CN204339163U - A kind of welding tooling of track traffic brakes rack construction part - Google Patents
A kind of welding tooling of track traffic brakes rack construction part Download PDFInfo
- Publication number
- CN204339163U CN204339163U CN201420660131.8U CN201420660131U CN204339163U CN 204339163 U CN204339163 U CN 204339163U CN 201420660131 U CN201420660131 U CN 201420660131U CN 204339163 U CN204339163 U CN 204339163U
- Authority
- CN
- China
- Prior art keywords
- locating
- pedestal
- locating pieces
- pieces
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000003466 welding Methods 0.000 title claims abstract description 34
- 238000010276 construction Methods 0.000 title claims abstract 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract 20
- 230000007306 turnover Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 11
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 230000002787 reinforcement Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 230000002441 reversible effect Effects 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 238000012937 correction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000002427 irreversible effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及焊接工装,特别是一种轨道交通制动系统机架结构件的焊接工装。 The utility model relates to a welding tool, in particular to a welding tool for a rail traffic braking system frame structure.
背景技术 Background technique
随着轨道交通业务的高速发展,列车的多次提速,对轨道交通结构件的性能要求也越来越高,传统的手工拼装已无法满足其尺寸的保证与平面度要求,因此设计一种可行的组焊工装势在必行。 With the rapid development of rail transit business and the multiple speed-ups of trains, the performance requirements for rail transit structural parts are getting higher and higher. Traditional manual assembly can no longer meet the size guarantee and flatness requirements. Therefore, it is feasible to design a It is imperative to assemble welding equipment.
现有一种轨道交通制动系统机架结构件为船型架,放置于高铁底部,起到对于电器元件的支撑作用。如图1-3所示,该结构件由主板A、头部横梁B、左加强板C、右加强板D、中部横梁一E、中部横梁二F、加强板G和安装座H焊接组成,多个零件需要在多个位置和角度实现定位和焊接且需要保持较高精确度。此件装于高铁上某特定部位,故对零部件的装配尺寸有较高精度要求,对零件的平面度、垂直度也有一定要求。传统的手工拼装已无法保证尺寸的精度及零件的平面度、垂直度。 An existing rail transit braking system frame structure is a boat-shaped frame, which is placed at the bottom of the high-speed rail to support electrical components. As shown in Figure 1-3, the structural part is composed of main board A, head beam B, left reinforcement board C, right reinforcement board D, middle beam 1 E, middle beam 2 F, reinforcement board G and mounting seat H welded together. Multiple parts need to be positioned and welded at multiple positions and angles with high precision. This part is installed in a specific part of the high-speed rail, so there are high precision requirements for the assembly dimensions of the parts, and certain requirements for the flatness and verticality of the parts. Traditional manual assembly can no longer guarantee the accuracy of dimensions and the flatness and verticality of parts.
实用新型内容 Utility model content
本实用新型的目的在于提供一种轨道交通制动系统机架结构件的焊接工装,主要解决轨道交通结构件的装配定位焊接的技术问题,它能提高焊接制品的精度,保证其互换性,提高劳动生产率,降低制造成本,减轻劳动强度,保障安全生产。 The purpose of the utility model is to provide a welding tool for rail transit brake system frame structural parts, which mainly solves the technical problems of assembly and positioning welding of rail transit structural parts. It can improve the precision of welded products and ensure their interchangeability. Improve labor productivity, reduce manufacturing costs, reduce labor intensity, and ensure safe production.
为实现上述目的,本实用新型是这样实现的。 To achieve the above object, the utility model is achieved in this way.
一种轨道交通制动系统机架结构件的焊接工装,其特征在于:它包括翻转平台和连接在翻转平台上可翻转的基座;该基座上的前后两侧之间依次设置两个L定位块一、两个L定位块二和两个L定位块三,两个L定位块一、两个L定位块二和两个L定位块三的均通过气安装面安装在基座上,两个L定位块一、两个L定位块二和两个L定位块三的定位面均为相对设置,且同一侧的一个定位块一、一个L定位块二和一个L定位块三的定位面均在同一基准面上;在两个L定位块一之间的基座上设有四个垫块一,在两个L定位块二之间的基座上设有配置插销一的两个垫块二,在两个L定位块三之间的基座上设有四个垫块三;该基座的左右两侧各设置两个定位支座,该定位支座上均配置有插销二。 A welding tool for a frame structure of a rail transit braking system, characterized in that it includes an overturning platform and a reversible base connected to the overturning platform; two L Positioning block 1, two L positioning blocks 2 and two L positioning blocks 3, two L positioning blocks 1, two L positioning blocks 2 and two L positioning blocks 3 are all installed on the base through the air mounting surface, The positioning surfaces of two L positioning blocks 1, two L positioning blocks 2 and two L positioning blocks 3 are set oppositely, and the positioning of one positioning block 1, one L positioning block 2 and one L positioning block 3 on the same side The surfaces are all on the same datum plane; on the base between the two L positioning blocks 1, there are four pads 1, and on the base between the two L positioning blocks 2, there are two bolts 1 configured. Pad block 2, four pads 3 are arranged on the base between the two L positioning blocks 3; .
所述的轨道交通制动系统机架结构件的焊接工装,其特征在于:该焊接工装具有对应各压块的连接座,还具有卡规。 The welding tool for the frame structure of the rail transit braking system is characterized in that the welding tool has a connecting seat corresponding to each pressing block, and also has a caliper.
本实用新型的组焊工装在实施轨道交通结构件的组装定位焊接操作时的优点是。 The advantage of the assembly welding tool of the present utility model when implementing the assembly positioning welding operation of rail transit structural parts is that.
1、提高焊接制品的精度,保证其互换性。在装配定位焊时,如果不使用工装夹具,即使组合件是由几个零件组成的,欲保证各零件精确的相对位置,也是不可能的。此外,在焊接过程中,焊件往往会产生变形,尤其是复杂的结构,其变形有时会达到无法消除的程度,就会影响到后面总装配上作,甚至造成产品报废。采用工装夹具,不仅可以保证装配定位焊时,各零件正确的相对位置,而且可以防止或减少工件的焊接变形。尤其是批量生产时,可以稳定焊接质量,减少焊件尺寸偏差,保证产品的互换性。 1. Improve the precision of welding products and ensure their interchangeability. When assembling tack welding, if fixtures are not used, even if the assembly is composed of several parts, it is impossible to ensure the precise relative position of each part. In addition, during the welding process, the weldments are often deformed, especially for complex structures, and the deformation sometimes reaches an irreversible level, which will affect the final assembly and even cause the product to be scrapped. The use of fixtures can not only ensure the correct relative position of each part when assembling tack welding, but also prevent or reduce the welding deformation of the workpiece. Especially in mass production, it can stabilize the welding quality, reduce the size deviation of weldments, and ensure the interchangeability of products.
2、提高劳动生产率,降低制造成本。焊接结构生产过程一般包括:准备 (焊接材料的清洗、烘干、工件开坡口等),装配(对正、定位、夹紧或点固焊等),焊接,清理(从工装夹具上卸除工件,清除焊渣等),检验,焊后热处理及矫正,最后检验等工序。焊前和焊后各项辅助工序的劳动量往往超过焊接工序本身。因此,提高劳动生产率最有效的措施是减少辅助工序的时间。在焊接结构生产中,由于焊件的复杂程度不同,纯焊接时间仅占产品全部加工时间的10%~30%,其余为备料、装配及辅助工作等时间。如果采用高效率的焊接工装夹具,使辅助时间减少到20min,那么劳动生产率就可以提高40%。显然,欲缩短生产周期,提高劳动生产率,除了采用自动化焊接工艺外,还要采用先进的装配工艺,采用机械化和自动化程度高的工装夹具。 2. Improve labor productivity and reduce manufacturing costs. The production process of welded structures generally includes: preparation (cleaning, drying of welding materials, beveling of workpiece, etc.), assembly (alignment, positioning, clamping or spot welding, etc.), welding, cleaning (removal from the fixture Workpiece, removal of welding slag, etc.), inspection, post-weld heat treatment and correction, final inspection and other processes. The labor load of various auxiliary processes before and after welding often exceeds the welding process itself. Therefore, the most effective measure to increase labor productivity is to reduce the time of auxiliary processes. In the production of welded structures, due to the different complexity of weldments, pure welding time only accounts for 10% to 30% of the total processing time of the product, and the rest is time for material preparation, assembly and auxiliary work. If high-efficiency welding fixtures are used to reduce the auxiliary time to 20 minutes, the labor productivity can be increased by 40%. Obviously, in order to shorten the production cycle and improve labor productivity, in addition to the use of automated welding processes, advanced assembly processes must be adopted, and fixtures with high mechanization and automation levels should be used.
3、减轻劳动强度,保障安全生产。采用工装夹具,工件定位快速,装夹方便、省力,减轻了焊件装配定位和夹紧时的繁重体力劳动,劳动条件大为改善,同时有利于焊接生产安全管理。 3. Reduce labor intensity and ensure safe production. With the use of fixtures, the positioning of the workpiece is fast, the clamping is convenient and labor-saving, and the heavy physical labor during the assembly, positioning and clamping of the weldment is reduced, the working conditions are greatly improved, and it is also conducive to the safety management of welding production.
附图说明 Description of drawings
图1是轨道交通制动系统机架结构件的立体图。 Fig. 1 is a perspective view of a frame structure of a rail transit braking system.
图2是轨道交通制动系统机架结构件的右结构示意图。 Fig. 2 is a schematic diagram of the right structure of the frame structure of the rail transit braking system.
图3是轨道交通制动系统机架结构件的俯视结构示意图。 Fig. 3 is a top structural schematic diagram of the frame structure of the rail transit braking system.
图4是本实用新型的立体图。 Fig. 4 is a perspective view of the utility model.
图5是本实用新型的正面结构示意图。 Fig. 5 is a schematic diagram of the front structure of the utility model.
图6是本实用新型的俯视结构示意图。 Fig. 6 is a schematic top view of the utility model.
图7是本实用新型的使用状态示意图一。 Fig. 7 is a schematic diagram of the first use state of the utility model.
图8是本实用新型的使用状态示意图二。 Fig. 8 is a second schematic diagram of the use state of the utility model.
图9是本实用新型的使用状态示意图三。 Fig. 9 is a schematic diagram of the third use state of the utility model.
图10是本实用新型的使用状态立体图。 Fig. 10 is a perspective view of the utility model in use.
具体实施方式 Detailed ways
请参阅图4-6,本实用新型公开了一种轨道交通制动系统机架结构件的焊接工装。如图所示:它包括翻转平台1和连接在翻转平台上可翻转的基座2;该基座2上的前后两侧之间依次设置两个L定位块一3、两个L定位块二4和两个L定位块三5,两个L定位块一3、两个L定位块二4和两个L定位块三5的均通过气安装面安装在基座2上,两个L定位块一3、两个L定位块二4和两个L定位块5的定位面均为相对设置,且同一侧的一个定位块一3、一个L定位块二4和一个L定位块三5的定位面均在同一基准面上;在两个L定位块一3之间的基座2上设有四个垫块一7,在两个L定位块二4之间的基座2上设有配置插销一10的两个垫块二8,在两个L定位块三5之间的基座2上设有四个垫块三9;该基座2的左右两侧各设置两个定位支座6,该定位支座9上均配置有插销二11。 Please refer to Fig. 4-6, the utility model discloses a welding tool for a rail transit braking system frame structure. As shown in the figure: it includes an overturning platform 1 and a reversible base 2 connected to the overturning platform; two L positioning blocks one 3 and two L positioning blocks two are arranged in sequence between the front and rear sides of the base 2 4 and two L positioning blocks three 5, two L positioning blocks one 3, two L positioning blocks two 4 and two L positioning blocks three 5 are all installed on the base 2 through the air mounting surface, two L positioning blocks The positioning surfaces of block one 3, two L positioning blocks two 4 and two L positioning blocks 5 are relatively arranged, and one positioning block one 3, one L positioning block two 4 and one L positioning block three 5 on the same side The positioning surfaces are all on the same datum plane; on the base 2 between the two L positioning blocks one 3 are provided with four spacers one 7, on the base 2 between the two L positioning blocks two 4 are provided Two pads two 8 of configuration latch one 10 are provided with four pads three 9 on the base 2 between two L positioning blocks three 5; Seat 6, all are equipped with latch two 11 on this positioning support 9.
该焊接工装具有对应各压块的连接座,还具有卡规。 The welding tool has connecting seats corresponding to each pressing block, and also has snap gauges.
设定:基座2上指定上北下南左西右东,设定三维分别由北到南为X轴,底板朝上为Y轴,由东到西为Z轴。 Setting: Specify up, north, down, south, left, west, and right east on the base 2, set the three-dimensional direction from north to south as the X axis, with the base plate facing up as the Y axis, and from east to west as the Z axis.
使用本实用新型对轨道交通制动系统机架结构件的具体装配过程是:将4个矩形安装座H装配工装上,Y方向上水平放置于定位支座6和插销二11上,东西侧分别对4个安装座H用插销二进行定位,南北方向靠紧北侧的定位支座6、插销二11上的凹槽内,用F钳夹紧;将主板A放置于工装上水平面上,使其靠紧北侧的L定位块一3、L定位块二4和L定位块三5,东西方向使用L定位块一3、L定位块二4和L定位块三5上的插销一10,用F钳夹紧固 定;置头部横梁B共2件于工装东西侧各1件,使其北侧靠紧主板A,东西方向定位采用插入安装座H中的长形条中,用F型夹夹紧;装配中部横梁二F于工装上,使其北侧靠紧主板A,东侧紧靠垫块三9,通过垫块二8上的活动螺丝紧固;装配中部横梁一E于工装上,使其北侧靠紧主板A,西侧紧靠头垫块一7;在主板A和头部横梁B之间装2个左加强板C,紧靠头部横梁B件;装配2件右加强板D于工装上,紧靠头部横梁B,用F钳夹紧;将加强板G装配在工装上,通过垫块三8保证零件装配的高度和东西方向的位置,紧靠主板A,并用插销一10固定;点固以上所述主板A、头部横梁B、左加强板C、右加强板D、中部横梁一E、中部横梁二F、加强板G和安装座H。 The specific assembly process of using the utility model to the frame structure of the rail transit braking system is: put the 4 rectangular mounting bases H on the assembly tooling, place them horizontally on the positioning support 6 and the latch 2 11 in the Y direction, and place them on the east and west sides respectively. Position the 4 mounting bases H with pin 2, close the north-south direction to the groove on the positioning support 6 and pin 2 11 on the north side, and clamp with F pliers; place the main board A on the horizontal surface of the tooling, so that It is close to the L positioning block one 3, the L positioning block two 4 and the L positioning block three 5 on the north side, and the east-west direction uses the latch one 10 on the L positioning block one 3, the L positioning block two 4 and the L positioning block three 5, Clamp and fix with F clamps; place two pieces of head beam B on the east and west sides of the tooling, one piece each, so that the north side is close to the main board A, and the east-west direction is positioned by inserting into the long strip in the mounting seat H, using F clamp; assemble the middle crossbeam 2F on the tooling so that the north side is close to the main board A, and the east side is close to the pad 39, fastened by the movable screw on the pad 28; assemble the middle beam 1E on the tooling Make the north side close to the main board A, and the west side close to the head pad 17; install 2 left reinforcing plates C between the main board A and the head beam B, and close to the head beam B; assemble 2 pieces The right reinforcing plate D is placed on the tooling, close to the head beam B, and clamped with F pliers; assemble the reinforcing plate G on the tooling, and ensure the assembly height and the position of the parts in the east-west direction through the spacer 3, and it is close to the main board A , and fix with latch one 10; Point solid above-mentioned main board A, head crossbeam B, left reinforcement board C, right reinforcement board D, middle part crossbeam one E, middle part crossbeam two F, reinforcement board G and mounting seat H.
至此,该部件的各个零件已点焊固定好,然后在对应的焊接部位进行焊接,焊接完之后将该部件从工装上卸下来,对于不能在工装上焊接的部位,待部件从工装上卸下来之后进行焊接,用卷尺测量各零部件的相对尺寸、平面度、垂直度,其尺寸保证相对较好。之后对部件进行整形,以达到产品的质量要求(如图7-10)。 So far, each part of the component has been spot welded and fixed, and then welded at the corresponding welding position. After welding, the component is removed from the tooling. For parts that cannot be welded on the tooling, the parts are removed from the tooling After that, welding is carried out, and the relative size, flatness, and verticality of each component are measured with a tape measure, and the size guarantee is relatively good. After that, the parts are shaped to meet the quality requirements of the product (as shown in Figure 7-10).
综上所述仅为本实用新型的较佳实施例而已,并非用来限定本实用新型的实施范围。即凡依本实用新型申请专利范围的内容所作的等效变化与修饰,都应为本实用新型的技术范畴。 To sum up, the above are only preferred embodiments of the present utility model, and are not intended to limit the implementation scope of the present utility model. That is, all equivalent changes and modifications made according to the content of the patent scope of the utility model should be within the technical category of the utility model.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420660131.8U CN204339163U (en) | 2014-11-06 | 2014-11-06 | A kind of welding tooling of track traffic brakes rack construction part |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420660131.8U CN204339163U (en) | 2014-11-06 | 2014-11-06 | A kind of welding tooling of track traffic brakes rack construction part |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204339163U true CN204339163U (en) | 2015-05-20 |
Family
ID=53222465
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420660131.8U Expired - Lifetime CN204339163U (en) | 2014-11-06 | 2014-11-06 | A kind of welding tooling of track traffic brakes rack construction part |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204339163U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105364345A (en) * | 2015-11-17 | 2016-03-02 | 重庆市华青汽车配件有限公司 | Supporting frame of welding clamp of mini-truck longitudinal beam assembly |
| CN105364368A (en) * | 2015-11-17 | 2016-03-02 | 重庆市华青汽车配件有限公司 | Welding clamp of mini-truck longitudinal beam assembly |
-
2014
- 2014-11-06 CN CN201420660131.8U patent/CN204339163U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105364345A (en) * | 2015-11-17 | 2016-03-02 | 重庆市华青汽车配件有限公司 | Supporting frame of welding clamp of mini-truck longitudinal beam assembly |
| CN105364368A (en) * | 2015-11-17 | 2016-03-02 | 重庆市华青汽车配件有限公司 | Welding clamp of mini-truck longitudinal beam assembly |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206605196U (en) | The small sidewall welding frock of rail vehicle | |
| CN204235033U (en) | Locomotive bogie group is to frock | |
| CN104043936A (en) | A flexible robot welding tool for the chassis frame of a corn harvester | |
| CN202411719U (en) | Fixture for assembling and welding front end of underframe of railway vehicle | |
| CN102794413B (en) | Sand box positioning device | |
| CN204339163U (en) | A kind of welding tooling of track traffic brakes rack construction part | |
| CN105562993B (en) | A kind of coach compartment door skeleton weld jig | |
| CN204565511U (en) | A kind of pull bar otic placode fast accurate assembly tool | |
| CN203804479U (en) | Frame welding tool | |
| CN105643170B (en) | A welding device for the front frame of a double windshield frame | |
| CN207953309U (en) | A kind of shield machine cutter rack mounting apertures tooling | |
| CN204603640U (en) | Air-spring type full loading carriage back segment skeleton welding fixture special | |
| CN110883581A (en) | A caliper tooling | |
| CN204235024U (en) | A kind of welding tooling of track traffic brakes rack construction part | |
| CN204603639U (en) | Air-spring type full loading carriage leading portion skeleton welding fixture special | |
| CN103753077A (en) | Positioning device for frame side beam | |
| CN207840533U (en) | A kind of steering wheel fixing bracket welding positioning tool | |
| CN204954240U (en) | Subway framework curb girder braking sleeve pipe angel position control frock | |
| CN205798808U (en) | A kind of scalable welding localization tool | |
| CN222344654U (en) | A welding fixture for the tail support of an excavator | |
| CN204657802U (en) | A kind of underframe of coach frame welding fixture | |
| CN221538944U (en) | Vertical machining center tool for rail locomotive sleeve seat | |
| CN204771266U (en) | Be used for accurate box sensor welded location frock clamp | |
| CN204565508U (en) | A kind of grillage rivet welding frock | |
| CN222660569U (en) | Heavy fork truck portal back timber assembly welding frock |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150520 |