CN204412059U - A kind of flue gas spray pre-washing device for desulfuration absorbing tower - Google Patents
A kind of flue gas spray pre-washing device for desulfuration absorbing tower Download PDFInfo
- Publication number
- CN204412059U CN204412059U CN201420871119.1U CN201420871119U CN204412059U CN 204412059 U CN204412059 U CN 204412059U CN 201420871119 U CN201420871119 U CN 201420871119U CN 204412059 U CN204412059 U CN 204412059U
- Authority
- CN
- China
- Prior art keywords
- flue gas
- inlet passage
- fume inlet
- absorbing tower
- washing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a kind of flue gas spray pre-washing device for desulfuration absorbing tower, flue gas spray pre-washing device is arranged on the fume inlet passage of desulfuration absorbing tower, it is characterized in that: comprise atomizer and flusher, described atomizer and flusher are located at side and the top of the fume inlet passage of desulfuration absorbing tower respectively, and the delivery port of described flusher is right against the bottom surface of the fume inlet passage of desulfuration absorbing tower.Flue gas spray pre-washing device of the present utility model can be atomized lime stone slurry, form cloud and mist field, greatly improve desulfurizing agent specific area, desulfurization absorption reaction speed is accelerated, achieve high-efficiency desulfurization when little liquid-vapour ratio, reduce desulfurization energy consumption, have that desulfuration efficiency is high, energy consumption is low and the beneficial effect of environmental protection.
Description
Technical field
The utility model relates to a kind of flue gas spray pre-washing device, refers in particular to a kind of flue gas spray pre-washing device for desulfuration absorbing tower, belongs to generating equipment technical field.
Background technology
Natural environment pollute in, acid rain be due to the sulfur dioxide concentration in air exceed required standard formed there is certain corrosive rainwater, its pollution brought and the Value Loss caused very huge.As the thermal power plant that SO2 emissions are larger, State Council has issued " suggestion about accelerating development energy-conserving and environment-protective industry " (No. (2013) 30, promulgated by the State Council) and " prevention and control of air pollution action plan " (No. (2013) 37, promulgated by the State Council), severe environmental protection policy and measure are put into effect, before requiring on July in 2017 1, the concentration of emission of all heat power plant boiler SO 2 from fume drops to below 100mg/m3, (Beijing-Tianjin-Tangshan, key area, the Yangtze River Delta, Pearl River Delta, each one, big city, two wires) the sulfur dioxide emissioning concentration of power-plant flue gas be reduced to below 50mg/m3.
For the process of sulfur dioxide, the mode that existing thermal power plant all utilizes desulfuration absorbing tower to carry out wet sprinkling usually carrys out desulfurization.But the most operation energy consumption of existing desulfur technology is high, desulfuration efficiency is low, be difficult to meet the new environmental emission standard of country.
Utility model content
The purpose of this utility model is to solve that existing desulfuration absorbing tower desulfuration efficiency is low, operation energy consumption is high and cannot meet the problem of environmental emission standard, provides that a kind of desulfuration efficiency is high, energy consumption is low, treatment effect is good and the flue gas spray pre-washing device for desulfuration absorbing tower of environmental protection.
The purpose of this utility model can reach by the following technical solutions:
A kind of flue gas spray pre-washing device for desulfuration absorbing tower, flue gas spray pre-washing device is arranged on fume inlet passage, it is characterized in that: comprise atomizer and flusher, described atomizer and flusher are located at side and the top of fume inlet passage respectively, and the delivery port of described flusher is right against the bottom surface of fume inlet passage.
As a kind of preferential scheme, the flue gas flow direction of the outlet injection direction of described atomizer and the entrance of fume inlet passage is perpendicular.
As a kind of preferential scheme, described flusher and atomizer are arranged along the flue gas circulating direction order of the fume inlet passage of desulfuration absorbing tower.
Further, described atomizer offers an outlet and two imports, is interconnected between described export and import, and described two imports steam-out (SO) and lime stone slurry respectively, steam mixes with lime stone slurry and sprays by exporting.
As a kind of preferential scheme, described flusher comprises flushing arm and female pipe, and described flushing arm is located at the top of fume inlet passage, and its water inlet is communicated with the delivery port of female pipe.
As a kind of preferential scheme, described flushing arm is inclined and mounted on fume inlet passage and the Way out rinsing arm is arranged towards the outlet of fume inlet passage.
Further, described flushing arm and fume inlet passage, atomizer and fume inlet passage, rinse arm and female Guan Jun is tightly connected.
As a kind of preferential scheme, described flushing arm and fume inlet passage, atomizer and fume inlet passage, rinse arm and be connected by flange seal with female pipe.
Implement the utility model, there is following beneficial effect:
Flue gas spray pre-washing device of the present utility model can be atomized lime stone slurry, forms cloud and mist field, greatly improves desulfurizing agent specific area, desulfurization absorption reaction speed is accelerated, achieves high-efficiency desulfurization when little liquid-vapour ratio, reduce desulfurization energy consumption; And make flue gas and desulphurizer mixing full and uniform, desulfurization is quicker, strengthens sulfur dioxide in flue gas and the reaction probability as the lime stone slurry of desulfurizing agent, has that desulfuration efficiency is high, energy consumption is low, treatment effect is good and the beneficial effect of environmental protection.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structure chart of the utility model flue gas spray pre-washing device.
Fig. 2 is the structure chart of the fume inlet passage of flue gas spray pre-washing device of the present utility model.
Fig. 3 is the sectional view of atomizer.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Specific embodiment 1:
See Fig. 1 and Fig. 2, the flue gas spray pre-washing device 1 of the present embodiment is arranged on fume inlet passage 2, it is characterized in that: atomizer 11 and flusher 12, described atomizer 11 and flusher 12 are located at side and the top of fume inlet passage 2 respectively, and the delivery port of described flusher 12 is right against the bottom surface of fume inlet passage 2.Described flusher 12 comprises flushing arm 13 and female pipe 14, and described flushing arm 13 is located at the top of fume inlet passage 2, and its water inlet is communicated with the delivery port of female pipe 14, and its delivery port is right against the bottom surface of fume inlet passage 2.Described flushing arm 13 is inclined and mounted on fume inlet passage 2 and the Way out rinsing arm 13 is arranged towards the outlet of fume inlet passage 2, the flusher 12 of this structure can effectively by the inside of the lime stone slurry refunds desulfuration absorbing tower 3 on the bottom surface of fume inlet passage 2 that is deposited in below atomizer 11, prevent channel blockage, ensure that flue gas can enter desulfuration absorbing tower 3 with maximum flow.
As shown in Figure 3, described atomizer 11 offers an outlet 15 and two imports 16, be interconnected between described outlet 15 and import 16, described two imports 16 steam-out (SO) and lime stone slurry respectively, steam is mixed with lime stone slurry and is sprayed by outlet 15.In the course of the work, slurries in atomizer 11 and steam meet in atomizer 11 front end, form liquid bag vaporous state, and from its outlet 15 ejection, form cloud, greatly improve the specific area of lime stone slurry, when the flue gas containing sulfur dioxide gas enters fume inlet passage 2, major part flue gas fully contacts with vaporific lime stone slurry, both dust content was reduced, make again desulfurization absorption reaction speed accelerate, achieve high-efficiency desulfurization when little liquid-vapour ratio, reduce desulfurization energy consumption.
In order to improve the contact area of lime stone slurry and flue gas substantially, thus reach the object of the most efficient and low energy consumption of desulfurization, outlet 15 injection direction of described atomizer 11 and the flue gas flow direction of fume inlet passage 2 perpendicular.
Described flusher 12 and atomizer 11 are arranged along the flue gas circulating direction order of the fume inlet passage of desulfuration absorbing tower 2.The flusher 12 of this structure is located at before atomizer 11, by timed injection, by inner for the lime stone slurry refunds desulfuration absorbing tower 3 on the bottom surface of fume inlet passage 2 that is deposited in below atomizer 11, rinse more clean and quick, improve the efficiency of flushing, thus reduce the energy consumption of desulfuration absorbing tower further.
Described flushing arm 13 and fume inlet passage 2, atomizer 11 and fume inlet passage 2, rinses arm 13 and female pipe 14 is all tightly connected.As the preferred scheme of one, in order to Fast Installation and convenient disassembly, described flushing arm 13 and fume inlet passage 2, atomizer 11 and fume inlet passage 2, rinse arm 13 and be connected by flange seal with female pipe 14.
The course of work of this flue gas spray pre-washing device is as follows: first, first open flusher 12, the former flue of desulfuration absorbing tower 2 is rinsed, by the lime stone slurry on the flue bottom surface that is deposited in below atomizer 11 towards desulfuration absorbing tower direction refunds to the inside of desulfuration absorbing tower; Then, an import 16 toward atomizer 11 passes into steam, and makes steam pressure be adjusted to 0.01MPa; Finally, another import 16 toward atomizer 11 passes into lime stone slurry, and slowly regulates the pressure raising steam, makes the lime stone slurry sprayed from the outlet 15 of atomizer 11 become cloud.
Above disclosedly be only a kind of preferred embodiment of the utility model, certainly can not limit the interest field of the utility model with this, therefore according to the equivalent variations that the utility model claim is done, still belong to the scope that the utility model is contained.
Claims (8)
1. the flue gas spray pre-washing device for desulfuration absorbing tower, flue gas spray pre-washing device is arranged on fume inlet passage, it is characterized in that: comprise atomizer and flusher, described atomizer and flusher are located at side and the top of fume inlet passage respectively, and the delivery port of described flusher is right against the bottom surface of fume inlet passage.
2. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 1, is characterized in that: the flue gas flow direction of the outlet injection direction of described atomizer and the entrance of fume inlet passage is perpendicular.
3. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 1, is characterized in that: described flusher and atomizer are arranged along the flue gas circulating direction order of the fume inlet passage of desulfuration absorbing tower.
4. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to the arbitrary claim of claims 1 to 3, it is characterized in that: described atomizer offers an outlet and two imports, be interconnected between described export and import, described two imports steam-out (SO) and lime stone slurry respectively, steam mixes with lime stone slurry and sprays by exporting.
5. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 1 or 3, it is characterized in that: described flusher comprises flushing arm and female pipe, described flushing arm is located at the top of fume inlet passage, and its water inlet is communicated with the delivery port of female pipe.
6. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 5, is characterized in that: described flushing arm is inclined and mounted on fume inlet passage and the Way out rinsing arm is arranged towards the outlet of fume inlet passage.
7. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 5, is characterized in that: described flushing arm and fume inlet passage, atomizer and fume inlet passage, rinse arm and female Guan Jun is tightly connected.
8. a kind of flue gas spray pre-washing device for desulfuration absorbing tower according to claim 7, is characterized in that: described flushing arm and fume inlet passage, atomizer and fume inlet passage, rinse arm and be connected by flange seal with female pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420871119.1U CN204412059U (en) | 2014-12-31 | 2014-12-31 | A kind of flue gas spray pre-washing device for desulfuration absorbing tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420871119.1U CN204412059U (en) | 2014-12-31 | 2014-12-31 | A kind of flue gas spray pre-washing device for desulfuration absorbing tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204412059U true CN204412059U (en) | 2015-06-24 |
Family
ID=53462469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420871119.1U Active CN204412059U (en) | 2014-12-31 | 2014-12-31 | A kind of flue gas spray pre-washing device for desulfuration absorbing tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204412059U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114797341A (en) * | 2021-01-18 | 2022-07-29 | 玛特普拉斯有限公司 | Scrubber system equipped with pressure auto-controlled venturi |
-
2014
- 2014-12-31 CN CN201420871119.1U patent/CN204412059U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114797341A (en) * | 2021-01-18 | 2022-07-29 | 玛特普拉斯有限公司 | Scrubber system equipped with pressure auto-controlled venturi |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205700119U (en) | A kind of efficient desulfurizing tower | |
CN204710096U (en) | A kind of spray type desulfurization absorption tower | |
CN103007728A (en) | Operating method of annular pipe rotational flow wet process flue gas desulfurization tower | |
CN204768245U (en) | Flue gas desulfurizing apparatus | |
CN204412059U (en) | A kind of flue gas spray pre-washing device for desulfuration absorbing tower | |
CN103691295A (en) | Horizontal semi-dry process desulfurization device of flue at tail part of boiler | |
CN214182386U (en) | Complete device for waste gas treatment | |
CN202506310U (en) | Garbage-incinerated flue gas purification-combined deacidification system | |
CN205796820U (en) | A kind of desulfurating dust-removing equipment | |
CN107497281A (en) | Thermal power plant's corner-type flue FGD by spraying mist system | |
CN204637956U (en) | A kind of multi-stag acid tail gas absorption tower | |
CN203355569U (en) | Inlet smoke uniform distribution device for wet desulphurization absorption tower | |
CN204469535U (en) | Single tower many pH classified spraying controls desulfurizer | |
CN203710904U (en) | Transverse semi-drying desulfurization device for tail flue of boiler | |
CN205850546U (en) | Double alkali double circulation desulphurization absorption systems | |
CN204107304U (en) | Be provided with the flue gas wet denitration device of turbocharging turbulator | |
CN104740979A (en) | Tail gas purification cabinet | |
CN204073833U (en) | The desulphurization system of the tower external oxidation method of limestone-gypsum method wet type desulfurizing | |
CN204841380U (en) | SOx/NOx control integration system | |
CN203458954U (en) | Cyclone purifier | |
CN211913314U (en) | Single-tower multi-region efficient desulfurization system | |
CN202638256U (en) | Rotational flow double-alkali method desulfurization device | |
CN204656329U (en) | A kind of smelting exhaust treating apparatus | |
CN207941388U (en) | A kind of energy-saving desulfuration device of automatic control system | |
CN207102310U (en) | A kind of desulfurization high efficiency spray system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |