CN204554362U - A kind of Chlorine Buffer Vessel - Google Patents

A kind of Chlorine Buffer Vessel Download PDF

Info

Publication number
CN204554362U
CN204554362U CN201520242502.5U CN201520242502U CN204554362U CN 204554362 U CN204554362 U CN 204554362U CN 201520242502 U CN201520242502 U CN 201520242502U CN 204554362 U CN204554362 U CN 204554362U
Authority
CN
China
Prior art keywords
chlorine
buffer vessel
outlet pipe
steam outlet
safety valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520242502.5U
Other languages
Chinese (zh)
Inventor
张勇
张洪飞
李世泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chenzhou Juxing Environmental Protection Technology Co., Ltd.
Original Assignee
East Yongxing County Great Mansion Nonferrous Metal Utilizes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Yongxing County Great Mansion Nonferrous Metal Utilizes Co Ltd filed Critical East Yongxing County Great Mansion Nonferrous Metal Utilizes Co Ltd
Priority to CN201520242502.5U priority Critical patent/CN204554362U/en
Application granted granted Critical
Publication of CN204554362U publication Critical patent/CN204554362U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

Chlorine Buffer Vessel is supported by leg, Chlorine Buffer Vessel there is chlorine suction tude, chlorine steam outlet pipe, safety valve suction tude, barometer PRESSURE PIPE and fixed support, chlorine steam outlet pipe there is Chlorine Buffer Vessel air valve switch, safety valve is arranged in safety valve suction tude, and safety valve steam outlet pipe is communicated with chlorine steam outlet pipe, is communicated with position after Chlorine Buffer Vessel air valve switch, barometer is arranged in barometer PRESSURE PIPE, and chlorine leakage alarm is contained on fixed support.

Description

A kind of Chlorine Buffer Vessel
Technical field
The utility model relates to a kind of Chlorine Buffer Vessel.
Background technique
Smelting industry, needs to pass into chlorine in the secret pot of refining and carries out chemical reaction when refining secret.At present, the operation adding chlorine when refining secret is: chlorine is compressed in liquid chlorine storage tank, and the air outlet leather hose of liquid chlorine storage tank is communicated with, and the leather hose the other end is communicated with high-temperature resistant glass tube, and the high-temperature resistant glass tube the other end passes in the secret pot of refining.During use, open liquid chlorine storage tank air valve switch and release chlorine, chlorine is by leather hose, and high-temperature resistant glass tube enters the secret pot of refining and carries out chemical reaction.This kind of chlorine leads directly to operation following problem: one, liquid chlorine storage tank internal air pressure is high, when opening liquid chlorine storage tank air valve switch, Ruo Kaitai is large, chlorine spurts out, because pipeline transmission quantity is certain, excessive unnecessary chlorine does not have localized transmissions and storage, leather hose can be made to expand to such an extent as to leather hose disengaging or explosion, have the potential safety hazard of chlorine leakage, leather hose expands in addition also can affect the working life of leather hose; If liquid chlorine storage tank air valve switch is opened too little, chlorine in the secret pot of refining can be caused not enough, can not fully react, two, in the liquid chlorine storage tank firm used time, chlorine fills, air pressure superelevation, when in liquid chlorine storage tank, chlorine runs low, air pressure is lower, along with the consumption of chlorine, chlorine air pressure in liquid chlorine storage tank is indefinite, and liquid chlorine storage tank air valve switch opens the bad control of size.Effects of air pressure gas flow rate in addition, gas flow rate have impact on the amount that the unit time passes into chlorine in the secret pot of refining, the uncertain quantity not sufficient that surely can cause chlorine in the secret pot of refining of air pressure, refine in secret pot and there will be because chlorine is inadequate, cause the insufficient or chlorine of chemical reaction too much to occur that extra chemical reaction causes the phenomenon of the wasting of resources.And the amount of refining chlorine in secret pot also will adjust according to the actual conditions of the chemical reaction carried out sometimes.Three, chlorine is toxic gas, and suck people and know from experience seriously poisoning, chlorine leakage can threaten safety of workers, also can cause environmental pollution, and this kind of chlorine leads directly to operation and lacks leakage monitoring means.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of Chlorine Buffer Vessel can carrying out the control of chlorine air pressure, chlorine leakage monitoring.Lead directly in operation at chlorine and add this Chlorine Buffer Vessel, can play and control chlorine air pressure, the effects such as monitoring chlorine gas leakage situation.
In order to achieve the above object, the utility model solves the technological scheme that its technical problem adopts is following design:
Chlorine Buffer Vessel is supported by leg, Chlorine Buffer Vessel there is chlorine suction tude, chlorine steam outlet pipe, safety valve suction tude, barometer PRESSURE PIPE and fixed support, chlorine steam outlet pipe there is Chlorine Buffer Vessel air valve switch, safety valve is arranged in safety valve suction tude, and safety valve steam outlet pipe is communicated with chlorine steam outlet pipe, is communicated with position after Chlorine Buffer Vessel air valve switch, barometer is arranged in barometer PRESSURE PIPE, and chlorine leakage alarm is contained on fixed support.
Chlorine leakage alarm setting height(from bottom) is preferably chlorine leakage alarm 1 ~ 1.5 meter of above Chlorine Buffer Vessel, and namely fixed support is high 1 ~ 1.5 meter.
The beneficial effects of the utility model are: one, effectively the air pressure reduced in leather hose prevents leather hose from expanding or explosion, increase leather hose working life; Two, effectively control inputs refines the air pressure in secret pot, can continue, stablize input chlorine according to chemical reaction situation in the secret pot of refining, chlorine can not be caused to waste.Three, monitor chlorine leakage situation, protection workman life safety, prevents the pollution of the environment.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the utility model is further illustrated.
Fig. 1 is a kind of plan view of Chlorine Buffer Vessel.
In figure
1, Chlorine Buffer Vessel 2, leg 3, chlorine suction tude
4, chlorine steam outlet pipe 5, safety valve suction tude 6, barometer PRESSURE PIPE
7, fixed support 8, Chlorine Buffer Vessel air valve switch 9, safety valve
10, safety valve steam outlet pipe 11, barometer 12, chlorine leakage alarm.
Embodiment
Chlorine Buffer Vessel 1 is supported by leg 2, Chlorine Buffer Vessel 1 there is chlorine suction tude 3, chlorine steam outlet pipe 4, safety valve suction tude 5, barometer PRESSURE PIPE 6 and fixed support 7, chlorine steam outlet pipe 4 there is Chlorine Buffer Vessel air valve switch 8, safety valve 9 is arranged in safety valve suction tude 5, and safety valve steam outlet pipe 10 is communicated with chlorine steam outlet pipe 4, is communicated with position after Chlorine Buffer Vessel air valve switch 8, barometer 10 is arranged in barometer PRESSURE PIPE 9, and chlorine leakage alarm 11 is contained on fixed support 7.
Chlorine leakage alarm 12 setting height(from bottom) is preferably chlorine leakage alarm 1 ~ 1.5 meter of above Chlorine Buffer Vessel, and namely fixed support is high 1 ~ 1.5 meter.
Before using, be communicated with liquid chlorine storage tank, chlorine suction tude 3 with leather hose, chlorine steam outlet pipe 4, high-temperature resistant glass tube.During use, close Chlorine Buffer Vessel air valve switch 8, open liquid chlorine storage tank air valve switch, chlorine enters Chlorine Buffer Vessel 1 from liquid chlorine storage tank by leather hose, chlorine suction tude 3, observe barometer 10, understand Chlorine Buffer Vessel 1 internal air pressure situation, open Chlorine Buffer Vessel air valve switch 8 when Chlorine Buffer Vessel 1 internal air pressure is required air pressure, chlorine is being entered the secret pot of refining carried out chemical reaction by chlorine steam outlet pipe 4, leather hose, high-temperature resistant glass tube.In the liquid chlorine storage tank firm used time, liquid chlorine storage tank internal air pressure superelevation, easily causes Chlorine Buffer Vessel 1 internal air pressure too high, after observing barometer 11, regulate chlorine storage tank air valve switch as the case may be, by turning down or closing, control the amount entering the gas of Chlorine Buffer Vessel 1.When Chlorine Buffer Vessel 1 internal air pressure exceedes safe atmospheric pressure value, the safety valve of Chlorine Buffer Vessel 1 is opened automatically, increase the step-down of a Cemented filling chlorine, thus control air pressure and protect Chlorine Buffer Vessel 1, if because Chlorine Buffer Vessel air valve switch 8 is closed, the air pressure that gas storage too much causes exceedes safety value, then open Chlorine Buffer Vessel air valve switch 8; If because liquid chlorine storage tank switch is opened to cause too greatly and exceeded safety value, then turn down or temporary close liquid chlorine gas tank air valve, treat that air pressure is reduced in and open.When there being the situation of chlorine leakage in working procedure, chlorine leakage alarm 12 is by timely alarm, and now workman closes liquid chlorine storage tank air valve switch, after waiting a period of time, overhauls.

Claims (4)

1. a Chlorine Buffer Vessel, Chlorine Buffer Vessel (1) is supported by leg (2), its be characterised in that:chlorine Buffer Vessel (1) there is chlorine suction tude (3), chlorine steam outlet pipe (4), barometer PRESSURE PIPE (6) and fixed support (7), chlorine steam outlet pipe (4) there is Chlorine Buffer Vessel air valve switch (8), barometer (10) is arranged in barometer PRESSURE PIPE (9), and chlorine leakage alarm (11) is contained on fixed support (7).
2. according to a kind of Chlorine Buffer Vessel according to claim 1, it is characterized in that: Chlorine Buffer Vessel (1) has safety valve suction tude (5), safety valve (9) is arranged in safety valve suction tude (5), and safety valve steam outlet pipe (10) is communicated with chlorine steam outlet pipe (4).
3. according to a kind of Chlorine Buffer Vessel according to claim 2, it is characterized in that:safety valve steam outlet pipe (10) is communicated with position after Chlorine Buffer Vessel air valve switch (8) with chlorine steam outlet pipe (4).
4. according to a kind of Chlorine Buffer Vessel according to claim 1, it is characterized in that:fixed support (7) is high 1 ~ 1.5 meter.
CN201520242502.5U 2015-04-21 2015-04-21 A kind of Chlorine Buffer Vessel Expired - Fee Related CN204554362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520242502.5U CN204554362U (en) 2015-04-21 2015-04-21 A kind of Chlorine Buffer Vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520242502.5U CN204554362U (en) 2015-04-21 2015-04-21 A kind of Chlorine Buffer Vessel

Publications (1)

Publication Number Publication Date
CN204554362U true CN204554362U (en) 2015-08-12

Family

ID=53829469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520242502.5U Expired - Fee Related CN204554362U (en) 2015-04-21 2015-04-21 A kind of Chlorine Buffer Vessel

Country Status (1)

Country Link
CN (1) CN204554362U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104791609A (en) * 2015-04-21 2015-07-22 永兴县东宸有色金属再生利用有限公司 Chlorine buffering tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104791609A (en) * 2015-04-21 2015-07-22 永兴县东宸有色金属再生利用有限公司 Chlorine buffering tank

Similar Documents

Publication Publication Date Title
CN204554362U (en) A kind of Chlorine Buffer Vessel
CN104791609A (en) Chlorine buffering tank
CN206660891U (en) Desulphurization reaction groove mixture pressure balances bleeding device
CN101994858A (en) Air valve for preventing water hammer due to cavities collapsing
CN206904353U (en) Oil-gas Separation air bleeding valve
CN205607614U (en) Quick leakage detecting device of pressure vessel
CN204239767U (en) Coal gas diffusion bell jar control valve unit
CN201368335Y (en) Water seal fire arrestor
CN109751871A (en) A kind of Chlorine Buffer Vessel
CN205297646U (en) Automatic water discharging device of gas drainage pipe remote control
CN210287398U (en) Safety device for high-level overflow water system of cooling water of gas cooler
CN204034070U (en) A kind of respirator school inspection instrument
CN204220117U (en) A kind of for without the energy saver on asbestos silicate board production equipment
CN201359133Y (en) Device for preventing gas leakage of water-sealed valve of gas-conduit
CN204981915U (en) Slag waste heat has vexed combustible gas safety prevention and control device of heat of pressure
CN204878872U (en) A U-shaped device for water sealing
CN207158807U (en) A kind of device for being used to balance titanium tetrachloride pressure inside the tank
CN204269183U (en) Water-sealing fire-retardant venting of dust explosion device liquid level gauge
CN208858520U (en) A kind of automatic drain structure of vacuum pump under vacuum conditions
CN107747638A (en) A kind of U-shaped water seal arrangement
CN202724511U (en) Cabinet type automatic fire extinguishing device for oil tank
CN207569275U (en) A kind of U-shaped water seal arrangement
CN207034645U (en) It is a kind of that there is the anti-blocking and gas pipeline drainer of gas cutting function
CN205287332U (en) Water fire extinguisher
CN206369642U (en) It is hydrogenated with kettle sampler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181227

Address after: 423300 Room 301, 297 Benjiang South Road, Benjiang Town, Yongxing County, Chenzhou City, Hunan Province

Patentee after: Chenzhou Juxing Environmental Protection Technology Co., Ltd.

Address before: 423300 Pearl Dragon Formation, Qinglu Village, Berlin Town, Yongxing County, Chenzhou City, Hunan Province

Patentee before: East, Yongxing County great mansion nonferrous metal utilizes Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812