CN204551758U - For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column - Google Patents
For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column Download PDFInfo
- Publication number
- CN204551758U CN204551758U CN201520231690.1U CN201520231690U CN204551758U CN 204551758 U CN204551758 U CN 204551758U CN 201520231690 U CN201520231690 U CN 201520231690U CN 204551758 U CN204551758 U CN 204551758U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- concrete column
- pipe concrete
- bracket
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种用于钢梁、钢支撑与扁钢管混凝土柱连接的贴板式节点。牛腿的一端连接在钢梁端面上,另一端与扁钢管混凝土柱矩形钢管的短边所在侧面固接,支撑牛腿一端斜插地连接到牛腿一侧翼与矩形钢管短边所在侧面连接一侧的直角上,两翼分别与牛腿侧翼、扁钢管混凝土柱矩形钢管短边所在侧面连接,牛腿和支撑牛腿均通过两侧的贴板连接到扁钢管混凝土柱上,支撑牛腿另一端连接钢梁端面;贴板焊接在牛腿和支撑牛腿的翼缘以及扁钢管混凝土柱矩形钢管长边所在的侧面上。本实用新型应用在多高层的钢结构中,可满足梁柱刚接传力需求,用于钢梁与扁钢管混凝土柱的刚接连接,传力明确、构造简单、加工方便快捷并且能容易灌注混凝土。
The utility model discloses a plate-attached joint used for connecting steel beams, steel supports and flat steel tube concrete columns. One end of the corbel is connected to the end face of the steel beam, and the other end is fixedly connected to the side of the short side of the rectangular steel pipe of the flat steel tube concrete column. One end of the supporting corbel is connected obliquely to the side of the corbel and the short side of the rectangular steel pipe is connected At right angles to the side, the two wings are respectively connected to the side of the corbel and the side where the short side of the rectangular steel tube of the flat steel pipe concrete column is located. Connect the end face of the steel beam; the paste plate is welded on the corbel and the flange of the supporting corbel and the side where the long side of the rectangular steel tube of the flat steel tube concrete column is located. The utility model is applied in a multi-story steel structure, which can meet the rigid connection force transmission requirements of beams and columns, and is used for the rigid connection of steel beams and flat steel pipe concrete columns. The utility model has clear force transmission, simple structure, convenient and quick processing, and can easily pour concrete.
Description
技术领域 technical field
本实用新型涉及一种钢梁、支撑与柱的连接节点,尤其是涉及一种用于钢梁、钢支撑与扁钢管混凝土柱连接的贴板式节点,可广泛应用于多高层钢结构中H型钢梁、支撑与扁钢管混凝土柱的刚接连接。 The utility model relates to a connection node of a steel beam, a support and a column, in particular to a plate-attached joint used for connecting a steel beam, a steel support and a flat steel tube concrete column, which can be widely used in H-shaped multi-story steel structures. Rigid connection of steel beams, braces and flat concrete filled steel tube columns.
背景技术 Background technique
多高层钢结构中,钢梁多为H型钢梁,钢柱多为矩形钢管混凝土柱,且设置有抗侧力支撑。钢梁、支撑与钢柱的刚接连接是提供结构整体刚度和抗震性能的最基本的措施。目前常用的连接节点是在钢柱对应梁、支撑翼缘的位置设置横隔板,钢梁、支撑翼缘的内力通过隔板传递给钢柱,提供一定的刚度和强度保证,从而形成刚接节点。隔板有内隔板与贯通横隔板两种,分别对应于箱型柱和冷弯成型高频焊接矩形钢管柱两种构件。 In the multi-story steel structure, the steel girders are mostly H-shaped steel beams, and the steel columns are mostly rectangular steel tube concrete columns, and are provided with anti-lateral force supports. The rigid connection of steel beams, supports and steel columns is the most basic measure to provide the overall rigidity and seismic performance of the structure. At present, the commonly used connection nodes are to set transverse diaphragms at the positions corresponding to the beams and supporting flanges of the steel columns. The internal force of the steel beams and supporting flanges is transmitted to the steel columns through the diaphragms, providing a certain degree of rigidity and strength guarantee, thus forming a rigid joint. node. There are two types of partitions: inner partitions and through transverse partitions, which correspond to the two components of box-shaped columns and cold-formed high-frequency welded rectangular steel pipe columns respectively.
为了方便钢管柱内混凝土的浇灌,隔板上需要设置灌浆孔和透气孔,灌浆孔的直径不宜小于150mm。另外,为了节点域内力传递需要,灌浆孔对隔板的削弱不能过大,这限制了钢柱的截面宽度不能过小,截面宽度一般不小于350~400mm。 In order to facilitate the pouring of concrete in the steel pipe column, grouting holes and ventilation holes need to be set on the partition, and the diameter of the grouting hole should not be less than 150mm. In addition, for the needs of force transmission in the joint domain, the weakening of the diaphragm by the grouting hole should not be too large, which limits the cross-sectional width of the steel column to not be too small, and the cross-sectional width is generally not less than 350~400mm.
在钢结构住宅中,过大的钢柱截面会在住宅的各个功能房间的四角出现凸柱阳角,影响室内建筑使用功能。建筑设计希望将结构构件的隐藏在墙体厚度内,比如剪力墙结构。这就要求住宅内采用的钢构件截面宽度控制在180mm至300mm之间。 In the steel structure residence, the excessively large steel column cross-section will appear in the four corners of each functional room of the residence, which will affect the use function of the interior building. Architectural design wishes to hide structural members within the thickness of the wall, such as shear wall structures. This requires that the section width of the steel members used in the residence be controlled between 180mm and 300mm.
国家目前在大力推广建筑工业化以及住宅产业化,钢结构是较好的绿色建筑产品,抗震性能极其优越。怎样将钢结构用于住宅体系,充分发挥钢结构产业化的特性,并满足住宅建筑的功能需求,是一项非常重要且迫切的工作。 The country is currently vigorously promoting the industrialization of construction and housing. Steel structures are better green building products with extremely superior seismic performance. How to use steel structure in residential system, give full play to the characteristics of industrialization of steel structure, and meet the functional requirements of residential buildings is a very important and urgent task.
因此提出了采用扁钢管混凝土柱的形式,将钢箱形柱的短边尺寸尽量做小,和混凝土剪力墙厚度等同,钢箱形柱的长边尺寸则尽量做大,形成扁钢管混凝土柱,以满足住宅对钢结构体系提出的要求。但是,扁钢管混凝土柱由于截面宽度较小,为了保证顺利浇灌内部混凝土,已无法容纳横隔板,因此与钢梁、支撑的连接无法采用横隔板的形式。 Therefore, it is proposed to adopt the form of flat steel tube concrete column, to make the short side dimension of the steel box column as small as possible, which is equal to the thickness of the concrete shear wall, and to make the long side dimension of the steel box column as large as possible to form a flat steel tube concrete column To meet the requirements of the residential steel structure system. However, due to the small width of the section, the flat concrete-filled steel tube column cannot accommodate the diaphragm in order to ensure the smooth pouring of the internal concrete, so the connection with the steel beams and supports cannot be in the form of a diaphragm.
基于以上技术背景,目前的隔板连接节点要求钢柱截面不能过小,而建筑功能要求钢柱截面不能过大。 Based on the above technical background, the current partition connection joints require that the steel column section should not be too small, while the architectural function requires that the steel column section should not be too large.
发明内容 Contents of the invention
为了克服现有隔板式梁、支撑与柱刚接节点与钢结构住宅较小钢柱截面的矛盾,配合扁钢管混凝土柱住宅结构体系的开发,本实用新型提出了一种用于钢梁、钢支撑与扁钢管混凝土柱连接的贴板式节点,可广泛应用于多高层钢结构中H型钢梁、支撑与与扁钢管混凝土柱的刚接连接,能满足梁柱刚接节点的传力需求,构造简单、传力明确、加工方便快捷、灌注混凝土容易。 In order to overcome the contradiction between the existing clapboard-type beams, supports and rigid joints of columns and the smaller steel column sections of steel structure houses, and cooperate with the development of the flat steel tube concrete column house structure system, the utility model proposes a steel beam, The plate-attached joints connecting steel supports and flat concrete-filled steel tube columns can be widely used in the rigid connection between H-shaped steel beams, supports and flat steel-filled concrete columns in multi-story steel structures, and can meet the force transmission requirements of beam-column rigid joints. Simple, clear force transmission, convenient and fast processing, easy to pour concrete.
本实用新型采用的技术方案是: The technical scheme that the utility model adopts is:
牛腿的一端连接在钢梁端面上,牛腿另一端与扁钢管混凝土柱矩形钢管的短边所在侧面固定连接,支撑牛腿一端斜插地连接到牛腿一侧翼与矩形钢管短边所在侧面连接一侧的直角上,支撑牛腿的两翼分别与牛腿侧翼、扁钢管混凝土柱矩形钢管短边所在侧面连接,牛腿和支撑牛腿均通过两侧的贴板连接到扁钢管混凝土柱上,支撑牛腿另一端连接钢梁端面;钢梁和牛腿的轴线均与扁钢管混凝土柱矩形钢管的长边平行,贴板焊接在牛腿的翼缘上、扁钢管混凝土柱矩形钢管长边所在的侧面上和支撑牛腿的翼缘上。 One end of the corbel is connected to the end face of the steel beam, the other end of the corbel is fixedly connected to the side where the short side of the rectangular steel tube of the flat steel tube concrete column is located, and one end of the supporting corbel is connected obliquely to the side of the side of the corbel and the short side of the rectangular steel tube At right angles on one side of the connection, the two wings of the supporting corbel are respectively connected to the side of the corbel and the short side of the rectangular steel tube of the flat steel pipe concrete column. , the other end of the supporting corbel is connected to the end face of the steel beam; the axes of the steel beam and the corbel are parallel to the long side of the rectangular steel tube of the flat concrete filled steel tube column, and the paste plate is welded on the flange of the corbel, where the long side of the rectangular steel tube of the flat steel tube concrete column is located on the sides and on the flanges of the supporting corbels.
所述的牛腿同一侧的上、下翼缘连接有一块共同的贴板或者各连接有一块贴板。 The upper and lower flanges on the same side of the corbel are connected with a common veneer or each are connected with a veneer.
所述的牛腿的翼缘、支撑牛腿的翼缘均与贴板焊接。 The flange of the corbel and the flange of the supporting corbel are all welded with the veneer.
所述的扁钢管混凝土柱与贴板通过三面围焊的方式焊接。 The flat steel pipe concrete column and the laminated plate are welded by three-side surrounding welding.
所述的扁钢管混凝土柱与贴板上设有开孔,扁钢管混凝土柱与贴板通过对穿杆件连接。 The flat steel pipe concrete column and the pasting board are provided with openings, and the flat steel pipe concrete column and the pasting board are connected through cross-piercing rods.
所述的对穿杆件为对穿钢筋,对穿钢筋的两端与贴板焊接。 The piercing bar is a piercing steel bar, and the two ends of the piercing steel bar are welded to the pasting plate.
所述的对穿杆件为对穿螺栓,对穿螺栓的两端通过螺帽拧紧固定。 The piercing rod is a piercing bolt, and the two ends of the piercing bolt are tightened and fixed by nuts.
所述的钢梁翼缘与牛腿翼缘之间焊接,所述钢梁腹板与牛腿腹板之间、钢梁腹板与支撑牛腿腹板之间均通过连接板连接,连接板用高强螺栓固定。 The welding between the steel beam flange and the corbel flange, the steel beam web and the corbel web, the steel beam web and the supporting corbel web are all connected by connecting plates, and the connecting plates are made of high-strength Bolt on.
所述的扁钢管混凝土柱是由矩形钢管内部浇筑混凝土形成,矩形钢管的长边与短边比值为1~5。 The flat steel pipe concrete column is formed by pouring concrete inside a rectangular steel pipe, and the ratio of the long side to the short side of the rectangular steel pipe is 1-5.
所述的钢梁、牛腿均为H型钢, 支撑牛腿可以是H型钢也可以是方矩形钢管。 The steel beams and corbels are all H-shaped steel, and the supporting corbel can be H-shaped steel or square rectangular steel pipe.
本实用新型的有益效果体现在: The beneficial effects of the utility model are reflected in:
本实用新型可以为结构提供很好的抗侧力性能,为节点提供很好的连接刚度。 The utility model can provide good lateral force resistance performance for the structure and good connection rigidity for nodes.
本实用新型的外贴板节点构造加工简单,与普通的箱形柱比较,不用组装内隔板,不需要电渣焊,降低了加工制作难度。 The node structure of the outer plate of the utility model is simple to process, and compared with the common box-shaped column, it does not need to assemble the inner partition plate, and does not need electroslag welding, which reduces the difficulty of processing and manufacturing.
本实用新型能保证节点和节点域的刚度和强度,防止贴板在受压翼缘传递的压力作用下产生局部鼓曲变形。 The utility model can ensure the rigidity and strength of the node and the node domain, and prevent the local bulging deformation of the laminated plate under the pressure transmitted by the compressed flange.
本实用新型可广泛应用于钢结构住宅、公寓等居住建筑中截面宽度较小的扁钢管混凝土柱与钢梁的连接节点中。 The utility model can be widely used in connection nodes between flat steel pipe concrete columns and steel beams with small section width in residential buildings such as steel structure houses and apartments.
附图说明 Description of drawings
图1是本实用新型钢梁上下翼缘有一块共同的贴板的立面图。 Fig. 1 is the elevation view that the upper and lower flanges of the steel girder of the present invention have a common pasting plate.
图2是本实用新型钢梁上下翼缘各有一块贴板的立面图。 Fig. 2 is the elevation view of the upper and lower flanges of the steel girder of the present invention respectively having a plate attached.
图3是本实用新型的平面图。 Fig. 3 is a plan view of the utility model.
图中:1、扁钢管混凝土柱,2、对穿杆件,3、贴板,4、钢梁,5、混凝土,6、连接板,7、焊缝,8、牛腿,9、对接焊缝,10、高强螺栓,11、支撑牛腿。 In the figure: 1. Flat steel tube concrete column, 2. Cross-piercing rod, 3. Laminated plate, 4. Steel beam, 5. Concrete, 6. Connecting plate, 7. Weld seam, 8. Corbel, 9. Butt welding seam, 10, high-strength bolts, 11, supporting corbels.
具体实施方式 Detailed ways
下面结合附图及具体实施例对本实用新型作进一步详细说明。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail.
如图1所示,本实用新型包括:将钢梁4、牛腿8与支撑牛腿11现场拼接,牛腿8的一端平行连接在钢梁4端面上,牛腿8另一端与扁钢管混凝土柱1矩形钢管的短边所在的侧面通过贴板3固定连接,支撑牛腿11一端斜插地连接到牛腿8一侧翼与矩形钢管短边所在侧面连接一侧的直角上,支撑牛腿11的两翼分别与牛腿8侧翼、扁钢管混凝土柱1矩形钢管短边所在侧面连接,牛腿8和支撑牛腿11均通过两侧的贴板3连接到扁钢管混凝土柱1上,支撑牛腿11另一端连接钢梁4端面;钢梁4和牛腿8的轴线均与扁钢管混凝土柱1矩形钢管的长边平行,贴板3焊接在牛腿8的翼缘上、扁钢管混凝土柱1矩形钢管长边所在的侧面上和支撑牛腿11的翼缘上。 As shown in Figure 1, the utility model includes: splicing the steel beam 4, the corbel 8 and the supporting corbel 11 on site, one end of the corbel 8 is connected to the end face of the steel beam 4 in parallel, and the other end of the corbel 8 is connected to the flat steel pipe concrete The side of the short side of the rectangular steel pipe of the column 1 is fixedly connected by the sticking plate 3, and one end of the supporting corbel 11 is connected obliquely to the right angle between the side wing of the corbel 8 and the side where the short side of the rectangular steel pipe is located, and the supporting corbel 11 The two wings of the corbel 8 are respectively connected with the side of the corbel 8 and the short side of the rectangular steel pipe of the flat steel pipe concrete column 1. The corbel 8 and the supporting corbel 11 are connected to the flat steel pipe concrete column 1 through the sticking plates 3 on both sides, and the supporting corbel 11 The other end is connected to the end face of the steel beam 4; the axes of the steel beam 4 and the corbel 8 are parallel to the long side of the rectangular steel tube of the flat concrete-filled steel tube column 1, and the paste plate 3 is welded on the flange of the corbel 8, and the flat steel tube concrete column 1 is rectangular On the side where the long side of the steel pipe is located and on the flange supporting the corbel 11.
优选地,如图2所示,牛腿8同一侧的上、下翼缘各连接有一块贴板3,分为上下翼缘的贴板3,一块贴板将牛腿8上翼缘、扁钢管混凝土柱1和支撑牛腿11加固连接,另一块贴板将牛腿8下翼缘与扁钢管混凝土柱1加固连接。 Preferably, as shown in Figure 2, the upper and lower flanges on the same side of the corbel 8 are respectively connected with a patch 3, which is divided into the patch 3 of the upper and lower flanges, and a patch connects the upper flange of the corbel 8, the flat The concrete-filled steel tube column 1 is reinforced and connected with the support corbel 11, and another plate is used to reinforce and connect the lower flange of the corbel 8 with the flat concrete-filled steel tube column 1.
优选地,如图1所示,牛腿8同一侧的上、下翼缘连接有一块共同的贴板3,实际将图2的两块贴板3连接成一体,同一侧的上、下翼缘通过该贴板3连接 Preferably, as shown in Figure 1, the upper and lower flanges on the same side of the corbel 8 are connected with a common patch 3, actually connecting the two panels 3 in Figure 2 into one, the upper and lower wings on the same side edges are connected through the subplate 3
牛腿8的翼缘与贴板3焊接,如图2和图3所示的焊缝7。扁钢管混凝土柱1与贴板3通过三面围焊的方式焊接,如图2和图3所示的焊缝7。 The flange of the corbel 8 is welded to the veneer 3, as shown in the weld 7 in Figures 2 and 3. The flat steel tube concrete column 1 is welded to the laminated plate 3 by means of three-sided surrounding welding, as shown in Fig. 2 and Fig. 3 as the weld seam 7 .
优选地,在扁钢管混凝土柱1的壁板较薄时,为了提高刚度和强度,扁钢管混凝土柱1与贴板3上设有开孔,如图1所示,扁钢管混凝土柱1与贴板3通过对穿杆件2连接。当对穿杆件2为对穿钢筋时,对穿钢筋的两端与贴板3焊接。当对穿杆件2为对穿螺栓时,对穿螺栓的两端通过螺帽拧紧固定。 Preferably, when the wall plate of the flat steel tube concrete column 1 is relatively thin, in order to improve the rigidity and strength, the flat steel tube concrete column 1 and the sticking plate 3 are provided with openings, as shown in Figure 1, the flat steel tube concrete column 1 and the sticking plate The plates 3 are connected through the piercing rods 2 . When the penetrating bar 2 is a penetrating steel bar, the two ends of the penetrating steel bar are welded to the pasting plate 3 . When the penetrating rod member 2 is a penetrating bolt, both ends of the penetrating bolt are tightened and fixed by nuts.
优选地,如图1所示,钢梁4翼缘与牛腿8、支撑牛腿11的翼缘之间均焊接,如图1~图3的对接焊缝9,钢梁4腹板与牛腿8腹板之间以及钢梁4腹板与支撑牛腿11腹板之间通过连接板6连接,连接板6分别用高强螺栓10固定在钢梁4腹板、支撑牛腿11与牛腿8腹板上,连接板6用于抗剪切力。 Preferably, as shown in Figure 1, the flanges of the steel beam 4 and the flanges of the corbel 8 and the supporting corbel 11 are all welded, such as the butt weld 9 shown in Figures 1 to 3, the web of the steel beam 4 and the corbel The webs of the legs 8 and the webs of the steel beam 4 and the supporting corbel 11 are connected through the connecting plate 6, and the connecting plate 6 is respectively fixed on the web of the steel beam 4, the supporting corbel 11 and the corbel with high-strength bolts 10. 8 on the web, the connecting plate 6 is used to resist shear force.
扁钢管混凝土柱1是由矩形钢管内部浇筑混凝土形成,矩形钢管的长边与短边比值为1~5。钢梁4与牛腿8均采用H型钢梁,支撑牛腿11可以是H型钢也可以是方矩形钢管 The flat steel pipe concrete column 1 is formed by pouring concrete inside a rectangular steel pipe, and the ratio of the long side to the short side of the rectangular steel pipe is 1-5. Both the steel beam 4 and the corbel 8 are H-shaped steel beams, and the supporting corbel 11 can be H-shaped steel or square rectangular steel pipe
本实用新型的工作原理如下: The working principle of the utility model is as follows:
本实用新型中钢梁端部传递的弯矩表现为上下翼缘的轴力,该轴力先经过牛腿再通过两侧焊缝传递到贴板,贴板通过焊缝传递到扁钢管混凝土柱,保证节点和节点域的刚度和强度。 The bending moment transmitted by the end of the steel beam in the utility model is expressed as the axial force of the upper and lower flanges. The axial force first passes through the corbel and then passes through the welds on both sides to the plate, and the plate is transmitted to the flat steel pipe concrete column through the weld. , to ensure the stiffness and strength of the nodes and node domains.
钢梁端部传递的剪力通过钢梁腹板与牛腿腹板之间的连接板的高强度连接传递,进行抗剪。 The shear force transmitted at the end of the steel beam is transmitted through the high-strength connection of the connecting plate between the steel beam web and the corbel web for shear resistance.
对穿杆件的作用是为贴板和附近的扁钢管混凝土柱的壁板提供局部稳定的支撑,防止贴板在受压翼缘传递的压力作用下产生局部鼓曲变形。 The role of the piercing member is to provide local stable support for the panel and the wall of the nearby flat steel tube concrete column, and to prevent the local buckling deformation of the panel under the pressure transmitted by the compression flange.
本实用新型的扁钢管混凝土柱内没有隔板,混凝土的浇灌非常顺利,不受任何影响。 There is no dividing plate in the flat steel tube concrete column of the utility model, and the pouring of concrete is very smooth without any influence.
支撑构件与梁柱的连接,在计算时虽然可以按铰接,但节点一般都按刚接构造。本节点形式可以较好的保证支撑节点的传力,提供较好的节点性能。 Although the connection between the support member and the beam-column can be calculated as a hinge, the joints are generally constructed as a rigid connection. This node form can better guarantee the force transmission of the support node and provide better node performance.
本说明书实施例所述的内容仅仅是对实用新型构思的实现形式的列举,本实用新型的保护范围不应当被视为仅限于实施例所陈述的具体形式,本实用新型的保护范围也及于本领域技术人员根据本实用新型构思所能够想到的等同技术手段。 The content described in the embodiments of this specification is only an enumeration of the realization forms of the utility model concept, and the protection scope of the utility model should not be regarded as being limited to the specific forms stated in the embodiments, and the protection scope of the utility model also extends to Equivalent technical means that those skilled in the art can think of according to the concept of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520231690.1U CN204551758U (en) | 2015-04-15 | 2015-04-15 | For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520231690.1U CN204551758U (en) | 2015-04-15 | 2015-04-15 | For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204551758U true CN204551758U (en) | 2015-08-12 |
Family
ID=53826889
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520231690.1U Expired - Fee Related CN204551758U (en) | 2015-04-15 | 2015-04-15 | For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204551758U (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105822019A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Beam supporting two-side-plate joint with external extending cover plates |
| CN105821965A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Multi-cavity concrete filled steel tube combination column supporting frame system installed in supported and inserted mode |
| CN105839791A (en) * | 2016-05-20 | 2016-08-10 | 西安建筑科技大学 | Double-side-plate supporting node of overhung cover plate |
| CN105839792A (en) * | 2016-05-20 | 2016-08-10 | 西安建筑科技大学 | Double-side-plate supporting node formed by splicing beam end and having extending cover plate |
| CN105863077A (en) * | 2016-05-20 | 2016-08-17 | 西安建筑科技大学 | Support inserting type beam post support U-shaped bilateral plate node |
| CN105971127A (en) * | 2016-05-20 | 2016-09-28 | 西安建筑科技大学 | Support insertion type double-side-plate beam column supporting joint |
| CN113833111A (en) * | 2021-09-16 | 2021-12-24 | 杭州铁木辛柯建筑结构设计事务所有限公司 | Steel frame-support connection node based on main connecting plate thickness design |
| CN114000654A (en) * | 2021-11-12 | 2022-02-01 | 中冶赛迪工程技术股份有限公司 | Energy dissipating support - connection structure of embedded steel tubular concrete column |
| CN114427317A (en) * | 2022-01-26 | 2022-05-03 | 福建工程学院 | Side plate type steel pipe concrete special-shaped column and concrete beam connecting structure |
| CN116084576A (en) * | 2022-12-05 | 2023-05-09 | 北京住总集团有限责任公司 | A construction method of embedded steel skeleton |
| CN116220219A (en) * | 2023-01-10 | 2023-06-06 | 上海民航新时代机场设计研究院有限公司 | A steel beam and concrete beam connection structure and construction technology |
-
2015
- 2015-04-15 CN CN201520231690.1U patent/CN204551758U/en not_active Expired - Fee Related
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105821965B (en) * | 2016-05-20 | 2018-03-30 | 西安建筑科技大学 | A kind of multi-cavity steel tube concrete coupled column support frame system for supporting insertion installation |
| CN105971127B (en) * | 2016-05-20 | 2018-07-31 | 西安建筑科技大学 | A kind of support plug-in type beam column supporting bilateral plate node |
| CN105839791A (en) * | 2016-05-20 | 2016-08-10 | 西安建筑科技大学 | Double-side-plate supporting node of overhung cover plate |
| CN105839792A (en) * | 2016-05-20 | 2016-08-10 | 西安建筑科技大学 | Double-side-plate supporting node formed by splicing beam end and having extending cover plate |
| CN105863077A (en) * | 2016-05-20 | 2016-08-17 | 西安建筑科技大学 | Support inserting type beam post support U-shaped bilateral plate node |
| CN105971127A (en) * | 2016-05-20 | 2016-09-28 | 西安建筑科技大学 | Support insertion type double-side-plate beam column supporting joint |
| CN105821965A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Multi-cavity concrete filled steel tube combination column supporting frame system installed in supported and inserted mode |
| CN105839792B (en) * | 2016-05-20 | 2019-01-22 | 西安建筑科技大学 | A beam-end spliced double-sided plate support node with an overhanging cover plate |
| CN105822019A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Beam supporting two-side-plate joint with external extending cover plates |
| CN113833111A (en) * | 2021-09-16 | 2021-12-24 | 杭州铁木辛柯建筑结构设计事务所有限公司 | Steel frame-support connection node based on main connecting plate thickness design |
| CN113833111B (en) * | 2021-09-16 | 2022-12-23 | 杭州铁木辛柯建筑结构设计事务所有限公司 | Steel frame-support connection node based on main connection board thickness design |
| CN114000654A (en) * | 2021-11-12 | 2022-02-01 | 中冶赛迪工程技术股份有限公司 | Energy dissipating support - connection structure of embedded steel tubular concrete column |
| CN114427317A (en) * | 2022-01-26 | 2022-05-03 | 福建工程学院 | Side plate type steel pipe concrete special-shaped column and concrete beam connecting structure |
| CN116084576A (en) * | 2022-12-05 | 2023-05-09 | 北京住总集团有限责任公司 | A construction method of embedded steel skeleton |
| CN116220219A (en) * | 2023-01-10 | 2023-06-06 | 上海民航新时代机场设计研究院有限公司 | A steel beam and concrete beam connection structure and construction technology |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204551758U (en) | For the sticking board type mental node that girder steel, bracing members are connected with Flat steel pipe concrete column | |
| CN102296705B (en) | Composite steel pipe concrete column and steel beam connecting node | |
| CN204608999U (en) | A kind of abutment node be connected with Flat steel pipe concrete column for girder steel | |
| CN101265724B (en) | Joints between steel-plated square concrete-filled steel tube columns and I-beams | |
| CN204510482U (en) | A kind of through concrete-filled steel square tubular column of stiffener and H profile steel beam structures with semi-rigid joints | |
| CN202139694U (en) | Connecting node of compound concrete-filled tubular column and steel beam | |
| CN204199440U (en) | The node structure that a kind of concrete column is connected with girder steel | |
| CN107476446B (en) | Banded enhancement mode node that H shaped steel roof beam and wide steel core concrete column minor face are connected | |
| CN102979168A (en) | Industrialized multi-story high-rise assembled steel structure frame - centrally-braced system | |
| CN204609003U (en) | A kind of box node be connected with Flat steel pipe concrete column for girder steel | |
| CN102635166A (en) | Connecting node of square steel pipe column and H-shaped steel beams | |
| CN106436926A (en) | Square steel tube column-H-shaped steel beam end-plate connecting node | |
| CN104196128A (en) | Insertion plate type node for connection of steel beam and flat concrete-filled steel tube column | |
| CN105863056B (en) | A kind of dual-sided board bolt joint and assembly method for beam column | |
| CN103276802B (en) | A kind of many Tall Steels of industrialization assembled Framed Structure with Special-Shaped Columns system | |
| CN204059608U (en) | A kind of sticking board type mental node be connected with Flat steel pipe concrete column for girder steel | |
| CN213038987U (en) | A kind of square steel tube concrete column-steel beam upper welded and lower bolted clapboard through node | |
| CN213773848U (en) | A T-shaped CFST column and steel beam connecting node structure | |
| CN203514533U (en) | Inner partition plate-outer partition plate square concrete filled steel tubular column and steel beam cross-shaped joint structure | |
| CN204551759U (en) | For the board plug type node that girder steel, bracing members are connected with Flat steel pipe concrete column | |
| CN105863080B (en) | A kind of bilateral plate node and assembly method by lower flange connection | |
| CN108104263A (en) | A kind of novel fabricated steel-regeneration concrete combination frame structural system | |
| CN107386463A (en) | A kind of lower logical upper link point | |
| CN105863081A (en) | Multi-cavity concrete filled steel tube combination column and steel beam bolt joint and assembly method | |
| CN205677091U (en) | A kind of bolted dual-sided board node |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 651701 Yang Lin Industrial Park, Songming, Yunnan, Kunming Patentee after: YUNNAN CONSTRUCTION ENGINEERING STEEL STRUCTURE CO.,LTD. Patentee after: HANGZHOU TONGMSK ARCHITECTURAL STRUCTURE DESIGN STUDIO CO.,LTD. Address before: 651701 Yang Lin Industrial Park, Songming, Yunnan, Kunming Patentee before: YUNNAN CONSTRUCTION ENGINEERING STEEL STRUCTURE Co.,Ltd. Patentee before: HANGZHOU TONGMSK ARCHITECTURAL STRUCTURE DESIGN STUDIO CO.,LTD. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 651701 Yang Lin Industrial Park, Songming, Yunnan, Kunming Co-patentee after: HANGZHOU TONGMSK ARCHITECTURAL STRUCTURE DESIGN STUDIO CO.,LTD. Patentee after: YCIH STEEL STRUCTURE CO.,LTD. Address before: 651701 Yang Lin Industrial Park, Songming, Yunnan, Kunming Co-patentee before: HANGZHOU TONGMSK ARCHITECTURAL STRUCTURE DESIGN STUDIO CO.,LTD. Patentee before: YUNNAN CONSTRUCTION ENGINEERING STEEL STRUCTURE CO.,LTD. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 |