CN204528727U - A kind of bagged cement shipment device - Google Patents

A kind of bagged cement shipment device Download PDF

Info

Publication number
CN204528727U
CN204528727U CN201520243463.0U CN201520243463U CN204528727U CN 204528727 U CN204528727 U CN 204528727U CN 201520243463 U CN201520243463 U CN 201520243463U CN 204528727 U CN204528727 U CN 204528727U
Authority
CN
China
Prior art keywords
bagged cement
bracket
unloading
conveying mechanism
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520243463.0U
Other languages
Chinese (zh)
Inventor
黄文圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Resources Cement Technology R&D Co Ltd
Original Assignee
China Resources Cement Technology R&D Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Resources Cement Technology R&D Co Ltd filed Critical China Resources Cement Technology R&D Co Ltd
Priority to CN201520243463.0U priority Critical patent/CN204528727U/en
Application granted granted Critical
Publication of CN204528727U publication Critical patent/CN204528727U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

本实用新型公开了一种袋装水泥装船装置,包括移动平台、输送机构、卸料机构、第一卷扬机和第二卷扬机,所述输送机构安装于移动平台上,所述卸料机构与输送机构连接,所述第一卷扬机与输送机构的一端连接;所述卸料机构包括卸料皮带、支架和多根托辊,所述卸料皮带与输送机构连接,所述支架与卸料皮带连接,所述托辊安装于支架,且所述托辊与卸料皮带形成卸料通道,所述第二卷扬机与支架连接。本实用新型可控制袋装水泥落入船体的速度,避免袋装水泥落入船体时发生较大的冲击,从而降低了破包率,同时也提高了装卸速度。

The utility model discloses a bagged cement loading device, which comprises a mobile platform, a conveying mechanism, an unloading mechanism, a first hoist and a second hoist, the conveying mechanism is installed on the mobile platform, the unloading mechanism and the conveying Mechanism connection, the first hoist is connected to one end of the conveying mechanism; the unloading mechanism includes a discharge belt, a bracket and a plurality of idlers, the unloading belt is connected to the conveying mechanism, and the bracket is connected to the unloading belt , the idler roller is installed on the bracket, and the idler roller and the discharge belt form a discharge channel, and the second hoist is connected to the bracket. The utility model can control the speed at which the bagged cement falls into the ship's hull, avoiding a large impact when the bagged cement falls into the ship's body, thereby reducing the bag breaking rate and improving the loading and unloading speed at the same time.

Description

一种袋装水泥装船装置A bagged cement shipping device

技术领域technical field

本实用新型涉及货物装船设备,具体涉及一种袋装水泥装船装置。The utility model relates to cargo loading equipment, in particular to a bagged cement shipping device.

背景技术Background technique

制造好的货物常会采用船类运输,如袋装水泥。目前的袋装水泥装船装置主要由移动平台1、输送机构2和溜槽3构成(如图1所示)。在袋装水泥装船的过程中,溜槽必须具有一定大小的角度,当袋装水泥自溜槽落到船体时,袋装水泥只能落于溜槽的一侧,这影响工人的装卸速度;同时袋装水泥自溜槽滑落的速度无法控制,袋装水泥滑落船体时的速度较大,则袋装水泥与船体之间的冲击力较大,这造成破包率高。Manufactured goods are often transported by ship, such as bagged cement. Present bagged cement ship loading device is mainly made of mobile platform 1, conveying mechanism 2 and chute 3 (as shown in Figure 1). In the process of bagged cement loading, the chute must have a certain angle. When the bagged cement falls from the chute to the hull, the bagged cement can only fall on one side of the chute, which affects the loading and unloading speed of workers; The speed at which the packed cement slides down from the chute cannot be controlled. If the speed at which the bagged cement slides down the hull is high, the impact force between the bagged cement and the hull is relatively large, which results in a high rate of bag breakage.

实用新型内容Utility model content

本实用新型的目的是为了克服以上现有技术存在的不足,提供了一种结构简单、合理,装卸效率高且可降低破包率的袋装水泥装船装置。The purpose of this utility model is to overcome the shortcomings of the prior art above, and provide a bagged cement shipping device with simple and reasonable structure, high loading and unloading efficiency, and can reduce the broken bag rate.

本实用新型的目的通过以下的技术方案实现:本袋装水泥装船装置,包括移动平台、输送机构、卸料机构、第一卷扬机和第二卷扬机,所述输送机构安装于移动平台上,所述卸料机构与输送机构连接,所述第一卷扬机与输送机构的一端连接;所述卸料机构包括卸料皮带、支架和多根托辊,所述卸料皮带与输送机构连接,所述支架与卸料皮带连接,所述托辊安装于支架,且所述托辊与卸料皮带形成卸料通道,所述第二卷扬机与支架连接。The purpose of this utility model is achieved through the following technical solutions: the bagged cement shipping device includes a mobile platform, a conveying mechanism, a discharge mechanism, a first hoist and a second hoist, and the conveying mechanism is installed on the mobile platform. The unloading mechanism is connected with the conveying mechanism, and the first winch is connected with one end of the conveying mechanism; the unloading mechanism includes a discharge belt, a bracket and a plurality of idlers, the discharge belt is connected with the conveying mechanism, and the The bracket is connected to the discharge belt, the idler roller is installed on the bracket, and the idler roller and the discharge belt form a discharge channel, and the second hoist is connected to the bracket.

优选的,所述卸料机构还包括弹簧和连接杆,所述支架通过连接杆与卸料皮带连接,所述弹簧套接于连接杆,此弹簧位于卸料通道的外面,且所述弹簧的一端顶住支架,所述弹簧的另一端固定于连接杆的端部。Preferably, the unloading mechanism also includes a spring and a connecting rod, the bracket is connected to the unloading belt through the connecting rod, the spring is sleeved on the connecting rod, the spring is located outside the unloading channel, and the spring’s One end bears against the bracket, and the other end of the spring is fixed on the end of the connecting rod.

优选的,多根所述托辊均匀分布于支架。Preferably, a plurality of said idlers are evenly distributed on the support.

优选的,所述卸料皮带的下方设置有导向板。Preferably, a guide plate is provided below the discharge belt.

优选的,所述支架的上端设有挡板。Preferably, the upper end of the bracket is provided with a baffle.

优选的,所述支架与卸料皮带平行设置。Preferably, the bracket is arranged parallel to the discharge belt.

优选的,所述移动平台包括支撑平台和导轨,所述支撑平台安装于导轨上。Preferably, the mobile platform includes a support platform and a guide rail, and the support platform is installed on the guide rail.

优选的,所述输送机构包括上料部和上扬部,所述上料部可移动的安装于支撑平台上,且所述上料部与上扬部连接,所述上扬部与第一卷扬机连接。Preferably, the conveying mechanism includes a feeding part and a lifting part, the feeding part is movably installed on the support platform, and the feeding part is connected with the lifting part, and the lifting part is connected with the first winch.

本实用新型相对于现有技术具有如下的优点:本袋装水泥装船装置中的卸料机构采用了卸料皮带、支架和多根托辊,则这可控制袋装水泥落入船体的速度,避免袋装水泥落入船体时发生较大的冲击,从而降低了破包率。本袋装水泥装船装置中的卸料机构采用了卸料皮带、支架和多根托辊,当将卸料皮带与船体的底部垂直时,袋装水泥会落于卸料皮带的下方,则位于卸料皮带两侧的工作人员都可以进行装卸,这提高了装卸速度。Compared with the prior art, the utility model has the following advantages: the unloading mechanism in the bagged cement loading device adopts a unloading belt, a bracket and a plurality of supporting rollers, which can control the speed at which the bagged cement falls into the hull , to avoid a large impact when the bagged cement falls into the hull, thereby reducing the rate of bag breakage. The unloading mechanism in the bagged cement loading device adopts a unloading belt, brackets and multiple idlers. When the unloading belt is perpendicular to the bottom of the hull, the bagged cement will fall below the unloading belt, then Workers located on both sides of the unloading belt can carry out loading and unloading, which improves the loading and unloading speed.

附图说明Description of drawings

图1是传统的袋装水泥装船装置的结构示意图。Fig. 1 is a structural schematic diagram of a traditional bagged cement shipping device.

图2是本实用新型的袋装水泥装船装置的结构示意图。Fig. 2 is a schematic structural view of the bagged cement shipping device of the present invention.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

如图2所示的袋装水泥装船装置,包括移动平台1、输送机构2、卸料机构4、第一卷扬机5和第二卷扬机6,所述输送机构2安装于移动平台1上,所述卸料机构4与输送机构2连接,所述第一卷扬机5与输送机构2的一端连接;所述卸料机构4包括卸料皮带401、支架402和多根托辊403,所述卸料皮带401与输送机构2连接,所述支架402与卸料皮带401连接,所述托辊403安装于支架402,且所述托辊403与卸料皮带401形成卸料通道7,所述第二卷扬机6与支架402连接。The bagged cement shipping device shown in Figure 2 includes a mobile platform 1, a conveying mechanism 2, a discharge mechanism 4, a first hoist 5 and a second hoist 6, and the conveying mechanism 2 is installed on the mobile platform 1, so The discharge mechanism 4 is connected with the conveying mechanism 2, and the first winch 5 is connected with one end of the conveying mechanism 2; the discharge mechanism 4 includes a discharge belt 401, a bracket 402 and a plurality of idlers 403, and the discharge The belt 401 is connected with the conveying mechanism 2, the support 402 is connected with the discharge belt 401, the idler roller 403 is installed on the support 402, and the idler roller 403 and the discharge belt 401 form a discharge passage 7, and the second The winch 6 is connected to the bracket 402 .

所述卸料机构4还包括弹簧404和连接杆405,所述支架402通过连接杆405与卸料皮带401连接,所述弹簧404套接于连接杆405,此弹簧404位于卸料通道7的外面,所述弹簧404的一端顶住支架402,所述弹簧404的另一端固定于连接杆405的端部。具体的,弹簧404具有两组,这两组弹簧404分别顶住支架402的两端,从而保证平稳性。弹簧404可及时调整卸料通道7的宽度,使卸料通道7的宽度与袋装水泥的厚度匹配,从而提高袋装水泥下落的稳定性。The discharge mechanism 4 also includes a spring 404 and a connecting rod 405, the bracket 402 is connected to the discharge belt 401 through the connecting rod 405, the spring 404 is sleeved on the connecting rod 405, and the spring 404 is located at the end of the discharge channel 7. Outside, one end of the spring 404 bears against the bracket 402 , and the other end of the spring 404 is fixed to the end of the connecting rod 405 . Specifically, there are two groups of springs 404, and these two groups of springs 404 withstand the two ends of the bracket 402 respectively, so as to ensure stability. The spring 404 can adjust the width of the discharge channel 7 in time, so that the width of the discharge channel 7 matches the thickness of the bagged cement, thereby improving the stability of the bagged cement falling.

多根所述托辊403均匀分布于支架402。托辊403均匀分布可进一步提高袋装水泥下落的稳定性。A plurality of idlers 403 are evenly distributed on the support 402 . The uniform distribution of the supporting rollers 403 can further improve the stability of the bagged cement falling.

所述卸料皮带401的下方设置有导向板8。具体的,导向板8铰接于卸料皮带401的下方,导向板8可使袋装水泥落于卸料皮带401的两侧,方便工作人员装卸,提高工作人员的工作效率。A guide plate 8 is provided below the discharge belt 401 . Specifically, the guide plate 8 is hinged below the discharge belt 401, and the guide plate 8 can make the bagged cement fall on both sides of the discharge belt 401, which is convenient for the staff to load and unload, and improves the work efficiency of the staff.

所述支架402的上端设有挡板9。挡板9可保证自输送机构的上扬部落下的袋装水泥落入卸料通道7中,提高了工作的可靠性。The upper end of the bracket 402 is provided with a baffle 9 . The baffle plate 9 can ensure that the bagged cement falling from the uplift of the conveying mechanism falls into the discharge channel 7, which improves the reliability of the work.

所述支架402与卸料皮带401平行设置。The bracket 402 is arranged parallel to the discharge belt 401 .

所述移动平台1包括支撑平台101和导轨102,所述支撑平台101安装于导轨102上。所述输送机构2包括上料部201和上扬部202,所述上料部201通过导轨可移动的安装于支撑平台101上,且所述上料部201与上扬部202连接,所述上扬部202与第一卷扬机5连接。具体的,支撑平台101相对于码头10的地面进行纵向移动,而输送机构2在支撑平台101上相对地面进行横向移动,从而可有效调整本袋装泥装船装置与船体11之间相对位置,保证工作的有效进行。The mobile platform 1 includes a support platform 101 and a guide rail 102 , and the support platform 101 is installed on the guide rail 102 . The conveying mechanism 2 includes a feeding part 201 and a lifting part 202. The feeding part 201 is movably installed on the support platform 101 through a guide rail, and the feeding part 201 is connected with the lifting part 202. The lifting part 202 is connected with the first winch 5 . Specifically, the support platform 101 moves longitudinally relative to the ground of the wharf 10, and the conveying mechanism 2 moves laterally on the support platform 101 relative to the ground, so that the relative position between the bagged mud loading device and the hull 11 can be effectively adjusted, Ensure that the work is carried out effectively.

本袋装水泥装船装置的工作过程如下所述:先将袋装水泥放上输送机构的上料部,袋装水泥依次经过上料部和上扬部后进入托辊与卸料皮带形成卸料通道中,因托辊和卸料皮带的共同作用,即袋装水泥在下落的过程中,将袋装水泥一直被托辊和卸料皮带夹紧,从而可以控制袋装水泥的下落速度,避免袋装水泥落入船体的速度过快,故降低了存包率。同时,袋装水泥被托辊和卸料皮带下落的过程中是被夹紧的,故卸料皮带的的倾斜角度影响较小,使卸料皮带可与船体的底部垂直,则工作可在卸料皮带的两侧袋装水泥,从而提高装卸速度。The working process of this bagged cement shipping device is as follows: first put the bagged cement on the feeding part of the conveying mechanism, the bagged cement passes through the feeding part and the lifting part in turn, and then enters the idler roller and the discharge belt to form a discharge In the channel, due to the joint action of the idler roller and the discharge belt, the bagged cement is always clamped by the idler roller and the discharge belt during the falling process, so that the falling speed of the bagged cement can be controlled to avoid The bagged cement falls into the hull too fast, so the bag storage rate is reduced. At the same time, the bagged cement is clamped by the idler roller and the discharge belt during the falling process, so the inclination angle of the discharge belt has little influence, so that the discharge belt can be perpendicular to the bottom of the hull, and the work can be carried out during the discharge process. Cement is bagged on both sides of the material belt, thereby increasing the loading and unloading speed.

上述具体实施方式为本实用新型的优选实施例,并不能对本实用新型进行限定,其他的任何未背离本实用新型的技术方案而所做的改变或其它等效的置换方式,都包含在本实用新型的保护范围之内。The specific implementation described above is a preferred embodiment of the utility model, and does not limit the utility model. Any other changes or other equivalent replacement methods that do not deviate from the technical solution of the utility model are included in the utility model. within the scope of the new protection.

Claims (8)

1.一种袋装水泥装船装置,包括移动平台、输送机构、卸料机构、第一卷扬机和第二卷扬机,所述输送机构安装于移动平台上,所述卸料机构与输送机构连接,所述第一卷扬机与输送机构的一端连接;其特征在于:所述卸料机构包括卸料皮带、支架和多根托辊,所述卸料皮带与输送机构连接,所述支架与卸料皮带连接,所述托辊安装于支架,且所述托辊与卸料皮带形成卸料通道,所述第二卷扬机与支架连接。1. A bagged cement loading device, comprising a mobile platform, a conveying mechanism, a discharge mechanism, a first hoist and a second hoist, the conveying mechanism is installed on the mobile platform, and the discharge mechanism is connected with the conveying mechanism, The first winch is connected to one end of the conveying mechanism; it is characterized in that: the unloading mechanism includes a discharge belt, a bracket and a plurality of idlers, the unloading belt is connected with the conveying mechanism, and the support is connected with the unloading belt connected, the idler roller is installed on the bracket, and the idler roller and the discharge belt form a discharge channel, and the second hoist is connected to the bracket. 2.根据权利要求1所述的袋装水泥装船装置,其特征在于:所述卸料机构还包括弹簧和连接杆,所述支架通过连接杆与卸料皮带连接,所述弹簧套接于连接杆,此弹簧位于卸料通道的外面,且所述弹簧的一端顶住支架,所述弹簧的另一端固定于连接杆的端部。2. The bagged cement shipping device according to claim 1, characterized in that: the unloading mechanism also includes a spring and a connecting rod, the bracket is connected with the unloading belt through the connecting rod, and the spring is sleeved on the The connecting rod, the spring is located outside the discharge channel, and one end of the spring bears against the bracket, and the other end of the spring is fixed to the end of the connecting rod. 3.根据权利要求1所述的袋装水泥装船装置,其特征在于:多根所述托辊均匀分布于支架。3. The bagged cement shipping device according to claim 1, characterized in that: a plurality of said idler rollers are evenly distributed on the support. 4.根据权利要求1所述的袋装水泥装船装置,其特征在于:所述卸料皮带的下方设置有导向板。4. The bagged cement loading device according to claim 1, characterized in that: a guide plate is arranged below the discharge belt. 5.根据权利要求1所述的袋装水泥装船装置,其特征在于:所述支架的上端设有挡板。5. The bagged cement shipping device according to claim 1, characterized in that: the upper end of the bracket is provided with a baffle. 6.根据权利要求1所述的袋装水泥装船装置,其特征在于:所述支架与卸料皮带平行设置。6. The bagged cement loading device according to claim 1, characterized in that: the support is arranged parallel to the discharge belt. 7.根据权利要求1所述的袋装水泥装船装置,其特征在于:所述移动平台包括支撑平台和导轨,所述支撑平台安装于导轨上。7. The bagged cement shipping device according to claim 1, wherein the mobile platform includes a support platform and a guide rail, and the support platform is installed on the guide rail. 8.根据权利要求7所述的袋装水泥装船装置,其特征在于:所述输送机构包括上料部和上扬部,所述上料部可移动的安装于支撑平台上,且所述上料部与上扬部连接,所述上扬部与第一卷扬机连接。8. The bagged cement shipping device according to claim 7, characterized in that: the conveying mechanism includes a feeding part and a lifting part, and the feeding part is movably installed on a support platform, and the upper The material part is connected with the lifting part, and the rising part is connected with the first winch.
CN201520243463.0U 2015-04-21 2015-04-21 A kind of bagged cement shipment device Expired - Lifetime CN204528727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520243463.0U CN204528727U (en) 2015-04-21 2015-04-21 A kind of bagged cement shipment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520243463.0U CN204528727U (en) 2015-04-21 2015-04-21 A kind of bagged cement shipment device

Publications (1)

Publication Number Publication Date
CN204528727U true CN204528727U (en) 2015-08-05

Family

ID=53742749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520243463.0U Expired - Lifetime CN204528727U (en) 2015-04-21 2015-04-21 A kind of bagged cement shipment device

Country Status (1)

Country Link
CN (1) CN204528727U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106185377A (en) * 2016-08-23 2016-12-07 湖北林龙机电设备有限公司 Two-stage floating type port traffic machine
CN107323945A (en) * 2017-07-10 2017-11-07 武汉海博机电工程有限公司 A kind of variable amplitude loads sidewall belt conveyor onto ship
CN107381107A (en) * 2017-07-10 2017-11-24 武汉海博机电工程有限公司 A kind of coke ship loader
CN112794120A (en) * 2021-01-04 2021-05-14 李建强 A retractable folding baffle plate for a ship unloader

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106185377A (en) * 2016-08-23 2016-12-07 湖北林龙机电设备有限公司 Two-stage floating type port traffic machine
CN106185377B (en) * 2016-08-23 2018-03-13 湖北林龙机电设备有限公司 The floating type port traffic machine of two-stage
CN107323945A (en) * 2017-07-10 2017-11-07 武汉海博机电工程有限公司 A kind of variable amplitude loads sidewall belt conveyor onto ship
CN107381107A (en) * 2017-07-10 2017-11-24 武汉海博机电工程有限公司 A kind of coke ship loader
CN107323945B (en) * 2017-07-10 2023-06-06 武汉海博机电工程有限公司 Variable amplitude shipment flange belt feeder
CN112794120A (en) * 2021-01-04 2021-05-14 李建强 A retractable folding baffle plate for a ship unloader

Similar Documents

Publication Publication Date Title
CN205555290U (en) Movable belt conveyer
CN204528727U (en) A kind of bagged cement shipment device
CN207932427U (en) A kind of logistics haulage equipment
CN205327990U (en) Ramp type material automatic material conveying device
CN208932432U (en) A kind of automatic loading and unloading device
CN206886165U (en) A kind of filling bottle pusher
CN105129348B (en) Plastic products conveying arrangement
CN203903429U (en) Material receiving belt conveyer of tripper car
CN217534465U (en) Adjustable conveying belt auxiliary blanking device
CN204237279U (en) A kind of tobacco flow bolt feeder
CN103303657A (en) Adjustable manual material smoothing device
CN219566382U (en) A logistics cargo slideway equipment
CN207128729U (en) A kind of water pipeline conveys antichattering system
CN207158144U (en) Raise belt feeder
CN205931422U (en) Automatic material arranging machine
CN209506952U (en) A kind of overturning conveying device
CN212150561U (en) Glass bottle processing loading attachment
CN204453858U (en) Heavy steel plate storehouse raw coal storage and transportation apparatus
CN211870511U (en) Belt conveyor for aluminum production
CN205060687U (en) Novel conveyer is used in commodity circulation transportation
CN206842433U (en) Convey adjusting apparatus
CN205060885U (en) Band conveyer overlap joint feeding device
CN205708672U (en) Novel loading device
CN204675419U (en) A kind of airtight decoking reclaimer system
CN203173308U (en) Belt conveyer middle support mechanism for conveying sheet materials

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150805