CN204492226U - A kind of lower foundation ditch steel stair passage - Google Patents

A kind of lower foundation ditch steel stair passage Download PDF

Info

Publication number
CN204492226U
CN204492226U CN201420546473.7U CN201420546473U CN204492226U CN 204492226 U CN204492226 U CN 204492226U CN 201420546473 U CN201420546473 U CN 201420546473U CN 204492226 U CN204492226 U CN 204492226U
Authority
CN
China
Prior art keywords
steel
platform
girder
marking time
stair passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420546473.7U
Other languages
Chinese (zh)
Inventor
江涛
马飞
秦晓武
陈练
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201420546473.7U priority Critical patent/CN204492226U/en
Application granted granted Critical
Publication of CN204492226U publication Critical patent/CN204492226U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a kind of in-site installation steel stair passage of lower foundation ditch, particularly a kind of lower foundation ditch stair passage adopting the ultra-deep foundation pit of inner support system.Utilize inner support beam the section of marking time, half space, platform and brace summer to be connected, form lower foundation ditch stair passage.Every bench forms by steel plate of marking time, girder and railing unit of marking time.By half space and platform support and connection between every unit section of marking time, half space bottom platform beam supports lower support steel post.The utility model is settled flexibly, and Stability Analysis of Structures is safe and reliable.

Description

A kind of lower foundation ditch steel stair passage
Technical field
The utility model relates to a kind of in-site installation steel stair passage of lower foundation ditch, particularly a kind of lower foundation ditch stair passage adopting the ultra-deep foundation pit of inner support system.
Background technology
At the realm of building construction, lower foundation ditch passage generally adopts simple and easy the setting up of steel pipe can utilize on-the-spot material, draws materials conveniently, but in Super Deep Foundation Pit Construction, pattern foundation pit supporting structure and the Main Underground body structure construction period longer, adopt steel pipe to set up and there is inconvenience.
In the pit earthwork excavation stage, earthwork face declines with excavation progress, and steel tube pathway cannot be set up in scene;
Adopt steel pipe to set up Channel Engineering amount large, set up program loaded down with trivial details;
Passage set up by steel pipe, and floor space is large, is unfavorable for foundation ditch Ground arrangement;
Steel pipe is set up passage peace and is torn complexity open, length consuming time.
Utility model content
The purpose of this utility model is, provides that a kind of safe and reliable, construction and installation are quick, location is simple, good looking appearance is generous, rigidity and globality is good, the lower foundation ditch steel stair passage that can reuse.
Steel stair is mainly reliably connected with inner support beam by the utility model, Appropriate application foundation ditch inner space, reduces lower foundation ditch plank road to the impact of foundation ditch layout.
This lower foundation ditch steel stair passage is made up of the section of marking time, half space, platform and brace summer, the section of marking time comprises girder (1), setscrew (2), steel junction plate (3), supports angle steel (4), foot pedal (5), railing (6), half space by: railing (6), landing slab (7), platform longeron (8), platform beams (9) form, platform by: steel junction plate (3), steel post (10) form.The section of marking time upper end is connected with brace summer, and the section of marking time lower end and platform longeron (8) are welded to connect; Halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and the welding of platform longeron (8), platform beams (9) is supported on steel post (10); Steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom is connected with brace summer.Described girder (1) lower end is by being welded to connect to platform longeron (8); Foot pedal (5) is by being welded to connect on girder (1); Railing (6) is by being welded to connect on girder (1).
Compared with the plank road that the utility model and steel pipe are set up, have the following advantages:
1) steel structure stairway is steel structures coating, and whole component can be recycled.
2) steel structure stairway is clearly stressed, and stair bench is main bearing member, and load is finally passed to brace summer, and stress point is reliable.
3) steel structure stairway bench step plate is provided with support angle steel in bottom, improves globality and the fastness of whole stair.
4) steel stair is supported on brace summer, and overall appearance is generous, simple economy, is applicable to the base pit engineering adopting inner support system.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the section of marking time and brace summer drawing;
Fig. 3 is the A-A sectional drawing of Fig. 1;
Fig. 4 is the elevation that steel column is connected with brace summer;
Fig. 5 is the top view that steel column is connected with brace summer.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Shown in Fig. 1-5, this lower foundation ditch steel stair passage is made up of the section of marking time, half space, platform three parts.
The described section of marking time by: girder (1), setscrew (2), steel junction plate (3), support angle steel (4), foot pedal (5), railing (6) part form; Half space respectively by: railing (6), landing slab (7), platform longeron (8), platform beams (9) form; Platform respectively by: setscrew (2), steel junction plate (3), steel post (10) form.
The section of marking time upper end adopts setscrew (2) to be connected with brace summer (11), and the section of marking time lower end and platform longeron (8) are welded to connect; Halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and platform longeron (8), platform beams (9) supporting welding are supported on steel post (10); Steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom is connected with brace summer (11).
The described section of marking time girder (1) upper end adopts setscrew (2) to be connected on brace summer (11) by steel junction plate (3), and girder (1) lower end is by being welded to connect to platform longeron (8); Foot pedal (5) is by being welded to connect on girder (1), for increasing stability, adding under foot pedal (5) and support angle steel (4), supporting angle steel (4) by being welded to connect on girder (1); Railing (6) is by being welded to connect on girder (1).
The landing slab (7) of described half space is supported on platform longeron (8), platform beams (9) by welding, and platform longeron (8), platform beams (9) are supported on steel post (10) by steel junction plate (3) welding.
Steel post (10) top of described platform is connected with platform longeron (8), platform beams (9) by steel junction plate (3), and steel post (10) bottom adopts setscrew (2) to be connected with brace summer (11) by steel junction plate (3).
Beam (1) adopts channel-section steel as the carrying main beam (1) of stair passage.
Girder (1) and steel post (10) are connected on brace summer (11), not by the impact of pit earthwork without upright supports point.
Foot pedal (5) and landing slab (7) adopt highway tread pattern steel plate to make.
Compared with the plank road that the utility model and steel pipe are set up, have the following advantages:
1) steel structure stairway is steel structures coating, and whole component can be recycled.
2) steel structure stairway is clearly stressed, and stair bench is main bearing member, and load is finally passed to brace summer (11), and stress point is reliable.
3) steel structure stairway bench step plate is provided with support angle steel in bottom, improves globality and the fastness of whole stair.
4) steel stair is supported on brace summer (11), and overall appearance is generous, simple economy, is applicable to the base pit engineering adopting inner support system.

Claims (5)

1. a lower foundation ditch steel stair passage, it is characterized in that: by the section of marking time, half space, platform and brace summer composition, the section of marking time comprises girder (1), setscrew (2), steel junction plate (3), support angle steel (4), foot pedal (5), railing (6), half space is by railing (6), landing slab (7), platform longeron (8), platform beams (9) forms, platform is by steel junction plate (3), steel post (10) forms, the section of marking time upper end is connected with brace summer, the section of marking time lower end and platform longeron (8) are welded to connect, halfpace plate (7) is supported on platform longeron (8), platform beams (9) by welding, and the welding of platform longeron (8), platform beams (9) is supported on steel post (10), steel post (10) top is connected with platform longeron (8), platform beams (9) by steel junction plate (3), steel post (10) bottom is connected with brace summer, and described girder (1) lower end is by being welded to connect to platform longeron (8), foot pedal (5) is by being welded to connect on girder (1), railing (6) is by being welded to connect on girder (1).
2. steel stair passage according to claim 1, it is characterized in that: steel post (10) top of described platform is connected with platform longeron (8), platform beams (9) by steel junction plate (3), adopts setscrew (2) to be connected with brace summer by steel junction plate (3) bottom steel post.
3. steel stair passage according to claim 1, is characterized in that: girder (1) adopts channel-section steel as the carrying main beam of stair passage.
4. steel stair passage according to claim 1, is characterized in that: girder (1) and steel post (10) are connected on brace summer, not by the impact of pit earthwork without upright supports point.
5. steel stair passage according to claim 1, its characteristic value is: foot pedal (5) and landing slab (7) adopt highway tread pattern steel plate to make.
CN201420546473.7U 2014-09-22 2014-09-22 A kind of lower foundation ditch steel stair passage Expired - Fee Related CN204492226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420546473.7U CN204492226U (en) 2014-09-22 2014-09-22 A kind of lower foundation ditch steel stair passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420546473.7U CN204492226U (en) 2014-09-22 2014-09-22 A kind of lower foundation ditch steel stair passage

Publications (1)

Publication Number Publication Date
CN204492226U true CN204492226U (en) 2015-07-22

Family

ID=53571544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420546473.7U Expired - Fee Related CN204492226U (en) 2014-09-22 2014-09-22 A kind of lower foundation ditch steel stair passage

Country Status (1)

Country Link
CN (1) CN204492226U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit
CN116561853A (en) * 2023-04-26 2023-08-08 青岛理工大学 Calculation method for overall stability of foundation pit cat ladder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit
CN112727152B (en) * 2020-12-28 2022-06-03 宜昌富海建设工程有限公司 Connection structure between construction stair and floor in deep basal pit
CN116561853A (en) * 2023-04-26 2023-08-08 青岛理工大学 Calculation method for overall stability of foundation pit cat ladder

Similar Documents

Publication Publication Date Title
CN204098463U (en) Builder's jack
US8235346B2 (en) Support bracket for a column
CN102704491B (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN107090975A (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN102733606A (en) Construction method of high large cantilever structure
CA2996987C (en) Timber pole foundation structure
CN104480922A (en) Space truss formwork supporting system and construction method thereof
CN204876096U (en) Stand and crossbeam bolted connection structure in aluminum alloy house
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN204282793U (en) Movable groined type steel scaffold
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN204492226U (en) A kind of lower foundation ditch steel stair passage
CN203531005U (en) Steel structure combined type tower crane base structure
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN104674997B (en) A kind of supporting construction and its construction method on timber buildings roof modelled after an antique
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN203238950U (en) Concrete beam formwork supported by trusses suspended in air
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN104989092A (en) Construction method of high-altitude overhang superposition type steel truss bearing platform
CN205116776U (en) Support access structure
CN206246124U (en) Hydroenergy storage station slope construction variable-angle digs chassis
CN106368426B (en) A kind of auxiliary shoring system of super high-rise building climbing equipment
CN205369057U (en) A from lock bracket that is used for two high mounds of wall formula
CN204299072U (en) The two badly bleeding stair of a kind of two circular hollow steel column supporting
CN209292858U (en) The main bridge energy conservation arch rib of bridge road

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20170922

CF01 Termination of patent right due to non-payment of annual fee