CN204517271U - A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified - Google Patents
A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified Download PDFInfo
- Publication number
- CN204517271U CN204517271U CN201520186388.9U CN201520186388U CN204517271U CN 204517271 U CN204517271 U CN 204517271U CN 201520186388 U CN201520186388 U CN 201520186388U CN 204517271 U CN204517271 U CN 204517271U
- Authority
- CN
- China
- Prior art keywords
- load
- sill
- steel pipe
- arm head
- pole cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 230000005540 biological transmission Effects 0.000 title claims abstract description 14
- 239000012212 insulator Substances 0.000 title claims abstract description 12
- 239000000463 material Substances 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 229910000617 Mangalloy Inorganic materials 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model belongs to electric power network technical field, particularly relate to a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.The utility model changes the just achievable events in operation that in the past need to have a power failure, and can carry out, improve power supply reliability on alive circuit.
Description
Technical field
The utility model belongs to electric power network technical field, particularly relates to a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified.
Background technology
The circuit of steel pipe pole has the advantages such as good looking appearance, floor space are little, shaft tower material is not easily lost, but also there is the shortcomings such as cost is high, maintenance inconvenience, transport inconvenience, applied to some extent in transmission line in recent years, but not very extensive, only have when minority area or special requirement and just set up this type of transmission line.Tradition live line working is installed, is safeguarded that insulating tool used and method of operation do not update to new standard.Particularly need when steel pipe pole cross-arm Head suspension suspension centre, because the similar cuboid component of steel pipe pole is succinct, cross-arm head is smooth and do not have installing hole, and hot line job is difficult to launch.The load entablature of conventional steel cast shaft tower live line working replacing insulator under electrified work tower head jig used is the gravity that level design is difficult to bear Great span, large load.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of special bearing tool of confession power transmission line steel pipe rod replacing insulator under electrified that can bear the gravity of Great span, greatly load.
The utility model realizes like this, a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.
Further, the two ends of load sill are provided with instrument hitch point, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.
Further, in the framework of trapezoidal load crossbeam, arrange two reinforce cant beam.
Compared with prior art, beneficial effect is the utility model:
1, the utility model changes the just achievable events in operation that in the past need to have a power failure, and can carry out, improve power supply reliability on alive circuit;
2, the utility model can adapt to the installation of this area all 220 kilovolts and 66 KV transmission line steel pipe pole cross-arm heads, and the steel pipe type shaft tower transmission line being suitable for all Great span, large load, single conductor and multiple wire uses, and improves versatility;
3, while the utility model is arranged on steel pipe pole cross-arm head, also effectively increases live wire distance to the ground, air gap, the insulating coefficient enhancing insulating tool and insulation level, improve fail safe;
4, can improve when the utility model uses on dead line because coaster suspension centre is too low and cause insulator to install difficulty, setting fastening and difficulty of triping, improve ranges of operability.
Accompanying drawing explanation
Fig. 1 is the tool construction schematic diagram that the utility model embodiment provides.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
See Fig. 1, a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature 2 and load sill 7, and connect the oblique pull beam 3 of load entablature 2 and load sill 7, the two ends of load sill 7 are provided with instrument hitch point 3, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.In the framework of trapezoidal load crossbeam, arrange two reinforce cant beam 8.Load sill 7 lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole 5, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill 7 that one fastening sill 4 is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, are fixed as one between fastening sill 4 and load sill 7 by fastening bolt 6 through adjustable elongated hole.
Trapezoidal load crossbeam: trapezoidal load crossbeam is stressed maximum component in this cover instrument, for carrying from all vertical loads of wire, trapezoidal load crossbeam is reinforced cant beam 8 by 1 load entablature, 2,1 load sill, 7,2 oblique pull beams 1 and two and is formed.
Load entablature 2 lies in a horizontal plane in load sill 7 upper strata, utilizes oblique pull beam 1 and reinforce cant beam 8 to be rationally connected with load sill 7.Load sill 7 lies in a horizontal plane in steel pipe pole cross-arm head upper strata, and both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head.Its two ends are provided with instrument hitch point 3, and for hanging insulating tool, hitch point bolt can turn on all kinds of insulating tool of convenient connection.Fastening sill 4: lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously.Utilize fastening bolt 6 to connect levels crossbeam, make the utility model firmly be located in steel pipe pole cross-arm head.Adjustable elongated hole, design is in load sill and appropriate location, fastening sill both sides, make this jig width adjustable, vertically penetrate fastening bolt and connect levels crossbeam, fastening bolt: using the development of high strength manganese steel material, for connecting load sill and fastening sill, vertically penetrating the adjustable elongated hole of load sill and fastening sill, this cover jig is made to keep balance, for carrying the uneven pulling force from producing in operation.Instrument hitch point: for hanging insulating tool, its bolt adopts high strength manganese steel material to manufacture can turn on all kinds of insulating tool of convenient connection.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection range of the present utility model.
Claims (3)
1. one kind supplies the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.
2. as claimed in claim 1 for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, the two ends of load sill are provided with instrument hitch point, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.
3. as claimed in claim 1 for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, in the framework of trapezoidal load crossbeam, arrange two reinforce cant beams.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520186388.9U CN204517271U (en) | 2015-03-31 | 2015-03-31 | A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520186388.9U CN204517271U (en) | 2015-03-31 | 2015-03-31 | A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204517271U true CN204517271U (en) | 2015-07-29 |
Family
ID=53715207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520186388.9U Active CN204517271U (en) | 2015-03-31 | 2015-03-31 | A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204517271U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106602465A (en) * | 2017-01-17 | 2017-04-26 | 广西电网有限责任公司贺州供电局 | Power transmission line tangent tower first insulator replacement tool |
-
2015
- 2015-03-31 CN CN201520186388.9U patent/CN204517271U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106602465A (en) * | 2017-01-17 | 2017-04-26 | 广西电网有限责任公司贺州供电局 | Power transmission line tangent tower first insulator replacement tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20170083532A (en) | Power transmission tower | |
CN203150936U (en) | Power distribution cabinet pedestal | |
CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
CN202970091U (en) | 220-kilovolt same-rod two-circuit tower head full composite material steel pipe rod | |
CN204538469U (en) | Diagonal-bracing type line lever switch support | |
CN206319631U (en) | A kind of shear wall vertical adjustment mechanism | |
CN204517271U (en) | A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified | |
CN205296966U (en) | Transmission line iron tower | |
CN102619377B (en) | Improved auxiliary holding pole fixing base | |
CN201963015U (en) | High-voltage terminal steel pipe rod with platform | |
CN204311794U (en) | A kind of composite material transformer substation framework | |
CN203161459U (en) | Fixing device used for fixing wind power generator tower barrel with platform | |
CN103928867A (en) | Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode | |
CN203871746U (en) | Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line | |
CN204081984U (en) | The assembling cat ladder that a kind of Construction of Steel Structure is general | |
CN206942282U (en) | A kind of reinforcement type electric force pole tower | |
CN204651778U (en) | A kind of servicing unit changing electric transmission line isolator | |
CN204538475U (en) | Hanging line lever switch support | |
CN203813320U (en) | Tool for live exchange of 220 kV narrow base tower strain insulator string | |
CN204143774U (en) | Electric power steel pipe tower signboard fixing device | |
CN203097401U (en) | Windproof side pull structure for 220-kilovolt cat-head type tower | |
CN204112824U (en) | A kind of high-tension pole increases lightning protection device | |
CN206432624U (en) | Transmission line tangent tower first insulator changes instrument | |
CN202925981U (en) | 750kV composite material cross arm | |
CN202474705U (en) | Electrified installation tool for bird scarer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |