CN204456419U CN201520058444.0U CN201520058444U CN204456419U CN 204456419 U CN204456419 U CN 204456419U CN 201520058444 U CN201520058444 U CN 201520058444U CN 204456419 U CN204456419 U CN 204456419U
Authority
CN
China
Prior art keywords
hand
pumping plant
cover unit
cylindrical shell
glass fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520058444.0U
Other languages
Chinese (zh)
Inventor
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xylem Europe GmbH
Original Assignee
Xylem China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xylem China Co Ltd filed Critical Xylem China Co Ltd
Priority to CN201520058444.0U priority Critical patent/CN204456419U/en
Application granted granted Critical
Publication of CN204456419U publication Critical patent/CN204456419U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to antifreeze heat-insulating technique field, provides a kind of Integral rain/sewage lifting pump station defroster, and described defroster comprises cover unit (1), canister unit (2) and outside barrier (3); Described canister unit (2) is by external insulation layer outer cover unit (8) and cylindrical shell (9) is bonding forms; Described outside barrier (3) is arranged on the outside of canister unit (2), extends between frozen soil layer and non-frozen soil layer along horizontal direction to surrounding; Described cover unit (1) comprises hand-hole aluminium alloys lid (4), hand-hole roll guard (5) and pumping plant glass fiber reinforced plastic top (6); Described hand-hole aluminium alloys lid (4) inner side is provided with heat insulating material (7), and described hand-hole roll guard (5) is from hand-hole aluminium alloys lid (4) described in inner support; Described pumping plant glass fiber reinforced plastic top (6) inner side is provided with heat insulating material and this heat insulating material extends to described cylindrical shell (9) inner side.

Description

Integral rain/sewage lifting pump station defroster
Technical field
The utility model relates to antifreeze heat-insulating technique field, particularly, provides Integral rain/sewage lifting pump station defroster.
Background technology
Existing a kind of name is called that the Chinese invention patent of " integrated sewage water/rainwater-collecting and conveying device " discloses a kind of Integral rain, sewage lifting pump station system, and its structure includes cylindrical shell, the cup dolly with sloped sidewall, more than one proof submersible sand discharging pump, water inlet pipe, the net formula trashrack of band deflector or crushed rack bar screen, outlet pipe, exhaust plant and intelligent control system.This invention has floor space little, and structure is simple, and installation and maintenance are convenient, and the impurity discharge efficiency in sewage is high, avoids contamination precipitation or floating, and use occasion is extensive, stable and cost is low, the advantage that automaticity is high.
In addition, China's application number is 201320429759.2, name is called that the utility model patent of " a kind of intelligent integral type sewage closed lifting pumping plant " discloses a kind of intelligent integral type sewage closed lifting pumping plant, it comprises the pit shaft that catchments, insert at the dredge pump of wellbore bottom that catchments, the fluid level controller that automatic control of sewage disposal pump opens and closes, connecting pipe between dredge pump and waste, ducted by-pass valve control and for maintenance, the working platform provided is provided, the pit shaft that catchments is glass fiber reinforced plastic prefabricated structure, wastewater inlet and waste are separately positioned on the wall portion of the pit shaft that catchments, dredge pump can arrange multiple stage, and wherein one is stand by pump, and every platform dredge pump outlet all connects a blow-off line, and the outlet of every bar blow-off line all communicates with the waste on collecting well barrel, fluid level controller is arranged on and catchments in pit shaft, and magnitude setting is equal with dredge pump quantity, and every fluid level controller controls the keying of a pump, and the top being positioned at dredge pump is arranged in order by setting height.This utility model has automatic pollution discharge, free from environmental pollution and have easy for installation, the advantage that use cost is low, the life-span is long.
TOP pumping plant, with the performance of its excellence, has now been widely used in each province on the south boundary, Xi'an-Beijing-be linked as greatly, city.Northeastward and the winter temperature lower ground district such as northwest, the use of current TOP in these regions is very limited, in order to ensure that TOP pumping plant is in the smooth installation in these regions winters and even running, also requires further improvement so reequip the structure of putting, to adapt to low temperature environment.
Utility model content
(1) technical problem
Technical problem to be solved in the utility model is that provide for above-mentioned prior art present situation a kind of can play heat insulation antifreeze Integral rain, sewage lifting pump station defroster.
(2) technical scheme
In order to overcome the deficiencies in the prior art, the utility model provides a kind of Integral rain/sewage lifting pump station defroster, and described defroster comprises cover unit 1, canister unit 2 and outside barrier 3; Described canister unit 2 is by external insulation layer outer cover unit 8 and cylindrical shell 9 is bonding forms; Described outside barrier 3 is arranged on the outside of canister unit 2, extends between frozen soil layer and the non-frozen soil layer along horizontal direction to surrounding; Described cover unit 1 comprises hand-hole aluminium alloys lid 4, hand-hole roll guard 5 and pumping plant glass fiber reinforced plastic top 6; Described hand-hole aluminium alloys lid 4 is connected with described pumping plant glass fiber reinforced plastic top 6 by the first bonded block; Described hand-hole roll guard 5 is connected with described pumping plant glass fiber reinforced plastic top 6 by the second bonded block; Be provided with heat insulating material 7 inside described hand-hole aluminium alloys lid 4, described hand-hole roll guard 5 is from hand-hole aluminium alloys lid 4 described in inner support; Described pumping plant glass fiber reinforced plastic top 6 covers on described cylindrical shell 9; Heat insulating material is provided with and this heat insulating material extends to inside described cylindrical shell 9 inside described pumping plant glass fiber reinforced plastic top 6.
Further, described first bonded block and described second bonded block are hinge or hinge.
Further, form seal foaming chamber 10 between described external insulation layer outer cover unit 8 and described cylindrical shell 9, described insulation layer outer cover unit 8 comprises insulation layer GRP overcoat 11, GRP ring 12 and inner support muscle 13.
Further, heat insulating material 7 is injected with in described seal foaming chamber 10.
Further, described canister unit 2 is formed by GRP material adhesive by external insulation layer outer cover unit 8 and cylindrical shell 9.
(3) Advantageous Effects
The utility model passes through the smart design between cover unit 1, canister unit 2 and outside barrier 3, makes cylindrical shell 9 inside good with outside effect of heat insulation, is convenient to installation and maintenance, and safely, firmly.
By arranging outside barrier 3, liquid in pumping plant can not be frozen, ensureing that pumping plant normally runs.Accompanying drawing explanation
Fig. 1 is the structural representation according to Integral rain of the present utility model/sewage lifting pump station defroster;
Fig. 2 is the structural representation according to cover unit of the present utility model;
Fig. 3 is according to canister unit structural representation of the present utility model;
Fig. 4 is the partial enlarged drawing of A in Fig. 3.
Specific embodiment
Be described in further detail below with reference to Fig. 1-4 pairs of the utility model.
See figures.1.and.2, a kind of Integral rain/sewage lifting pump station defroster that the utility model provides comprises cover unit 1, canister unit 2 and outside barrier 3; Described canister unit 2 is formed by GRP material adhesive by external insulation layer outer cover unit 8 and cylindrical shell 9; Described outside barrier 3 is arranged on the outside of canister unit 2, extends between frozen soil layer and the non-frozen soil layer along horizontal direction to surrounding; Described cover unit 1 comprises hand-hole aluminium alloys lid 4, hand-hole roll guard 5 and pumping plant glass fiber reinforced plastic top 6; Described hand-hole aluminium alloys lid 4 is connected with described pumping plant glass fiber reinforced plastic top 6 by the first bonded block; Described hand-hole roll guard 5 is connected with described pumping plant glass fiber reinforced plastic top 6 by the second bonded block; Be provided with heat insulating material 7 inside described hand-hole aluminium alloys lid 4, described hand-hole roll guard 5 is from hand-hole aluminium alloys lid 4 described in inner support; Described pumping plant glass fiber reinforced plastic top 6 covers on described cylindrical shell 9; Heat insulating material is provided with and this heat insulating material extends to inside described cylindrical shell 9 inside described pumping plant glass fiber reinforced plastic top 6.
Wherein, described first bonded block and described second bonded block are hinge or hinge, or other dismountable linkage.
As shown in Figure 3 and Figure 4, seal foaming chamber 10 is formed between described external insulation layer outer cover unit 8 and described cylindrical shell 9, be injected with heat insulating material 7 in described seal foaming chamber 10, described insulation layer outer cover unit 8 comprises insulation layer GRP overcoat 11, GRP ring 12 and inner support muscle 13.In other words, cylindrical shell 9 outer setting foam chamber 10, cavity top and the bottom GRP ring in described bubble chamber 10 do end socket, and outside GRP tube does thermal-insulation coat, inner by brace rod as support guaranteed strength, after in cavity, inject heat insulating material.
Wherein, outside barrier 3 is made up of specific heat insulating material.According to factor calculated values such as the pumping plant environment frozen soil layer degree of depth and conditions of environmental geology, make outside barrier 3 around pumping plant in layer, the interchange of heat around isolation pumping plant between the non-frozen soil layer in bottom and top frozen soil layer, ensures pumping plant ambient temperature.
Wherein, cover unit 1, canister unit 2 and outside barrier 3 form effective closed insulation layer, the interchange of heat of isolated pumping plant inside and outside, thus realize antifreeze effect.
Wherein, based on pumping plant surrounding environment, outside barrier is set, the non-frozen soil layer of isolating exterior and frozen soil layer.
Wherein, heat insulating material is set at pumping plant outlet pipeline external surface.
Wherein, use coefficient of thermal conductivity lower than the thermal insulation material of 0.05W/ (m.K) by arranging outside barrier 3, according to pumping plant installation site actual temperature, soil layer construction, water content and freeze the information such as layer depth, heat conduction analysis and calculating is carried out by software, according to analysis result, the separation layer 3 of respective thickness and diameter is set in relevant position, interchange of heat between effective blocking-up cylindrical shell 9 surrounding frozen soil layer and non-frozen soil layer, reduce non-frozen soil layer thermal loss, the low temperature of frozen soil layer is isolated to separation layer 3 top effectively, thus improve the temperature of non-frozen soil layer, by CALCULATION OF THERMAL and practical application prove this technology can guarantee pumping plant internal temperature effectively higher than freezing point, liquid in pumping plant can not be frozen, ensure that pumping plant normally runs.Because northern area winter temperature is between subzero 15 degrees Celsius to subzero 30 degrees Celsius, if do not use this freezing proof technique, in pumping plant, liquid there will be icing phenomenon under the impact of low temperature, have a strong impact on the performance of pumping plant, thus have influence on the universal use of integrated prefabricated pumping plant at northern area, as adopted this technology greatly can improve pumping plant in the low temperature resistant performance of northern area, ensure the normal operation of integrated prefabricated pumping plant in northern low temperature environment.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (5)

1. Integral rain/sewage lifting pump station defroster, is characterized in that: described defroster comprises cover unit (1), canister unit (2) and outside barrier (3); Described canister unit (2) is by external insulation layer outer cover unit (8) and cylindrical shell (9) is bonding forms; Described outside barrier (3) is arranged on the outside of canister unit (2), extends between frozen soil layer and non-frozen soil layer along horizontal direction to surrounding; Described cover unit (1) comprises hand-hole aluminium alloys lid (4), hand-hole roll guard (5) and pumping plant glass fiber reinforced plastic top (6); Described hand-hole aluminium alloys lid (4) is connected with described pumping plant glass fiber reinforced plastic top (6) by the first bonded block; Described hand-hole roll guard (5) is connected with described pumping plant glass fiber reinforced plastic top (6) by the second bonded block; Described hand-hole aluminium alloys lid (4) inner side is provided with heat insulating material (7), and described hand-hole roll guard (5) is from hand-hole aluminium alloys lid (4) described in inner support; Described pumping plant glass fiber reinforced plastic top (6) covers on described cylindrical shell (9); Described pumping plant glass fiber reinforced plastic top (6) inner side is provided with heat insulating material and this heat insulating material extends to described cylindrical shell (9) inner side.
2. device according to claim 1, is characterized in that: described first bonded block and described second bonded block are hinge or hinge.
3. device according to claim 1, it is characterized in that: form seal foaming chamber (10) between described external insulation layer outer cover unit (8) and described cylindrical shell (9), described insulation layer outer cover unit (8) comprises insulation layer GRP overcoat (11), GRP ring (12) and inner support muscle (13).
4. device according to claim 3, is characterized in that: be injected with heat insulating material (7) in described seal foaming chamber (10).
5. device according to claim 1, is characterized in that: described canister unit (2) is formed by GRP material adhesive by external insulation layer outer cover unit (8) and cylindrical shell (9).
CN201520058444.0U 2015-01-27 2015-01-27 Integral rain/sewage lifting pump station defroster Active CN204456419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520058444.0U CN204456419U (en) 2015-01-27 2015-01-27 Integral rain/sewage lifting pump station defroster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520058444.0U CN204456419U (en) 2015-01-27 2015-01-27 Integral rain/sewage lifting pump station defroster

Publications (1)

Publication Number Publication Date
CN204456419U true CN204456419U (en) 2015-07-08

Family

ID=53663326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520058444.0U Active CN204456419U (en) 2015-01-27 2015-01-27 Integral rain/sewage lifting pump station defroster

Country Status (1)

Country Link
CN (1) CN204456419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986619A (en) * 2015-01-27 2016-10-05 赛莱默(中国)有限公司 Integral rainwater/waste water lifting pump station antifreeze device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986619A (en) * 2015-01-27 2016-10-05 赛莱默(中国)有限公司 Integral rainwater/waste water lifting pump station antifreeze device
CN105986619B (en) * 2015-01-27 2018-06-05 赛莱默水处理系统(沈阳)有限公司 Integral rain/sewage lifting pump station defroster

Similar Documents

Publication Publication Date Title
CN104196047B (en) A kind of high-lift siphon drainge system of self-recoverage side slope and water discharge method of exempting from the reverse setting-out of power
CN204185871U (en) A kind of high-lift siphon drainge system of self-recoverage side slope of exempting from the reverse setting-out of power
CN201801947U (en) Negative pressure collecting device for outdoor sewage
CN203755436U (en) Integrated pre-rotating pump station device
CN102936920B (en) Vacuum rainwater drainage system and method
CN204456419U (en) Integral rain/sewage lifting pump station defroster
CN105986619B (en) Integral rain/sewage lifting pump station defroster
CN103806525A (en) Gantry self-flushing device for rainwater storage tank
CN206826886U (en) A kind of natural lift water intaking pumping station
CN208685753U (en) A kind of municipal box culvert sewage converging system
CN202865974U (en) Vacuum rainwater drainage system
CN203174663U (en) Device for pouring rainwater on high-rise building roof underground
CN205678648U (en) A kind of outdoor frost pipe dredge
CN104563205A (en) Tunnel fire-fighting system employing tunnel surging water as water source
CN107700548A (en) A kind of integrated valve well
CN104266079B (en) Marsh gas storage cabinet gas outlet and inlet structure and connection method
CN203808225U (en) Integrated prefabricated pump station with self-coupling submerged pump
CN204000800U (en) The energy-saving drainage system of bulb type generator set
CN203614802U (en) Anti-freezing water pipe for pressing type valve
CN207017354U (en) Extremely frigid zones exceed the water intaking port system of ground fire cistern
CN203385230U (en) Solar heat collection device
CN202252805U (en) Full-automatic dewatering and draining device for directly-buried steam pipe
CN201072240Y (en) Solar water heater with deicing equipment
CN213869094U (en) Anti-freezing device for water conservancy and hydropower equipment
CN204099888U (en) Methane holder enters air outlet structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170221

Address after: 110027 Shenyang economic and Technological Development Zone, Liaoning Development Road No. 11 A, No. 4

Patentee after: Sailaimo water treatment system (Shenyang) Co., Ltd.

Address before: 200051 room 3110-3014, building A, Shanghai, Hongqiao, Zunyi Road, No. 100, Shanghai,

Patentee before: Xylem (China) Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20200910

Address after: Schaffhausen, Switzerland

Patentee after: Xylem Europe Ltd.

Address before: 110027 Shenyang economic and Technological Development Zone, Liaoning Development Road No. 11 A, No. 4

Patentee before: XYLEM WATER SOLUTIONS (SHENYANG) Co.,Ltd.

TR01 Transfer of patent right