CN204464736U - The plug-pull tool of communication 2M cable - Google Patents
The plug-pull tool of communication 2M cable Download PDFInfo
- Publication number
- CN204464736U CN204464736U CN201520071695.2U CN201520071695U CN204464736U CN 204464736 U CN204464736 U CN 204464736U CN 201520071695 U CN201520071695 U CN 201520071695U CN 204464736 U CN204464736 U CN 204464736U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- handle bracket
- handle
- plug
- gangbar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000004891 communication Methods 0.000 title claims abstract description 7
- 239000000463 material Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Abstract
The plug-pull tool of communication 2M cable, it comprises the handle bracket of a long tubular, and an end of described handle bracket is fixedly connected with a sleeve, and the side of this sleeve offers the radial opening facilitating 2M chieftain to pass in and out; One microscler gangbar is axially set on handle bracket center, one end to be exposed outside handle bracket and is configured with turning handle, the other end stretches in sleeve, be one be inserted in that the 2M chieftain of radial opening is adjacent to put and the cylindrical gangbar head that it can be driven to rotate; Described sleeve is fixed on the end of handle bracket primarily of at least one fixed leg and a stator by fixed screw; The both sides that described sleeve is positioned at radial opening are respectively arranged with the bearing pin that a cooperation gangbar head carries out 3 fixing 2M chieftains; Described turning handle is a T-shaped handle; It is simple that it has structure, compact, uses easy to operate, uses and control the features such as flexible, laborsaving.
Description
Technical field
The utility model relates to a kind of plug-pull tool of the 2M cable that communicates, belong to the technical field of tools of communications patching systems.
Background technology
In daily machine room inspection process, often can run into the operation needing the 2M cable on equipment and distributing frame is carried out to grafting and extracts, this operation has generally all come with hand.But along with the continuous increase of equipment in machine room, 2M cable on equipment and distributing frame becomes more and more intensive, the working method of this manual plug will bring two large problems, first, intensive 2M cable can hinder stretching into of finger, make the 2M cable on plug Single port become abnormal difficult, have impact on operating efficiency; Secondly, in the middle of the 2M cable process of certain port of plug, the movement range of hand, once excessive, is just easy to make the 2M cable of adjacent port to loosen, and has influence on the normal business run, causes the rising of failure rate.
Summary of the invention
The purpose of this utility model is the deficiency overcoming prior art existence, and provides a kind of structure simple, compact, uses easy to operate, uses and control flexible, that labour-saving communicates 2M cable plug-pull tool.
The purpose of this utility model has been come by following technical solution, a kind of plug-pull tool of the 2M cable that communicates, it comprises the handle bracket of a long tubular, and an end of described handle bracket is fixedly connected with a sleeve, and the side of this sleeve offers the radial opening facilitating 2M chieftain to pass in and out; One microscler gangbar is axially set on handle bracket center, one end to be exposed outside handle bracket and is configured with turning handle, the other end stretches in sleeve, be one be inserted in that the 2M chieftain of radial opening is adjacent to put and the cylindrical gangbar head that it can be driven to rotate.
Described sleeve is fixed on the end of handle bracket primarily of at least one fixed leg and a stator by fixed screw; The both sides that described sleeve is positioned at radial opening are respectively arranged with the bearing pin that a cooperation gangbar head carries out 3 fixing 2M chieftains; Described turning handle is a T-shaped handle.
Described gangbar head adopts PVC material to make, and the cross section of described handle bracket is square.
It is simple that the utility model has structure, compact, uses easy to operate, uses and control the features such as flexible, laborsaving.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the end face structure schematic diagram of sleeve described in the utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail: shown in Fig. 1,2, the plug-pull tool of a kind of 2M cable that communicates described in the utility model, it comprises the handle bracket 1 of a long tubular, one end of described handle bracket 1 is fixedly connected with a sleeve 2, and the side of this sleeve 2 offers the radial opening 3 facilitating 2M chieftain to pass in and out; One microscler gangbar 4 is axially set on handle bracket 1 axle center, one end to be exposed outside handle bracket 1 and is configured with turning handle 5, the other end stretches in sleeve 2, be one be inserted in that the 2M chieftain of radial opening 3 is adjacent to put and the cylindrical gangbar head 6 that it can be driven to rotate, it can reach the object screwing and back-out 2M chieftain.
Shown in Fig. 1, sleeve 2 described in the utility model is fixed on the end of handle bracket 1 by fixed screw 9 primarily of at least one fixed leg 7 and a stator 8; The both sides that described sleeve 2 is positioned at radial opening 3 are respectively arranged with the bearing pin 10 that a cooperation gangbar head 6 carries out 3 fixing 2M chieftains; Described turning handle 5 is a T-shaped handle, and this T-shaped handle makes rotation more convenient laborsaving.
Described gangbar head adopts PVC material to make, and the cross section of described handle bracket is square.
In prior art, make with the hands online cable few and arrange loose number to mix the time of average plug 2M chieftain's needs at about 1.5 minutes, mix at the number that cable is intensive and carry out same operation and then need 2 minutes, and have the probability of 40% to cause getting loose of side number matching terminal, the terminal got loose has certain impact probability to operation business.
Carry out plug by instrument described in the utility model finger can be avoided to rise up in intensive cable, thus the touching to other terminals can be avoided, realize plugging time shorten by 0.52 minute, and reach terminal 0% around and get loose.
Claims (3)
1. the plug-pull tool of communication 2M cable, it comprises the handle bracket of a long tubular, and it is characterized in that an end of described handle bracket is fixedly connected with a sleeve, the side of this sleeve offers the radial opening facilitating 2M chieftain to pass in and out; One microscler gangbar is axially set on handle bracket center, one end to be exposed outside handle bracket and is configured with turning handle, the other end stretches in sleeve, be one be inserted in that the 2M chieftain of radial opening is adjacent to put and the cylindrical gangbar head that it can be driven to rotate.
2. the plug-pull tool of communication 2M cable according to claim 1, is characterized in that described sleeve is fixed on the end of handle bracket primarily of at least one fixed leg and a stator by fixed screw; The both sides that described sleeve is positioned at radial opening are respectively arranged with the bearing pin that a cooperation gangbar head carries out 3 fixing 2M chieftains; Described turning handle is a T-shaped handle.
3. the plug-pull tool of communication 2M cable according to claim 1 and 2, it is characterized in that described gangbar head adopts PVC material to make, the cross section of described handle bracket is square.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520071695.2U CN204464736U (en) | 2015-02-02 | 2015-02-02 | The plug-pull tool of communication 2M cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520071695.2U CN204464736U (en) | 2015-02-02 | 2015-02-02 | The plug-pull tool of communication 2M cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204464736U true CN204464736U (en) | 2015-07-08 |
Family
ID=53671564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520071695.2U Withdrawn - After Issue CN204464736U (en) | 2015-02-02 | 2015-02-02 | The plug-pull tool of communication 2M cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204464736U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104701710A (en) * | 2015-02-02 | 2015-06-10 | 国家电网公司 | Insertion and extraction tool for communication 2M cable |
CN105337141A (en) * | 2015-11-27 | 2016-02-17 | 国网河南省电力公司商丘供电公司 | Pluggable device with CC3 type 2M connector of outgoing line board of optical transceiver |
-
2015
- 2015-02-02 CN CN201520071695.2U patent/CN204464736U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104701710A (en) * | 2015-02-02 | 2015-06-10 | 国家电网公司 | Insertion and extraction tool for communication 2M cable |
CN105337141A (en) * | 2015-11-27 | 2016-02-17 | 国网河南省电力公司商丘供电公司 | Pluggable device with CC3 type 2M connector of outgoing line board of optical transceiver |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204464736U (en) | The plug-pull tool of communication 2M cable | |
CN104607090A (en) | Stirring shaft structure capable of conveniently replacing stirring paddle | |
CN104701710B (en) | A kind of plug-pull tool of the 2M cable that communicates | |
CN204216511U (en) | Wire stripping pliers | |
CN204277947U (en) | For the equipment that bolt in fan blade is taken out | |
CN204441765U (en) | A kind of high voltage isolation switch contact dismantling device | |
CN203956832U (en) | Insulating short section lock ring removes and installs device | |
CN203690600U (en) | Novel cable sleeve of electric tool | |
CN203992171U (en) | A kind of electric power cable clipping apparatus | |
CN204135979U (en) | Oil motor rotor bearing disassembling fixture | |
CN204585241U (en) | Novel mechanical hand structure | |
CN204040664U (en) | Dish-type handle valve mechanical lock | |
CN202674061U (en) | Main shaft for electric motor | |
CN203301010U (en) | Direction-changing operation combination tool | |
CN204113870U (en) | A kind of easy-to-dismount armature shaft | |
CN204382175U (en) | Incremental encoder tool special for dismounting | |
CN204354038U (en) | A kind of valve F type spanner | |
CN104315115A (en) | Gear easy to disassemble | |
CN204763829U (en) | A carry hand rope for handbag | |
CN204205405U (en) | The replaceable special pin pulling clamp of a kind of insulator R type pin | |
CN203756697U (en) | Adjustable type U-shaped bolt | |
CN203508683U (en) | Anchor rod bending machine | |
CN203967629U (en) | A kind of long-distance transmission thread breakage place reconnects device | |
CN204019469U (en) | A kind of axle sleeve dismantling device | |
CN102280829B (en) | Novel large interlocking mechanism with propulsion device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150708 Effective date of abandoning: 20160928 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |