,一种台区线损异常稽核仪,台区的出线开关、分支表箱处设有断路器1,断路器上安装稽核仪,稽核仪包括三相CT表2,所述的三相CT表接出有7根导线,其中4根导线末端分别设有快装线夹3,快装线夹可采用全塑封鳄鱼夹,另外3根导线末端设有开合式电流互感器4,所述的快装线夹接入所述的断路器中测取电压,接入点分别是断路器上的A相、B相、C相及中性线N相,刚好4根导线,利用鳄鱼夹可以方便快速接入到断路器上测得电压,所述的开合式电流互感器设于断路器出线端测取出线端电流,开合式电流互感器主要安装在出线开断路器输出导线上,三个开合式电流互感器为一组,刚好配3根导线,此类电流互感器在安装、拆卸过程中无需断电,只需在打开状态下将断路器的输出线束放置到圆形感应圈内即可,非常方便,实际操作时可根据实际情况,选择不同规格的电流互感器:如600A/5A,400A/5A,200A/5A,100A/5A等,所述的三相CT表内设有将采集电压或电流信息传输到主站系统的GPRS通信模块,能够及时将数据远程传输到主站系统上进行数据分析,运用该稽核系统后,效果非常明显:一、以1个低压台区为例,通过安装异常稽核仪并结合低压台区线损分析管理软件,可将低压台区线损从10%降低到3%左右,每个台区200户(月均用电100kWh)左右,月降低损失1400kWh/台区,1个县局台区数量约500个,月降低损失700,000kWh/台区,节省损失约35万元/月;二、台区线损指标的提升,间接也推动的配电网规划管理、运行管理、检修管理、营销用电管理、计量管理、抄核收管理等方面的提升,全面提升了电网经营企业对台区设备及用户的管理水平。As shown in Figures 1 to 4, a line loss abnormality audit instrument in the station area, a circuit breaker 1 is installed at the outlet switch and branch meter box of the station area, and an audit instrument is installed on the circuit breaker. The audit instrument includes a three-phase CT meter 2 , the three-phase CT meter is connected with 7 wires, and the ends of the 4 wires are respectively equipped with quick-loading wire clips 3. The fast-loading wire clips can be fully plastic-enclosed crocodile clips, and the ends of the other 3 wires are equipped with open-close current Transformer 4, the fast-loading clamp is connected to the circuit breaker to measure the voltage, and the access points are the A phase, B phase, C phase and neutral line N phase on the circuit breaker, exactly 4 The wire can be conveniently and quickly connected to the circuit breaker to measure the voltage by using alligator clips. The split current transformer is installed at the outlet end of the circuit breaker to measure the current at the outlet end of the circuit breaker. The split current transformer is mainly installed on the outlet of the circuit breaker On the output wires, three open-close current transformers form a group, which is just equipped with 3 wires. This type of current transformer does not need to be powered off during installation and disassembly. It only needs to place the output wire harness of the circuit breaker in the open state. It can be placed inside the circular induction coil, which is very convenient. In actual operation, current transformers of different specifications can be selected according to the actual situation: such as 600A/5A, 400A/5A, 200A/5A, 100A/5A, etc., the three-phase The CT meter is equipped with a GPRS communication module that transmits the collected voltage or current information to the main station system, which can transmit the data to the main station system in time for data analysis. After using the audit system, the effect is very obvious: 1. With 1 Take a low-voltage station area as an example. By installing an abnormality checker and combining the line loss analysis and management software of the low-voltage station area, the line loss of the low-voltage station area can be reduced from 10% to about 3%. 100kWh), the monthly loss is reduced by 1400kWh/unit, the number of 1 county bureau is about 500, the monthly loss is reduced by 700,000kWh/unit, and the loss is saved by about 350,000 yuan/month; 2. The improvement of the line loss index of the station area , Indirectly also promoted the improvement of distribution network planning management, operation management, maintenance management, marketing power management, measurement management, copy verification and collection management, etc., and comprehensively improved the management level of power grid operating companies on equipment and users in the Taiwan area.
如图3至图4所示,在具体设备安装采集时,所述的稽核仪还包括计表箱5,由于在用的出线开关、分支表箱的表箱空间有限,很难放置一个三相CT表,所以本方案选用一个专用计表箱放置三相CT表计,计表箱包括箱体和上盖,使用箱体时安装在出线开关、分支表箱旁边,方便安装及拆卸,作为优选,所述的箱体设有上部储物格和下部储物格,三相CT表固定在上部储物格内,所述的快装线夹和开合式电流互感器在不使用时分别放置在两个下部储物格中,使得巡检人员在不使用时携带起来更方便,相关的导线线束卷取后可与快装线夹和开合式电流互感器一起放入到下部储物格中,另外为了让稽核仪在正常使用时导线线束不显得凌乱,所述的下部储物格与上部储物格之间的分隔板上设有方便导线通过的线槽51,分隔板上线槽可以设多个,按照本实用新型中的导线数量,两个下部储物格可以分别设3个线槽和4个线槽,使得线路更明确,下部储物格侧壁或底壁设有供导线穿出用的通孔52,因为快装线夹和开合式电流互感器都要接入到断路器上,所以其导线最终都是要延伸出计表箱外部,为了方便这些导线穿出才设置了通孔,最后为了方便计表箱的拆装,所述的计表箱背部设有圆弧形抱箍组件53,抱箍组件包括固定于计表箱背部的固定板531及活动板532,固定板与活动板的横截面均为圆弧形,一般计表箱都固定在电线杆上或者PVC管道上,所以圆弧形的形状非常适合安装和拆卸。As shown in Figures 3 to 4, when the specific equipment is installed and collected, the audit instrument also includes a meter box 5. Due to the limited space in the meter box of the outlet switch and branch meter box in use, it is difficult to place a three-phase CT meter, so this plan uses a special meter box to place the three-phase CT meter. The meter box includes the box body and the upper cover. When using the box body, it is installed next to the outlet switch and the branch meter box, which is convenient for installation and removal. , the box body is provided with an upper storage compartment and a lower storage compartment, the three-phase CT meter is fixed in the upper storage compartment, and the quick-loading clamp and the open-close current transformer are respectively placed in the The two lower storage compartments make it more convenient for inspectors to carry them when not in use. The relevant wire harnesses can be put into the lower storage compartments together with the quick-release wire clamp and the open-close current transformer after being coiled. In addition, in order to make the wiring harness of the auditory instrument not appear messy during normal use, the partition plate between the lower storage compartment and the upper storage compartment is provided with a wire groove 51 for the passage of the wire, and the wire groove on the partition board can be Set multiple, according to the number of wires in the utility model, the two lower storage compartments can be respectively provided with 3 wire slots and 4 wire slots, so that the lines are more clear, and the side wall or bottom wall of the lower storage compartment is provided with wires The through hole 52 for passing through, because the quick-loading clamp and the open-close current transformer must be connected to the circuit breaker, so its wires will eventually extend out of the meter box, and these wires are set in order to facilitate the passing of these wires. Finally, in order to facilitate the disassembly and assembly of the meter box, the back of the meter box is provided with an arc-shaped hoop assembly 53, and the hoop assembly includes a fixed plate 531 and a movable plate 532 fixed on the back of the meter box. The cross-sections of the fixed plate and the movable plate are both arc-shaped, and the meter boxes are generally fixed on utility poles or PVC pipes, so the arc-shaped shape is very suitable for installation and disassembly.
对于主站系统的线损分析软件,所述的主站系统包括用于定时或人工接收来自所述GPRS通信模块传输信号的GPRS接收模块,GPRS接收模块连接有数据分析模块,数据分析模块将数据导出图表或表格进行显示,能让接收到的数据更直观地显示出来,具体分析方式如下:For the line loss analysis software of the master station system, the master station system includes a GPRS receiving module for timing or manually receiving transmission signals from the GPRS communication module, the GPRS receiving module is connected with a data analysis module, and the data analysis module converts the data Exporting charts or tables for display can make the received data more intuitive. The specific analysis methods are as follows:
所述的数据分析模块将接收到的电压、电流信息按内置线损计算公式计算出公共终端变量与分支之间的线损率,线损率=公变终端电量-分支总电量/公变总电量,当线损率大于8%时,一般认为其分支存在故障,主要影响因素有:a、电流互感器变比不对,系统变比比现场变比要大;b.公变终端误差较大,走快。当线损率小于0%时,主要影响因素有:a、电流互感器变比不对,系统变比比现场变比要小;b、公变终端误差较大,走慢;c、电流互感器与公变终端之间的极性接反;d、电流互感器与公变终端之间的错接线;e、电流互感器与公变终端之间的断相故障(电流缺相、电压断相);f、电流互感器与公变终端之间的任何一粒螺丝未拧紧;g、功率因数问题。线损率大于8%或小于0%时重点查看该分支处的电量使用情况;数据分析模块还可用于分析分支电量与该分支下接入点用户电量,即数据分析模块按线损计算公式计算分支电量与该分支电量下接入点用户电量之间的线损,线损率=分支电量-该分支用户电量/分支电量,当线损率大于8%,该分支必有问题;数据分析模块还可用于将分支分相电量与对应相的接入点用户电量比较分析,即某相线损率大于8%,其它相线损率在正常范围内,就可以锁定该相用户,这样排查起来的工作量就会少很多,效果也最佳。The data analysis module calculates the received voltage and current information according to the built-in line loss calculation formula to calculate the line loss rate between the public terminal variable and the branch, and the line loss rate = public transformer terminal power - branch total power / public transformer total For electricity, when the line loss rate is greater than 8%, it is generally considered that there is a fault in its branch. The main influencing factors are: a. The transformation ratio of the current transformer is wrong, and the system transformation ratio is larger than the field transformation ratio; b. The public transformer terminal error is large, go fast. When the line loss rate is less than 0%, the main influencing factors are: a. The transformation ratio of the current transformer is wrong, and the system transformation ratio is smaller than the on-site transformation ratio; The polarity between the public transformer terminals is reversed; d. Miswiring between the current transformer and the public transformer terminal; e. The phase failure between the current transformer and the public transformer terminal (current phase loss, voltage phase loss) ; f, any screw between the current transformer and the public transformer terminal is not tightened; g, power factor problem. When the line loss rate is greater than 8% or less than 0%, focus on checking the power usage at the branch; the data analysis module can also be used to analyze the branch power and the user power of the access point under the branch, that is, the data analysis module calculates according to the line loss calculation formula The line loss between the branch power and the access point user power under the branch power, the line loss rate = the branch power - the branch user power / the branch power, when the line loss rate is greater than 8%, there must be a problem with the branch; data analysis module It can also be used to compare and analyze the branch phase-separated power and the user power of the access point of the corresponding phase, that is, if the line loss rate of a certain phase is greater than 8%, and the line loss rate of other phases is within the normal range, the user of this phase can be locked, and the investigation can be done in this way The workload will be much less, and the effect will be the best.
另外数据分析模块包括用于导入台区下小区用户用电数据的数据存档模块,从而方便将现场采集到的数据与之前导入的用户用电数据相对较,也可以导入别的小区用户进行数据对比,来寻找差别点及改进点,另外根据各地区的实际情况,所述的数据计算模块中包括线损公式自定义模块,即用户可以自定义设置总计量单元或分计量单元,也可以自定义线损的计算公式等。In addition, the data analysis module includes a data archiving module for importing the electricity consumption data of users in the sub-area, so that the data collected on site can be compared with the previously imported user electricity consumption data, and it can also be imported into users in other communities for data comparison , to find differences and improvements. In addition, according to the actual situation of each region, the data calculation module includes a line loss formula customization module, that is, the user can customize the total measurement unit or sub-measurement unit, or customize Line loss calculation formula, etc.
具体分析举例,以图5中的数据为例,公变终端电量104.55-(A1-1分支电量46.08)-(A2-1分支电量58.45)=0.02kWh,线损电量只有0.02kWh;For a specific analysis example, taking the data in Figure 5 as an example, the public transformer terminal power is 104.55-(A1-1 branch power 46.08)-(A2-1 branch power 58.45)=0.02kWh, and the line loss power is only 0.02kWh;
而A1-1分支A相电量21.15-A相用户电量21.07=0.08kWh,线损电量只有0.08kWh;A1-1分支B相电量10.12-B相用户电量10.08=0.04kWh,线损电量只有0.04kWh;而A1-1分支C相电量14.81-C相用户电量14.78=0.03kWh,线损电量只有0.03kWh;And A1-1 branch A-phase power 21.15-A-phase user power 21.07=0.08kWh, line loss power is only 0.08kWh; A1-1 branch B-phase power 10.12-B-phase user power 10.08=0.04kWh, line loss power is only 0.04kWh ; while A1-1 branch C-phase power 14.81-C-phase user power 14.78=0.03kWh, line loss power is only 0.03kWh;
而A2-1分支A相电量51.15-A相用户电量39.47=11.68kWh,线损电量就有11.68kWh;A2-1分支B相电量7.29-B相用户电量7.26=0.03kWh,线损电量只有0.03kWh;而A2-1分支C相电量0.01-C相用户电量0=0.01kWh,线损电量只有0.01kWh;由此可见问题就出在A2-1分支的A相用户上,针对性非常强。And A2-1 branch A-phase power 51.15-A-phase user power 39.47=11.68kWh, line loss power is 11.68kWh; A2-1 branch B-phase power 7.29-B-phase user power 7.26=0.03kWh, line loss power is only 0.03 kWh; while A2-1 branch C-phase power 0.01-C-phase user power 0=0.01kWh, line loss power is only 0.01kWh; thus it can be seen that the problem lies in the A-phase users of A2-1 branch, which is very targeted.
实际操作时,排查分支处时方法如下:In actual operation, the method of checking the branch is as follows:
a.用台区线损异常稽核仪采集数据并结合系统主站进行相关数据分析;a. Use the line loss anomaly inspector in the station area to collect data and analyze relevant data in combination with the system master station;
b.现场排查:一个台区分3~5个人去检查,一个人负责20~40块电表,并仔细查看分支线上或接入点旁及下户线等地方有没有私自搭接电线的条件,如有仔细查看有无搭接痕迹或烧弧痕迹;b. On-site inspection: 3 to 5 people in one station will check, and one person will be responsible for 20 to 40 meters, and carefully check whether there are any conditions for privately connecting wires on the branch line or next to the access point and the down line, etc., such as Check carefully whether there are lap marks or arc burn marks;
c.开盖检查完毕,封印必须封号,检查时如有时钟异常、报警、极性接反指示等异常情况请记录下来;c. After opening the cover and inspecting, the seal must be sealed. If there are abnormal clocks, alarms, reverse polarity indications, etc. during the inspection, please record them;
d.过几天观察线损情况,如还有问题,再去现场核对,开盖观察是否封印完好,如有损害必有问题;d. Observe the line damage in a few days, if there is still a problem, go to the site to check, open the cover and observe whether the seal is intact, if there is damage, there must be a problem;
e.如无异常,就有理由怀疑其他问题:分支分相偏重负荷、线路供电半径是否过大、线径是否过小等各种原因。e. If there is no abnormality, there are reasons to suspect other problems: branch phase separation and heavy load, whether the power supply radius of the line is too large, whether the wire diameter is too small and other reasons.
以上仅就本实用新型较佳的实例作了说明,但不能理解为是对权利要求的限制。本实用新型不仅局限与以上实例,其具体结构允许有变化,本领域技术人员可以根据本实用新型作出各种改变和变形,只要不脱离本实用新型的精神,均应属于本实用新型所附权利要求所定义的范围。The above is only a description of the preferred examples of the utility model, but should not be construed as a limitation on the claims. The utility model is not only limited to the above examples, but its specific structure is allowed to change. Those skilled in the art can make various changes and deformations according to the utility model. As long as they do not depart from the spirit of the utility model, all should belong to the rights attached to the utility model. The scope defined by the requirement.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520393677.6U CN204649874U (en) | 2015-06-09 | 2015-06-09 | A kind of platform district line loss is abnormal checks instrument |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520393677.6U CN204649874U (en) | 2015-06-09 | 2015-06-09 | A kind of platform district line loss is abnormal checks instrument |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204649874U true CN204649874U (en) | 2015-09-16 |
Family
ID=54102610
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520393677.6U Expired - Lifetime CN204649874U (en) | 2015-06-09 | 2015-06-09 | A kind of platform district line loss is abnormal checks instrument |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204649874U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109463822A (en) * | 2018-11-19 | 2019-03-15 | 佛山科学技术学院 | A warning traffic smart glove with camera function |
| CN111337774A (en) * | 2020-03-19 | 2020-06-26 | 广西电网有限责任公司贵港供电局 | A device for measuring line loss assessment of low-voltage lines |
| CN111693809A (en) * | 2020-06-11 | 2020-09-22 | 广东电网有限责任公司清远供电局 | Low-voltage line loss metering device |
| CN114089096A (en) * | 2021-10-20 | 2022-02-25 | 国网浙江省电力有限公司嘉兴供电公司 | Low-voltage transformer area line loss segmented troubleshooting device and method |
-
2015
- 2015-06-09 CN CN201520393677.6U patent/CN204649874U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109463822A (en) * | 2018-11-19 | 2019-03-15 | 佛山科学技术学院 | A warning traffic smart glove with camera function |
| CN111337774A (en) * | 2020-03-19 | 2020-06-26 | 广西电网有限责任公司贵港供电局 | A device for measuring line loss assessment of low-voltage lines |
| CN111693809A (en) * | 2020-06-11 | 2020-09-22 | 广东电网有限责任公司清远供电局 | Low-voltage line loss metering device |
| CN114089096A (en) * | 2021-10-20 | 2022-02-25 | 国网浙江省电力有限公司嘉兴供电公司 | Low-voltage transformer area line loss segmented troubleshooting device and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105044487A (en) | Transformer area line loss abnormity examination system and method | |
| CN106990328B (en) | Distribution network emergency repair abnormal data analysis, fault location system and method | |
| CN102611172B (en) | Standard design of electric automobile charging facility | |
| CN103941158B (en) | Power distribution network fault diagnosis method based on multi-source information | |
| CN106872856B (en) | Active repair system and method for distribution network faults based on multiple fault acquisition | |
| CN106291252A (en) | A kind of 10kV line loss and low-voltage platform area line loss management analysis method | |
| CN100580464C (en) | Detection method and detection system for large-scale grounding grids in power plants and substations | |
| CN102497021A (en) | Real-time monitoring and analysis system for distribution circuit | |
| CN101893672A (en) | A state monitoring and fault diagnosis and early warning device for mine-used high-voltage cables | |
| CN101739877A (en) | Simulation training system of 10KV typical customer distribution room | |
| CN103713210A (en) | Dry power transformer monitoring and diagnosis system | |
| CN106094571B (en) | Multifunctional anti-electricity-theft simulation experiment platform | |
| CN101769980A (en) | Test method for simulating power transmission debugging | |
| CN105388357A (en) | Electricity larceny prevention system | |
| CN106814286B (en) | Distribution network fault location system, method and server based on multiple fault acquisition | |
| CN204649874U (en) | A kind of platform district line loss is abnormal checks instrument | |
| CN201926727U (en) | Power quality monitor | |
| CN105390053A (en) | Intelligent ammeter and electricity consumption information acquisition site simulation training platform | |
| CN106841932A (en) | Fault Location in Distribution Network based on short circuit current | |
| CN103995227B (en) | The planned state test method of distribution switch | |
| CN108597291A (en) | A kind of matching net wire loss simulation training system | |
| CN106771841B (en) | A kind of through-flow system of substation S type and method | |
| CN201576285U (en) | 10KV typical customer power distribution room simulation training system | |
| CN104655989A (en) | Smart meter collecting function based remote inspection method for power outage fields | |
| CN112396906A (en) | Comprehensive simulation system for professional post skills and examination of electricity inspection for actual operation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150916 |