CN204460195U - A kind of CFBB adds sand system - Google Patents

A kind of CFBB adds sand system Download PDF

Info

Publication number
CN204460195U
CN204460195U CN201520037344.XU CN201520037344U CN204460195U CN 204460195 U CN204460195 U CN 204460195U CN 201520037344 U CN201520037344 U CN 201520037344U CN 204460195 U CN204460195 U CN 204460195U
Authority
CN
China
Prior art keywords
boiler
sand
pressure
coal
weighing belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520037344.XU
Other languages
Chinese (zh)
Inventor
梁永斌
吕云鹏
孙婧
王�华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Technology Gropu Engineering Design Co ltd
Original Assignee
Coal Industry Jinan Design & Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Coal Industry Jinan Design & Research Co Ltd filed Critical Coal Industry Jinan Design & Research Co Ltd
Priority to CN201520037344.XU priority Critical patent/CN204460195U/en
Application granted granted Critical
Publication of CN204460195U publication Critical patent/CN204460195U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

本实用新型属于热力发电燃料输送技术领域,特别涉及一种循环流化床锅炉加砂系统。该循环流化床锅炉加砂系统,包括原煤仓,原煤仓底部连接设有若干耐压称重式皮带给煤机,耐压称重式皮带给煤机出口与锅炉进料口相连接,其特征是:所述原煤仓侧端设有砂仓,砂仓底部通过给料管道与耐压称重式皮带给煤机相连接。本实用新型的有益效果是:利用了输煤系统的输送设备,省去了斗式提升机,不但简化了床料输送系统,而且节省了投资;砂仓设置在原煤仓旁,设计和施工上都比较方便,且不影响锅炉钢架的整体受力情况,提高了锅炉运行的安全可靠性;结构简单合理、占用空间小,适于广泛推广应用。

The utility model belongs to the technical field of fuel delivery for thermal power generation, in particular to a sand adding system for a circulating fluidized bed boiler. The circulating fluidized bed boiler sand adding system includes a raw coal bunker. The bottom of the raw coal bunker is connected with a number of pressure-resistant weighing belt coal feeders, and the outlet of the pressure-resistant weighing belt coal feeder is connected with the boiler feed port. The feature is: a sand bin is provided at the side end of the raw coal bunker, and the bottom of the sand bin is connected with a pressure-resistant weighing belt coal feeder through a feeding pipe. The beneficial effects of the utility model are: the transportation equipment of the coal transportation system is used, and the bucket elevator is omitted, which not only simplifies the bed material transportation system, but also saves investment; All are relatively convenient, and do not affect the overall stress of the steel frame of the boiler, which improves the safety and reliability of the boiler operation; the structure is simple and reasonable, and the space occupied is small, which is suitable for wide application.

Description

一种循环流化床锅炉加砂系统A circulating fluidized bed boiler sand adding system

(一)        技术领域 (1) Technical field

    本实用新型属于热力发电燃料输送技术领域,特别涉及一种循环流化床锅炉加砂系统。 The utility model belongs to the technical field of thermal power generation fuel delivery, in particular to a circulating fluidized bed boiler sand adding system.

(二)        背景技术 (2) Background technology

    目前,热力发电厂中的循环流化床锅炉床料输送系统从原理上划分,可大致分为三种:人工输送、机械输送和气力输送。其中人工输送因为劳动强度大、人工消耗多、添料速度慢等因素,一般不建议采用。气力输送是目前在建循化流化床锅炉相对采用较多的一种方式,但为了运行稳定,此方式需建立一套独立的气力输送系统,投资比较高。机械输送也是目前使用较多的一种床料输送方式,目前国内循化流化床锅炉采用较多的是利用高差靠床料的重力自流进行添加。该系统设置方式相对独立,系统配置为一个启动床料仓、一台斗式提升机及连接管道和阀门。一般在锅炉框架内较高位置设置独立的启动床料仓,利用斗式提升机将床料送至启动床料仓,然后通过管道连接靠床料自身的重力流入锅炉床料进口。但此方式需要在锅炉框架内的较高处找到一个合适的空间来设置启动床料仓,给设计和施工造成一定的困难。 At present, the circulating fluidized bed boiler bed material conveying system in thermal power plants can be roughly divided into three types in principle: manual conveying, mechanical conveying and pneumatic conveying. Among them, manual transportation is generally not recommended due to factors such as high labor intensity, high labor consumption, and slow feeding speed. Pneumatic conveying is a method that is relatively widely used in circulating fluidized bed boilers under construction at present, but in order to operate stably, this method needs to establish an independent pneumatic conveying system, and the investment is relatively high. Mechanical conveying is also a kind of bed material conveying method that is widely used at present. At present, domestic circulating fluidized bed boilers are mostly used to add by using the gravity flow of the bed material by the height difference. The system is set up in a relatively independent way, and the system is configured as a starting bed silo, a bucket elevator, connecting pipes and valves. Generally, an independent start-up bed silo is set at a higher position in the boiler frame, and the bed material is sent to the start-up bed silo by a bucket elevator, and then the bed material flows into the boiler bed material inlet by the gravity of the bed material itself through a pipeline connection. However, this method needs to find a suitable space at a higher place in the boiler frame to set up the starting bed silo, which causes certain difficulties in design and construction.

(三)        发明内容 (3) Contents of the invention

    本实用新型为了弥补现有技术的不足,提供了一种结构简单合理、运行安全可靠、投资少、占用空间小的循环流化床锅炉加砂系统。 In order to make up for the deficiencies of the prior art, the utility model provides a circulating fluidized bed boiler sanding system with simple and reasonable structure, safe and reliable operation, low investment and small occupied space.

本实用新型是通过如下技术方案实现的: The utility model is achieved through the following technical solutions:

一种循环流化床锅炉加砂系统,包括原煤仓,原煤仓底部连接设有若干耐压称重式皮带给煤机,耐压称重式皮带给煤机出口与锅炉进料口相连接,其特征是:所述原煤仓侧端设有砂仓,砂仓底部通过给料管道与耐压称重式皮带给煤机相连接。 A circulating fluidized bed boiler sanding system, including a raw coal bunker, the bottom of the raw coal bunker is connected with a number of pressure-resistant weighing belt coal feeders, and the outlet of the pressure-resistant weighing belt coal feeder is connected to the boiler feed port. It is characterized in that: the side end of the raw coal bunker is provided with a sand bin, and the bottom of the sand bin is connected with a pressure-resistant weighing belt coal feeder through a feeding pipeline.

所述给料管道上设有手动插板门。 The feeding pipeline is provided with a manual sliding door.

本实用新型的有益效果是:与传统的机械式床料输送系统相比,利用了输煤系统的输送设备,省去了斗式提升机,不但简化了床料输送系统,而且节省了投资;砂仓设置在原煤仓旁与传统的在锅炉框架内较高位置设置独立的启动床料仓相比,设计和施工上都比较方便,且不影响锅炉钢架的整体受力情况,提高了锅炉运行的安全可靠性;结构简单合理、占用空间小,适于广泛推广应用。 The beneficial effects of the utility model are: compared with the traditional mechanical bed material conveying system, the conveying equipment of the coal conveying system is used, and the bucket elevator is omitted, which not only simplifies the bed material conveying system, but also saves investment; Compared with the traditional setting of an independent start-up bed silo at a higher position in the boiler frame, the sand bin is set next to the raw coal bunker, which is more convenient in design and construction, and does not affect the overall stress of the boiler steel frame, which improves the efficiency of the boiler. Safe and reliable operation; simple and reasonable structure, small footprint, suitable for wide application.

(四)        附图说明 (4) Description of drawings

下面结合附图对本实用新型作进一步的说明。 Below in conjunction with accompanying drawing, the utility model is further described.

附图1为本实用新型的主视结构示意图; Accompanying drawing 1 is the main view structural representation of the utility model;

附图2为本实用新型的侧视结构示意图; Accompanying drawing 2 is the side view structural representation of the utility model;

附图3为本实用新型的俯视结构示意图; Accompanying drawing 3 is the top view structural representation of the utility model;

图中,1原煤仓,2耐压称重式皮带给煤机,3锅炉进料口,4砂仓,5给料管道,6手动插板门。 In the figure, 1 raw coal bunker, 2 pressure-resistant weighing belt coal feeder, 3 boiler feed port, 4 sand bin, 5 feeding pipeline, 6 manual sliding door.

(五)        具体实施方式 (5) Specific implementation methods

附图为本实用新型的一种具体实施例。该实施例包括原煤仓1,原煤仓1底部连接设有若干耐压称重式皮带给煤机2,耐压称重式皮带给煤机2出口与锅炉进料口3相连接,原煤仓1侧端设有砂仓4,砂仓4底部通过给料管道5与耐压称重式皮带给煤机2相连接。给料管道5上设有手动插板门6。 Accompanying drawing is a kind of concrete embodiment of the utility model. This embodiment comprises raw coal bunker 1, and the bottom of raw coal bunker 1 is connected with several pressure-resistant weighing belt coal feeders 2, and the outlet of pressure-resistant weighing belt coal feeder 2 is connected with boiler feed port 3, and raw coal bunker 1 A sand bin 4 is arranged at the side end, and the bottom of the sand bin 4 is connected with a pressure-resistant weighing belt coal feeder 2 through a feeding pipeline 5 . The feeding pipeline 5 is provided with a manual sliding panel door 6 .

采用本实用新型的一种循环流化床锅炉加砂系统,砂仓4设置于已有的燃料输送系统的双侧电液动犁式卸料器下方。 Adopting a circulating fluidized bed boiler sand adding system of the present invention, the sand bin 4 is arranged under the double-side electro-hydraulic plow unloader of the existing fuel delivery system.

采用本实用新型的一种循环流化床锅炉加砂系统,锅炉启动前利用已有的燃料输送系统将储存在燃料棚附近的石英砂等床料通过输煤皮带→破碎楼→输煤皮带→双侧电液动犁式卸料器→砂仓4(启动给料仓)→给料管道5→耐压称重式皮带给煤机2→锅炉进料口3。当锅炉内床料添加到要求厚度时,关闭手动插板门6和耐压称重式皮带给煤机2,继续向砂仓4(启动给料仓)送砂至额定容量时停送。砂仓4(启动给料仓)的额定容积应能满足锅炉运行过程中补料的要求。本实用新型的循环流化床锅炉床料输送系统对已有的燃料输送系统中的破碎装置--齿辊破碎机,要求输送砂子时两滚轮之间留有一定的间隙,以保证石英砂等床料的粒径满足循环流化床锅炉的需要。 Using the circulating fluidized bed boiler sanding system of the utility model, the existing fuel delivery system is used to transfer the bed materials such as quartz sand stored near the fuel shed through the coal conveyor belt → crushing building → coal conveyor belt → Double-sided electro-hydraulic plow unloader→sand bin 4 (start feeding bin)→feeding pipeline 5→pressure-resistant weighing belt coal feeder 2→boiler inlet 3. When the bed material in the boiler is added to the required thickness, close the manual sliding door 6 and the pressure-resistant weighing belt coal feeder 2, and continue to send sand to the sand bin 4 (start feeding bin) until the rated capacity is reached. The rated volume of the sand bin 4 (start-up feeding bin) should be able to meet the requirements for feeding the boiler during operation. The circulating fluidized bed boiler bed material conveying system of the utility model needs a certain gap between the two rollers when conveying the sand, so as to ensure that the crushing device in the existing fuel conveying system—the toothed roller crusher The particle size of the bed material meets the needs of the circulating fluidized bed boiler.

Claims (2)

1. a CFBB adds sand system, comprise run coal bin (1), run coal bin (1) bottom is connected with some withstand voltage Weighing type belt coal-feeding machines (2), withstand voltage Weighing type belt coal-feeding machine (2) outlet is connected with boiler feed mouth (3), it is characterized in that: described run coal bin (1) side is provided with sand storehouse (4), sand storehouse (4) bottom is connected with withstand voltage Weighing type belt coal-feeding machine (2) by feeding lines (5).
2. a kind of CFBB according to claim 1 adds sand system, it is characterized in that: described feeding lines (5) is provided with manual inserting plate door (6).
CN201520037344.XU 2015-01-20 2015-01-20 A kind of CFBB adds sand system Expired - Lifetime CN204460195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520037344.XU CN204460195U (en) 2015-01-20 2015-01-20 A kind of CFBB adds sand system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520037344.XU CN204460195U (en) 2015-01-20 2015-01-20 A kind of CFBB adds sand system

Publications (1)

Publication Number Publication Date
CN204460195U true CN204460195U (en) 2015-07-08

Family

ID=53667072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520037344.XU Expired - Lifetime CN204460195U (en) 2015-01-20 2015-01-20 A kind of CFBB adds sand system

Country Status (1)

Country Link
CN (1) CN204460195U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697058A (en) * 2016-03-29 2016-06-22 中国恩菲工程技术有限公司 Sand silo
CN105823038A (en) * 2016-05-12 2016-08-03 内蒙古京泰发电有限责任公司 Coal conveying system used for circulating fluidized bed boiler and large-ratio coal slurry mixed burning
CN107189823A (en) * 2017-07-31 2017-09-22 陕西延长石油(集团)有限责任公司 A kind of online sanding device of high circulation multiplying power fluidized-bed gasification furnace and sand adding method
CN110542081A (en) * 2019-08-20 2019-12-06 中国能源建设集团江苏省电力设计院有限公司 Continuous bed material adding system of circulating fluidized bed boiler

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105697058A (en) * 2016-03-29 2016-06-22 中国恩菲工程技术有限公司 Sand silo
CN105823038A (en) * 2016-05-12 2016-08-03 内蒙古京泰发电有限责任公司 Coal conveying system used for circulating fluidized bed boiler and large-ratio coal slurry mixed burning
CN107189823A (en) * 2017-07-31 2017-09-22 陕西延长石油(集团)有限责任公司 A kind of online sanding device of high circulation multiplying power fluidized-bed gasification furnace and sand adding method
CN110542081A (en) * 2019-08-20 2019-12-06 中国能源建设集团江苏省电力设计院有限公司 Continuous bed material adding system of circulating fluidized bed boiler

Similar Documents

Publication Publication Date Title
CN204460195U (en) A kind of CFBB adds sand system
CN204460194U (en) The broken cloth system of a kind of Geldart-D particle
CN204285498U (en) A kind of dry method coal slurry industry
CN202532424U (en) Energy-saving environment-friendly steam generating device
CN204611815U (en) Coal slime mixes burning anti-block apparatus
CN205187365U (en) Stone coal malleation air conveying system
CN202090946U (en) Orepass with ore drawing hopper
CN102175032A (en) Technological process for delivering dry coal slurry in electric plant
CN102009851A (en) Conveying method for bottom discharge bin pump
CN204665880U (en) Half-dried refractory powder drying device
CN206230696U (en) Dry-mixed mortar and concrete preparation system
CN201100652Y (en) Boiler combustion feeding device
CN204329539U (en) A kind of hot-air drying unit
CN104180631B (en) A kind of coal slime rapid drying device
CN201703873U (en) Material conveying device
CN203695244U (en) Novel coal ash sorting device
CN204246975U (en) A kind of sack cleaner fluidisation storehouse ash-discharging device
CN204084347U (en) A kind of CFB boiler lime stone two-stage add-on system
CN201959828U (en) Milling machine of feeding system
CN203220788U (en) Underflow anti-blocking device of thickener
CN207402974U (en) A processing device for the production of environmentally friendly bricks
CN204297714U (en) For the vacuum discharge device of organic waste dry-type anaerobic fermentation system
CN206280101U (en) A kind of unmanned non-cementing continuous filling system of Tailings Slurry of guard
CN204063848U (en) A kind of coal slime rapid drying device
CN205746811U (en) A kind of boiler quickly adds bed system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250000 No. 141 Dikou Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: GENERAL TECHNOLOGY GROPU ENGINEERING DESIGN Co.,Ltd.

Address before: 250000 No. 141 Dikou Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: COAL INDUSTRY JINAN DESIGN & RESEARCH Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150708