CN204590131U - The loader of energy ramming - Google Patents

The loader of energy ramming Download PDF

Info

Publication number
CN204590131U
CN204590131U CN201520112779.6U CN201520112779U CN204590131U CN 204590131 U CN204590131 U CN 204590131U CN 201520112779 U CN201520112779 U CN 201520112779U CN 204590131 U CN204590131 U CN 204590131U
Authority
CN
China
Prior art keywords
rammer
support arm
loader
rack
lower support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520112779.6U
Other languages
Chinese (zh)
Inventor
周良操
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520112779.6U priority Critical patent/CN204590131U/en
Application granted granted Critical
Publication of CN204590131U publication Critical patent/CN204590131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The loader of energy ramming, primarily of loader, rammer, upper support arm, lower support arm, folding and unfolding oil cylinder composition.Top between loader two front-wheels, is front methods, rack after reinforcing.Two upper support arm front ends and rammer epimere hinge, rear end and front airframe hinge.Lower support arm front end and rammer hypomere hinge, rear end and front airframe hinge.Upper and lower support arm is all hydraulic jack.Folding and unfolding oil cylinder pushes away, pull on support arm up and down, front and back rotate.Upper and lower support arm rammer supports upright in front methods, rack front, also can fall down rammer folding and unfolding on front methods, rack.During rammer operation, rammer stands upright on front methods, rack front, and loading shovel is lifted to top, abdicates underlying space.Loading shovel operation, rammer on front methods, rack, is abdicated front space by upper and lower support arm folding and unfolding.Scraper bowl and rammer non-interference.Loader carries out ramming operation under can being replaced with rammer situation not taking off scraper bowl.

Description

The loader of energy ramming
Technical field
The utility model belongs to engineering machinery field, particularly can the loader of ramming.
Background technology
Existing loader, mainly with scraper bowl shovel dress loose unpacked material, as coal, sandstone, earth, rubbish, fertilizer etc.Use a lot in sandstone heap district, civil engineering building site, building site of repairing the roads.Loader is also a lot of for standby time.Mainly its working range is very single, mainly to the entrucking of loose unpacked material.If van several days less than, just idle several days.Loader is also for shoveling the transhipment of dress loose unpacked material short distance.As field newly constructs a road, studies for a second time courses one has flunked highway, often with small-sized loading mechanical shovel soil, shovel rubble etc.The maintenance workman of highway, a work team is with regard to several, tens workmans.Particularly mountain area, sometimes, go out one morning is exactly tens kilometers, few with the vehicle of band itself, sometimes will repave rubble after the compacting of repairing road surface, and new benefit road surface is fragmentary often temporarily, and every block area and little when, there is loader at scene often, and does not have rammer, brings very big inconvenience to work.In Municipal transformation, the underground pipeline that road is common on both sides of the road, track remodelling, digs out trench, and pipeline modification completes, and is exactly first to banket.Banketing and also want ramming, is that workman uses conventional method hand compaction sometimes.Though have loader to leave unused neighbouring, driver is often unwilling in order to interim ramming and changes rammer, and rammer does not transport to scene often, so loader can not ramming.
Summary of the invention
The purpose of this utility model is to provide one to shovel dress, again can the novel loader of ramming.
The utility model is achieved in that the loader of energy ramming, primarily of loader, rammer, upper support arm, lower support arm, folding and unfolding oil cylinder composition.Upper methods, rack between loader two front-wheels, is called front methods, rack here, after reinforcing, has sufficient intensity.Upper support arm, lower support arm are arranged on the front methods, rack of top between loader two front-wheels.Rammer is supported be arranged on front methods, rack by upper support arm, lower support arm, can uprightly and fall down.Operationally, stand upright on front methods, rack front, loading shovel up, abdicates front space to rammer.When loading shovel works, rammer is in the state of being fallen down on front methods, rack by upper support arm, the folding and unfolding of lower support arm, abdicates front space.Upper support arm front end and rammer epimere hinge, rear end and front airframe hinge.Lower support arm front end and rammer hypomere hinge, rear end and front airframe hinge.Folding and unfolding oil cylinder one end and upper support arm hinge, the other end and front airframe hinge.Upper support arm, lower support arm are hydraulic jacks.The kind of rammer has Weight type rammer and vibration-type rammer.Upper support arm, lower support arm can in rammer folding and unfoldings to front methods, rack and can be upright rammer in the past methods, rack support to front methods, rack front.
The beneficial effects of the utility model are, loader can prestowage rammer, under not affecting and loading effect situation, can carry out ramming operation again.This is to when occurring needing ramming operation in construction temporarily, and loader just can complete ramming operation, and is can ramming under loader does not take off scraper bowl replacing rammer situation.Both brought conveniently to construction, expanded again the loader scope of application.
Accompanying drawing explanation
Fig. 1 is the overall structure figure of the loader of energy ramming.
Fig. 2 is the situation map of rammer folding and unfolding on front methods, rack.
Fig. 3 be rammer folding and unfolding on front methods, rack, the situation map that the scraper bowl of loader falls to the ground.
In accompanying drawing, scraper bowl 1, arm 2, bucket cylinder 3, loader 4, front methods, rack 5, upper support arm 6, rammer 7, lower support arm 8, folding and unfolding oil cylinder 9.
Hydraulic jack comprises oil cylinder and piston rod, hereinafter referred to as oil cylinder.
Detailed description of the invention
In Fig. 1, it is the overall structure of the loader of energy ramming.Upper support arm 6 and lower support arm 8 are all oil cylinders, have enough rigidity.Rammer 7 is supported on front methods, rack 5 front by two upper support arms 6 and two lower support arms 8, carries out ramming operation, and the arm 2 that scraper bowl 1 is loaded machine 4 is lifted to top, situation when abdicating front space.Two upper support arm 6 front ends and rammer 7 epimere hinge, rear end and front methods, rack 5 hinge.Two lower support arm 8 front ends and rammer 7 hypomere hinge.Folding and unfolding oil cylinder 9 one end and upper support arm 6 hinge, the other end and front methods, rack 5 hinge.Folding and unfolding oil cylinder 9 controls upper support arm and rotates up and down, can control rammer 7 upright after and the height on ground.Upper support arm is rammer main support arm.The piston rod of lower support arm stretches, and Main Function is the verticality regulating rammer and ground.
In Fig. 2, be the situation of rammer folding and unfolding on front methods, rack.The folding and unfolding of rammer is upper support arm, lower support arm and folding and unfolding oil cylinder have coordinated.Folding and unfolding oil cylinder is slowly pushed to during support arm upwards rotates backward, and lower support arm, upper support arm coordinate and slowly shorten.Rammer by support arm drive mobile in, also drive lower support arm upwards, rotate backward.Last rammer is fallen down on front methods, rack by folding and unfolding.
In Fig. 3, be rammer folding and unfolding on front methods, rack, the situation that the scraper bowl of loader falls to the ground.Rammer folding and unfolding on front methods, rack after, abdicated front space.The scraper bowl of loader can carry out shovel and pretend industry under arm 2 and bucket cylinder 3 act on.

Claims (6)

1. the loader of energy ramming, primarily of loader, rammer, upper support arm, lower support arm, folding and unfolding oil cylinder composition, is characterized in that:
(1), upper support arm, lower support arm are arranged on the front methods, rack of top between loader two front-wheels;
(2), rammer is supported by upper support arm, lower support arm;
(3), rammer operationally, stand upright on front methods, rack front, loading shovel is up;
(4), when loading shovel works, rammer is in the state of being fallen down on front methods, rack by upper support arm, the folding and unfolding of lower support arm.
2. the loader of energy according to claim 1 ramming, is characterized in that: upper support arm, lower support arm are hydraulic jacks.
3. the loader of energy according to claim 1 ramming, is characterized in that: upper support arm front end and rammer epimere hinge, rear end and front airframe hinge.
4. the loader of energy according to claim 1 ramming, is characterized in that: lower support arm front end and rammer hypomere hinge, rear end and front airframe hinge.
5. the loader of energy according to claim 1 ramming, is characterized in that: folding and unfolding oil cylinder one end and upper support arm hinge, the other end and front airframe hinge.
6. the loader of energy according to claim 1 ramming, is characterized in that: the kind of rammer has Weight type rammer and vibration-type rammer.
CN201520112779.6U 2015-02-16 2015-02-16 The loader of energy ramming Expired - Fee Related CN204590131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520112779.6U CN204590131U (en) 2015-02-16 2015-02-16 The loader of energy ramming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520112779.6U CN204590131U (en) 2015-02-16 2015-02-16 The loader of energy ramming

Publications (1)

Publication Number Publication Date
CN204590131U true CN204590131U (en) 2015-08-26

Family

ID=53926299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520112779.6U Expired - Fee Related CN204590131U (en) 2015-02-16 2015-02-16 The loader of energy ramming

Country Status (1)

Country Link
CN (1) CN204590131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631538A (en) * 2015-02-16 2015-05-20 周良操 Loader with ramming function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631538A (en) * 2015-02-16 2015-05-20 周良操 Loader with ramming function
CN104631538B (en) * 2015-02-16 2017-02-01 周良操 Loader with ramming function

Similar Documents

Publication Publication Date Title
Zhang et al. Backfilling technology and strata behaviors in fully mechanized coal mining working face
CN104564090A (en) Multifunctional tunnel repairing integrated machine
CN205024740U (en) Civil engineering uses multi -functional excavating machinery
CN202359544U (en) Compacting device for earthwork in slope section
CN108561146A (en) A kind of shield machine of variable-diameter
CN105133856A (en) Method for integrally displacing building by utilizing assembly trailer
CN101634375B (en) Construction device and method for underground pipeline installation
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN204371346U (en) All-in-one is repaiied in multi-functional lane
CN113029794B (en) Three-dimensional similarity simulation device and method for gangue self-sliding filling in goaf of steep coal seam
CN204590131U (en) The loader of energy ramming
CN203361215U (en) Pavement leveling and tamping vehicle
CN203403461U (en) Multidirectional dump reversing device for loader
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN103343554A (en) Multidirectional dumping steering device for loader
CN202865863U (en) Basic structure of heavy piece lifting frame
CN206634089U (en) Contact area steady type hydraulic crawler excavator crawler belt can be increased
CN104631538A (en) Loader with ramming function
CN213574165U (en) Coal mine tunneling and supporting device
CN113684876B (en) Loader shovel loading track optimization method based on operation performance data interpolation
CN112343614B (en) U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method
CN214783786U (en) Large-scale cloth machine of side-running formula
CN201495571U (en) Special soil lifting device for topdown construction method underground excavation engineering
CN205153010U (en) It inserts loader of sluice gate frame to set up flexible arm and change outfit soon
CN204225079U (en) Low-frequency high-amplitude multifunctional table back of the body compacting facility

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20170216

CF01 Termination of patent right due to non-payment of annual fee