CN204401469U - A kind of for concrete in mass building block lifting dabbing device - Google Patents

A kind of for concrete in mass building block lifting dabbing device Download PDF

Info

Publication number
CN204401469U
CN204401469U CN201420849654.7U CN201420849654U CN204401469U CN 204401469 U CN204401469 U CN 204401469U CN 201420849654 U CN201420849654 U CN 201420849654U CN 204401469 U CN204401469 U CN 204401469U
Authority
CN
China
Prior art keywords
pulley
fixed
steel pipe
chiseling
volume concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420849654.7U
Other languages
Chinese (zh)
Inventor
周勇军
王业路
吴玉文
唐龙龙
闫强
苏增军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chang'an University
Original Assignee
Chang'an University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chang'an University filed Critical Chang'an University
Priority to CN201420849654.7U priority Critical patent/CN204401469U/en
Application granted granted Critical
Publication of CN204401469U publication Critical patent/CN204401469U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Percussive Tools And Related Accessories (AREA)

Abstract

The utility model discloses a kind of for concrete in mass building block lifting dabbing device, comprise long drag-line, short drag-line, scaffolding steel pipe, fixed block, mobile pulley, electric hammer, concrete in mass building block and anchor frame; Described scaffolding steel pipe is fixedly installed on concrete in mass building block surrounding, and described fixed block and mobile pulley are all arranged on scaffolding steel pipe, and fixed block is provided with two, and mobile pulley is arranged between two fixed blocks; Described long drag-line one end is fixed on an anchor frame, and the other end is walked around a fixed block successively and is connected with electric hammer with mobile pulley; Described short drag-line one end is fixed on scaffolding steel pipe, and the other end is walked around mobile pulley and another fixed block and another anchor frame successively and fixed.This utility model is elevated by cable control electric hammer, reaches the object of mobile off-load dabbing, accelerates the progress of construction, increases work efficiency.

Description

一种针对大体积混凝土砌块吊装凿毛装置A device for hoisting and chiseling large-volume concrete blocks

技术领域technical field

本实用新型属于桥梁领域,特别涉及一种针对大体积混凝土砌块吊装凿毛装置。The utility model belongs to the field of bridges, in particular to a hoisting and chiseling device for large-volume concrete blocks.

背景技术Background technique

常规的凿毛方式是采用人力的方法,通过电锤的震动来削减混凝土表层,使之与新浇筑的混凝土相衔接。由于电锤重量过于沉重,施工时会大大消耗人体的能量,常见的现象是干一会歇一会,大大减缓了施工的进度。The conventional method of chiseling is to use manpower to cut the concrete surface through the vibration of the electric hammer, so that it can be connected with the newly poured concrete. Due to the heavy weight of the electric hammer, the energy of the human body will be greatly consumed during construction. The common phenomenon is to work for a while and rest for a while, which greatly slows down the construction progress.

实用新型内容Utility model content

为解决现有技术存在的混凝土结构凿毛劳动力强度较高,机械施工技术落后的问题,本实用新型提供了一种针对大体积混凝土砌块吊装凿毛装置,能够解决现有技术中电锤重量过于沉重,减缓了施工的进度的问题。In order to solve the problems of high labor intensity and backward mechanical construction technology in the prior art for chiseling concrete structures, the utility model provides a hoisting and chiseling device for large-volume concrete blocks, which can solve the problem of the weight of the electric hammer in the prior art. Too heavy, slowing down the progress of the construction problem.

为实现上述目的,本实用新型采取如下技术解决方案:In order to achieve the above object, the utility model takes the following technical solutions:

一种针对大体积混凝土砌块吊装凿毛装置,包括长拉索、短拉索、脚手架钢管、固定滑轮、移动滑轮、电锤、大体积混凝土砌块和锚定架;所述的脚手架钢管固定设置在大体积混凝土砌块四周,所述的固定滑轮和移动滑轮均设置在脚手架钢管上,固定滑轮设有两个,移动滑轮设置在两个固定滑轮之间;所述的长拉索一端固定在一个锚定架上,另一端依次绕过一个固定滑轮和移动滑轮与电锤连接;所述的短拉索一端固定在脚手架钢管上,另一端依次绕过移动滑轮和另一个固定滑轮与另一个锚定架固定。A hoisting chiseling device for large-volume concrete blocks, comprising long stay cables, short stay cables, scaffold steel pipes, fixed pulleys, moving pulleys, electric hammers, large-volume concrete blocks and anchor frames; the scaffold steel pipes are fixed Set around the large-volume concrete block, the fixed pulley and the moving pulley are both set on the steel pipe of the scaffold, there are two fixed pulleys, and the moving pulley is set between the two fixed pulleys; one end of the long cable is fixed On an anchor frame, the other end goes around a fixed pulley and a moving pulley in turn to connect with the electric hammer; one end of the short cable is fixed on the steel pipe of the scaffold, and the other end turns around a moving pulley and another fixed pulley to connect with the other end. An anchor bracket is fixed.

还包括劲性弹簧,所述的长拉索与电锤之间通过劲性弹簧连接。A stiff spring is also included, and the long drag cable is connected with the electric hammer through a stiff spring.

所述的移动滑轮包括上下设置在滑轮支架的大滑轮和小滑轮,大滑轮设置在小滑轮上方,所述的小滑轮为两个,所述的移动滑轮通过大滑轮活动设置在脚手架钢管上,所述的长拉索和短拉索分别绕过两个小滑轮。The moving pulley includes a large pulley and a small pulley arranged on the pulley bracket up and down, the large pulley is arranged above the small pulley, and there are two small pulleys, and the moving pulley is set on the steel pipe of the scaffold through the large pulley. Described long stay cable and short stay cable walk around two small pulleys respectively.

所述的两个小滑轮之间还设有小劲性弹簧。Also be provided with small stiff spring between described two small pulleys.

所述的固定滑轮包括上部的固定装置和下部的滑轮装置,所述的固定装置和滑轮装置均为圆饼状结构,且两个圆饼状结构所在的平面相互垂直;所述的固定装置轴向上设置有通孔,所述的固定滑轮通过通孔设置在脚手架钢管上。The fixed pulley includes an upper fixing device and a lower pulley device, the fixing device and the pulley device are all round cake-shaped structures, and the planes where the two round cake-shaped structures are located are perpendicular to each other; the shaft of the fixing device A through hole is arranged upward, and the fixed pulley is arranged on the steel pipe of the scaffold through the through hole.

所述的通孔的直径大于脚手架钢管直径2mm。The diameter of the through hole is 2mm greater than the diameter of the scaffolding steel pipe.

所述的脚手架钢管数量为8个,分别在大体积混凝土砌块前后左右各有两个。The number of scaffold steel pipes is 8, and there are two respectively at the front, rear, left, and right sides of the large-volume concrete block.

相对于现有技术,本实用新型具有以下优点:Compared with the prior art, the utility model has the following advantages:

本实用新型一种针对大体积混凝土砌块吊装凿毛装置,通过长拉索和短拉索及脚手架钢管上设置固定滑轮和移动滑轮,将电锤吊装,由拉索控制其升降,达到移动减载凿毛的目的,加快施工的进度,提高工作效率。解决现有技术中电锤重量过于沉重,减缓了施工的进度的问题。The utility model is a hoisting and chiseling device for large-volume concrete blocks. A fixed pulley and a moving pulley are arranged on the steel pipe of the scaffold through the long cable and the short cable, and the electric hammer is hoisted. The purpose of carrying the chisel is to speed up the progress of the construction and improve the work efficiency. It solves the problem that the weight of the electric hammer in the prior art is too heavy, which slows down the construction progress.

进一步,通过长拉索的长短可调节电锤的升降,通过短拉索的的长短调整电锤水平方向的相对位置,而劲性弹簧则可在较小的范围内灵活的移动。Further, the lift of the electric hammer can be adjusted by the length of the long cable, and the relative position of the electric hammer in the horizontal direction can be adjusted by the length of the short cable, while the stiff spring can move flexibly within a small range.

附图说明Description of drawings

图1为大体积混凝土砌块吊装凿毛装置示意图;Fig. 1 is the schematic diagram of hoisting and chiseling device for mass concrete blocks;

图2为移动滑轮三视图;Fig. 2 is three views of moving pulley;

图2a为移动滑轮主视图;Figure 2a is a front view of the moving pulley;

图2b为移动滑轮左视图;Figure 2b is a left view of the moving pulley;

图2c为移动滑轮仰视图;Figure 2c is a bottom view of the moving pulley;

图3为固定滑轮三视图;Fig. 3 is three views of fixed pulley;

图3a为固定滑轮主视图;Figure 3a is a front view of the fixed pulley;

图3b为固定滑轮左视图;Figure 3b is a left view of the fixed pulley;

图3c为固定滑轮仰视图。Figure 3c is a bottom view of the fixed pulley.

图中,1-长拉索;2-短拉索;3-脚手架钢管;4-固定滑轮;5-移动滑轮;6-劲性弹簧;7-电锤;8-大体积混凝土砌块;9-小劲性弹簧;10-小滑轮;11-滑轮支架;12-大滑轮;13-锚定架;41-固定装置;42-滑轮装置;43-通孔。In the figure, 1-long cable; 2-short cable; 3-scaffold steel pipe; 4-fixed pulley; 5-moving pulley; 6-stiff spring; 7-electric hammer; 8-mass concrete block; 9 10-small pulley; 11-pulley support; 12-big pulley; 13-anchor frame; 41-fixing device; 42-pulley device; 43-through hole.

具体实施方式Detailed ways

以下结合附图及实施例对本实用新型作进一步的详细说明。Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail.

参考图1所示,一种针对大体积混凝土砌块吊装凿毛装置,包括长拉索1、短拉索2、脚手架钢管3、固定滑轮4、移动滑轮5、劲性弹簧6、电锤7、大体积混凝土砌块8、小劲性弹簧9、小滑轮10、螺栓11、大滑轮12、锚定架13。脚手架3有八个,分别在大体积混凝土砌块前后左右各有两个,起到支架的作用。Referring to Fig. 1, a hoisting chiseling device for large-volume concrete blocks includes a long cable 1, a short cable 2, a scaffold steel pipe 3, a fixed pulley 4, a moving pulley 5, a rigid spring 6, and an electric hammer 7 , large-volume concrete block 8, small spring 9, small pulley 10, bolt 11, large pulley 12, anchor frame 13. There are eight scaffolds 3, and there are two respectively in the front, back, left, and right sides of the large-volume concrete block, which play the role of supports.

参见图2,移动滑轮5,呈椭圆饼状。上下各有滑轮装置,上部有一大滑轮12,下部有两个小滑轮10。大滑轮12担于脚手架3钢管上,下部小滑轮10分别有长拉索1和短拉索2通过。移动滑轮5可在脚手架3钢管上自由的滑动。Referring to Fig. 2, the mobile pulley 5 is in the shape of an oval pie. Pulley device is respectively arranged up and down, and a large pulley 12 is arranged on the top, and two small pulleys 10 are arranged on the bottom. Big pulley 12 bears on scaffold 3 steel pipes, and bottom small pulley 10 has long stay cable 1 and short stay cable 2 to pass through respectively. Mobile pulley 5 can slide freely on scaffold 3 steel pipes.

参见图3,固定滑轮4其形状不规则,固定滑轮4包括上部的固定装置41和下部的滑轮装置42;所述的固定装置41轴向上设置有通孔43,所述的固定滑轮4通过通孔43设置在脚手架钢管3上。上部和下部均为薄圆饼状,同时成90度。上部有一通孔43,用于穿入脚手架钢管内,直径比钢管略大2mm。Referring to Fig. 3, the shape of the fixed pulley 4 is irregular, and the fixed pulley 4 includes an upper fixing device 41 and a lower pulley device 42; the fixing device 41 is axially provided with a through hole 43, and the fixed pulley 4 passes through The through hole 43 is provided on the scaffolding steel pipe 3 . The upper and lower parts are both pancake-shaped and at 90 degrees at the same time. There is a through hole 43 on the top, which is used to penetrate in the steel pipe of the scaffold, and the diameter is slightly larger than the steel pipe by 2mm.

长拉索1一段固定于锚定架13上,另一端通过固定滑轮4和移动滑轮5中的其中一个小滑轮10,然后与劲性弹簧6相衔接,劲性弹簧6相衔接末端挂装电锤7。短拉索2,一端固定于脚手架3钢管上,另一端经过移动滑轮5上的另一个小滑轮10绕出,再经过固定滑轮4绕出,最后固定于锚定架13上。这样便把电锤7掉在空中。One section of the long cable 1 is fixed on the anchor frame 13, and the other end passes through one of the small pulleys 10 in the fixed pulley 4 and the moving pulley 5, and then connects with the stiff spring 6, and the stiff spring 6 is connected to the terminal to hang the electric cable. Hammer 7. Short stay cable 2, one end is fixed on scaffold 3 steel pipes, and the other end goes out through another small pulley 10 on the moving pulley 5, goes out through fixed pulley 4 again, is fixed on the anchor frame 13 at last. Like this just electric hammer 7 is dropped in the air.

工作原理:按照图1安装本实用新型的装置,工人只需要控制电锤7便可以进行工作,较现有的人工作业省时省力。当需要调整位置时,通过长拉索1的长短可调节电锤7的升降,通过短拉索2的长短调整电锤7水平方向的相对位置,而劲性弹簧6则可保证电锤7在较小的范围内灵活的移动。Working principle: install the device of the utility model according to Fig. 1, the workers only need to control the electric hammer 7 and then they can work, which saves time and effort compared with the existing manual work. When the position needs to be adjusted, the lift of the electric hammer 7 can be adjusted by the length of the long cable 1, and the relative position of the electric hammer 7 in the horizontal direction can be adjusted by the length of the short cable 2, while the stiff spring 6 can ensure that the electric hammer 7 is in the Flexible movement within a small range.

以上内容是对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施方式仅限于此,对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单的推演或替换,都应当视为属于本实用新型由所提交的权利要求书确定实用新型保护范围。The above content is a further detailed description of the utility model, and it cannot be determined that the specific implementation of the utility model is limited to this. For those of ordinary skill in the technical field to which the utility model belongs, without departing from the concept of the utility model, Several simple inferences or substitutions can also be made, all of which should be considered as belonging to the protection scope of the utility model determined by the submitted claims.

Claims (7)

1.一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:包括长拉索(1)、短拉索(2)、脚手架钢管(3)、固定滑轮(4)、移动滑轮(5)、电锤(7)、大体积混凝土砌块(8)和锚定架(13);所述的脚手架钢管(3)固定设置在大体积混凝土砌块(8)四周,所述的固定滑轮(4)和移动滑轮(5)均设置在脚手架钢管(3)上,固定滑轮(4)设有两个,移动滑轮(5)设置在两个固定滑轮(4)之间;所述的长拉索(1)一端固定在一个锚定架(13)上,另一端依次绕过一个固定滑轮(4)和移动滑轮(5)与电锤(7)连接;所述的短拉索(2)一端固定在脚手架钢管(3)上,另一端依次绕过移动滑轮(5)和另一个固定滑轮(4)与另一个锚定架(13)固定。1. A hoisting and chiseling device for large-volume concrete blocks, characterized in that: it comprises a long stay cable (1), a short stay cable (2), a scaffold steel pipe (3), a fixed pulley (4), a moving pulley (5 ), electric hammer (7), large-volume concrete block (8) and anchor frame (13); the scaffold steel pipe (3) is fixedly arranged around the large-volume concrete block (8), and the (4) and moving pulley (5) are all arranged on the scaffold steel pipe (3), fixed pulley (4) is provided with two, and moving pulley (5) is arranged between two fixed pulleys (4); Described long One end of the dragline (1) is fixed on an anchor frame (13), and the other end is sequentially bypassed by a fixed pulley (4) and a moving pulley (5) to connect with the electric hammer (7); the short dragline (2 ) one end is fixed on the scaffold steel pipe (3), and the other end walks around the moving pulley (5) and another fixed pulley (4) and fixes with another anchor frame (13) successively. 2.根据权利要求1所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:还包括劲性弹簧(6),所述的长拉索(1)与电锤(7)之间通过劲性弹簧(6)连接。2. A device for hoisting and chiseling large-volume concrete blocks according to claim 1, characterized in that: it also includes a stiff spring (6), the long cable (1) and the electric hammer (7) Connected by a stiff spring (6). 3.根据权利要求1所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:所述的移动滑轮(5)包括设置在滑轮支架(11)上的大滑轮(12)和小滑轮(10),大滑轮(12)设置在小滑轮(10)上方,所述的小滑轮(10)为两个,所述的移动滑轮(5)通过大滑轮(12)活动设置在脚手架钢管(3)上,所述的长拉索(1)和短拉索(2)分别绕过两个小滑轮(10)。3. A kind of device for hoisting and chiseling large-volume concrete blocks according to claim 1, characterized in that: said moving pulley (5) comprises a large pulley (12) arranged on the pulley bracket (11) and a Small pulley (10), large pulley (12) is arranged on the top of small pulley (10), described small pulley (10) is two, and described mobile pulley (5) is arranged on scaffold by the activity of large pulley (12) On the steel pipe (3), the long stay cable (1) and the short stay cable (2) walk around two small pulleys (10) respectively. 4.根据权利要求3所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:所述的两个小滑轮(10)之间还设有小劲性弹簧(9)。4. A device for hoisting and chiseling large-volume concrete blocks according to claim 3, characterized in that a small spring (9) is provided between the two small pulleys (10). 5.根据权利要求1所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:所述的固定滑轮(4)包括上部的固定装置(41)和下部的滑轮装置(42),所述的固定装置(41)和滑轮装置(42)均为圆饼状结构,且两个圆饼状结构所在的平面相互垂直;所述的固定装置(41)轴向上设置有通孔(43),所述的固定滑轮(4)通过通孔(43)设置在脚手架钢管(3)上。5. A device for hoisting and chiseling large-volume concrete blocks according to claim 1, characterized in that: the fixed pulley (4) includes an upper fixing device (41) and a lower pulley device (42) , the described fixing device (41) and the pulley device (42) are all round pie-shaped structures, and the planes where the two round pie-shaped structures are located are perpendicular to each other; the described fixing device (41) is axially provided with a through hole (43), the fixed pulley (4) is arranged on the scaffold steel pipe (3) through the through hole (43). 6.根据权利要求5所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:所述的通孔(43)的直径大于脚手架钢管(3)直径2mm。6. A device for hoisting and chiseling large-volume concrete blocks according to claim 5, characterized in that: the diameter of the through hole (43) is 2 mm larger than the diameter of the scaffold steel pipe (3). 7.根据权利要求1所述的一种针对大体积混凝土砌块吊装凿毛装置,其特征在于:所述的脚手架钢管(3)数量为8个,分别在大体积混凝土砌块(8)前后左右各有两个。7. A kind of chiseling device for hoisting and chiseling large-volume concrete blocks according to claim 1, characterized in that: the number of scaffold steel pipes (3) is 8, respectively before and after the large-volume concrete blocks (8) There are two on each side.
CN201420849654.7U 2014-12-27 2014-12-27 A kind of for concrete in mass building block lifting dabbing device Expired - Fee Related CN204401469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420849654.7U CN204401469U (en) 2014-12-27 2014-12-27 A kind of for concrete in mass building block lifting dabbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420849654.7U CN204401469U (en) 2014-12-27 2014-12-27 A kind of for concrete in mass building block lifting dabbing device

Publications (1)

Publication Number Publication Date
CN204401469U true CN204401469U (en) 2015-06-17

Family

ID=53425345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420849654.7U Expired - Fee Related CN204401469U (en) 2014-12-27 2014-12-27 A kind of for concrete in mass building block lifting dabbing device

Country Status (1)

Country Link
CN (1) CN204401469U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612059A (en) * 2014-12-27 2015-05-13 长安大学 Mass concrete block hoisting and chiseling device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612059A (en) * 2014-12-27 2015-05-13 长安大学 Mass concrete block hoisting and chiseling device and method
CN104612059B (en) * 2014-12-27 2016-03-30 长安大学 A kind of for concrete in mass building block lifting dabbing device and method

Similar Documents

Publication Publication Date Title
CN203729560U (en) Construction platform device for large chimneys
CN104612059B (en) A kind of for concrete in mass building block lifting dabbing device and method
CN203346037U (en) Hanging basket for spray seeding operation at very steep slope
CN204280974U (en) A kind of template hoisting device
CN204224128U (en) A kind of safe tower crane
CN205099288U (en) Work platform of climbing certainly from climbing device and use device
CN204152417U (en) A kind of removable hanging ladder
CN203769086U (en) Concrete embedded part
CN202227705U (en) tensioning device
CN202954551U (en) Simple steel reinforcement cage for high-altitude welding
CN210979215U (en) Tunnel small side wall walk-behind chisel bracket
CN205153493U (en) Wall body ceramic tile vacuum positioner is cast to essence
CN204532376U (en) Split type lifting construction trolley
CN204252551U (en) The vibrating spear positioning device of a kind of batter post/wall concrete pouring construction
CN204081438U (en) Inclination Core Walls Structure curtain wall finishing hanging basket rail set
CN203924695U (en) A kind of indirect cool tower mould-lifting device
CN203320922U (en) Supporting device for forming of elevator shaft template
CN205381883U (en) Novel big arm of tower crane segmentation demolish supplementaryly device
CN202990395U (en) Rotating horizontal protection tool for climbing scaffold
CN102277957B (en) Overhaul platform of desulfurizing tower
CN206681389U (en) A kind of autoclaved lightweight sand aerated concrete batten mounting hanger
CN205500545U (en) Hoisting device for tower crane
CN206769400U (en) A kind of portable concrete-face closure machine
CN204510768U (en) A kind of without support operation frame
CN206396757U (en) New Anchor Cable removes machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20161227

CF01 Termination of patent right due to non-payment of annual fee