CN204366143U - Double-hole tube processing unit (plant) - Google Patents
Double-hole tube processing unit (plant) Download PDFInfo
- Publication number
- CN204366143U CN204366143U CN201420805326.7U CN201420805326U CN204366143U CN 204366143 U CN204366143 U CN 204366143U CN 201420805326 U CN201420805326 U CN 201420805326U CN 204366143 U CN204366143 U CN 204366143U
- Authority
- CN
- China
- Prior art keywords
- double
- hole pipe
- knife
- planers
- processing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 abstract description 6
- 238000003754 machining Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Automatic Tool Replacement In Machine Tools (AREA)
Abstract
本实用新型公开了一种双孔管加工装置,包括刀盒及夹具,所述刀盒包括多个刀架、以及与该多个刀架一一对应并分别安装在该多个刀架上的多个刨刀;所述夹具设置在工作台上,该夹具每排夹持与刨刀数量相同的双孔管工件,以供刀架上的多个刨刀分别对应一个双孔管工件并同时进行刨削加工。该种双孔管加工装置能够提升双孔管工件的加工效率,且多个刨刀同时加工出的多个双孔管工件之间尺寸差异小,方便后续装配环节时将双孔管工件两两精准的装配拼焊在一起。
The utility model discloses a double-hole pipe processing device, which comprises a knife box and a fixture. The knife box includes a plurality of tool rests, and one-to-one correspondence with the plurality of knife rests and is respectively installed on the plurality of knife rests. A plurality of planers; the fixture is arranged on the workbench, and each row of the fixture holds the same number of double-hole pipe workpieces as the number of planers, so that the multiple planers on the tool holder respectively correspond to a double-hole pipe workpiece and plan at the same time processing. This kind of double-hole pipe processing device can improve the processing efficiency of double-hole pipe workpieces, and the size difference between multiple double-hole pipe workpieces processed by multiple planers at the same time is small, which is convenient for the double-hole pipe workpieces to be accurately matched in pairs in the subsequent assembly process. The assembly is tailored and welded together.
Description
技术领域 technical field
本实用新型涉及一种型材加工装置,具体涉及一种适用于双孔管加工的刨削装置。 The utility model relates to a profile processing device, in particular to a planing device suitable for processing double-hole pipes.
背景技术 Background technique
传统的双孔管刨削加工,是在刨床上安装一把刨刀后,利用刨刀进行平面和圆弧槽的刨削加工,该加工装置主要有两点不足:1、由于双孔管属于大批量生产的零件,此方法装夹换料频繁、加工周期长、加工效率低下,给双孔管工件的生产制造周期带来很大影响;2、由于双孔管零件最终是两两装配拼焊在一起,传统的单件加工会使各个加工的工件之间尺寸差异不同,而尺寸公差的影响会给后续装配环节带来困难。 The traditional planing process of double-hole pipe is to install a planer on the planer, and use the planer to plan the plane and arc groove. For the parts produced, this method has frequent clamping and refueling, long processing cycle, and low processing efficiency, which has a great impact on the production cycle of the double-hole tube workpiece; 2. Because the double-hole tube parts are finally assembled and welded in pairs At the same time, the traditional single-piece processing will cause different dimensional differences between the processed workpieces, and the influence of dimensional tolerances will bring difficulties to the subsequent assembly process.
实用新型内容 Utility model content
针对现有技术的不足,本实用新型的目的旨在提供一种高效、精准的双孔管加工装置。 Aiming at the deficiencies of the prior art, the purpose of the utility model is to provide an efficient and precise double-hole tube processing device.
为实现上述目的,本实用新型采用如下技术方案: In order to achieve the above object, the utility model adopts the following technical solutions:
一种双孔管加工装置,包括刀盒及夹具,所述刀盒包括多个刀架、以及与该多个刀架一一对应并分别安装在该多个刀架上的多个刨刀;所述夹具设置在工作台上,该夹具每排夹持与刨刀数量相同的双孔管工件,以供刀架上的多个刨刀分别对应一个双孔管工件并同时进行刨削加工。 A double-hole tube processing device, comprising a knife box and a fixture, the knife box includes a plurality of tool holders, and a plurality of planers corresponding to the plurality of tool holders one by one and installed on the plurality of tool holders; The fixture is arranged on the workbench, and each row of the fixture clamps the same number of double-hole pipe workpieces as the number of planers, so that a plurality of planers on the tool holder respectively correspond to a double-hole pipe workpiece and perform planing processing at the same time.
进一步的,该刀盒包括三个刀架、以及与该三个刀架一一对应、并分别安装在该三个刀架上的三个刨刀。 Further, the knife box includes three knife holders, and three planers corresponding to the three knife holders and installed on the three knife holders respectively.
进一步的,该刀盒的三个刀架呈一字排列,中间的刀架为固定刀架,两侧的刀架为活动刀架。 Further, the three knife holders of the knife box are arranged in a line, the middle knife holder is a fixed knife holder, and the knife holders on both sides are movable knife holders.
进一步的,所述活动刀架可分别经由一个螺钉来调节该刀架与其他刀架之间的距离。 Further, the distance between the movable tool holder and other tool holders can be adjusted via a screw respectively.
本实用新型的有益效果在于: The beneficial effects of the utility model are:
相比于现有技术,本实用新型提供的双孔管加工装置能够提升双孔管工件的加工效率,且多个刨刀同时加工出的多个双孔管工件之间尺寸差异小,方便后续装配环节时将双孔管工件两两精准的装配拼焊在一起。 Compared with the prior art, the double-hole pipe processing device provided by the utility model can improve the processing efficiency of double-hole pipe workpieces, and the size difference between multiple double-hole pipe workpieces processed by multiple planers at the same time is small, which is convenient for subsequent assembly During the link, the two-hole pipe workpieces are accurately assembled and welded together in pairs.
附图说明 Description of drawings
图1是本实用新型实施例提供的装配在刨床上的双孔管加工装置结构示意图。 Fig. 1 is a schematic structural diagram of a double-hole pipe processing device assembled on a planer provided by an embodiment of the present invention.
具体实施方式 Detailed ways
下面,结合附图以及具体实施方式,对本实用新型做进一步描述: Below, in conjunction with accompanying drawing and specific embodiment, the utility model is described further:
请参见图1,本实用新型提供的双孔管加工装置10,包括刀盒11及夹具12。刀盒11与刨床20有专用接口,从而可方便地装卸在刨床20上。 Please refer to FIG. 1 , the double-hole pipe processing device 10 provided by the present invention includes a knife box 11 and a clamp 12 . The knife box 11 has a dedicated interface with the planer 20, so that it can be easily loaded and unloaded on the planer 20.
所述刀盒11包括多个刀架、以及与该多个刀架一一对应并分别安装在该多个刀架上的多个刨刀。 The knife box 11 includes a plurality of knife holders, and a plurality of planers corresponding to the plurality of knife holders and mounted on the plurality of knife holders respectively.
经过加工试验论证,同时安装四把或者多于四把刨刀进行刨削时,刀具悬伸长,刚性差,加工时难以保证工件表面高精度要求。因此,在双孔管工件的加工精度要求较高时,优选的,所述刀盒11包括两个或者三个刨刀。 It has been demonstrated through processing experiments that when four or more planing knives are installed at the same time for planing, the overhang of the knives is long and the rigidity is poor, and it is difficult to ensure the high precision requirements of the workpiece surface during processing. Therefore, when the machining precision of the double-hole tube workpiece is required to be high, preferably, the knife box 11 includes two or three planers.
鉴于“同时安装二把刨刀进行刨削时,虽可以满足加工要求,但提升加工效率不大;同时安装三把刨刀进行刨削时,可在满足工件加工精度要求的同时,最大化的提高加工效率”,本实施例中,所述刀盒11包括三个刀架110、112、114,以及与该三个刀架110、112、114一一对应并分别安装在该三个刀架110、112、114上的三个刨刀111、113、115。 In view of the fact that "when two planers are installed at the same time for planing, although the processing requirements can be met, the processing efficiency is not greatly improved; when three planers are installed for planing at the same time, the machining accuracy can be satisfied while the machining accuracy can be maximized. Efficiency", in this embodiment, the knife box 11 includes three knife rests 110, 112, 114, and one-to-one correspondence with the three knife rests 110, 112, 114 and are respectively installed on the three knife rests 110, 114, Three planers 111,113,115 on 112,114.
优选的,本实施例中,该刀盒11的三个刀架110、112、114呈一字排列,中间的刀架112为固定刀架,两侧的刀架110、114为活动刀架。 Preferably, in this embodiment, the three knife holders 110, 112, 114 of the knife box 11 are arranged in a line, the middle knife holder 112 is a fixed knife holder, and the knife holders 110, 114 on both sides are movable knife holders.
具体的,所述活动的刀架110、114可分别经由一个螺钉116来调节该刀架110/114与刀架112之间的距离,从而调整各个刨刀刀尖之间的距离。 Specifically, the movable tool holders 110, 114 can adjust the distance between the tool holders 110/114 and the tool holder 112 via a screw 116, so as to adjust the distance between the blade tips of each planer.
所述夹具12设置在工作台(图未示)上,其可采用螺钉120和斜块122来夹紧工件。该夹具12每排可夹持的双孔管工件数目与刨刀数目相同,以供刀架上的多个刨刀分别对应一个双孔管工件并同时进行刨削加工。 The fixture 12 is arranged on a workbench (not shown in the figure), and can use screws 120 and inclined blocks 122 to clamp the workpiece. The number of double-hole pipe workpieces that can be clamped by each row of the fixture 12 is the same as the number of planers, so that a plurality of planers on the tool holder correspond to a double-hole pipe workpiece and planing simultaneously.
本实施例中,夹具12用于夹持六个双孔管工件30,每排的双孔管工件为三个,以供刀架110、112、114上的三个刨刀111、113、115分别对应一个双孔管工件并同时进行刨削加工。 In this embodiment, the fixture 12 is used to clamp six double-hole tube workpieces 30, and there are three double-hole tube workpieces in each row, for the three planers 111, 113, 115 on the tool holders 110, 112, 114 respectively Corresponding to a double-hole pipe workpiece and performing planing processing at the same time.
由于刀盒11包括多个刀架以及安装在刀架上的多个刨刀,所述夹具每排夹持与刨刀数量相同的双孔管工件,以供刀架上的多个刨刀分别对应一个双孔管工件并同时进行刨削加工,能够提升双孔管工件的加工效率,且多个刨刀同时加工出的多个双孔管工件之间尺寸差异小,方便后续装配环节时将双孔管工件两两精准的装配拼焊在一起。 Since the cutter box 11 includes a plurality of cutter rests and a plurality of planers installed on the cutter rest, each row of the clamps holds the same double-hole tube workpieces as the number of planers, so that a plurality of planers on the cutter holder correspond to a double-hole tube workpiece respectively. Hole pipe workpieces are planed at the same time, which can improve the processing efficiency of double-hole pipe workpieces, and the size difference between multiple double-hole pipe workpieces processed by multiple planers at the same time is small, which is convenient for the double-hole pipe workpieces to be assembled in the subsequent assembly process. Two by two precise assembly and welding together.
对于本领域的技术人员来说,可根据以上描述的技术方案以及构思,做出其它各种相应的改变以及变形,而所有的这些改变以及变形都应该属于本实用新型权利要求的保护范围之内。 For those skilled in the art, various other corresponding changes and modifications can be made according to the technical solutions and ideas described above, and all these changes and modifications should fall within the protection scope of the claims of the present invention .
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420805326.7U CN204366143U (en) | 2014-12-17 | 2014-12-17 | Double-hole tube processing unit (plant) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420805326.7U CN204366143U (en) | 2014-12-17 | 2014-12-17 | Double-hole tube processing unit (plant) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204366143U true CN204366143U (en) | 2015-06-03 |
Family
ID=53322392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420805326.7U Expired - Lifetime CN204366143U (en) | 2014-12-17 | 2014-12-17 | Double-hole tube processing unit (plant) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204366143U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113145913A (en) * | 2021-04-25 | 2021-07-23 | 佛山市国洪金属制品有限公司 | Pipe fitting keyway planer |
CN119657993A (en) * | 2025-02-21 | 2025-03-21 | 山西富亨迪新材料股份有限公司 | Magnesium ingot planing device |
-
2014
- 2014-12-17 CN CN201420805326.7U patent/CN204366143U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113145913A (en) * | 2021-04-25 | 2021-07-23 | 佛山市国洪金属制品有限公司 | Pipe fitting keyway planer |
CN119657993A (en) * | 2025-02-21 | 2025-03-21 | 山西富亨迪新材料股份有限公司 | Magnesium ingot planing device |
CN119657993B (en) * | 2025-02-21 | 2025-05-23 | 山西富亨迪新材料股份有限公司 | Magnesium ingot planing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104339201B (en) | A kind of Special clamping device of rod-shaped articles processing | |
CN204262641U (en) | A kind of weld jig | |
CN204366143U (en) | Double-hole tube processing unit (plant) | |
CN201997722U (en) | Combined Tool Holder for Motor End Cover Machining | |
CN203831132U (en) | Locating seat | |
CN207267160U (en) | A kind of clamping device of thin-walled parts | |
CN205888951U (en) | Centering mechanism device | |
CN205147984U (en) | CNC processing burr rapid removal device | |
CN203092188U (en) | A fixture with reference positioning for milling machine | |
CN203578793U (en) | Cutter | |
CN206925596U (en) | Work pieces process fixed jig | |
CN206598117U (en) | A kind of lathe is with multiple parts fixation locators | |
CN203495273U (en) | Spalling prevention centering expansive force clamp | |
CN204413174U (en) | Tools for alignment of workpiece face repair | |
CN204053527U (en) | A kind of thermostat housing turning attachment | |
CN204262817U (en) | A kind of fixture for machine tool | |
CN204195308U (en) | A kind of supporting base slot fixture | |
CN205147917U (en) | A cutting positioning device | |
CN203712335U (en) | Boring and face milling machining tool | |
CN202479839U (en) | Turning device for processing centre cylinder of air pre-heater of power station | |
CN103302311B (en) | Machining method for turning regular triangular pyramid or right-angled triangular pyramid | |
CN204621280U (en) | Apply to the fast fixture of EDM | |
CN205630592U (en) | Device of cylinder surface groove | |
CN204339344U (en) | A kind of novel can the fraise jig device of Fast Installation | |
CN205702985U (en) | Bracket processing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150603 |
|
CX01 | Expiry of patent term |