CN204401437U - 弓背式仰拱栈桥 - Google Patents
弓背式仰拱栈桥 Download PDFInfo
- Publication number
- CN204401437U CN204401437U CN201420678692.0U CN201420678692U CN204401437U CN 204401437 U CN204401437 U CN 204401437U CN 201420678692 U CN201420678692 U CN 201420678692U CN 204401437 U CN204401437 U CN 204401437U
- Authority
- CN
- China
- Prior art keywords
- trestle
- inverted arch
- ramp
- width
- formula inverted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009412 basement excavation Methods 0.000 claims abstract description 7
- 241001669679 Eleotris Species 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005422 blasting Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型公开了一种弓背式仰拱栈桥,由两幅相互平行的栈桥体构成,其特征在于,两幅栈桥体之间由多个撑杆相互连接,每幅栈桥体包括前栈桥、后栈桥及后栈桥坡道,前栈桥的后端与后栈桥的前端、后栈桥的后端与后栈桥坡道的前端均为可拆卸连接;前栈桥前部、后栈桥后部均设有行走装置,前栈桥的前端置于未开挖段路面上,后栈桥的后端及后栈桥坡道置于已衬砌路面上。
Description
技术领域
本实用新型涉及一种在隧洞和地下工程施工中辅助车辆通行的可移动装置。
背景技术
隧洞和其它地下工程施工中,仰拱作业一般含有开挖、清基、钢筋安装、混凝土浇筑等施工工序,仰拱槽开挖及其后续工序作业时间长,影响其前后方向车辆的正常通行,因此施做仰拱对掘进干扰大一直是国内隧洞钻爆法施工中未能很好解决的一大难题。目前,大多数钻爆法施工的隧洞采用仰拱半幅施作或采用简易栈桥辅助车辆通行的方法进行仰拱施工。
传统栈桥一般采用的是工字钢加钢板或者钢筋焊接的固定结构,自重大,适应性、灵活性差,移动困难,不但仰拱施工质量难以控制,而且开挖、衬砌不能同步进行,导致劳动强度高、功效非常低,大大影响了隧洞衬砌施工的速度。施工单位为了完成任务,不得不在隧洞狭小的空间里密集配备资源,单一推进掌子面掘进的同时,无法很好的兼顾其他作业面的良好进展,导致二次衬砌的跟进难以保证。
发明内容
本实用新型的目的是提供一种可循环利用、快速移动和快速安装的辅助车辆通行的可移动施工装置。
为达到以上目的,本实用新型是采取如下技术方案予以实现的:
一种弓背式仰拱栈桥,由两幅相互平行的栈桥体构成,其特征在于,两幅栈桥体之间由多个撑杆相互连接,每幅栈桥体包括前栈桥、后栈桥及后栈桥坡道,前栈桥的后端与后栈桥的前端、后栈桥的后端与后栈桥坡道的前端均为可拆卸连接;前栈桥前部、后栈桥后部均设有行走装置,前栈桥的前端置于未开挖段路面上,后栈桥的后端及后栈桥坡道置于已衬砌路面上。
上述方案中,所述前栈桥的后端与后栈桥的前端通过连接板及销钉连接。所述后栈桥的后端与后栈桥坡道的前端通过连接钩连接。
所述行走装置为一对通过螺栓与栈桥体连接的行走轮。
所述后栈桥后端与已衬砌路面混凝土间支垫枕木。
相比现有技术,本实用新型具有自重轻、移动灵活、对已浇筑混凝土损伤小等优点。
附图说明
图1为本实用新型的结构示意图。其中a图为底板浇筑前平视图;b图为a图的俯视图;c图为底板浇筑后平视图。
图2为图1中后栈桥的结构平视图。其中,图2A是A-A向剖视图;图2B是B-B向剖视图;图2C是C-C向剖视图;图2D是D-D向剖视图;图2E是E-E向剖视图。
图3为图1中前栈桥的结构平视图。其中,图3A是A-A向剖视图;图3B是B-B向剖视图;图3C是C-C向剖视图;图3D是D-D向剖视图;图3E是E-E向剖视图。
图4为图1中后栈桥坡道的结构平视图。其中图4A是A-A向剖视图。
图1~图4中:1、前栈桥;2、后栈桥;3、后栈桥坡道;4、行走轮;5、撑杆;6、连接钩;7、连接板;8、顶板;9、腹板;10、底板;11、封板;12、襟板;13、三角筋;14、前栈桥斜坡;15、后栈桥斜坡。
具体实施方式
如图1所示,一种隧洞施工辅助车辆通行的弓背式仰拱栈桥,由两幅相互平行的栈桥体构成,两幅栈桥体之间由4个撑杆5相互连接。每幅栈桥体包括前栈桥1、后栈桥2、后栈桥坡道3、行走轮4,前栈桥后端与后栈桥前端通过连接板7连接;后栈桥2的后端与后栈桥坡道3的前端通过连接钩6互相连接。前栈桥前部、后栈桥后部均设有行走装置,行走装置为一对通过螺栓与栈桥体连接的行走轮4。前栈桥前端置于未开挖段路面上,后栈桥后端及后栈桥坡道置于已浇筑底板(已衬砌路面)上,后栈桥后端与底板混凝土间支垫枕木以固定栈桥尾部。
参考图2~图4,前栈桥、后栈桥、后栈桥坡道均采用钢板焊接,包括顶板8、腹板9、底板10、封板11、襟板12和三角筋13。斜坡部分的腹板加厚。
图1装置的施工原理:
(1)参考图1中a、b,将前栈桥1、后栈桥2、后栈桥坡道3、行走轮4及撑杆5按图组装完毕,将组装好的栈桥前端置于未开挖路面,尾端用千斤顶顶升,将枕木放置在已浇筑底板混凝土上,栈桥落下置于枕木上,完成栈桥安装,车辆自前栈桥斜坡14(图3)或后栈桥斜坡15(图4)通过栈桥。
(2)在底板槽中施工底板钢筋和底板混凝土浇筑。
(3)参考图1中的c,将栈桥后端用千斤顶顶升,拆除栈桥下的枕木,行走 轮4置于已浇筑底板混凝土上,将栈桥前端通过装载机或挖掘机提起,向后推动,将前栈桥上的行走轮置于已浇筑底板混凝土上,开挖底板槽。
(4)底板槽开挖后,将栈桥前端通过装载机或挖掘机提起,向前拖动,将栈桥前端置于未开挖路面,栈桥尾端置于底板表面的枕木上,完成栈桥行走及安装,进行步骤(1)~(3)的下一个施工循环。
Claims (5)
1.一种弓背式仰拱栈桥,由两幅相互平行的栈桥体构成,其特征在于,两幅栈桥体之间由多个撑杆相互连接,每幅栈桥体包括前栈桥、后栈桥及后栈桥坡道,前栈桥的后端与后栈桥的前端、后栈桥的后端与后栈桥坡道的前端均为可拆卸连接;前栈桥前部、后栈桥后部均设有行走装置,前栈桥的前端置于未开挖段路面上,后栈桥的后端及后栈桥坡道置于已衬砌路面上。
2.如权利要求1所述的弓背式仰拱栈桥,其特征在于,所述前栈桥的后端与后栈桥的前端通过连接板及销钉连接。
3.如权利要求1所述的弓背式仰拱栈桥,其特征在于,所述后栈桥的后端与后栈桥坡道的前端通过连接钩连接。
4.如权利要求1所述的弓背式仰拱栈桥,其特征在于,所述行走装置为一对通过螺栓与栈桥体连接的行走轮。
5.如权利要求1所述的弓背式仰拱栈桥,其特征在于,所述后栈桥后端与已衬砌路面混凝土间支垫枕木。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420678692.0U CN204401437U (zh) | 2014-11-13 | 2014-11-13 | 弓背式仰拱栈桥 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420678692.0U CN204401437U (zh) | 2014-11-13 | 2014-11-13 | 弓背式仰拱栈桥 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204401437U true CN204401437U (zh) | 2015-06-17 |
Family
ID=53425313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420678692.0U Expired - Fee Related CN204401437U (zh) | 2014-11-13 | 2014-11-13 | 弓背式仰拱栈桥 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204401437U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758761A (zh) * | 2016-12-12 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | 装配式模块化桥及使用方法 |
CN106758757A (zh) * | 2016-12-13 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | 一种人工拼装式单层公路快速桥 |
CN107725073A (zh) * | 2017-11-06 | 2018-02-23 | 中建八局第建设有限公司 | 一种简易多跨式隧道用仰拱栈桥结构及施工方法 |
CN108049303A (zh) * | 2017-12-19 | 2018-05-18 | 成都锐龙机械制造有限公司 | 一种驱动后置栈桥及安装、调整方法 |
CN108691274A (zh) * | 2017-04-05 | 2018-10-23 | 新疆顺安众达交通技术服务有限公司 | 承重可调安装便捷钢构梁技术方法 |
CN111335144A (zh) * | 2020-03-24 | 2020-06-26 | 甘肃路桥建设集团有限公司 | 一种公路隧道弓式张弦梁仰拱栈桥制作方法 |
-
2014
- 2014-11-13 CN CN201420678692.0U patent/CN204401437U/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758761A (zh) * | 2016-12-12 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | 装配式模块化桥及使用方法 |
CN106758757A (zh) * | 2016-12-13 | 2017-05-31 | 湖北华舟重工应急装备股份有限公司 | 一种人工拼装式单层公路快速桥 |
CN108691274A (zh) * | 2017-04-05 | 2018-10-23 | 新疆顺安众达交通技术服务有限公司 | 承重可调安装便捷钢构梁技术方法 |
CN107725073A (zh) * | 2017-11-06 | 2018-02-23 | 中建八局第建设有限公司 | 一种简易多跨式隧道用仰拱栈桥结构及施工方法 |
CN107725073B (zh) * | 2017-11-06 | 2024-04-02 | 中建八局第一建设有限公司 | 一种基于简易栈桥的隧道施工方法 |
CN108049303A (zh) * | 2017-12-19 | 2018-05-18 | 成都锐龙机械制造有限公司 | 一种驱动后置栈桥及安装、调整方法 |
CN108049303B (zh) * | 2017-12-19 | 2023-12-15 | 成都锐龙机械制造有限公司 | 一种驱动后置栈桥及安装方法、调整方法 |
CN111335144A (zh) * | 2020-03-24 | 2020-06-26 | 甘肃路桥建设集团有限公司 | 一种公路隧道弓式张弦梁仰拱栈桥制作方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204401437U (zh) | 弓背式仰拱栈桥 | |
CN109505630B (zh) | 全液压履带式自行栈桥及施工方法 | |
CN103016029B (zh) | 一种大断面隧道分组二衬施工方法 | |
CN103075163B (zh) | 一种大断面隧道二衬施工换撑工艺 | |
CN106351670B (zh) | 一种封闭的预支护隧道结构 | |
CN103195450B (zh) | 液压隧道仰拱作业台车及仰拱施工方法 | |
CN106640133B (zh) | 多功能伸缩式仰拱栈桥 | |
CN106050245A (zh) | 矩形隧道断面零距离下穿既有车站的支护结构及构建方法 | |
CN205876339U (zh) | 箱型主梁中承式自行液压仰拱栈桥 | |
CN204851287U (zh) | 一种大断面整体移动式模板支架 | |
JP6146980B2 (ja) | トンネルの拡幅部構築方法と、トンネル拡幅部の構造 | |
CN102536277B (zh) | 一种悬臂式掘进机随车配套支锚系统 | |
CN204436407U (zh) | 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的结构 | |
CN207634089U (zh) | 一种大斜度隧道二衬模板台车装置 | |
CN203822325U (zh) | 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护 | |
CN203035204U (zh) | 一种大断面隧道二衬分组模板台车 | |
CN104372746B (zh) | 铁路桥梁预制后张法简支t梁注砼模板支架及其安装工艺 | |
CN108442945A (zh) | 一种自行式隧道衬砌台车 | |
CN206092014U (zh) | 一种适用于多导洞开挖的临时支撑体系转换台车 | |
CN205821982U (zh) | 自行式隧道仰拱栈桥 | |
CN108843339B (zh) | 既有隧道扩挖时穿越大型溶洞的辅助注浆平台及施工方法 | |
CN102562098A (zh) | 隧道钢制快速拆装临时仰拱 | |
CN206319892U (zh) | 新型水工隧洞装卸施工台车 | |
CN103075164B (zh) | 一种双洞二衬依次同步推进施工工艺 | |
CN209619827U (zh) | 全液压履带式自行栈桥 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 |