CN204588583U - A kind of safe construction jacking system - Google Patents
A kind of safe construction jacking system Download PDFInfo
- Publication number
- CN204588583U CN204588583U CN201420783907.5U CN201420783907U CN204588583U CN 204588583 U CN204588583 U CN 204588583U CN 201420783907 U CN201420783907 U CN 201420783907U CN 204588583 U CN204588583 U CN 204588583U
- Authority
- CN
- China
- Prior art keywords
- pulley
- controller
- rolling disc
- support body
- jacking system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of safe construction jacking system, comprise mould base, support body and support, described support body is fixed on base by bottom shock absorption device, described base is provided with steel wire rope winch, described support body end face is provided with adapter plate, described adapter plate end face is provided with rolling disc, described rolling disc is connected with bracket slide, described cradle top surface is provided with operator's station, described operator's station surrounding is respectively arranged with guar plate, described guar plate surface is provided with overweight controller, hoist-engine controller and rolling disc controller, the side end face of described support is provided with balance block opposite side and is provided with the 3rd pulley, magnet sucking disc and weight is provided with immediately below described 3rd pulley is vertical, the vibrations that this kind of shock absorption device energy actv. cancellation pulley brings, the weight of overweight controller to object judges, building hoist meeting automatic alarm when the load, and it is out of service, safe and simple easy to operate, largely increase work efficiency.
Description
Technical field
The utility model relates to a kind of elevator, is specially a kind of safe construction jacking system, belongs to technical field of buildings.
Background technology
Along with the development of society, the progress of technology, along with the development of Building Trade in China, building hoist becomes the important tool in skyscraper, it is means of delivery safe in skyscraper, reliably, vertically, play very large effect to improving working conditions, reducing labor intensity, in construction, elevator has become the requisite vertical transport vehicle, and the directed vertical transport of traditional building hoist can not have been closed people's demand; The carelessness of managerial leak and operating personal in addition, the safety misadventure having elevator to collapse in various places in recent years occurs, and causes a large amount of personal casualty, is badly in need of carrying out safety upgrade to traditional elevator, avoids the generation of safety misadventure as far as possible.
Utility model content
The technical problems to be solved in the utility model overcomes existing defect, provides a kind of safe construction jacking system, adopts controller, reduces collapse accident and occur, thus solve the problem.
For achieving the above object, the utility model provides following technical scheme: a kind of safe construction jacking system, comprise mould base, support body and support, described support body is fixed on base by bottom shock absorption device, described base is provided with steel wire rope winch, described support body end face is provided with adapter plate, described adapter plate end face is provided with rolling disc, described rolling disc is connected with bracket slide, described cradle top surface is provided with operator's station, described operator's station surrounding is respectively arranged with guar plate, described guar plate surface is provided with overweight controller, hoist-engine controller and rolling disc controller, the side end face of described support is provided with balance block opposite side and is provided with the 3rd pulley, magnet sucking disc and weight is provided with immediately below described 3rd pulley is vertical, described weight is contacted with each other at one piece by magnet sucking disc.
Further, described steel wire winch and the first pulley are in the same horizontal line and be fixed on support body, described first pulley and the second pulley are on same vertical surface, described second pulley is fixed on support, described second pulley and the 3rd pulley are in same level, and described 3rd pulley is on support.
Further, described magnet sucking disc, steel wire winch and rolling disc pass through point and are connected to overweight controller, hoist-engine controller and rolling disc controller, and described overweight controller, hoist-engine controller and rotating disk controller are respectively arranged with handlebar stem.
Further, described steel wire winch, the first pulley, the second pulley, the 3rd pulley are connected by steel rope with magnet sucking disc.
Further, directly over described magnet sucking disc, vertical direction is provided with limiting stopper.
Compared with prior art, the beneficial effects of the utility model are: this kind of building hoist is provided with limiting stopper, weight can not rise too high and cause the excess of stroke, there will not be unnecessary accident, base top surface is provided with shock absorption device, the vibrations that shock absorption device energy actv. cancellation pulley brings, rolling disc controller and hoist-engine controller are according to the weight size of object, by handlebar stem to the speeds control risen, the weight of overweight controller to object judges, building hoist meeting automatic alarm when the load, and out of service.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for specification sheets, is used from explanation the utility model, does not form restriction of the present utility model with embodiment one of the present utility model.
In accompanying drawing:
Fig. 1 is a kind of safe construction lifting device structure schematic diagram described in the utility model;
Fig. 2 is a kind of safe construction jacking system protection plate structure schematic diagram described in the utility model;
In figure: 1, support body; 2, shock absorption device; 3, base; 4, steel wire winch; 5, the first pulley; 6, the second pulley; 7, adapter plate; 8, magnet sucking disc; 9, weight; 10, steel rope; 11, stop block; 12, the 3rd pulley; 13, support; 14, operator's station; 15, protective frame; 16, balance block; 17, rolling disc; 18, hoist-engine controller; 19, rolling disc controller; 20, overweight controller; 21, handlebar stem.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment; technical scheme in the utility model embodiment is clearly and completely described; obviously; described embodiment is only the utility model part embodiment; instead of whole embodiments; based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1-2, the utility model provides a kind of technical scheme: a kind of safe construction jacking system, comprise mould base 3, support body 1 and support 13, described support body 1 is fixing on the base 3 by bottom shock absorption device 2, described base 3 is provided with steel wire rope winch 4, described support body 1 end face is provided with adapter plate 7, described adapter plate 7 end face is provided with rolling disc 17, described rolling disc 17 and support 13 sliding block joint, described support 13 end face is provided with operator's station 14, described operator's station 14 surrounding is respectively arranged with guar plate 15, described guar plate 15 surface is provided with overweight controller 20, hoist-engine controller 18 and rolling disc controller 19, the side end face of described support 13 is provided with balance block 16 opposite side and is provided with the 3rd pulley 12, magnet sucking disc 8 and weight 9 is provided with immediately below described 3rd pulley 12 is vertical, described weight 9 is contacted with each other at one piece by magnet sucking disc 8.
Concrete installation and occupation mode: first support body 1 is fixing on the base 3 by bottom shock absorption device 2, described steel wire winch 4 has slight vibrations by steel rope 10 with movable pulley, slight vibrations do not come into the picture just, be prone to accidents, the vibrations that shock absorption device energy actv. cancellation pulley brings, described base 3 is provided with power source steel wire coil and raises machine 4, magnet sucking disc 8 and weight 9 is provided with immediately below described 3rd pulley 12 is vertical, described weight 9 contacts with each other at one piece by magnet sucking disc 8, by steel rope 10 by pulley driving magnet sucking disc 8, animal body 9 is with had the effect of magnetic force by magnet sucking disc 8 under, described adapter plate 7 end face is provided with rolling disc 17, described rolling disc 17 can carry out 360 degree of rotations to support 13, all directions can be hung weight 9 and be sent, described support 13 end face is provided with operator's station 14, described operator's station 14 surrounding is respectively arranged with guar plate 15, owing to being in skyscraper operation, so building hoist is all higher, arranging guar plate 15 is safety in order to protect self, described guar plate 15 surface is provided with overweight controller 20, hoist-engine controller 18 and rolling disc controller 19, control the running velocity of building hoist, and alarm and reminding is provided with to weight 9 overload.
Embodiment 1: described steel wire winch 4 and the first pulley 5 are in the same horizontal line and be fixed on support body 1, described first pulley 5 and the second pulley 6 are on same vertical surface, described second pulley 6 is fixed on support 13, described second pulley 6 and the 3rd pulley 12 are in same level, described 3rd pulley 12 is on support 13, improve safety, if not in vertical surface, horizontal surface fluctuation of service.
Embodiment 2: described magnet sucking disc 8, steel wire winch 4 and rolling disc logical 17 is crossed and be electrically connected to overweight controller 20, hoist-engine controller 18 and rolling disc controller 19, described overweight controller 20, hoist-engine controller 18 and rotating disk controller 19 are respectively arranged with handlebar stem 21, described overweight controller 20, hoist-engine controller 18 are by handlebar stem 21 controlling run speed, when described handlebar stem 21 up lifts, running velocity is accelerated, down move hourly velocity to slow down, when weight is overweight, overweight controller 20 can automatic alarm.
Embodiment 3: described steel wire winch 4, first pulley 5, second pulley 6, the 3rd pulley 12 are connected 10 with magnet sucking disc 8 by steel rope, power transmission.
Embodiment 4: directly over described magnet sucking disc 8, vertical direction is provided with limiting stopper 11, weight 9 can not rise too high and cause the excess of stroke, occurs unnecessary accident.
The utility model is a kind of safe construction jacking system, this kind of building hoist is provided with limiting stopper 11, weight 9 can not rise too high and cause the excess of stroke, there will not be unnecessary accident, base 3 end face is provided with shock absorption device 2, steel wire winch 4 has slight vibrations by steel rope 10 with movable pulley, slight vibrations do not come into the picture just, be prone to accidents, the vibrations that shock absorption device 2 energy actv. cancellation pulley brings, rolling disc controller 19 and hoist-engine controller 18 are according to the weight size of object, by handlebar stem 21 to the speeds control risen, the weight of overweight controller 20 pairs of objects judges, building hoist meeting automatic alarm when the load, and it is out of service.
Last it is noted that the foregoing is only preferred embodiment of the present utility model; be not limited to the utility model; although be described in detail the utility model with reference to previous embodiment; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; all within spirit of the present utility model and principle; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (5)
1. a safe construction jacking system, comprise mould base, support body and support, it is characterized in that: described support body is fixed on base by bottom shock absorption device, described base is provided with steel wire rope winch, described support body end face is provided with adapter plate, described adapter plate end face is provided with rolling disc, described rolling disc is connected with bracket slide, described cradle top surface is provided with operator's station, described operator's station surrounding is respectively arranged with guar plate, described guar plate surface is provided with overweight controller, hoist-engine controller and rolling disc controller, the side end face of described support is provided with balance block opposite side and is provided with the 3rd pulley, magnet sucking disc and weight is provided with immediately below described 3rd pulley is vertical, described weight is contacted with each other at one piece by magnet sucking disc.
2. a kind of safe construction jacking system according to claim 1, it is characterized in that: described steel wire winch and the first pulley are in the same horizontal line and be fixed on support body, described first pulley and the second pulley are on same vertical surface, described second pulley is fixed on support, described second pulley and the 3rd pulley are in same level, and described 3rd pulley is on support.
3. a kind of safe construction jacking system according to claim 1, it is characterized in that: described magnet sucking disc, steel wire winch and rolling disc pass through point and be connected to overweight controller, hoist-engine controller and rolling disc controller, and described overweight controller, hoist-engine controller and rotating disk controller are respectively arranged with handlebar stem.
4. a kind of safe construction jacking system according to claim 1, is characterized in that: described steel wire winch, the first pulley, the second pulley, the 3rd pulley are connected by steel rope with magnet sucking disc.
5. a kind of safe construction jacking system according to claim 1, is characterized in that: directly over described magnet sucking disc, vertical direction is provided with limiting stopper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420783907.5U CN204588583U (en) | 2014-12-11 | 2014-12-11 | A kind of safe construction jacking system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420783907.5U CN204588583U (en) | 2014-12-11 | 2014-12-11 | A kind of safe construction jacking system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204588583U true CN204588583U (en) | 2015-08-26 |
Family
ID=53924759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420783907.5U Expired - Fee Related CN204588583U (en) | 2014-12-11 | 2014-12-11 | A kind of safe construction jacking system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204588583U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386608A (en) * | 2014-12-11 | 2015-03-04 | 太仓吉威机械技术有限公司 | Safety construction lifting device |
CN105908670A (en) * | 2016-06-20 | 2016-08-31 | 无锡虹业自动化工程有限公司 | Steel wire waste disposal forklift |
-
2014
- 2014-12-11 CN CN201420783907.5U patent/CN204588583U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386608A (en) * | 2014-12-11 | 2015-03-04 | 太仓吉威机械技术有限公司 | Safety construction lifting device |
CN105908670A (en) * | 2016-06-20 | 2016-08-31 | 无锡虹业自动化工程有限公司 | Steel wire waste disposal forklift |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206720645U (en) | One kind building hoistable platform | |
CN107311069A (en) | A kind of lowering or hoisting gear for construction | |
CN101934989A (en) | Dynamic balance building tower crane | |
CN208413709U (en) | A kind of unit glass curtain wall ring rail Lift-on/Lift-off System | |
CN204588583U (en) | A kind of safe construction jacking system | |
CN202988621U (en) | Vacuum suction hanging machine | |
CN104386608A (en) | Safety construction lifting device | |
CN103058072B (en) | Large luffing jib tower crane introduction mechanism | |
CN104409997A (en) | Transformer substation power transformation and distribution room switch cabinet mounting system | |
CN202186847U (en) | Movable hanger frame | |
CN205222344U (en) | Elevator with anti -falling device | |
CN211393512U (en) | Swift current car protection device is prevented to construction elevator | |
CN204304281U (en) | Substation's changed into switchhouse switch cubicle enters cabinet platform | |
CN204173776U (en) | Frame-type low clearance armored rope electric hoist dolly | |
CN208843522U (en) | There is computer room directly to drag and changes list around elevator | |
CN202864624U (en) | Electric basket | |
CN206940261U (en) | Lifting leveling unit for nuclear power station construction | |
CN203904849U (en) | Double-girder gantry type bridge erection machine | |
CN204096945U (en) | A kind of hoisting device for blast furnace air machine overhauling | |
CN204588497U (en) | The vertical dolly of a kind of high elevator that hoists | |
CN104003264A (en) | Construction hoist for building | |
CN204727483U (en) | A kind of hoisting crane fixed pulley | |
CN203938366U (en) | Wallboard Lift-on/Lift-off System | |
CN103193140B (en) | Lower beam structure for elevator without machine room | |
CN220412727U (en) | Portable pipeline hoist and mount platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||