CN204626434U - 一种人工挖孔桩止水结构 - Google Patents

一种人工挖孔桩止水结构 Download PDF

Info

Publication number
CN204626434U
CN204626434U CN201520125323.3U CN201520125323U CN204626434U CN 204626434 U CN204626434 U CN 204626434U CN 201520125323 U CN201520125323 U CN 201520125323U CN 204626434 U CN204626434 U CN 204626434U
Authority
CN
China
Prior art keywords
pile
water
stake
soon
hand excavated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520125323.3U
Other languages
English (en)
Inventor
张满江红
欧阳昭田
周松松
邱时秒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201520125323.3U priority Critical patent/CN204626434U/zh
Application granted granted Critical
Publication of CN204626434U publication Critical patent/CN204626434U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种人工挖孔桩止水结构,包括人工挖孔桩,在人工挖孔桩的外圈设置止水帷幕环,止水帷幕环呈空心圆柱状结构,由三孔旋喷桩构成,旋喷桩为高压旋喷桩,旋喷桩长度进入全风化土层1.5米,三孔旋喷桩直径为600mm、圆心间隔为400mm,局部直径为500mm、圆心间隔为300mm,具体设计可依据人工挖孔桩的直径大小确定。此方法不受人工挖孔桩的桩径、桩长的限制。该结构有效的解决了人工挖孔桩的多方位止水问题。

Description

一种人工挖孔桩止水结构
技术领域
本实用新型涉及建筑领域,特别是地下工程中的桩基础止水结构。
背景技术
在地下水非常丰富沿海或沿江地区,人工挖孔桩在施工过程中会面临孔内严重积水导致无法施工的问题,若采用潜水泵大量抽水以保证人工挖孔桩内的施工环境,在周边建筑物对降水异常敏感的地区是无法实施的,抽水将会导致周边建筑物沉降开裂。以往的止水结构通常通过:加大护壁的厚度,护壁混凝土采用抗渗混凝土,在护壁施工段的接缝处用密封止水浆抹一圈,但此技术无法阻断从桩孔底部涌出的水,止水效果有限。另一种常用的止水办法是在基坑四周做一圈止水帷幕,止水帷幕进入全风化或中风化地层,基坑内施工的人工挖孔桩内仅有少量的岩隙水,不抽水或少量抽水基本可以满足桩孔内的施工环境。但此方法无法对个别位于基坑止水帷幕外的人工挖孔桩进行止水。
为解决位于基坑止水帷幕外的人工挖孔桩止水问题,或基坑止水帷幕未进入不透水层,人工挖孔桩内积水严重的问题,为了使得人工挖孔桩可以满足施工要求,我们自主研制设计了人工挖孔桩止水结构。
实用新型内容
本实用新型的目的是:解决人工挖孔桩的多方位止水问题。
为了实现上述目的,本实用新型的技术方案是提供一种人工挖孔桩止水结构,包括人工挖孔桩,在人工挖孔桩的外圈设置环形止水帷幕,环形止水帷幕呈空心圆柱状结构,由三孔旋喷桩构成,旋喷桩为高压旋喷桩,旋喷桩长度进入全风化土层1.5米,三孔旋喷桩直径为600mm、圆心间隔为400mm,局部直径为500mm、圆心间隔为300mm,具体设计可依据人工挖孔桩的直径大小确定。此方法不受人工挖孔桩的桩径、桩长的限制。
本人工挖孔桩止水结构与现结构相比,有如下技术效果:
现有结构位于基坑止水帷幕范围内,止水帷幕进入强透水层以下,基本能阻断基坑外的地下水,保证桩孔内渗水不至于太多,但无法解决位于基坑止水帷幕外的人工挖孔桩止水问题,或基坑止水帷幕未进入不透水层,人工挖孔桩内积水严重的问题。
附图说明
图1:人工挖孔桩止水结构横截面示意图;
图2:人工挖孔桩止水结构轴切面示意图。
附图标记:1、人工挖孔桩、;2、人工挖孔桩护壁;3、三孔旋喷桩,4、全风化土层,5、中风化土层。
具体实施方式
下面结合具体实施案例对本实用新型具体说明如下:作为本实用新型的一个实施例的一种人工挖孔桩止水结构示意图,如图1所示,该人工挖孔桩止水结构,包括人工挖孔桩,在人工挖孔桩1的外圈设置止水帷幕环,止水帷幕环呈空心圆柱状结构,由三孔旋喷桩3构成,旋喷桩为高压旋喷桩,旋喷桩长度进入全风化土层1.5米,三孔旋喷桩直径为600mm、圆心间隔为400mm,局部直径为500mm、圆心间隔为300mm,具体设计可依据人工挖孔桩的直径大小确定。此方法不受人工挖孔桩的桩径、桩长的限制。实际施工中,需按要求进行人工挖孔桩护壁2施工,在保证周围天然基础无降水施工风险的前提下顺序进行孔桩施工。

Claims (3)

1.一种人工挖孔桩止水结构,包括人工挖孔桩(1),其特征在于:在人工挖孔桩的外圈设置止水帷幕环,止水帷幕环呈空心圆柱状结构,由三孔旋喷桩(3)构成,旋喷桩长度进入全风化土层(4)1.5米。
2.根据权利要求1所述的一种人工挖孔桩止水结构,其特征在于:三孔旋喷桩直径为600mm、圆心间隔为400mm,局部直径为500mm、圆心间隔为300mm。
3.根据权利要求1所述的一种人工挖孔桩止水结构,其特征在于:旋喷桩为高压旋喷桩。
CN201520125323.3U 2015-03-04 2015-03-04 一种人工挖孔桩止水结构 Expired - Fee Related CN204626434U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520125323.3U CN204626434U (zh) 2015-03-04 2015-03-04 一种人工挖孔桩止水结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520125323.3U CN204626434U (zh) 2015-03-04 2015-03-04 一种人工挖孔桩止水结构

Publications (1)

Publication Number Publication Date
CN204626434U true CN204626434U (zh) 2015-09-09

Family

ID=54045478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520125323.3U Expired - Fee Related CN204626434U (zh) 2015-03-04 2015-03-04 一种人工挖孔桩止水结构

Country Status (1)

Country Link
CN (1) CN204626434U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761175A (zh) * 2021-01-13 2021-05-07 中铁第四勘察设计院集团有限公司 富水砂土层的水桶止水帷幕、挖孔桩支撑结构及施工工艺
CN114439024A (zh) * 2020-11-02 2022-05-06 中国建筑第四工程局有限公司 一种钢管帷幕辅助桩基成孔施工工艺
CN115748783A (zh) * 2022-12-15 2023-03-07 中铁广州工程局集团有限公司 高压旋喷桩止水帷幕处理水上大直径桩基漏浆的施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439024A (zh) * 2020-11-02 2022-05-06 中国建筑第四工程局有限公司 一种钢管帷幕辅助桩基成孔施工工艺
CN112761175A (zh) * 2021-01-13 2021-05-07 中铁第四勘察设计院集团有限公司 富水砂土层的水桶止水帷幕、挖孔桩支撑结构及施工工艺
CN115748783A (zh) * 2022-12-15 2023-03-07 中铁广州工程局集团有限公司 高压旋喷桩止水帷幕处理水上大直径桩基漏浆的施工方法

Similar Documents

Publication Publication Date Title
CN102155241A (zh) 一种岩溶注浆加固止水施工方法
CN209636826U (zh) 富水砂砾石地层基坑止水结构
CN103195477B (zh) 一种井下巷道高承压涌水的自流排水系统
CN103410564B (zh) 一种隧道涌水处治结构及其施工方法
CN105862721B (zh) 一种适用于高层建筑结构加固纠偏具有可调性预埋钢管的注浆复合地基及其施工方法
CN102296621B (zh) 一种地面分仓止水帷幕的施工方法
CN114738050A (zh) 一种复杂软岩隧道的防渗排水施工方法
CN104695457B (zh) 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法
CN108252719A (zh) 一种城市浅埋隧道下穿软流塑状红黏土层施工方法
CN107339108A (zh) 地下水富集的砂层地段地铁管棚施工方法
CN112081125A (zh) 潜水砂卵石地层基坑封底结构及施工工艺
CN204626434U (zh) 一种人工挖孔桩止水结构
CN103572764A (zh) 超深人工挖孔桩护壁止水结构及其施工方法
CN109881691B (zh) 一种深基坑开挖过程中基坑内基底勘探孔管涌的处理方法
CN104988914A (zh) 一种水域环境下的钻孔灌注桩断桩处理方法
CN102995647B (zh) 一种桩孔注浆隔渗的地下水控制方法
CN206928688U (zh) 一种盾构隧道近距离侧穿建筑物的加固结构
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN206438515U (zh) 一种用于承压水地区桩锚支护体系中的堵漏装置
CN105421498B (zh) 一种基于立体帷幕‑井群体系的基坑防渗水及沉降控制方法
CN208105281U (zh) 一种含富水砂卵石地层的地铁车站基坑止水及降水系统
CN205421303U (zh) 一种高水位粉砂土地基的降水处理装置
CN107956484B (zh) 既有盾构隧道变形控制的加固结构及施工方法
CN103343534A (zh) 基坑施工封闭降水方法
CN102220764A (zh) 深基坑支护体系及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20170304