CN204492216U - Ready-package building frontier defense guardrail fastening devices - Google Patents

Ready-package building frontier defense guardrail fastening devices Download PDF

Info

Publication number
CN204492216U
CN204492216U CN201520105825.XU CN201520105825U CN204492216U CN 204492216 U CN204492216 U CN 204492216U CN 201520105825 U CN201520105825 U CN 201520105825U CN 204492216 U CN204492216 U CN 204492216U
Authority
CN
China
Prior art keywords
support
fixed bin
grab
eccentric wheel
frontier defense
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520105825.XU
Other languages
Chinese (zh)
Inventor
向国庆
徐丽珍
向旻
贾军伟
刘晓玲
黄长丽
王雪岚
王佳宇
黄亚克
任勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Original Assignee
Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Construction Engineering Group Second Construction Engineering Co Ltd filed Critical Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Priority to CN201520105825.XU priority Critical patent/CN204492216U/en
Application granted granted Critical
Publication of CN204492216U publication Critical patent/CN204492216U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A kind of ready-package building frontier defense guardrail fastening devices, comprise two symmetrical fixators, wherein single fixator is made up of fixed bin (3), support (6) and grab (1), grab (1) is connected with support (6), support (6) is fixed in fixed bin (3), and gap is arranged at bottom, has square shaft (9) in fixed bin (3), square shaft (9) there is eccentric wheel (2), eccentric wheel (2) below limited location bolt (8); The groove corresponding with eccentric wheel (2) is arranged at support (6) bottom in fixed bin (3); Fixed bin (3) bottom is sleeve pipe, and the steel pipe railing (5) of protective guard installed by sleeve pipe; (6) have multiple draw-in groove to support; Grab (1) is flexibly connected with support (6) by draw-in groove; Grab (1) is bolted on support (6); Sleeve pipe there is bolt (4).Not only the utility model is saved material but also is saved time and realizes Fast Installation and fix building frontier defense guardrail, puts into job site, safe and reliable, is subject to the welcome of constructor.

Description

Ready-package building frontier defense guardrail fastening devices
Technical field
The utility model belongs to building implements field, relates in particular to a kind of ready-package building frontier defense guardrail fastening devices and protective guard construction method thereof.
Background technology
According to pertinent regulations, in order to ensure the life security of construction worker in building construction process, prevent construction worker from causing casualty accident from falling from high altitude, all must install protective guard at the stair outer rim of building, balcony, window, elevator shaft mouth, protective guard is one of construction safety essential condition of producing.At present, in the above-mentioned position of building, the mounting technique that protective guard has comparative maturity is installed.But the traditional method that frontier defense guardrail in building is installed is, according to column sectional dimension, steel pipe is cut into corresponding length, and by encirclement mode, protective guard is fixed on column, prevents constructor from falling, so namely waste material, efficiency is not high yet.
Chinese patent 200620135431X discloses one " protective guard fastening devices ", it is fixed protective guard for building end face, comprises two clamping plates, have guiding device between two clamping plates, between two clamping plates, clamping regulator is installed, clamping plate has protective guard clamping device.Have no the patent document that frontier defense guardrail in building is fixing.
Utility model content
Not only the purpose of this utility model is to provide a kind of ready-package building frontier defense guardrail fastening devices and protective guard construction method thereof, and this device is saved material but also saved time and realizes Fast Installation and fix building frontier defense guardrail, puts into job site, safe and reliable.
The purpose of this utility model and solve its technical problem underlying and realize by the following technical solutions: a kind of ready-package building frontier defense guardrail fastening devices, comprise two symmetrical fixators, wherein single fixator is made up of fixed bin, support and grab, grab is connected with support, support is fixed in fixed bin, and gap is arranged at bottom, has square shaft in fixed bin, square shaft there is eccentric wheel, limited location bolt below eccentric wheel; Frame bottom in fixed bin has the groove corresponding with eccentric wheel; Fixed bin bottom is sleeve pipe, and the steel pipe railing of protective guard installed by sleeve pipe.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described support has multiple draw-in groove, described grab is flexibly connected with support by draw-in groove.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described grab is bolted on support.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described sleeve pipe has bolt.
Principle of the present utility model: before installation, according to concrete column sectional dimension, is fixed on grab on support, insert in fixed bin, the bearing surface of grab and fixed bin is pasted into the surface of concrete column, rotates clockwise eccentric wheel, makes it to prop up caging bolt, now, eccentric wheel is apart from farthest, the center of circle under the progradation of support and grab, and after stepping the concave point of support, the rebound effect of timbering material tightly can prop up eccentric wheel, restriction eccentric wheel is rotated counterclockwise, and is firmly fixed on concrete column.After the fixator of two concrete columns is installed, steel pipe railing is inserted in the sleeve pipe on fixed bin, by bolton, the effect of constructor's security protection can be played.
The utility model compared with prior art has obvious advantage and beneficial effect.Not only from above technical scheme, the utility model is saved material but also is saved time and realizes Fast Installation and fix building frontier defense guardrail, puts into job site, safe and reliable, is inherently subject to the welcome of constructor.Because it has following characteristics:
1, support is established multiple draw-in groove, just can adapt to the concrete column of different cross section size.
2, the highest salient point of eccentric wheel stepped support concave point, moved after can preventing support.
3, eccentric while establish caging bolt, another side support is provided with the groove corresponding with eccentric wheel, and it is spacing firm to make, fixing firm.
Accompanying drawing explanation
Fig. 1 is the structural representation of the single fixator of the utility model;
Fig. 2 is using state figure of the present utility model.
Mark in figure:
1, grab; 2, eccentric wheel; 3, fixed bin; 4, bolt; 5, steel pipe railing; 6, support; 7, concrete column; 8, caging bolt; 9, square shaft.
detailed description of the invention:
Below in conjunction with accompanying drawing and preferred embodiment, to according to ready-package building frontier defense guardrail fastening devices detailed description of the invention, structure, feature and the effect thereof that the utility model proposes, be described in detail as follows.
See Fig. 1-2, a kind of ready-package building frontier defense guardrail fastening devices, comprise two symmetrical fixators, wherein single fixator is made up of fixed bin 3, support 6 and grab 1, and grab 1 is connected with support 6, and support 6 is fixed in fixed bin 3, gap is arranged at bottom, there is square shaft 9 in fixed bin 3, square shaft 9 has eccentric wheel 2, limited location bolt 8 below eccentric wheel 2; The groove corresponding with eccentric wheel 2 is had bottom support 6 in fixed bin 3; Fixed bin 3 bottom is sleeve pipe, and the steel pipe railing 5 of protective guard installed by sleeve pipe.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described support 6 has multiple draw-in groove, described grab 1 is flexibly connected with support 6 by draw-in groove.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described grab 1 is bolted on support 6.
Above-mentioned ready-package building frontier defense guardrail fastening devices, wherein: described sleeve pipe has bolt 4.
The utility model principle: according to concrete column 7 sectional dimension, fixed on the frame 6 by grab 1, insert in fixed bin 3, the bearing surface of grab 1 and fixed bin 3 is pasted into the surface of concrete column 7, rotate clockwise eccentric wheel 2, make it to prop up caging bolt 8, now, eccentric wheel 2 apart from farthest, the center of circle under the progradation of support and grab, after stepping the concave point of support 6, the rebound effect of timbering material can tightly prop up eccentric wheel 2, and restriction eccentric wheel 2 is rotated counterclockwise, and is firmly fixed on concrete column 7.After the fixator of two concrete columns 7 is installed, steel pipe railing 5 is inserted in the sleeve pipe on fixed bin 3, by fastening for bolt 4, the effect of constructor's security protection can be played.
The utility model has following characteristics:
1, support is established multiple draw-in groove, just can adapt to the concrete column of different cross section size.
2, the highest salient point of eccentric wheel stepped support concave point, moved after can preventing support.
3, eccentric while establish caging bolt, another side support is provided with the groove corresponding with eccentric wheel, and it is spacing firm to make, fixing firm.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, anyly do not depart from technical solutions of the utility model content, the any simple modification done above embodiment according to technical spirit of the present utility model, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (4)

1. a ready-package building frontier defense guardrail fastening devices, it is characterized in that: comprise two symmetrical fixators, wherein single fixator is made up of fixed bin (3), support (6) and grab (1), grab (1) is connected with support (6), support (6) is fixed in fixed bin (3), and gap is arranged at bottom, and fixed bin has square shaft (9 in (3), square shaft (9) there is eccentric wheel (2), eccentric wheel (2) below limited location bolt (8); The groove corresponding with eccentric wheel (2) is arranged at support (6) bottom in fixed bin (3); Fixed bin (3) bottom is sleeve pipe, and the steel pipe railing (5) of protective guard installed by sleeve pipe.
2. ready-package building frontier defense guardrail fastening devices as claimed in claim 1, it is characterized in that: (6) have multiple draw-in groove to described support, described grab (1) is flexibly connected with support (6) by draw-in groove.
3. ready-package building frontier defense guardrail fastening devices as claimed in claim 1, is characterized in that: described grab (1) is bolted on support (6).
4. ready-package building frontier defense guardrail fastening devices as claimed in claim 1, is characterized in that: described sleeve pipe has bolt (4).
CN201520105825.XU 2015-02-13 2015-02-13 Ready-package building frontier defense guardrail fastening devices Withdrawn - After Issue CN204492216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520105825.XU CN204492216U (en) 2015-02-13 2015-02-13 Ready-package building frontier defense guardrail fastening devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520105825.XU CN204492216U (en) 2015-02-13 2015-02-13 Ready-package building frontier defense guardrail fastening devices

Publications (1)

Publication Number Publication Date
CN204492216U true CN204492216U (en) 2015-07-22

Family

ID=53571534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520105825.XU Withdrawn - After Issue CN204492216U (en) 2015-02-13 2015-02-13 Ready-package building frontier defense guardrail fastening devices

Country Status (1)

Country Link
CN (1) CN204492216U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652836A (en) * 2015-02-13 2015-05-27 贵州建工集团第二建筑工程有限责任公司 Rapid installation type building edge guard railing fixing device and guard railing construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652836A (en) * 2015-02-13 2015-05-27 贵州建工集团第二建筑工程有限责任公司 Rapid installation type building edge guard railing fixing device and guard railing construction method thereof
CN104652836B (en) * 2015-02-13 2016-06-29 贵州建工集团第二建筑工程有限责任公司 The fixing device of a kind of ready-package building frontier defense guardrail and guard rail construction method thereof

Similar Documents

Publication Publication Date Title
CN205348818U (en) Protection guardrail with adjustable assembled height
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN204552130U (en) One is telescopic faces bound defence rail
CN204492216U (en) Ready-package building frontier defense guardrail fastening devices
CN206942181U (en) A kind of construction wall faces the guard assembly at side hole
CN212506753U (en) Rollover prevention trapezoidal device utilizing overhanging I-shaped steel embedded ring
CN104141392A (en) Tool type edge protecting device for balconies and floor slabs and installing method of tool type edge protecting device
CN204111114U (en) A kind of novel wall-attached frame for building hoist
CN204174950U (en) A kind of rope type faces frontier defense guardrail
CN201106280Y (en) Hanging outrigger scaffold post-anchorage piece
CN204152551U (en) A kind of reusable mine down-hole filling barricade
CN203583906U (en) Disassembling-free floor edge guardrail in decoration stage
CN203834959U (en) Safety protective fence used for building construction
CN210342850U (en) High-strength cement telegraph pole
CN202627472U (en) Adjustable base of steel pipe scaffold
CN203808541U (en) Tool guardrail for use on H-beams
CN212478117U (en) Utilize I-steel embedded ring of encorbelmenting to prevent bow member and trapezoidal piece composite set that turns on one's side
CN203066503U (en) Edge and opening protection device
CN203271165U (en) Protective barrier capable of freely stretching and retracting
CN104652836B (en) The fixing device of a kind of ready-package building frontier defense guardrail and guard rail construction method thereof
CN205417482U (en) GMT assembly device
CN204754260U (en) A mounting for frontier defense guardrail bar is faced at entrance to a cave
CN212656567U (en) Railing anchor clamps are prevented to for building interim
CN203334705U (en) Protective stair
CN104179359A (en) Retractile protection fence

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150722

Effective date of abandoning: 20160629

C25 Abandonment of patent right or utility model to avoid double patenting