CN204436333U - Spiral digging machine underground multifunctional work protection cabin - Google Patents
Spiral digging machine underground multifunctional work protection cabin Download PDFInfo
- Publication number
- CN204436333U CN204436333U CN201520119065.8U CN201520119065U CN204436333U CN 204436333 U CN204436333 U CN 204436333U CN 201520119065 U CN201520119065 U CN 201520119065U CN 204436333 U CN204436333 U CN 204436333U
- Authority
- CN
- China
- Prior art keywords
- work
- digging machine
- work chamber
- spiral digging
- business
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of Spiral digging machine underground multifunctional work protection cabin, comprise connector, can be connected with general Spiral digging machine, work chamber, be arranged on the conical tamper earthenware below work chamber, described work chamber is by four root posts, upper rminal disc, under take over a business formation, described upper rminal disc, under take over a business by four root posts welding, described connector is fixed on described upper rminal disc by inverted cone-shaped fixed mount, described inverted cone-shaped fixed mount is surrounded by some joint pins, in described work chamber, upper end is provided with bar, described work chamber lower end is provided with foot guard plate, described foot guard plate is welded on described column.The utility model protects the co-ordination of cabin and Spiral digging machine by this work; considerably increase the artificial embedding instrument in down-hole and the fetch earth safety and convenience that operate; manual working efficiency is improved greatly; improve the safety of workman at downhole operations, the backfill compacting work of prospect pit can be carried out simultaneously.
Description
Technical field
The utility model relates to a kind of underground work protective device, is specifically related to a kind of Spiral digging machine underground multifunctional work protection cabin.
Background technology
At present, in building field most wells, operation is the artificial lifting free-hand operation in down-hole, greatly dangerous, simultaneously because make workman cannot to carry in down-hole soil sample that down-hole gathers and instrument is improved in workman's underground work suspention measure not, by two Secondary Suspensions, instrument alive for soil sample can only be fallen into designated depth in well, be there is severe compromise in suspension system self stability, therefore there is severe compromise and ineffective feature in original artificial underground work pattern, in soil property, in bad or deep-well, (>15m) cannot carry out artificial underground work, artificial underground work cannot be carried out presently more than in the deep-well of 15m, engineering construction is made to be subject to serious restriction in prospecting stratum.
Utility model content
For solving the problem, the utility model provides a kind of Spiral digging machine underground multifunctional work protection cabin.
For achieving the above object, the technical scheme that the utility model is taked is:
Spiral digging machine underground multifunctional work protection cabin; comprise connector; can be connected with general Spiral digging machine; work chamber, be arranged on conical tamper earthenware below work chamber; described work chamber by four root posts, upper rminal disc, under take over a business to form; described upper rminal disc, under take over a business by four root posts welding; described connector is fixed on described upper rminal disc by inverted cone-shaped fixed mount; described inverted cone-shaped fixed mount is surrounded by some joint pins; in described work chamber, upper end is provided with bar; described work chamber lower end is provided with foot guard plate, and described foot guard plate is welded on described column.The co-ordination of cabin and Spiral digging machine is protected by this work; considerably increase the artificial embedding instrument in down-hole and the fetch earth safety and convenience that operate; operating efficiency is improved greatly; overcome the problem that original artificial down-hole cannot carry instrument and the soil sample that will bury underground in a large number, improve the safety of workman at downhole operations
As preferably, described bar two ends are welded with described column.
As preferably, described upper rminal disc, under take over a business to be disk.
As preferably, described upper rminal disc, under take over a business all to adopt thickness to be that 30mm steel plate makes.
The utility model has following beneficial effect:
The co-ordination of cabin and Spiral digging machine is protected by this work; considerably increase the artificial embedding instrument in down-hole and the fetch earth safety and convenience that operate; manual working efficiency is improved greatly; overcome the problem that original artificial down-hole cannot carry instrument and the soil sample that will bury underground in a large number; improve the safety of workman at downhole operations, the backfill compacting work of prospect pit can be carried out simultaneously.
Accompanying drawing explanation
The structural representation of Fig. 1 the utility model embodiment.
Detailed description of the invention
In order to make the purpose of this utility model and advantage clearly understand, below in conjunction with embodiment, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model embodiment provides a kind of Spiral digging machine underground multifunctional work protection cabin, comprise connector 1, work chamber 9, be arranged on the conical tamper earthenware 8 below work chamber 9, described work chamber 9 is by four root posts 7, upper rminal disc 3, under take over a business 4 formations, described upper rminal disc 3, under take over a business 4 and welded by four root posts 7, described connector 1 is fixed on described upper rminal disc 3 by inverted cone-shaped fixed mount 2, described inverted cone-shaped fixed mount 2 is surrounded by some joint pins, in described work chamber 9, upper end is provided with bar 5, described work chamber 9 lower end is provided with foot guard plate 6, described foot guard plate 6 is welded on described column 7.
Described bar 5 two ends are welded with described column.
Described upper rminal disc 3, under take over a business equal 4 for disk.
Described upper rminal disc 3, under take over a business 4 all adopt thickness be 30mm steel plate make.
This concrete enforcement can install the job platform of skilled worker when down-hole installs instruments, use during the backfill earthwork as hammer ram.Maximum outside diameter is 600mm, for being directly the underground work use of 700mm; Personnel's working space can hold height 1.75m, and the skilled worker of body weight 85kg, in underground work, can stand during operation or the operation of version crouching posture; Upper rminal disc 3, under take over a business 4 be 30mm steel plates make, can prevent having diameter can not wound at the junk of 200mm when underground work
When this concrete enforcement uses, personnel have wireless interspeaker to keep in touch when underground work, if there is emergency, can carry out intercommunication call, operating personnel can propose by commander immediately in well; Personnel in underground work are, use high-pressure pump to think air-supply in well, and cave in if meet earthwork large volume in well, on Working cabin, there is certain guard space lower steel plate urban conservation area, catches ajutage rapidly, being breathed by the mouth of pipe, can strive for enough rescue period to living in people; This concrete enforcement is connected by drilling machine drilling rod, can according to space, down-hole when underground work, in time up and down and rotation platform, and the economization time of operation people in down-hole; Rotary drilling rig lifting force reaches 15T, and hoisting velocity is 70m/min, process that can be very fast when underground work occurs abnormal; After operation completes in well, in well, backfill certain earth volume, then this instrument that up and down drilling rod connects, empty earth fill can be tamped.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (4)
1. Spiral digging machine underground multifunctional work protection cabin, it is characterized in that, comprise connector (1), work chamber (9), be arranged on the conical tamper earthenware (8) of work chamber (9) below, described work chamber (9) is by four root posts (7), upper rminal disc (3), under take over a business (4) form, described upper rminal disc (3), under take over a business (4) and welded by four root posts (7), described connector (1) is fixed on described upper rminal disc (3) by inverted cone-shaped fixed mount (2), described inverted cone-shaped fixed mount (2) is surrounded by some joint pins, described work chamber (9) interior upper end is provided with bar (5), described work chamber (9) lower end is provided with foot guard plate (6), described foot guard plate (6) is welded on described column (7).
2. Spiral digging machine underground multifunctional work protection cabin according to claim 1, it is characterized in that, described bar (5) two ends are welded with described column.
3. Spiral digging machine underground multifunctional work according to claim 1 protection cabin, is characterized in that, described upper rminal disc (3), under take over a business (4) and be disk.
4. Spiral digging machine underground multifunctional work according to claim 1 protection cabin, is characterized in that, described upper rminal disc (3), under take over a business (4) and all adopt thickness to be the making of 30mm steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520119065.8U CN204436333U (en) | 2015-02-27 | 2015-02-27 | Spiral digging machine underground multifunctional work protection cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520119065.8U CN204436333U (en) | 2015-02-27 | 2015-02-27 | Spiral digging machine underground multifunctional work protection cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204436333U true CN204436333U (en) | 2015-07-01 |
Family
ID=53604211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520119065.8U Expired - Fee Related CN204436333U (en) | 2015-02-27 | 2015-02-27 | Spiral digging machine underground multifunctional work protection cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204436333U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155503A (en) * | 2015-07-30 | 2015-12-16 | 信息产业部电子综合勘察研究院 | Packaged technology for installing after-construction monitoring instruments in high-thickness loess deep filling layer |
-
2015
- 2015-02-27 CN CN201520119065.8U patent/CN204436333U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155503A (en) * | 2015-07-30 | 2015-12-16 | 信息产业部电子综合勘察研究院 | Packaged technology for installing after-construction monitoring instruments in high-thickness loess deep filling layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614020B (en) | Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same | |
CN101886390B (en) | All casing static pressure pile pulling technology in narrow space | |
CN102644275A (en) | Rotary-digging combined pile-forming construction method in complicated geological conditions | |
CN102587380A (en) | Construction method for wholly removing drilling pile head | |
CN104532853B (en) | Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning | |
CN102953373B (en) | Quicksand condition For Artificial Excavation Caisson Pile construction | |
CN103266602A (en) | Diameter-expanding pile for manual hole digging and construction method thereof | |
CN203114170U (en) | In-hole hammer drilling embedding rock-socketed prestressed pipe pile device | |
CN103485344A (en) | Method for extracting construction engineering pile foundation | |
CN106013150B (en) | A kind of pile press machine | |
CN105862862B (en) | A kind of large diameter pile buries hammer Refloatation method | |
CN204436333U (en) | Spiral digging machine underground multifunctional work protection cabin | |
CN105113976B (en) | Wire brush bit convolution rig and solve burying, fall bore, the method for bit freezing | |
CN204299468U (en) | A kind of positioning and guiding system and device of hidden hole drilling boring | |
CN104264679B (en) | A kind of electric power pylon basis heavy caliber Underwater pile construction method | |
CN208472692U (en) | A kind of inclinometer pipe protective device for dam facing pipe connection method | |
CN204782730U (en) | Steel brush drill bit rig that circles round | |
CN102913121B (en) | Flexible swing pipe vibrator boring machine | |
CN103821137B (en) | The construction method of guncreting pile at the bottom of the embedding rock of a kind of long auger, expansion | |
CN206617118U (en) | A kind of large diameter borehole drill bit with boring mud fishing device | |
CN203080528U (en) | Drilling and spraying integrated foundation treating special drilling tool assembly | |
CN206928296U (en) | Pile pulling system | |
CN206902712U (en) | Pile pulling recharge system | |
CN202055748U (en) | Rotary drilling rig | |
CN103274329B (en) | A kind of top draws jack for the construction method of pile-anchor retaining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 Termination date: 20160227 |