A kind of lower foundation ditch steel stair passage Download PDFInfo
- Publication number
- CN204492226U CN204492226U CN201420546473.7U CN201420546473U CN204492226U CN 204492226 U CN204492226 U CN 204492226U CN 201420546473 U CN201420546473 U CN 201420546473U CN 204492226 U CN204492226 U CN 204492226U
- Authority
- CN
- China
- Prior art keywords
- steel
- platform
- girder
- marking time
- stair passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 80
- 239000010959 steel Substances 0.000 title claims abstract description 80
- 238000003466 welding Methods 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model relates to a kind of in-site installation steel stair passage of lower foundation ditch, particularly a kind of lower foundation ditch stair passage adopting the ultra-deep foundation pit of inner support system.Utilize inner support beam the section of marking time, half space, platform and brace summer to be connected, form lower foundation ditch stair passage.Every bench forms by steel plate of marking time, girder and railing unit of marking time.By half space and platform support and connection between every unit section of marking time, half space bottom platform beam supports lower support steel post.The utility model is settled flexibly, and Stability Analysis of Structures is safe and reliable.
Description
Technical field
The utility model relates to a kind of in-site installation steel stair passage of lower foundation ditch, particularly a kind of lower foundation ditch stair passage adopting the ultra-deep foundation pit of inner support system.
Background technology
At the realm of building construction, lower foundation ditch passage generally adopts simple and easy the setting up of steel pipe can utilize on-the-spot material, draws materials conveniently, but in Super Deep Foundation Pit Construction, pattern foundation pit supporting structure and the Main Underground body structure construction period longer, adopt steel pipe to set up and there is inconvenience.
In the pit earthwork excavation stage, earthwork face declines with excavation progress, and steel tube pathway cannot be set up in scene;
Adopt steel pipe to set up Channel Engineering amount large, set up program loaded down with trivial details;
Passage set up by steel pipe, and floor space is large, is unfavorable for foundation ditch Ground arrangement;
Steel pipe is set up passage peace and is torn complexity open, length consuming time.
Utility model content
The purpose of this utility model is, provides that a kind of safe and reliable, construction and installation are quick, location is simple, good looking appearance is generous, rigidity and globality is good, the lower foundation ditch steel stair passage that can reuse.
Steel stair is mainly reliably connected with inner support beam by the utility model, Appropriate application foundation ditch inner space, reduces lower foundation ditch plank road to the impact of foundation ditch layout.
This lower foundation ditch steel stair passage is made up of the section of marking time, half space, platform and brace summer, the section of marking time comprises girder (1), setscrew (2), steel junction plate (3), supports angle steel (4), foot pedal (5), railing (6), half space by: railing (6), landing slab (7), platform longeron (8), platform beams (9) form, platform by: steel junction plate (3), steel post (10) form.The section of marking time upper end is connected with brace summer, and the section of marking time lower end and platform longeron (8) are welded to connect; Halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and the welding of platform longeron (8), platform beams (9) is supported on steel post (10); Steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom is connected with brace summer.Described girder (1) lower end is by being welded to connect to platform longeron (8); Foot pedal (5) is by being welded to connect on girder (1); Railing (6) is by being welded to connect on girder (1).
Compared with the plank road that the utility model and steel pipe are set up, have the following advantages:
1) steel structure stairway is steel structures coating, and whole component can be recycled.
2) steel structure stairway is clearly stressed, and stair bench is main bearing member, and load is finally passed to brace summer, and stress point is reliable.
3) steel structure stairway bench step plate is provided with support angle steel in bottom, improves globality and the fastness of whole stair.
4) steel stair is supported on brace summer, and overall appearance is generous, simple economy, is applicable to the base pit engineering adopting inner support system.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the section of marking time and brace summer drawing;
Fig. 3 is the A-A sectional drawing of Fig. 1;
Fig. 4 is the elevation that steel column is connected with brace summer;
Fig. 5 is the top view that steel column is connected with brace summer.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Shown in Fig. 1-5, this lower foundation ditch steel stair passage is made up of the section of marking time, half space, platform three parts.
The described section of marking time by: girder (1), setscrew (2), steel junction plate (3), support angle steel (4), foot pedal (5), railing (6) part form; Half space respectively by: railing (6), landing slab (7), platform longeron (8), platform beams (9) form; Platform respectively by: setscrew (2), steel junction plate (3), steel post (10) form.
The section of marking time upper end adopts setscrew (2) to be connected with brace summer (11), and the section of marking time lower end and platform longeron (8) are welded to connect; Halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and platform longeron (8), platform beams (9) supporting welding are supported on steel post (10); Steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom is connected with brace summer (11).
The described section of marking time girder (1) upper end adopts setscrew (2) to be connected on brace summer (11) by steel junction plate (3), and girder (1) lower end is by being welded to connect to platform longeron (8); Foot pedal (5) is by being welded to connect on girder (1), for increasing stability, adding under foot pedal (5) and support angle steel (4), supporting angle steel (4) by being welded to connect on girder (1); Railing (6) is by being welded to connect on girder (1).
The landing slab (7) of described half space is supported on platform longeron (8), platform beams (9) by welding, and platform longeron (8), platform beams (9) are supported on steel post (10) by steel junction plate (3) welding.
Steel post (10) top of described platform is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom adopts setscrew (2) to be connected with brace summer (11) by steel junction plate (3).
Beam (1) adopts channel-section steel as the carrying main beam (1) of stair passage.
Girder (1) and steel post (10) are connected on brace summer (11), not by the impact of pit earthwork without upright supports point.
Foot pedal (5) and landing slab (7) adopt highway tread pattern steel plate to make.
Compared with the plank road that the utility model and steel pipe are set up, have the following advantages:
1) steel structure stairway is steel structures coating, and whole component can be recycled.
2) steel structure stairway is clearly stressed, and stair bench is main bearing member, and load is finally passed to brace summer (11), and stress point is reliable.
3) steel structure stairway bench step plate is provided with support angle steel in bottom, improves globality and the fastness of whole stair.
4) steel stair is supported on brace summer (11), and overall appearance is generous, simple economy, is applicable to the base pit engineering adopting inner support system.
Claims (5)
1. a lower foundation ditch steel stair passage, it is characterized in that: by the section of marking time, half space, platform and brace summer composition, the section of marking time comprises girder (1), setscrew (2), steel junction plate (3), support angle steel (4), foot pedal (5), railing (6), half space is by railing (6), landing slab (7), platform longeron (8), platform beams (9) forms, platform is by steel junction plate (3), steel post (10) forms, the section of marking time upper end is connected with brace summer, the section of marking time lower end and platform longeron (8) are welded to connect, halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and the welding of platform longeron (8), platform beams (9) is supported on steel post (10), steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), steel post (10) bottom is connected with brace summer, and described girder (1) lower end is by being welded to connect to platform longeron (8), foot pedal (5) is by being welded to connect on girder (1), railing (6) is by being welded to connect on girder (1).
2. steel stair passage according to claim 1, it is characterized in that: steel post (10) top of described platform is connected with platform longeron (8), platform beams (9) by steel junction plate (3), adopts setscrew (2) to be connected with brace summer by steel junction plate (3) bottom steel post.
3. steel stair passage according to claim 1, is characterized in that: girder (1) adopts channel-section steel as the carrying main beam of stair passage.
4. steel stair passage according to claim 1, is characterized in that: girder (1) and steel post (10) are connected on brace summer, not by the impact of pit earthwork without upright supports point.
5. steel stair passage according to claim 1, its characteristic value is: foot pedal (5) and landing slab (7) adopt highway tread pattern steel plate to make.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420546473.7U CN204492226U (en) | 2014-09-22 | 2014-09-22 | A kind of lower foundation ditch steel stair passage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420546473.7U CN204492226U (en) | 2014-09-22 | 2014-09-22 | A kind of lower foundation ditch steel stair passage |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204492226U true CN204492226U (en) | 2015-07-22 |
Family
ID=53571544
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420546473.7U Expired - Fee Related CN204492226U (en) | 2014-09-22 | 2014-09-22 | A kind of lower foundation ditch steel stair passage |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204492226U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112727152A (en) * | 2020-12-28 | 2021-04-30 | 咸宁智锐机电科技有限公司 | Connection structure between construction stair and floor in deep basal pit |
| CN116561853A (en) * | 2023-04-26 | 2023-08-08 | 青岛理工大学 | Calculation method for overall stability of foundation pit cat ladder |
-
2014
- 2014-09-22 CN CN201420546473.7U patent/CN204492226U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112727152A (en) * | 2020-12-28 | 2021-04-30 | 咸宁智锐机电科技有限公司 | Connection structure between construction stair and floor in deep basal pit |
| CN112727152B (en) * | 2020-12-28 | 2022-06-03 | 宜昌富海建设工程有限公司 | Connection structure between construction stair and floor in deep basal pit |
| CN116561853A (en) * | 2023-04-26 | 2023-08-08 | 青岛理工大学 | Calculation method for overall stability of foundation pit cat ladder |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204098463U (en) | Builder's jack | |
| US8235346B2 (en) | Support bracket for a column | |
| CN102704491B (en) | Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin | |
| CN107090975A (en) | Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss | |
| CN102733606A (en) | Construction method of high large cantilever structure | |
| CA2996987C (en) | Timber pole foundation structure | |
| CN104480922A (en) | Space truss formwork supporting system and construction method thereof | |
| CN204876096U (en) | Stand and crossbeam bolted connection structure in aluminum alloy house | |
| CN105952133A (en) | Suspended large-span reinforced concrete structure construction steel platform and construction method | |
| CN204282793U (en) | Movable groined type steel scaffold | |
| CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
| CN204492226U (en) | A kind of lower foundation ditch steel stair passage | |
| CN203531005U (en) | Steel structure combined type tower crane base structure | |
| CN104234447A (en) | Tool-type suspension staircase for deep foundation pit | |
| CN104674997B (en) | A kind of supporting construction and its construction method on timber buildings roof modelled after an antique | |
| CN204001731U (en) | A kind of shuttering supporting vertical rod base fixing device | |
| CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
| CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
| CN104989092A (en) | Construction method of high-altitude overhang superposition type steel truss bearing platform | |
| CN205116776U (en) | Support access structure | |
| CN206246124U (en) | Hydroenergy storage station slope construction variable-angle digs chassis | |
| CN106368426B (en) | A kind of auxiliary shoring system of super high-rise building climbing equipment | |
| CN205369057U (en) | A from lock bracket that is used for two high mounds of wall formula | |
| CN204299072U (en) | The two badly bleeding stair of a kind of two circular hollow steel column supporting | |
| CN209292858U (en) | The main bridge energy conservation arch rib of bridge road |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150722 Termination date: 20170922 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |