CN204387555U - Auxiliary device for pressure test of split air conditioner system - Google Patents

Auxiliary device for pressure test of split air conditioner system Download PDF

Info

Publication number
CN204387555U
CN204387555U CN201420836691.4U CN201420836691U CN204387555U CN 204387555 U CN204387555 U CN 204387555U CN 201420836691 U CN201420836691 U CN 201420836691U CN 204387555 U CN204387555 U CN 204387555U
Authority
CN
China
Prior art keywords
air conditioner
auxiliary device
main pipe
test
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420836691.4U
Other languages
Chinese (zh)
Inventor
苏升卫
王振铎
解伟
施清清
张乐
尹粤卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Gree Hefei Electric Appliances Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Gree Hefei Electric Appliances Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Gree Hefei Electric Appliances Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201420836691.4U priority Critical patent/CN204387555U/en
Application granted granted Critical
Publication of CN204387555U publication Critical patent/CN204387555U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

本实用新型提供一种用于分体式空调器系统压力测试的辅助装置,适于串联在室外机的截止阀与连接管之间,该辅助装置包括总管和设置在总管中部并连通总管的支管,总管的第一端设置有外螺纹,所述第一端的端部设置有收缩的锥形面端口,总管的第一端用于连接所述连接管;总管的第二端套设有接管螺母,总管的第二端的端部还设置有用于连接所述截止阀的喇叭口;支管上也设置外螺纹,用于连接压力测试设备,支管的端口内还设置有气门芯。该辅助装置可以很方便的安装在分体式空调器内、外机连接管上,在不破坏空调器管路结构的情况下完成压力测试,避免了空调器报废,减少检测成本,且可以重复使用,提高测试效率和安全性。

The utility model provides an auxiliary device for the pressure test of the split air conditioner system, which is suitable for being connected in series between the shut-off valve and the connecting pipe of the outdoor unit. The auxiliary device includes a main pipe and a branch pipe arranged in the middle of the main pipe and connected to the main pipe. The first end of the main pipe is provided with an external thread, and the end of the first end is provided with a contracted conical port, the first end of the main pipe is used to connect the connecting pipe; the second end of the main pipe is sleeved with a union nut The end of the second end of the main pipe is also provided with a bell mouth for connecting the shut-off valve; the branch pipe is also provided with external threads for connecting pressure testing equipment, and the port of the branch pipe is also provided with a valve core. The auxiliary device can be easily installed on the connecting pipes of the inner and outer units of the split air conditioner, and the pressure test can be completed without damaging the pipeline structure of the air conditioner, avoiding the scrapping of the air conditioner, reducing the cost of testing, and can be reused , improve test efficiency and safety.

Description

用于分体式空调器系统压力测试的辅助装置Auxiliary device for pressure testing of split air conditioner systems

技术领域technical field

本实用新型涉及空调技术领域,尤其涉及一种用于分体式空调器系统压力测试的辅助装置。The utility model relates to the technical field of air conditioning, in particular to an auxiliary device for pressure testing of a split air conditioner system.

背景技术Background technique

在空调器新品开发、产品检测中,为了监控空调器运行时的状态,需要测试吸气压力和排气压力,即系统低压和系统高压。目前国内销售的制冷量3P以下家用分体式空调器外机大截止阀上有注氟嘴,可以连接压力检测设备测试压力。在制冷时,大截止阀为吸气管路,检测到的压力是低压。热泵制热时反之,检测到的是高压。为了测试制冷时的系统高压和热泵制热时系统低压,一般在空调器室外机连接管路上打孔,焊接一个用于测试压力的接口。使用此方法测试高压,破坏了空调器的管路结构,降低整机可靠性。In the development of new air conditioners and product testing, in order to monitor the state of the air conditioner during operation, it is necessary to test the suction pressure and exhaust pressure, that is, the system low pressure and system high pressure. At present, there is a fluorine injection nozzle on the large shut-off valve of the external unit of the domestic split air conditioner with a cooling capacity below 3P, which can be connected to the pressure testing equipment to test the pressure. When cooling, the large cut-off valve is the suction line, and the detected pressure is low pressure. On the contrary, when the heat pump is heating, it detects high pressure. In order to test the high pressure of the system during cooling and the low pressure of the system during heating of the heat pump, holes are generally drilled on the connecting pipe of the outdoor unit of the air conditioner, and a port for testing the pressure is welded. Using this method to test high pressure will damage the pipeline structure of the air conditioner and reduce the reliability of the whole machine.

实用新型内容Utility model content

鉴于现有技术的现状,本实用新型的目的在于提供一种用于分体式空调器系统压力测试的辅助装置,该辅助装置可以很方便的安装在分体式空调器内、外机连接管上,在不破坏空调器管路结构的情况下完成压力测试,避免了空调器报废,减少检测成本,且可以重复使用,提高测试效率和安全性。为实现上述目的,本实用新型的技术方案如下:In view of the status quo of the prior art, the purpose of this utility model is to provide an auxiliary device for the pressure test of the split air conditioner system. The auxiliary device can be easily installed on the connecting pipes of the inner and outer units of the split air conditioner. The pressure test is completed without destroying the pipeline structure of the air conditioner, avoiding the scrapping of the air conditioner, reducing the cost of testing, and can be reused to improve test efficiency and safety. In order to achieve the above object, the technical scheme of the utility model is as follows:

一种用于分体式空调器系统压力测试的辅助装置,适于串联在室外机的截止阀与连接管之间,包括总管和设置在所述总管中部并连通所述总管的支管,所述总管的第一端设置有外螺纹,所述第一端的端部设置有收缩的锥形面端口,所述总管的第一端用于连接所述连接管;An auxiliary device for pressure testing of a split air conditioner system, suitable for being connected in series between the shut-off valve of the outdoor unit and the connecting pipe, including a main pipe and a branch pipe arranged in the middle of the main pipe and connected to the main pipe, the main pipe The first end of the first end is provided with an external thread, and the end of the first end is provided with a tapered port that shrinks, and the first end of the manifold is used to connect to the connecting pipe;

所述总管的第二端套设有接管螺母,所述总管的第二端的端部还设置有用于连接所述截止阀的喇叭口;The second end of the main pipe is sleeved with a union nut, and the end of the second end of the main pipe is also provided with a bell mouth for connecting the shut-off valve;

所述支管上也设置外螺纹,用于连接压力测试设备,所述支管的端口内还设置有气门芯。The branch pipe is also provided with external threads for connecting pressure testing equipment, and a valve core is also provided in the port of the branch pipe.

在其中一个实施例中,所述总管的中心线与所述支管的中心线之间的夹角为80°-100°。In one of the embodiments, the included angle between the central line of the main pipe and the central line of the branch pipe is 80°-100°.

在其中一个实施例中,所述总管的中心线与所述支管的中心线之间的夹角为90°±5°。In one of the embodiments, the angle between the centerline of the main pipe and the centerline of the branch pipe is 90°±5°.

在其中一个实施例中,所述总管、所述支管和所述接管螺母均由黄铜制成。In one of the embodiments, the main pipe, the branch pipe and the union nut are all made of brass.

在其中一个实施例中,所述气门芯与所述支管螺纹连接。In one of the embodiments, the valve core is screwed to the branch pipe.

在其中一个实施例中,所述支管的端口处还设置有密封帽。In one of the embodiments, a sealing cap is also provided at the port of the branch pipe.

在其中一个实施例中,所述密封帽为六角螺帽。In one embodiment, the sealing cap is a hexagonal nut.

本实用新型的有益效果是:The beneficial effects of the utility model are:

本实用新型的用于分体式空调器系统压力测试的辅助装置,可以很方便的安装在分体式空调器内、外机连接管上,辅助装置的支管用于测试压力。辅助装置的主管的一端采用外螺纹结构,并有密封锥面,能和连接管喇叭口有效的密封。主管的另一端采用喇叭口结构,便于和空调器外机阀门有效的密封连接。压力测试接口内部采用气门芯结构,测试压力时软管内部的顶针打开开关,装置处于导通状态。The auxiliary device used for the pressure test of the split air conditioner system of the utility model can be conveniently installed on the connecting pipes of the inner and outer units of the split air conditioner, and the branch pipe of the auxiliary device is used for testing the pressure. One end of the main pipe of the auxiliary device adopts an external thread structure and has a sealing cone surface, which can effectively seal with the bell mouth of the connecting pipe. The other end of the main pipe adopts a bell mouth structure, which is convenient for effective sealing connection with the valve of the external unit of the air conditioner. The pressure test interface adopts a valve core structure inside. When the pressure is tested, the thimble inside the hose opens the switch, and the device is in a conduction state.

分体式空调器装机时,先把此辅助装置安装在小阀门上,其次把连接管安装在辅助装置主管的对应接口上,然后使用把压力测试设备连接到支管的接口上即可测试压力。使用此辅助装置可以在不破坏空调器管路结构的情况下完成压力测试,避免了空调器报废,减少检测成本,且可以重复使用。此辅助装置安装方便、快捷,节约了普通测试高压压力的常规准备工作,提高测试效率。避免了在空调器高压管路上开孔、焊接支管等工作,提高了压力测试的安全性。When installing the split-type air conditioner, first install the auxiliary device on the small valve, then install the connecting pipe on the corresponding interface of the main pipe of the auxiliary device, and then use the pressure testing equipment to connect to the interface of the branch pipe to test the pressure. The auxiliary device can be used to complete the pressure test without damaging the pipeline structure of the air conditioner, avoiding the scrapping of the air conditioner, reducing the detection cost, and can be reused. This auxiliary device is easy and quick to install, saves the routine preparation work for ordinary high pressure testing, and improves testing efficiency. It avoids the work of opening holes and welding branch pipes on the high-pressure pipeline of the air conditioner, and improves the safety of the pressure test.

附图说明Description of drawings

图1为本实用新型的用于分体式空调器系统压力测试的辅助装置一实施例的结构示意图。FIG. 1 is a schematic structural view of an embodiment of an auxiliary device for pressure testing of a split-type air conditioner system according to the present invention.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例对本实用新型的用于分体式空调器系统压力测试的辅助装置进行进一步详细说明。应当理解,此处所描述的具体实施例仅用于解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the auxiliary device for pressure testing of the split air conditioner system of the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, not to limit the utility model.

参照图1,本实用新型一实施例的用于分体式空调器系统压力测试的辅助装置,串联在室外机的截止阀与连接管之间,该辅助装置包括总管1和设置在总管1中部并连通总管1的支管2,总管1和支管2形成三通。Referring to Fig. 1, an auxiliary device for pressure testing of a split-type air conditioner system according to an embodiment of the present invention is connected in series between the shut-off valve of the outdoor unit and the connecting pipe. Connect the branch pipe 2 of the main pipe 1, and the main pipe 1 and the branch pipe 2 form a tee.

总管1的第一端设置有外螺纹,总管1的第一端的端部设置有收缩的锥形面端口11,总管1的第一端用于连接所述连接管。总管1的第二端套设有接管螺母3,总管1的第二端的端部还设置有用于连接所述截止阀的喇叭口12。总管1、支管2和接管螺母3均采用铜制成,优选采用黄铜制成。The first end of the main pipe 1 is provided with an external thread, and the end of the first end of the main pipe 1 is provided with a constricted conical surface port 11, and the first end of the main pipe 1 is used for connecting the connecting pipe. The second end of the main pipe 1 is sheathed with a union nut 3 , and the end of the second end of the main pipe 1 is also provided with a bell mouth 12 for connecting the shut-off valve. The main pipe 1, the branch pipe 2 and the union nut 3 are all made of copper, preferably brass.

其中,总管1的第一端作为连接管连接端口,总管1的第二端作为截止阀连接端口。总管1的中心线与支管2的中心线之间的夹角为80°-100°。优选地,总管1的中心线支管2的中心线之间的夹角为90°±5°。在总管1的中心线与支管2的中心线垂直时为最佳,便于加工和连接压力测试设备。Wherein, the first end of the main pipe 1 is used as the connection port of the connecting pipe, and the second end of the main pipe 1 is used as the connection port of the shut-off valve. The included angle between the centerline of the main pipe 1 and the centerline of the branch pipe 2 is 80°-100°. Preferably, the included angle between the centerlines of the centerline branch pipes 2 of the main pipe 1 is 90°±5°. It is best when the centerline of the main pipe 1 is perpendicular to the centerline of the branch pipe 2, which is convenient for processing and connecting pressure testing equipment.

支管2上也设置外螺纹,用于连接压力测试设备,支管2的端口内还设置有气门芯4。优选地,气门芯4与支管2螺纹连接。其中支管2的端口作为压力测试端口。The branch pipe 2 is also provided with an external thread for connecting pressure testing equipment, and the port of the branch pipe 2 is also provided with a valve core 4 . Preferably, the valve core 4 is threadedly connected with the branch pipe 2 . The port of branch pipe 2 is used as the pressure test port.

作为一种可实施方式,支管2的端口处还设置有密封帽5,用于防止支管2的端口泄漏。优选地,密封帽5为六角螺帽。As a possible implementation manner, a sealing cap 5 is also provided at the port of the branch pipe 2 to prevent leakage at the port of the branch pipe 2 . Preferably, the sealing cap 5 is a hexagonal nut.

上述实施例的辅助装置的具体使用过程如下:The concrete use process of the auxiliary device of above-mentioned embodiment is as follows:

A:该辅助装置的截止阀连接端口(图1中的下端)采用喇叭口结构,安装在分体式空调器室外机的截止阀上。本装置的喇叭口和截止阀锥面对接到位后,使用扳手把本装置上自带的接管螺母3打紧即可。阀门连接端口采用喇叭结构,能和空调器外机截止阀的锥面有效的密封。A: The connection port of the shut-off valve of the auxiliary device (the lower end in Figure 1) adopts a bell-mouth structure and is installed on the shut-off valve of the outdoor unit of the split air conditioner. After the bell mouth of the device and the cone surface of the shut-off valve are put in place, use a wrench to tighten the attached union nut 3 on the device. The valve connection port adopts a trumpet structure, which can effectively seal with the cone surface of the air conditioner external unit shut-off valve.

B:此辅助装置的连接管连接端口(图1中的上端)采用锥面结构,用于安装空调器内、外机连接管,连接管的喇叭口面对准此辅助装置的锥面端后,用连接管上自带的接管螺母紧固,用扳手打紧;连接管连接端口采用锥面外螺纹结构,能和连接管喇叭口有效的密封。B: The connection port of the connecting pipe of the auxiliary device (the upper end in Figure 1) adopts a conical surface structure, which is used to install the connecting pipes of the inner and outer units of the air conditioner, and the bell mouth of the connecting pipe is aligned with the tapered end of the auxiliary device , Tighten with the union nut that comes with the connecting pipe, and tighten with a wrench; the connecting port of the connecting pipe adopts a tapered external thread structure, which can effectively seal with the bell mouth of the connecting pipe.

C:此辅助装置的压力测试端口(图1中的右端)为外圈螺纹结构,内部为气门芯4,用于连接压力测试设备。连接压力测试设备可以采用专用软管,软管的接管螺母上有一个顶针,连接到压力测试端口上,气门芯4处以导通状态。压力测试接口内部采用气门芯结构,外圈有螺纹,便于连接压力测试设备。C: The pressure test port (the right end in Figure 1) of this auxiliary device is an outer ring thread structure, and the inner part is a valve core 4, which is used to connect pressure test equipment. A special hose can be used to connect the pressure test equipment. There is a thimble on the union nut of the hose, which is connected to the pressure test port, and the valve core 4 is in a conducting state. The pressure test interface adopts a valve core structure inside, and the outer ring is threaded, which is convenient for connecting pressure test equipment.

分体式空调器连接后,对连接管至室内机部分进行抽真空,并检测系统是否存在泄漏。如无泄漏,打开室外机的截止阀,连接压力测试设备即可进行压力检测。也可以在抽真空前连接压力测试设备,确认系统无泄漏后,打开室外机的截止阀,进行系统压力检测。After the split type air conditioner is connected, vacuumize the connecting pipe to the indoor unit, and check the system for leaks. If there is no leakage, open the shut-off valve of the outdoor unit and connect the pressure testing equipment for pressure testing. It is also possible to connect pressure testing equipment before vacuuming, and after confirming that there is no leakage in the system, open the shut-off valve of the outdoor unit for system pressure testing.

以上实施例的用于分体式空调器系统压力测试的辅助装置,可以很方便的安装在分体式空调器内、外机连接管上,辅助装置的支管用于测试压力。辅助装置的主管的一端采用外螺纹结构,并有密封锥面,能和连接管喇叭口有效的密封。主管的另一端采用喇叭口结构,便于和空调器外机阀门有效的密封连接。压力测试接口内部采用气门芯结构,测试压力时软管内部的顶针打开开关,装置处于导通状态。The auxiliary device for the pressure test of the split-type air conditioner system in the above embodiments can be easily installed on the connecting pipes of the inner and outer units of the split-type air conditioner, and the branch pipe of the auxiliary device is used for pressure testing. One end of the main pipe of the auxiliary device adopts an external thread structure and has a sealing cone surface, which can effectively seal with the bell mouth of the connecting pipe. The other end of the main pipe adopts a bell mouth structure, which is convenient for effective sealing connection with the valve of the external unit of the air conditioner. The pressure test interface adopts a valve core structure inside. When the pressure is tested, the thimble inside the hose opens the switch, and the device is in a conduction state.

分体式空调器装机时,先把此辅助装置安装在小阀门(截止阀)上,其次把连接管安装在辅助装置主管的对应接口上,然后使用把压力测试设备连接到支管的接口上即可测试压力。使用此辅助装置可以在不破坏空调器管路结构的情况下完成压力测试,避免了空调器报废,减少检测成本,且可以重复使用。此辅助装置安装方便、快捷,节约了普通测试高压压力的常规准备工作,提高测试效率。避免了在空调器高压管路上开孔、焊接支管等工作,提高了压力测试的安全性。When installing the split-type air conditioner, first install the auxiliary device on the small valve (stop valve), then install the connecting pipe on the corresponding interface of the main pipe of the auxiliary device, and then use the pressure test equipment to connect to the interface of the branch pipe. Test pressure. The auxiliary device can be used to complete the pressure test without damaging the pipeline structure of the air conditioner, avoiding the scrapping of the air conditioner, reducing the detection cost, and can be reused. This auxiliary device is easy and quick to install, saves the routine preparation work for ordinary high pressure testing, and improves testing efficiency. It avoids the work of opening holes and welding branch pipes on the high-pressure pipeline of the air conditioner, and improves the safety of the pressure test.

以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementations of the utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the scope of protection of the utility model patent should be based on the appended claims.

Claims (7)

1., for an auxiliary device for detachable air conditioner system pressure test, be suitable for being connected between the stop valve of outdoor unit and connecting tube, it is characterized in that:
Comprise house steward (1) and be arranged on described house steward (1) middle part and be communicated with the arm (2) of described house steward (1), the first end of described house steward (1) is provided with outside thread, the end of described first end is provided with the conical surface port (11) of contraction, and the first end of described house steward (1) is for connecting described connecting tube;
Second end of described house steward (1) is arranged with union nut (3), and the end of second end of described house steward (1) is also provided with the horn mouth (12) for connecting described stop valve;
(2) also arrange outside thread to described arm, for Bonding pressure testing apparatus, are also provided with valve inside (4) in the port of described arm (2).
2. the auxiliary device for the test of detachable air conditioner system pressure according to claim 1, is characterized in that:
Angle between the center line of described house steward (1) and the center line of described arm (2) is 80 °-100 °.
3. the auxiliary device for the test of detachable air conditioner system pressure according to claim 2, is characterized in that:
Angle between the center line of described house steward (1) and the center line of described arm (2) is 90 ° ± 5 °.
4. the auxiliary device for the test of detachable air conditioner system pressure according to claim 1, is characterized in that:
Described house steward (1), described arm (2) and described union nut (3) are made by brass.
5. the auxiliary device for the test of detachable air conditioner system pressure according to any one of claim 1-4, is characterized in that:
Described valve inside (4) is threaded with described arm (2).
6. the auxiliary device for the test of detachable air conditioner system pressure according to any one of claim 1-4, is characterized in that:
The port of described arm (2) is also provided with sealed cap (5).
7. the auxiliary device for the test of detachable air conditioner system pressure according to claim 6, is characterized in that:
Described sealed cap (5) is hexagon nut.
CN201420836691.4U 2014-12-24 2014-12-24 Auxiliary device for pressure test of split air conditioner system Expired - Lifetime CN204387555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420836691.4U CN204387555U (en) 2014-12-24 2014-12-24 Auxiliary device for pressure test of split air conditioner system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420836691.4U CN204387555U (en) 2014-12-24 2014-12-24 Auxiliary device for pressure test of split air conditioner system

Publications (1)

Publication Number Publication Date
CN204387555U true CN204387555U (en) 2015-06-10

Family

ID=53360275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420836691.4U Expired - Lifetime CN204387555U (en) 2014-12-24 2014-12-24 Auxiliary device for pressure test of split air conditioner system

Country Status (1)

Country Link
CN (1) CN204387555U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111322481A (en) * 2020-03-26 2020-06-23 宁波奥克斯电气股份有限公司 Tooling equipment for air conditioner test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111322481A (en) * 2020-03-26 2020-06-23 宁波奥克斯电气股份有限公司 Tooling equipment for air conditioner test

Similar Documents

Publication Publication Date Title
CN205781521U (en) The sulfur hexafluoride gas detection joint of the anti-pressure release of energy
CN203963319U (en) Redundancy sealing pipeline connector
CN204514558U (en) A kind of tube bundle heat exchanger quick leak-checking instrument
CN204165884U (en) A kind of corrosive pipeline rate detection hanger device
CN203422188U (en) Gas pressure detection assembly
CN203979895U (en) A test device for the sealing effect of pipeline under pressure
CN204729806U (en) A kind of pipeline is tightly connected device
CN217926233U (en) Portable electric pressure test pump
CN205908903U (en) Take screw ferrule in pressure release hole
CN204725366U (en) A kind of tubing special fixture for hydrostatic tester
CN204922281U (en) Gas seal for pipe joints structure
CN205246296U (en) Pipeline microleakage detection device
CN211082993U (en) Air tightness detection structure of large-diameter cryogenic valve with thread
CN205078983U (en) Interim plugging device of large diameter pipeline
CN204255597U (en) Plastic fuel tank low temperature fall-down test plugging device
CN203879708U (en) Vacuumizing device
CN207556765U (en) Fuel cell car hydrogen leaks fast leakage detection apparatus
CN208254552U (en) A kind of thermal test flow differential pressure transmitter attachment device
CN206802429U (en) Exhaust apparatus with fast interface
CN207729094U (en) A kind of multiplex roles oil filter quick coupling
CN203162381U (en) Pressure transmitter fast connection device
CN201836567U (en) Elastic joint structure of ice storage device
CN204788831U (en) Device that leaks hunting of high -pressure gas spare part
CN209656233U (en) A kind of novel pipeline pressure testing/detecting device
CN205748818U (en) Detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150610