CN204620302U - A kind of metal surface automation paint line - Google Patents

A kind of metal surface automation paint line Download PDF

Info

Publication number
CN204620302U
CN204620302U CN201520138085.XU CN201520138085U CN204620302U CN 204620302 U CN204620302 U CN 204620302U CN 201520138085 U CN201520138085 U CN 201520138085U CN 204620302 U CN204620302 U CN 204620302U
Authority
CN
China
Prior art keywords
area
coating
automatic
production line
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520138085.XU
Other languages
Chinese (zh)
Inventor
田龙
田修
倪建友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangyou Jinghe Nano Technology Co ltd
Original Assignee
JIAXING JINGHE ENERGY SAVING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING JINGHE ENERGY SAVING TECHNOLOGY Co Ltd filed Critical JIAXING JINGHE ENERGY SAVING TECHNOLOGY Co Ltd
Priority to CN201520138085.XU priority Critical patent/CN204620302U/en
Application granted granted Critical
Publication of CN204620302U publication Critical patent/CN204620302U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

本实用新型公开了一种金属表面自动化涂装生产线,包括第一涂装区和第二涂装区;所述第一涂装区和第二涂装区内均依次设有除湿装置、除尘系统、自动喷漆装置、流平区、烘烤区和冷却区;待涂装物件通过输送机在第一涂装区内、第二涂装区内以及第一涂装区和第二涂装区之间传送;所述的涂装生产线设置于无尘车间内。本实用新型提供的金属表面自动化涂装生产线,采用自动化涂装技术替代了传统的高污染、高排放的电镀工艺,提高了工作效率,降低了人力成本;改善了工人的作业环境,并对生产过程中产生的废气和废水进行收集处理,减少了涂装对大气和水的污染。

The utility model discloses an automatic coating production line for metal surfaces, which comprises a first coating area and a second coating area; the first coating area and the second coating area are sequentially equipped with a dehumidification device and a dust removal system , automatic painting device, leveling area, baking area and cooling area; objects to be coated pass through the conveyor in the first coating area, in the second coating area and between the first coating area and the second coating area Transmission between; the coating production line is set in a clean room. The metal surface automatic coating production line provided by the utility model adopts automatic coating technology to replace the traditional high-pollution and high-emission electroplating process, which improves work efficiency and reduces labor costs; The exhaust gas and waste water generated in the process are collected and treated, which reduces the pollution of the atmosphere and water by coating.

Description

一种金属表面自动化涂装生产线A metal surface automatic coating production line

技术领域technical field

本实用新型涉及一种涂装设备,更具体地说涉及一种金属表面自动化涂装的生产线。The utility model relates to a coating equipment, in particular to a production line for automatic coating of metal surfaces.

背景技术Background technique

电镀是利用电解原理在某些金属表面上镀上一薄层其它金属或合金的过程,是利用电解作用使金属或其它材料制件的表面附着一层金属膜的工艺从而起到防止金属氧化,提高耐磨性、导电性、反光性、抗腐蚀性及增进美观等作用。传统电镀是材料表面处理的重要步骤,但是电镀的过程中产生的废气废水废渣对人类的生存环境影响非常大,污染严重,特别是传统电镀所需要的原料氰化钠如果使用不当,很容易影响人类的身体健康,随着人们对健康的需求日益增长以及国家对环境的监控日益严格,传统的电镀已经无法满足现有的社会要求;同时电镀产品的成本也比较高,增大了企业的生产成本。Electroplating is the process of plating a thin layer of other metals or alloys on the surface of certain metals using the principle of electrolysis. It is a process of using electrolysis to attach a layer of metal film to the surface of metal or other material parts to prevent metal oxidation. Improve wear resistance, electrical conductivity, reflective properties, corrosion resistance and improve appearance. Traditional electroplating is an important step in the surface treatment of materials, but the waste gas, waste water and slag generated during the electroplating process have a great impact on the living environment of human beings and cause serious pollution, especially if the raw material sodium cyanide required for traditional electroplating is used improperly, it is easy to affect Human health, with the growing demand for health and the increasingly stringent monitoring of the environment by the country, traditional electroplating can no longer meet the existing social requirements; at the same time, the cost of electroplating products is relatively high, which increases the production of enterprises. cost.

喷涂作业是工业生产中的重要环节,其直接决定工业产品的外观质量;喷涂作业主要是将预涂工件放置于喷漆室内,利用喷漆室内的喷枪对将液态由其雾化,使雾化后的漆膜附着在工件表面形成漆膜。Spraying operation is an important link in industrial production, which directly determines the appearance quality of industrial products; the spraying operation is mainly to place the pre-coated workpiece in the spray booth, and use the spray gun in the spray booth to atomize the liquid from it, so that the atomized The paint film adheres to the surface of the workpiece to form a paint film.

发明内容Contents of the invention

针对现有技术的不足,本实用新型的目的是提供一种生产成本较低、生产效率高、对环境污染小,可替代传统的高污染、高排放电镀工艺的金属表面自动化涂装生产线。Aiming at the deficiencies of the prior art, the purpose of this utility model is to provide an automatic metal surface coating production line with low production cost, high production efficiency and little environmental pollution, which can replace the traditional high-pollution and high-emission electroplating process.

本实用新型解决技术问题所采用的技术方案是:一种金属表面自动化涂装生产线,所述自动化涂装生产线包括第一涂装区和第二涂装区,所述的第一涂装区为底漆涂装区,所述的第二涂装区为面漆涂装区;所述第一涂装区内依次设有第一除湿装置、第一除尘系统、第一自动喷漆装置、第一流平区、第一烘烤区和第一冷却区;所述第二涂装区内依次设有第二除湿装置、第二除尘系统、第二自动喷漆装置、第二流平区、第二烘烤区和第二冷却区;待涂装物件通过输送机在第一涂装区内、第二涂装区内以及第一涂装区和第二涂装区之间传送;所述的涂装生产线设置于无尘车间内;The technical solution adopted by the utility model to solve the technical problem is: a metal surface automatic coating production line, the automatic coating production line includes a first coating area and a second coating area, and the first coating area is The primer coating area, the second coating area is the top paint coating area; the first dehumidification device, the first dust removal system, the first automatic paint spraying device, the first streamline Leveling area, first baking area and first cooling area; the second dehumidification device, second dust removal system, second automatic painting device, second leveling area, second baking area are arranged in sequence in the second coating area The baking area and the second cooling area; the object to be coated is conveyed in the first coating area, in the second coating area and between the first coating area and the second coating area by a conveyor; the coating The production line is set up in the clean room;

所述的第一除尘系统和第二除尘系统均包括手动除尘装置和自动除尘装置;The first dust removal system and the second dust removal system both include a manual dust removal device and an automatic dust removal device;

所述的第一自动喷漆装置和第二自动喷漆装置均为水帘式喷漆房,所述喷漆房包括室体、静压送风系统、抽风系统、水帘板、循环泵阀系统和漆雾过滤系统;所述抽风系统通过抽风管道与尾气处理系统相连;所述漆雾过滤系统与废水处理系统相连;The first automatic paint spraying device and the second automatic paint spraying device are both water curtain spray booths, and the spray paint booths include a chamber body, a static pressure air supply system, an exhaust system, a water curtain plate, a circulating pump valve system and paint mist Filtration system; the exhaust system is connected to the tail gas treatment system through the exhaust pipe; the paint mist filtration system is connected to the waste water treatment system;

所述的第一流平区、第一烘烤区和第一冷却区为一体结构,所述的第二流平区、第二烘烤区和第二冷却区也为一体结构;每个所述的一体结构均包括箱体,所述箱体内设有分隔的箱板;所述箱体内均设有传送带;The first leveling zone, the first baking zone and the first cooling zone are of an integral structure, and the second leveling zone, the second baking zone and the second cooling zone are also of an integral structure; each of the The integrated structure of each includes a box body, and a separated box plate is arranged in the box body; a conveyor belt is arranged in the box body;

所述第一烘烤区和第二烘烤区的顶部均设置有强制排废气装置;所述的强制排废气装置通过管道与尾气处理系统相连。The tops of the first roasting zone and the second roasting zone are equipped with forced exhaust gas devices; the forced exhaust gas devices are connected to the tail gas treatment system through pipelines.

进一步地,所述的漆雾过滤系统包括设于喷漆房底部的蓄水槽和设于喷漆房一侧的折流板气水分离器,所述折流板气水分离器的底部与蓄水槽相连;所述蓄水槽内纵向设有若干过滤挡板;所述折流板气水分离器内纵向分布有若干折流板;所述蓄水槽的排水口与废水处理系统相连。Further, the paint mist filtration system includes a water storage tank located at the bottom of the spray booth and a baffle air-water separator located at one side of the spray booth, the bottom of the baffle air-water separator is connected to the water storage tank ; The water storage tank is longitudinally provided with a number of filter baffles; the baffle plate air-water separator is longitudinally distributed with a number of baffle plates; the outlet of the water storage tank is connected to the waste water treatment system.

进一步地,所述静压送风系统包括供风口、静压箱和隔板高效过滤器;所述隔板高效过滤器对空气的过滤效率达99.99%。Further, the static pressure air supply system includes an air supply port, a static pressure box and a partition high-efficiency filter; the filtration efficiency of the partition high-efficiency filter for air reaches 99.99%.

进一步地,所述的尾气处理系统主要由抽风管道、气水分离器、水处理层、废水输出口、玻纤过滤箱、活性炭箱组和废气排放口组成;所述喷漆房的抽风系统通过抽风管道与气水分离器相连,所述气水分离器的上方通过抽风管道与玻纤过滤箱相连,所述玻纤过滤箱的后方依次设有活性炭箱组和废气排放口;所述气水分离器的下方与水处理层相连,所述水处理层的下方设有废水输出口,初步处理过的废水通过废水输出口进入废水处理系统。Further, the exhaust gas treatment system is mainly composed of an exhaust pipe, a gas-water separator, a water treatment layer, a waste water outlet, a glass fiber filter box, an activated carbon box group, and an exhaust outlet; The pipeline is connected with the gas-water separator, and the upper part of the gas-water separator is connected with the glass fiber filter box through the exhaust pipe, and the rear of the glass fiber filter box is provided with an activated carbon box group and a waste gas discharge port in turn; the gas-water separator The lower part of the device is connected with the water treatment layer, and the lower part of the water treatment layer is provided with a waste water output port, and the preliminarily treated waste water enters the waste water treatment system through the waste water output port.

进一步地,所述第一烘烤区和第二烘烤区内的顶部均设有若干个灯丝加热模块,每个所述的灯丝加热模块是独立的;所述第一烘烤区和第二烘烤区内均采用分段控温的方式。Further, several filament heating modules are provided on the top of the first baking area and the second baking area, and each of the filament heating modules is independent; the first baking area and the second baking area In the baking area, the method of segmented temperature control is adopted.

进一步地,所述的第一除湿装置和第二除湿装置均为电加热式预热烤炉;所述预热烤炉内设有石英远红外线发热管,所述发热管上设有铝制反光灯罩。Further, the first dehumidification device and the second dehumidification device are both electric heating preheating ovens; quartz far-infrared heating tubes are installed in the preheating ovens, and aluminum reflective tubes are installed on the heating tubes. lampshade.

进一步地,所述的手动除尘装置为下抽风式;所述的自动除尘装置内设有可产生正负离子的离子发生器。Further, the manual dedusting device is a downdraft type; the automatic dedusting device is equipped with an ion generator capable of generating positive and negative ions.

进一步地,所述的抽风管道内设置有若干挡水板。Further, several water baffles are arranged in the air suction duct.

本实用新型的有益效果是:与现有技术相比,本实用新型提供的金属表面自动化涂装生产线具有以下几点优势:The beneficial effects of the utility model are: compared with the prior art, the metal surface automatic coating production line provided by the utility model has the following advantages:

(1)采用自动化喷涂、固化,替代人工操作,降低了不稳定因素,减少了损耗时间,提高了工作效率,降低了人力成本;(1) Automatic spraying and curing are used to replace manual operations, which reduces unstable factors, reduces loss of time, improves work efficiency, and reduces labor costs;

(2)涂料采用环保材料,并在一个密闭无尘空间内完成,改善了工人的作业环境,并对生产过程中产生的废气和废水进行收集处理,减少了涂装对大气和水的污染;(2) The coating is made of environmentally friendly materials, and it is completed in a closed and dust-free space, which improves the working environment of the workers, and collects and treats the waste gas and waste water generated during the production process, reducing the pollution of the atmosphere and water by coating;

(3)采用自动化涂装技术替代了传统的高污染、高排放的电镀工艺,大大降低了重金属对环境的污染,同时也降低了生产成本。(3) The traditional high-pollution and high-emission electroplating process is replaced by automatic coating technology, which greatly reduces the pollution of heavy metals to the environment and also reduces production costs.

附图说明Description of drawings

图1为本实用新型金属表面自动化涂装生产线的示意图。Fig. 1 is the schematic diagram of the utility model metal surface automatic coating production line.

图2为本实用新型中喷漆房的示意图。Fig. 2 is the schematic diagram of the spray booth in the utility model.

图3为本实用新型中烘烤区的示意图。Fig. 3 is a schematic diagram of the baking zone in the present invention.

图4为本实用新型中尾气处理系统的示意图。Fig. 4 is a schematic diagram of the tail gas treatment system of the present invention.

图中,1-第一除湿装置;2-第一自动除尘装置;3-第一手动除尘装置;4-第一自动喷漆装置;5-第一流平区;6-第一烘烤区;7-第一冷却区;8-第二手动除尘装置;9-第二自动除尘装置;10-第二自动喷漆装置;11-第二流平区;12-第二烘烤区;13-第二冷却区;14-第二除湿装置;15-输送机;16-废气排放口;17-气水分离器;18-水处理层;19-抽风管道;20-抽风系统;21-废水输出口;22-玻纤过滤箱;23-活性炭箱组;41-供风口;42-静压箱;43-隔板高效过滤器;44-室体;45-折流板;46-折流板气水分离器;47-蓄水槽;48-过滤挡板;61-检修门;62-强制排废气装置;63-IR灯管。In the figure, 1-the first dehumidification device; 2-the first automatic dust removal device; 3-the first manual dust removal device; 4-the first automatic painting device; 5-the first leveling area; 6-the first baking area; 7 - the first cooling zone; 8- the second manual dust removal device; 9- the second automatic dust removal device; 10- the second automatic painting device; 11- the second leveling zone; 12- the second baking zone; 13- the second Second cooling zone; 14-Second dehumidification device; 15-Conveyor; 16-Exhaust gas discharge port; 17-Gas-water separator; 18-Water treatment layer; ;22-glass fiber filter box; 23-activated carbon box group; 41-air supply port; 42-static pressure box; 43-partition high-efficiency filter; Water separator; 47-reservoir; 48-filter baffle; 61-access door; 62-forced exhaust device; 63-IR lamp.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

实施例Example

如图1所示,一种金属表面自动化涂装生产线,所述自动化涂装生产线包括第一涂装区和第二涂装区,所述的第一涂装区为底漆涂装区,所述的第二涂装区为面漆涂装区;所述第一涂装区内依次设有第一除湿装置1、第一除尘系统、第一自动喷漆装置4、第一流平区5、第一烘烤区6和第一冷却区7;所述第二涂装区内依次设有第二除湿装置14、第二除尘系统、第二自动喷漆装置10、第二流平区11、第二烘烤区12和第二冷却区13;待涂装物件通过输送机15在第一涂装区内、第二涂装区内以及第一涂装区和第二涂装区之间传送。所述的涂装生产线设置于无尘车间内;所述无尘车间内的尘埃粒径小于5um,湿度接近自然湿度。As shown in Figure 1, a kind of metal surface automatic coating production line, described automatic coating production line comprises the first coating area and the second coating area, described first coating area is primer coating area, so The second painting area described above is the topcoat painting area; the first dehumidifying device 1, the first dust removal system, the first automatic painting device 4, the first leveling area 5, the first A baking zone 6 and a first cooling zone 7; a second dehumidification device 14, a second dust removal system, a second automatic painting device 10, a second leveling zone 11, a second The baking area 12 and the second cooling area 13; the objects to be coated are transported in the first coating area, in the second coating area and between the first coating area and the second coating area through the conveyor 15. The coating production line is set in a clean room; the dust particle size in the clean room is less than 5um, and the humidity is close to the natural humidity.

所述的第一除湿装置1和第二除湿装置14均为电加热式预热烤炉;所述预热烤炉内设有石英远红外线发热管,所述发热管上设有铝制反光灯罩。The first dehumidification device 1 and the second dehumidification device 14 are both electric heating preheating ovens; quartz far-infrared heating tubes are arranged in the preheating ovens, and aluminum reflective lampshades are arranged on the heating tubes .

所述的第一除尘系统包括第一手动除尘装置3和第一自动除尘装置2;所述第二除尘系统包括第二手动除尘装置8和第二自动除尘装置9。所述的第一、第二手动除尘装置为下抽风式,用于涂装前的静电除尘,中和工件原有静电,消除工件吸附粉尘能力,同时伴有高压空气可将工件原有表面的灰尘吹落,提高素材良率,为高质量喷涂打下基础,并能消除静电潜在的安全隐患。所述的第一、第二自动除尘装置内置有负反馈离子平衡自动调节装置,离子平衡电压<0±5V,快速的除静电时间1.0~3.0S,电离装置上设置有专用清洗器,可定期清洗灰尘,有效减少离子枪的故障发生率,提高离子枪使用寿命。离子枪是一种高效静电消除装置,通过高压气流将离子发生装置所产生的大量正负离子迅速吹向所要除静电的区域,中和物体上所积累的静电电荷,同时高速离子气流将静电吸引的尘粒吹除,并阻止其再次吸引尘埃粒子。The first dust removal system includes a first manual dust removal device 3 and a first automatic dust removal device 2 ; the second dust removal system includes a second manual dust removal device 8 and a second automatic dust removal device 9 . The first and second manual dedusting devices described above are of the downdraft type, which are used for electrostatic dust removal before painting, neutralize the original static electricity of the workpiece, and eliminate the ability of the workpiece to absorb dust. At the same time, the high-pressure air can remove the original surface of the workpiece The dust is blown off, improving the material yield, laying the foundation for high-quality spraying, and eliminating the potential safety hazards of static electricity. The first and second automatic dedusting devices have a built-in negative feedback ion balance automatic adjustment device, the ion balance voltage is <0±5V, and the fast static removal time is 1.0-3.0S. The ionization device is equipped with a special cleaner, which can be used regularly Clean the dust, effectively reduce the failure rate of the ion gun, and improve the service life of the ion gun. The ion gun is a high-efficiency static elimination device. Through the high-pressure air flow, a large number of positive and negative ions generated by the ion generating device are quickly blown to the area to be destaticized, neutralizing the electrostatic charge accumulated on the object, and at the same time, the high-speed ion air flow will attract the static electricity. Dust particles are blown away and prevented from attracting dust particles again.

如图2所示,所述的第一自动喷漆装置4和第二自动喷漆装置10均为水帘式喷漆房,所述喷漆房包括室体44、静压送风系统、抽风系统20、水帘板、循环泵阀系统和漆雾过滤系统;所述抽风系统20通过抽风管道19与尾气处理系统相连,所述的抽风管道19内设置有若干挡水板;所述漆雾过滤系统与废水处理系统相连。As shown in Figure 2, the first automatic paint spraying device 4 and the second automatic paint spraying device 10 are both water curtain spray paint booths, and the paint spray booths include a chamber body 44, a static pressure air supply system, an exhaust system 20, water Curtain panels, circulation pump valve system and paint mist filtration system; the exhaust system 20 is connected to the exhaust gas treatment system through the exhaust pipe 19, and several water baffles are arranged in the exhaust pipe 19; the paint mist filtration system is connected with the waste water The processing system is connected.

所述的漆雾过滤系统包括设于喷漆房底部的蓄水槽47和设于喷漆房一侧的折流板气水分离器46,所述折流板气水分离器46的底部与蓄水槽47相连;所述蓄水槽47内纵向设有若干过滤挡板48;所述折流板气水分离器46内纵向分布有若干折流板45;所述蓄水槽47的排水口与废水处理系统相连。漆雾的回收可分成二个部分:一是喷涂工件时,漆雾与水帘碰撞混合,水帘会溶入部分漆雾落入蓄水槽,再经过滤挡板过滤,排入废水处理系统;二是未溶入水帘的漆雾进入水洗室,与雾化喷嘴喷出的水雾充分混合,经折流板气水分离器,漆雾与折流板相碰撞,漆雾就粘附于折流板上,使其与空气分离,漆雾沉降后流入蓄水槽,排入废水处理系统。The paint mist filtration system includes a water storage tank 47 located at the bottom of the spray booth and a baffle air-water separator 46 located on one side of the spray booth, the bottom of the baffle air-water separator 46 is connected to the water storage tank 47 connected; the water storage tank 47 is longitudinally provided with several filter baffles 48; the baffle plate air-water separator 46 is longitudinally distributed with several baffle plates 45; the outlet of the water storage tank 47 is connected to the waste water treatment system . The recovery of paint mist can be divided into two parts: one is when the workpiece is sprayed, the paint mist collides with the water curtain and mixes, and the water curtain will dissolve part of the paint mist and fall into the water storage tank, which will be filtered by the filter baffle and discharged into the wastewater treatment system; The second is that the paint mist that has not been dissolved in the water curtain enters the water washing room, fully mixes with the water mist from the atomizing nozzle, passes through the baffle air-water separator, and the paint mist collides with the baffle, and the paint mist adheres to the surface. The baffle plate separates it from the air, and after the paint mist settles, it flows into the water storage tank and is discharged into the wastewater treatment system.

所述静压送风系统包括供风口41、静压箱42和隔板高效过滤器43;所述隔板高效过滤器43对空气的过滤效率达99.99%。顶部送风和底部抽风应均匀,并形成微正压,防止外界尘粒进入室内。The static pressure air supply system includes an air supply port 41, a static pressure box 42 and a partition high-efficiency filter 43; the filtration efficiency of the partition high-efficiency filter 43 for air reaches 99.99%. The air supply from the top and the exhaust from the bottom should be uniform and form a slight positive pressure to prevent external dust particles from entering the room.

所述的第一流平区5、第一烘烤区6和第一冷却区7为一体结构,所述的第二流平区11、第二烘烤区12和第二冷却区13也为一体结构;每个所述的一体结构均包括箱体,所述箱体内设有分隔的箱板;所述箱体内均设有传送带。The first leveling zone 5, the first baking zone 6 and the first cooling zone 7 are integrally structured, and the second leveling zone 11, the second baking zone 12 and the second cooling zone 13 are also integrated structure; each of the integrated structures includes a box body, and separate box panels are arranged in the box body; conveyor belts are arranged in the box body.

如图3所示,所述第一烘烤区6和第二烘烤区12的顶部均设置有强制排废气装置62;所述的强制排废气装置62通过管道与尾气处理系统相连。所述第一烘烤区6和第二烘烤区12内的顶部均设有若干个IR灯管63,每个所述的IR灯管63的上下高度可调节;所述第一烘烤区6和第二烘烤区12内均采用分段控温的方式。所述第一烘烤区6和第二烘烤区12的侧面设有检修门61。As shown in FIG. 3 , the tops of the first roasting zone 6 and the second roasting zone 12 are provided with a forced exhaust gas device 62 ; the forced exhaust gas device 62 is connected to the tail gas treatment system through pipelines. The top in the first baking area 6 and the second baking area 12 is provided with several IR lamp tubes 63, and the height of each of the IR lamp tubes 63 can be adjusted up and down; the first baking area 6 and the second baking zone 12 adopt the method of segmented temperature control. Inspection doors 61 are provided on the sides of the first baking zone 6 and the second baking zone 12 .

如图4所示,所述的尾气处理系统主要由抽风管道19、气水分离器17、水处理层18、废水输出口21、玻纤过滤箱22、活性炭箱组23和废气排放口16组成;所述喷漆房的抽风系统20通过抽风管道19与气水分离器17相连,所述气水分离器17的上方通过抽风管道与玻纤过滤箱22相连,所述玻纤过滤箱22的后方依次设有活性炭箱组23和废气排放口16;活性炭箱组23中采用直径为4mm×6mm长颗粒、煤球状,点吸附值为550mg/g的活性炭。所述气水分离器17的下方与水处理层18相连,所述水处理层18的下方设有废水输出口21,初步处理过的废水通过废水输出口21进入废水处理系统。As shown in Figure 4, the tail gas treatment system is mainly composed of an exhaust pipe 19, a gas-water separator 17, a water treatment layer 18, a waste water output port 21, a glass fiber filter box 22, an activated carbon box group 23 and an exhaust gas discharge port 16. The exhaust system 20 of the spray booth is connected to the gas-water separator 17 through the exhaust duct 19, and the top of the gas-water separator 17 is connected to the glass fiber filter box 22 through the exhaust duct, and the rear of the glass fiber filter box 22 Activated carbon box group 23 and exhaust gas discharge port 16 are provided in turn; adopt diameter as 4mm * 6mm long particle, briquette-shaped activated carbon in the activated carbon box group 23, point adsorption value 550mg/g. The lower part of the gas-water separator 17 is connected to the water treatment layer 18, and the lower part of the water treatment layer 18 is provided with a waste water outlet 21, through which the preliminarily treated waste water enters the waste water treatment system.

上述金属表面自动化涂装的生产工艺,主要包括以下工序:组装上件→预热除湿→手动静电除尘→自动静电除尘→底漆喷涂→一次流平→一次烘烤→一次冷却→下线转真空镀膜→上线→除湿→除尘→面漆自动喷涂→二次流平→二次烘烤→二次冷却→下料;待涂装物件通过输送机在各个工序之间传送;所述输送机的传送速度为3m/min。所述预热除湿的温度控制为45~55℃;所述自动静电除尘的时间为1.0~3.0s;所述一次烘烤和二次烘烤的温度均控制在220±5℃之间;所述一次流平和二次流平的时间均控制在15±2min之间;所述一次烘烤和二次烘烤的时间均控制在30±2min之间。The production process of the above-mentioned automatic coating of metal surfaces mainly includes the following processes: assembly of upper parts→preheating and dehumidification→manual electrostatic dust removal→automatic electrostatic dust removal→primer spraying→one-time leveling→one-time baking→one-time cooling→off-line to vacuum Coating → on-line → dehumidification → dust removal → automatic topcoat spraying → secondary leveling → secondary baking → secondary cooling → blanking; the objects to be coated are conveyed between the various processes by the conveyor; the conveying of the conveyor The speed is 3m/min. The temperature of the preheating and dehumidification is controlled at 45-55°C; the time of the automatic electrostatic dust removal is 1.0-3.0s; the temperature of the first baking and the second baking is controlled between 220±5°C; The time for the first leveling and the second leveling is controlled between 15±2min; the time for the first baking and the second baking is controlled between 30±2min.

以上实施方式仅用于说明本实用新型,而并非对本实用新型的限制,有关技术领域的普通技术人员,在不脱离本实用新型的精神和范围的情况下,还可以做出各种变化和变型,因此所有等同的技术方案也属于本实用新型的范畴,本实用新型的专利保护范围应由权利要求限定。The above embodiments are only used to illustrate the utility model, but not to limit the utility model. Those of ordinary skill in the relevant technical fields can also make various changes and modifications without departing from the spirit and scope of the utility model. , so all equivalent technical solutions also belong to the category of the utility model, and the patent protection scope of the utility model should be defined by the claims.

Claims (8)

1.一种金属表面自动化涂装生产线,其特征在于:所述自动化涂装生产线包括第一涂装区和第二涂装区,所述的第一涂装区为底漆涂装区,所述的第二涂装区为面漆涂装区;所述第一涂装区内依次设有第一除湿装置、第一除尘系统、第一自动喷漆装置、第一流平区、第一烘烤区和第一冷却区;所述第二涂装区内依次设有第二除湿装置、第二除尘系统、第二自动喷漆装置、第二流平区、第二烘烤区和第二冷却区;待涂装物件通过输送机在第一涂装区内、第二涂装区内以及第一涂装区和第二涂装区之间传送;所述的涂装生产线设置于无尘车间内;1. A metal surface automatic coating production line, characterized in that: said automatic coating production line comprises a first coating area and a second coating area, said first coating area is a primer coating area, and said The second painting area mentioned above is the topcoat painting area; the first dehumidification device, the first dust removal system, the first automatic painting device, the first leveling area, the first baking area and the first cooling area; the second coating area is equipped with a second dehumidification device, a second dust removal system, a second automatic painting device, a second leveling area, a second baking area and a second cooling area in sequence ; The object to be coated is conveyed in the first coating area, in the second coating area, and between the first coating area and the second coating area by a conveyor; the described coating production line is arranged in a dust-free workshop ; 所述的第一除尘系统和第二除尘系统均包括手动除尘装置和自动除尘装置;The first dust removal system and the second dust removal system both include a manual dust removal device and an automatic dust removal device; 所述的第一自动喷漆装置和第二自动喷漆装置均为水帘式喷漆房,所述喷漆房包括室体、静压送风系统、抽风系统、水帘板、循环泵阀系统和漆雾过滤系统;所述抽风系统通过抽风管道与尾气处理系统相连;所述漆雾过滤系统与废水处理系统相连;The first automatic paint spraying device and the second automatic paint spraying device are both water curtain spray booths, and the spray paint booths include a chamber body, a static pressure air supply system, an exhaust system, a water curtain plate, a circulating pump valve system and paint mist Filtration system; the exhaust system is connected to the tail gas treatment system through the exhaust pipe; the paint mist filtration system is connected to the waste water treatment system; 所述的第一流平区、第一烘烤区和第一冷却区为一体结构,所述的第二流平区、第二烘烤区和第二冷却区也为一体结构;每个所述的一体结构均包括箱体,所述箱体内设有分隔的箱板;所述箱体内均设有传送带;The first leveling zone, the first baking zone and the first cooling zone are of an integral structure, and the second leveling zone, the second baking zone and the second cooling zone are also of an integral structure; each of the The integrated structure of each includes a box body, and a separated box plate is arranged in the box body; a conveyor belt is arranged in the box body; 所述第一烘烤区和第二烘烤区的顶部均设置有强制排废气装置;所述的强制排废气装置通过管道与尾气处理系统相连。The tops of the first roasting zone and the second roasting zone are equipped with forced exhaust gas devices; the forced exhaust gas devices are connected to the tail gas treatment system through pipelines. 2.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述的漆雾过滤系统包括设于喷漆房底部的蓄水槽和设于喷漆房一侧的折流板气水分离器,所述折流板气水分离器的底部与蓄水槽相连;所述蓄水槽内纵向设有若干过滤挡板;所述折流板气水分离器内纵向分布有若干折流板;所述蓄水槽的排水口与废水处理系统相连。2. A metal surface automatic coating production line as claimed in claim 1, characterized in that: the paint mist filtration system includes a water storage tank at the bottom of the spray booth and a baffle air filter at one side of the spray booth. A water separator, the bottom of the baffle air-water separator is connected to the water storage tank; a number of filter baffles are longitudinally arranged in the water storage tank; a number of baffles are longitudinally distributed in the baffle air-water separator plate; the outlet of the water storage tank is connected with the waste water treatment system. 3.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述静压送风系统包括供风口、静压箱和隔板高效过滤器;所述隔板高效过滤器对空气的过滤效率达99.99%。3. A metal surface automatic coating production line as claimed in claim 1, characterized in that: the static pressure air supply system includes an air supply port, a static pressure box and a clapboard high efficiency filter; the clapboard high efficiency filter The air filtration efficiency reaches 99.99%. 4.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述的尾气处理系统主要由抽风管道、气水分离器、水处理层、废水输出口、玻纤过滤箱、活性炭箱组和废气排放口组成;所述喷漆房的抽风系统通过抽风管道与气水分离器相连,所述气水分离器的上方通过抽风管道与玻纤过滤箱相连,所述玻纤过滤箱的后方依次设有活性炭箱组和废气排放口;所述气水分离器的下方与水处理层相连,所述水处理层的下方设有废水输出口,初步处理过的废水通过废水输出口进入废水处理系统。4. A metal surface automatic coating production line as claimed in claim 1, characterized in that: the exhaust gas treatment system is mainly composed of an exhaust pipe, a gas-water separator, a water treatment layer, a waste water output port, and a glass fiber filter box , activated carbon box group and exhaust gas outlet; the exhaust system of the spray painting room is connected with the air-water separator through the exhaust pipe, and the upper part of the air-water separator is connected with the glass fiber filter box through the exhaust pipe, and the glass fiber filter The rear of the tank is provided with an activated carbon box group and a waste gas discharge port in turn; the bottom of the gas-water separator is connected to the water treatment layer, and a waste water output port is provided under the water treatment layer, and the preliminarily treated waste water passes through the waste water output port. into the wastewater treatment system. 5.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述第一烘烤区和第二烘烤区内的顶部均设有若干个灯丝加热模块,每个所述的灯丝加热模块是独立的;所述第一烘烤区和第二烘烤区内均采用分段控温的方式。5. A metal surface automatic coating production line as claimed in claim 1, characterized in that: several filament heating modules are arranged on the top of the first baking area and the second baking area, each of which The filament heating module described above is independent; both the first baking zone and the second baking zone adopt the method of segmented temperature control. 6.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述的第一除湿装置和第二除湿装置均为电加热式预热烤炉;所述预热烤炉内设有石英远红外线发热管,所述发热管上设有铝制反光灯罩。6. A metal surface automatic coating production line as claimed in claim 1, characterized in that: said first dehumidifier and second dehumidifier are both electric heating preheating ovens; said preheating ovens A quartz far-infrared heating tube is arranged inside, and an aluminum reflective lampshade is arranged on the heating tube. 7.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述的手动除尘装置为下抽风式;所述的自动除尘装置内设有可产生正负离子的离子发生器。7. A metal surface automatic coating production line as claimed in claim 1, characterized in that: said manual dedusting device is a down draft type; said automatic dedusting device is equipped with an ion generator capable of generating positive and negative ions . 8.如权利要求1所述的一种金属表面自动化涂装生产线,其特征在于:所述的抽风管道内设置有若干挡水板。8. An automatic metal surface coating production line as claimed in claim 1, characterized in that: said air duct is provided with several water baffles.
CN201520138085.XU 2015-03-08 2015-03-08 A kind of metal surface automation paint line Expired - Lifetime CN204620302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520138085.XU CN204620302U (en) 2015-03-08 2015-03-08 A kind of metal surface automation paint line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520138085.XU CN204620302U (en) 2015-03-08 2015-03-08 A kind of metal surface automation paint line

Publications (1)

Publication Number Publication Date
CN204620302U true CN204620302U (en) 2015-09-09

Family

ID=54039366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520138085.XU Expired - Lifetime CN204620302U (en) 2015-03-08 2015-03-08 A kind of metal surface automation paint line

Country Status (1)

Country Link
CN (1) CN204620302U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170387A (en) * 2015-09-25 2015-12-23 谭健民 Multithreading circular furniture painting production line
CN105289906A (en) * 2015-11-16 2016-02-03 东莞市新力光表面处理科技有限公司 Double-layer automatic paint spraying device for fingerprint recognizing chip
CN105562276A (en) * 2016-03-17 2016-05-11 重庆市贝勒尔涂装设备制造有限公司 Automatic spraying equipment
CN106111428A (en) * 2016-08-31 2016-11-16 重庆市贝勒尔涂装设备制造有限公司 A kind of lines spraying equipment
CN106269376A (en) * 2016-09-30 2017-01-04 中建钢构有限公司 Workpiece auto spray painting intelligence production line
CN106513269A (en) * 2016-12-21 2017-03-22 苏州曼柯精密部件有限公司 Paint spraying technology for automobile plastic automobile door protection plate
CN106853439A (en) * 2016-12-21 2017-06-16 苏州曼柯精密部件有限公司 The lacquer spraying technique of automobile plastic cement center panel
CN107096675A (en) * 2017-06-30 2017-08-29 浙江宇诚华尔涂装环保设备有限公司 A kind of spraying lacquer recovery device
CN108126856A (en) * 2017-10-30 2018-06-08 佛山汇众森泰科技有限公司 A kind of environmental protection and energy saving electric appliance surface paint spraying apparatus
CN108787293A (en) * 2018-08-16 2018-11-13 东莞市亚弘涂装设备有限公司 A kind of robot tracking spraying automatic assembly line
CN109739150A (en) * 2019-01-24 2019-05-10 上海安平静电科技有限公司 A kind of monitoring method and device of static elimination equipment
CN111085376A (en) * 2018-10-24 2020-05-01 南京锐迈涂料科技有限公司 Automobile wheel hub new paint UV solidification coating line

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170387A (en) * 2015-09-25 2015-12-23 谭健民 Multithreading circular furniture painting production line
CN105289906A (en) * 2015-11-16 2016-02-03 东莞市新力光表面处理科技有限公司 Double-layer automatic paint spraying device for fingerprint recognizing chip
CN105562276A (en) * 2016-03-17 2016-05-11 重庆市贝勒尔涂装设备制造有限公司 Automatic spraying equipment
CN106111428A (en) * 2016-08-31 2016-11-16 重庆市贝勒尔涂装设备制造有限公司 A kind of lines spraying equipment
CN106269376A (en) * 2016-09-30 2017-01-04 中建钢构有限公司 Workpiece auto spray painting intelligence production line
CN106513269A (en) * 2016-12-21 2017-03-22 苏州曼柯精密部件有限公司 Paint spraying technology for automobile plastic automobile door protection plate
CN106853439A (en) * 2016-12-21 2017-06-16 苏州曼柯精密部件有限公司 The lacquer spraying technique of automobile plastic cement center panel
CN107096675A (en) * 2017-06-30 2017-08-29 浙江宇诚华尔涂装环保设备有限公司 A kind of spraying lacquer recovery device
CN108126856A (en) * 2017-10-30 2018-06-08 佛山汇众森泰科技有限公司 A kind of environmental protection and energy saving electric appliance surface paint spraying apparatus
CN108787293A (en) * 2018-08-16 2018-11-13 东莞市亚弘涂装设备有限公司 A kind of robot tracking spraying automatic assembly line
CN111085376A (en) * 2018-10-24 2020-05-01 南京锐迈涂料科技有限公司 Automobile wheel hub new paint UV solidification coating line
CN109739150A (en) * 2019-01-24 2019-05-10 上海安平静电科技有限公司 A kind of monitoring method and device of static elimination equipment

Similar Documents

Publication Publication Date Title
CN204620302U (en) A kind of metal surface automation paint line
CN201366390Y (en) Water curtain venturi-type spray-painting booth
CN106031910A (en) A metal surface automatic coating production line and a metal surface automatic coating production process
CN204448395U (en) A kind of continous way paint line
CN104492643B (en) A kind of continous way paint line
CN105854503A (en) Treatment method of VOCs waste gases by internal circulation without external discharge
CN104759382B (en) Dry type spray room of double-chamber double-pressure structure
CN106216156A (en) A kind of environment-protected dust-free furniture painting room
CN205413473U (en) Dustless environmental protection spray booth
CN208643078U (en) A kind of multifunctional spraying japanning room
CN203030453U (en) Spraying baking integrated room recoil type wet process paint mist filtering device
CN203525932U (en) Local recirculating air utilizing device used on coating production line
CN211275172U (en) Environment-friendly equipment suitable for paint spraying workshop for paint spraying waste gas treatment
CN204544581U (en) A kind of dual-purpose room of novel lacquering and stoving varnish
CN201659058U (en) Automatic water cyclone painting system
CN205341143U (en) A segmented variable speed and flexible butt joint spraying intelligent assembly line
CN104436979A (en) VOCs waste gas treatment device
CN203525940U (en) Local recirculating air utilizing device used on coating production line
CN207254584U (en) A kind of dedicated environment-friendly high-efficiency flush coater of building machinery
CN105903625A (en) Oil spraying type multifunctional surface treatment equipment
CN201505597U (en) High-pressure suction roll type paint spraying treatment equipment
CN203750757U (en) Paint mist treatment system
CN211384340U (en) Exhaust gas treatment equipment for air conditioning panel spraying device
CN206168656U (en) Novel coiled material production environmental protection spray booth
CN206935641U (en) A kind of metal plate paint spraying tooling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Jiaxing City, Zhejiang province Xiuzhou District show 314000 Road No. 966 Building No. 22 center inv 2 C203 room

Patentee after: ZHEJIANG JINGHE NANO TECHNOLOGY CO.,LTD.

Address before: Jiaxing City, Zhejiang province Xiuzhou District show 314000 Road No. 966 Building No. 22 center inv 2 C203 room

Patentee before: JIAXING JINGHE ENERGY SAVING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210508

Address after: 341214 Shangyou Industrial Park, Jiangxi Province

Patentee after: SHANGYOU JINGHE NANO TECHNOLOGY Co.,Ltd.

Address before: Room C203, 2 / F, building 22, Zhifu center, 966 Xiuyuan Road, Xiuzhou District, Jiaxing City, Zhejiang Province, 314000

Patentee before: ZHEJIANG JINGHE NANO TECHNOLOGY Co.,Ltd.

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: ZHEJIANG JINGHE NANO TECHNOLOGY CO.,LTD. Person in charge of patents

Document name: Notification of conformity

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150909