CN204517271U - A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified - Google Patents

A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified Download PDF

Info

Publication number
CN204517271U
CN204517271U CN201520186388.9U CN201520186388U CN204517271U CN 204517271 U CN204517271 U CN 204517271U CN 201520186388 U CN201520186388 U CN 201520186388U CN 204517271 U CN204517271 U CN 204517271U
Authority
CN
China
Prior art keywords
load
sill
steel pipe
arm head
pole cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520186388.9U
Other languages
Chinese (zh)
Inventor
张森
陆尧
王观竹
李雪莲
常秀艳
赵群
袁一文
印文宝
潘鹏飞
周胜
赵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520186388.9U priority Critical patent/CN204517271U/en
Application granted granted Critical
Publication of CN204517271U publication Critical patent/CN204517271U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model belongs to electric power network technical field, particularly relate to a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.The utility model changes the just achievable events in operation that in the past need to have a power failure, and can carry out, improve power supply reliability on alive circuit.

Description

A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified
Technical field
The utility model belongs to electric power network technical field, particularly relates to a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified.
Background technology
The circuit of steel pipe pole has the advantages such as good looking appearance, floor space are little, shaft tower material is not easily lost, but also there is the shortcomings such as cost is high, maintenance inconvenience, transport inconvenience, applied to some extent in transmission line in recent years, but not very extensive, only have when minority area or special requirement and just set up this type of transmission line.Tradition live line working is installed, is safeguarded that insulating tool used and method of operation do not update to new standard.Particularly need when steel pipe pole cross-arm Head suspension suspension centre, because the similar cuboid component of steel pipe pole is succinct, cross-arm head is smooth and do not have installing hole, and hot line job is difficult to launch.The load entablature of conventional steel cast shaft tower live line working replacing insulator under electrified work tower head jig used is the gravity that level design is difficult to bear Great span, large load.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of special bearing tool of confession power transmission line steel pipe rod replacing insulator under electrified that can bear the gravity of Great span, greatly load.
The utility model realizes like this, a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.
Further, the two ends of load sill are provided with instrument hitch point, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.
Further, in the framework of trapezoidal load crossbeam, arrange two reinforce cant beam.
Compared with prior art, beneficial effect is the utility model:
1, the utility model changes the just achievable events in operation that in the past need to have a power failure, and can carry out, improve power supply reliability on alive circuit;
2, the utility model can adapt to the installation of this area all 220 kilovolts and 66 KV transmission line steel pipe pole cross-arm heads, and the steel pipe type shaft tower transmission line being suitable for all Great span, large load, single conductor and multiple wire uses, and improves versatility;
3, while the utility model is arranged on steel pipe pole cross-arm head, also effectively increases live wire distance to the ground, air gap, the insulating coefficient enhancing insulating tool and insulation level, improve fail safe;
4, can improve when the utility model uses on dead line because coaster suspension centre is too low and cause insulator to install difficulty, setting fastening and difficulty of triping, improve ranges of operability.
Accompanying drawing explanation
Fig. 1 is the tool construction schematic diagram that the utility model embodiment provides.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
See Fig. 1, a kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature 2 and load sill 7, and connect the oblique pull beam 3 of load entablature 2 and load sill 7, the two ends of load sill 7 are provided with instrument hitch point 3, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.In the framework of trapezoidal load crossbeam, arrange two reinforce cant beam 8.Load sill 7 lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole 5, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill 7 that one fastening sill 4 is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, are fixed as one between fastening sill 4 and load sill 7 by fastening bolt 6 through adjustable elongated hole.
Trapezoidal load crossbeam: trapezoidal load crossbeam is stressed maximum component in this cover instrument, for carrying from all vertical loads of wire, trapezoidal load crossbeam is reinforced cant beam 8 by 1 load entablature, 2,1 load sill, 7,2 oblique pull beams 1 and two and is formed.
Load entablature 2 lies in a horizontal plane in load sill 7 upper strata, utilizes oblique pull beam 1 and reinforce cant beam 8 to be rationally connected with load sill 7.Load sill 7 lies in a horizontal plane in steel pipe pole cross-arm head upper strata, and both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head.Its two ends are provided with instrument hitch point 3, and for hanging insulating tool, hitch point bolt can turn on all kinds of insulating tool of convenient connection.Fastening sill 4: lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously.Utilize fastening bolt 6 to connect levels crossbeam, make the utility model firmly be located in steel pipe pole cross-arm head.Adjustable elongated hole, design is in load sill and appropriate location, fastening sill both sides, make this jig width adjustable, vertically penetrate fastening bolt and connect levels crossbeam, fastening bolt: using the development of high strength manganese steel material, for connecting load sill and fastening sill, vertically penetrating the adjustable elongated hole of load sill and fastening sill, this cover jig is made to keep balance, for carrying the uneven pulling force from producing in operation.Instrument hitch point: for hanging insulating tool, its bolt adopts high strength manganese steel material to manufacture can turn on all kinds of insulating tool of convenient connection.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection range of the present utility model.

Claims (3)

1. one kind supplies the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, this instrument comprises trapezoidal load crossbeam, this trapezoidal load crossbeam comprises parallel load entablature and load sill, and connect the oblique pull beam of load entablature and load sill, load sill lies in a horizontal plane in steel pipe pole cross-arm head upper strata, both sides are provided with equidistant adjustable elongated hole, for adjusting the position of installing needed for fastening bolt and the width adapting to steel pipe pole cross-arm head, it is parallel with load sill that one fastening sill is set, lie in a horizontal plane in steel pipe pole cross-arm head lower floor, both sides are provided with equidistant adjustable elongated hole to adapt to the width of steel pipe pole cross-arm head simultaneously, be fixed as one through adjustable elongated hole by fastening bolt between fastening sill and load sill.
2. as claimed in claim 1 for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, the two ends of load sill are provided with instrument hitch point, for hanging insulating tool, can turn on all kinds of insulating tool of convenient connection by hitch point bolt.
3. as claimed in claim 1 for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified, it is characterized in that, in the framework of trapezoidal load crossbeam, arrange two reinforce cant beams.
CN201520186388.9U 2015-03-31 2015-03-31 A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified Active CN204517271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520186388.9U CN204517271U (en) 2015-03-31 2015-03-31 A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520186388.9U CN204517271U (en) 2015-03-31 2015-03-31 A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified

Publications (1)

Publication Number Publication Date
CN204517271U true CN204517271U (en) 2015-07-29

Family

ID=53715207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520186388.9U Active CN204517271U (en) 2015-03-31 2015-03-31 A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified

Country Status (1)

Country Link
CN (1) CN204517271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602465A (en) * 2017-01-17 2017-04-26 广西电网有限责任公司贺州供电局 Power transmission line tangent tower first insulator replacement tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602465A (en) * 2017-01-17 2017-04-26 广西电网有限责任公司贺州供电局 Power transmission line tangent tower first insulator replacement tool

Similar Documents

Publication Publication Date Title
KR20170083532A (en) Power transmission tower
CN203150936U (en) Power distribution cabinet pedestal
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN202970091U (en) 220-kilovolt same-rod two-circuit tower head full composite material steel pipe rod
CN204538469U (en) Diagonal-bracing type line lever switch support
CN206319631U (en) A kind of shear wall vertical adjustment mechanism
CN204517271U (en) A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified
CN205296966U (en) Transmission line iron tower
CN102619377B (en) Improved auxiliary holding pole fixing base
CN201963015U (en) High-voltage terminal steel pipe rod with platform
CN204311794U (en) A kind of composite material transformer substation framework
CN203161459U (en) Fixing device used for fixing wind power generator tower barrel with platform
CN103928867A (en) Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN204081984U (en) The assembling cat ladder that a kind of Construction of Steel Structure is general
CN206942282U (en) A kind of reinforcement type electric force pole tower
CN204651778U (en) A kind of servicing unit changing electric transmission line isolator
CN204538475U (en) Hanging line lever switch support
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN204143774U (en) Electric power steel pipe tower signboard fixing device
CN203097401U (en) Windproof side pull structure for 220-kilovolt cat-head type tower
CN204112824U (en) A kind of high-tension pole increases lightning protection device
CN206432624U (en) Transmission line tangent tower first insulator changes instrument
CN202925981U (en) 750kV composite material cross arm
CN202474705U (en) Electrified installation tool for bird scarer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant