CN204402521U - Mining hydraulic temporary support device - Google Patents

Mining hydraulic temporary support device Download PDF

Info

Publication number
CN204402521U
CN204402521U CN201520003692.5U CN201520003692U CN204402521U CN 204402521 U CN204402521 U CN 204402521U CN 201520003692 U CN201520003692 U CN 201520003692U CN 204402521 U CN204402521 U CN 204402521U
Authority
CN
China
Prior art keywords
steel pipe
support
large footpath
support device
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520003692.5U
Other languages
Chinese (zh)
Inventor
卢前明
王德凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201520003692.5U priority Critical patent/CN204402521U/en
Application granted granted Critical
Publication of CN204402521U publication Critical patent/CN204402521U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to mine roadway support field, specifically a kind of mining hydraulic temporary support device.In the coal road tunneling process of colliery, for the tunnel of just having excavated, temporary lining must be carried out, traditional temporary lining process bands cap point post and individual prop, support force is little, labour intensity is large, support speed is slow, weight is large, be not easy to carrying, and individual prop needs to set up hydraulic power unit provides power for it, the technical scheme that the utility model provides is the path steel pipe and the one section of large footpath steel pipe pin joint that utilize one section of one end to be welded with rectangular support steel plate, the other end of described large footpath steel pipe is threaded with jack top, after connecting each parts according to the method described above, shake jack depression bar can realize preventing coal cinder to be scattered to the support of top board.

Description

Mining hydraulic temporary support device
Technical field
The utility model relates to mine roadway support field, specifically a kind of mining hydraulic temporary support device.
Background technology
In the coal road tunneling process of colliery, for the tunnel of just having excavated, must temporary lining be carried out, avoid the inbreak of top board coal body to cause casualties.But traditional temporary lining process bands cap point post and individual prop, support force is little, and labour intensity is large, and support speed is slow, and weight is large, is not easy to carrying, and individual prop needs to set up hydraulic power unit provides power for it.Therefore, the temporary support device of a kind of convenient operation and carrying need be invented, can coal cinder be prevented to be scattered by immediate support top coal, ensure the safety of operating personnel.
Summary of the invention
In order to overcome the problems referred to above that prior art field exists, the purpose of this utility model is, provides a kind of hydraulic pressure temporary support device, can connect top at short notice, and provide certain setting load, ensures the safety of operating personnel.
To achieve these goals, the technical scheme that the utility model provides is the path steel pipe and the one section of large footpath steel pipe pin joint that utilize one section of one end to be welded with rectangular support steel plate, the other end of described large footpath steel pipe is threaded with jack top, after connecting each parts according to the method described above, shake jack depression bar can realize preventing coal cinder to be scattered to the support of top board.
Described large footpath steel pipe and path steel pipe body respectively there are 7 equal-sized circular holes, when described large footpath steel pipe and path fastener for connection, path steel pipe inserts in the steel pipe of large footpath and the circular hole on two steel pipe bodys is aligned, and then inserts described circular hole with pin and can realize described large footpath steel pipe and be connected with the quick of path steel pipe.
The mining hydraulic temporary support device that the utility model provides, its beneficial effect is, this apparatus structure is simple, easy accessibility, lightweight, do not rely on hydraulic power unit and power is provided, jack applies support force by the rectangular support steel plate of steel pipe top to top coal, effectively control being scattered of top coal, decrease the generation of security incident, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the utility model embodiment;
Fig. 2 is the cooperation schematic diagram of large footpath steel pipe and path steel pipe;
Fig. 3 is the lateral view after large footpath steel pipe and path steel pipe coordinate;
Detailed description of the invention
With reference to the accompanying drawings, in conjunction with the embodiments, to the mining hydraulic temporary support device that the utility model provides, be described in detail.
Embodiment
With reference to Fig. 1-Fig. 3, the mining hydraulic temporary support device of the present embodiment, it comprises jack 1, jack depression bar 2, large footpath steel pipe 3, threaded connector 4, pin 5, path steel pipe 6, rectangular support steel plate 7, reinforcing struts 8, described threaded connector 4 is processed with external screw thread, for entity structure, and be welded in jack 1 top, be processed with internal thread bottom described large footpath steel pipe 3, can be threaded with threaded connector 4.Described reinforcing struts all weld with between path steel pipe and rectangular support steel plate.
When using this device, first jack 1 level is placed on seat earth, steel pipe 3 bottom, large footpath and threaded connector 4 are screwed, then path steel pipe 6 is inserted in large footpath steel pipe 3, the height of adjustment path steel pipe 6, and make the tight jay of rectangular support steel plate, to reduce the lift of jack; Rapidly pin 5 is inserted in circular hole that path steel pipe 6 and large footpath steel pipe 3 align; Shake jack depression bar 2 makes device have certain setting load to top coal, prevents coal body inbreak.Along with the propelling of driving face, only by lifting jack unloading, device need be moved forward, and again shake jack, device is risen tight.

Claims (2)

1. mining hydraulic temporary support device, is characterized in that: one section of one end is welded with path steel pipe and one section of large footpath steel pipe pin joint of rectangular support steel plate, and the other end of described large footpath steel pipe is threaded with jack top.
2. mining hydraulic temporary support device according to claim 1, is characterized in that: described large footpath steel pipe and path steel pipe body respectively have 7 equal-sized circular holes.
CN201520003692.5U 2015-01-06 2015-01-06 Mining hydraulic temporary support device Expired - Fee Related CN204402521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520003692.5U CN204402521U (en) 2015-01-06 2015-01-06 Mining hydraulic temporary support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520003692.5U CN204402521U (en) 2015-01-06 2015-01-06 Mining hydraulic temporary support device

Publications (1)

Publication Number Publication Date
CN204402521U true CN204402521U (en) 2015-06-17

Family

ID=53426390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520003692.5U Expired - Fee Related CN204402521U (en) 2015-01-06 2015-01-06 Mining hydraulic temporary support device

Country Status (1)

Country Link
CN (1) CN204402521U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927254A (en) * 2016-06-30 2016-09-07 北京城建七建设工程有限公司 Emergency device for collapse of mined tunnel vault and application method
CN106194224A (en) * 2016-08-29 2016-12-07 招金矿业股份有限公司蚕庄金矿 A kind of combined type artificial point post being applicable to stope and installation method thereof
CN110130952A (en) * 2019-05-15 2019-08-16 王桂岩 A kind of artificial hydraulic pressure steel method for protecting support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927254A (en) * 2016-06-30 2016-09-07 北京城建七建设工程有限公司 Emergency device for collapse of mined tunnel vault and application method
CN106194224A (en) * 2016-08-29 2016-12-07 招金矿业股份有限公司蚕庄金矿 A kind of combined type artificial point post being applicable to stope and installation method thereof
CN110130952A (en) * 2019-05-15 2019-08-16 王桂岩 A kind of artificial hydraulic pressure steel method for protecting support

Similar Documents

Publication Publication Date Title
CN204627636U (en) The multi-functional chassis of wheeled four arm constructing tunnel
CN204402521U (en) Mining hydraulic temporary support device
CN204214731U (en) A kind of anchor pole dynamic load bringing device
CN103938663A (en) Correction device of inclined power transmission tower made of signal-splicing steel angle principal material
CN201083130Y (en) Coal mining development machine carried advance support device
CN103669431A (en) Device for adjusting inclined steel pylon in mining area of coal mine
CN103669432A (en) Jacking device for deviation rectification of steel pylon in mining area of coal mine
CN204371384U (en) Anchor Agent boost motor
CN203905988U (en) Slip type temporary supporting bracket
CN107143293A (en) A kind of all-hydraulic coal mine down-hole drilling auxiliary machinery
CN204299601U (en) Pier stud type advance timbering
CN204024686U (en) A kind of mine self moving hydraulic is lifted shed device
CN207847672U (en) Coal mine return air gate road without supporting outfit repeatedly
CN203594263U (en) Inclined steel pylon deviation correcting device for two-sort angle steel main material
CN104141286A (en) Construction adit blocking structure
CN203920973U (en) A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel
CN203847144U (en) Fully-mechanized coal mining face hydraulic support retracting equipment
CN204646231U (en) Be applicable to the piggyback temporary support device in the trapezoidal tunnel of colliery heavy grade
CN105221173A (en) Fully-mechanized mining working two ends crosses freeboard section supporting method
CN205775879U (en) A kind of multi-disc main couple Hanging Basket intelligent synchronization reach system
CN203730064U (en) Device for lifting and supporting loader head of reversed loader
CN203394548U (en) Tilting preventing device of single hydraulic prop
CN204235489U (en) To wheel extractor
CN204357472U (en) The airborne flexible U-shaped steel joist device of development machine
CN204588471U (en) Open slope shaft excavation simple gantry crane device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20160106