CN204295993U - The heat recovery of plastic pipe production line and control system - Google Patents

The heat recovery of plastic pipe production line and control system Download PDF

Info

Publication number
CN204295993U
CN204295993U CN201420782576.3U CN201420782576U CN204295993U CN 204295993 U CN204295993 U CN 204295993U CN 201420782576 U CN201420782576 U CN 201420782576U CN 204295993 U CN204295993 U CN 204295993U
Authority
CN
China
Prior art keywords
heat recovery
raw material
heat
air
hot blast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420782576.3U
Other languages
Chinese (zh)
Inventor
王紫清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN QINGCHUAN PININGS Co Ltd
Original Assignee
SICHUAN QINGCHUAN PININGS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN QINGCHUAN PININGS Co Ltd filed Critical SICHUAN QINGCHUAN PININGS Co Ltd
Priority to CN201420782576.3U priority Critical patent/CN204295993U/en
Application granted granted Critical
Publication of CN204295993U publication Critical patent/CN204295993U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

The heat recovery of plastic pipe production line and control system, comprise control device, waste-heat recovery device, residual heat using device, exhaust apparatus.Control device comprises master control borad and status displays.Waste-heat recovery device comprises the heat recovery pipe, negative-pressure air fan, the first temperature detector that are arranged on core.Residual heat using device comprises raw material preheating storehouse, and raw material preheating storehouse is connected with heat recovery pipe by hot blast manifold; Hot blast manifold is provided with air-heater, for the heat in heat recovery pipe is imported raw material cabin; Hot blast manifold is connected with cold wind arm, and air-cooler is set on cold wind arm.Hot blast manifold is provided with the second temperature detector.Air-heater, air-cooler and the second temperature-detecting device are connected with master control borad respectively.Exhaust apparatus is the exhaust branch pipe at top, raw material preheating storehouse, and the utility model extracts high-temperature gas out from core, and the heat of extraction is carried out Commercial cultivation, reaches energy-saving effect, eliminates the electrical heating energy consumption in raw material preheating storehouse.

Description

The heat recovery of plastic pipe production line and control system
Technical field
Relate to the heat recovery on a kind of plastic pipe production line and control system.
Background technology
Plastic pipe range of application is very wide, and application is at present mainly supplies water and supplies natural gas.The pipeline comprising urban pipe network is all mainly plastic cement pipeline, and national annual plastic cement pipeline output is very large.
The industrialization line flow procedure of plastic pipe is as follows.A plastic cement material is carried out preheating in raw material cabin, and its preheat temperature about 80 degree, in order to discharge the moisture content may carried secretly in plastic grains.Raw material cabin adopts electrical heating, and arranges electrical heating wire on raw material bulkhead.Because the plastic material needed for different production lines is different, or the output of scheduling of production is different, so general plastic pipe pipeline production line has the raw material cabin of various different capabilities.
Plastic grains after preheating puts into mould, and by applied at elevated temperature, it dissolves, and extrudes core continuously by screw rod, and plastic pipe is shaped.Plastic pipe after shaping enters into immediately in vacuum tank and carries out cold water spray, lowers the temperature to plastic pipe surface.Reducing temperature twice is carried out through cooler bin again after cooling.Plastic pipe after repeatedly lowering the temperature cuts off at the tail end of production line, rolls off the production line.
On plastic pipe production line, a plastics material is made to have plasticity mainly through high temperature, then at high temperature just plastic by extruding.The extrusion die temperature of general plastic cement pipeline is 180 degree to 200 degree, and this means that the plastic pipe temperature squeezed out in core is not less than 180 degree, the central temperature of plastic pipe reaches 200 degree.So plastic tube product line itself has a large amount of waste heats to utilize.And now, these waste heats are all taken away by circulating water, do not utilized.Heat dissipation in a large amount of plastic pipes, forms thermal waste, affects environment simultaneously.
Utility model content
In order to solve the problem, the utility model provides the heat recovery of plastic pipe production line and control system, core and the plastic pipe extruded central temperature can be reclaimed, and successfully the temperature of recovery be used plastic pipe workshop.
Plastic pipe production line waste heat recycling system provided by the utility model, comprises control device, waste-heat recovery device, residual heat using device, exhaust apparatus.
Described control device comprises master control borad and status displays; Master control borad is for the information of collecting and send instruction, and status displays is for showing current system running status.
Described waste-heat recovery device comprises plastic cement extruding core 12, and the heat recovery pipe 11 that core is arranged, and heat recovery pipe is provided with negative-pressure air fan 9, for being extracted by the waste heat in core; Heat recovery pipe is provided with the first temperature detector 10; Negative-pressure air fan 9 and the first temperature-detecting device 10 are connected with master control borad respectively.
Described residual heat using device comprises raw material preheating storehouse 1, and raw material preheating storehouse is connected with heat recovery pipe 11 by hot blast manifold 13; Hot blast manifold is provided with air-heater 8, for the heat in heat recovery pipe is imported raw material cabin; Hot blast manifold is connected with cold wind arm 7, and air-cooler 6 is set on cold wind arm.Hot blast manifold is provided with the second temperature detector 5.Air-heater, air-cooler and the second temperature-detecting device are connected with master control borad respectively.
Described exhaust apparatus comprises the exhaust branch pipe 14 being arranged on top, raw material preheating storehouse, and exhaust branch pipe is connected on exhaust main 2;
Be provided with Charge level measurer 4 in described raw material preheating storehouse, raw material preheating storehouse be provided with acoustic-optic alarm 3; Charge level measurer and acoustic-optic alarm are connected with master control borad respectively.
As above plastic pipe production line heat recovery and control system, further illustrate into, cold wind arm is provided with cooling gas check valve.
the beneficial effect of the utility model technology:
The utility model extracts high-temperature gas out from core, and the heat of extraction is carried out Commercial cultivation.
Core is provided with temperature-detecting device, and controls the running parameter of negative-pressure air fan by master control borad, prevent negative-pressure air fan by excessive for the heat in core extraction, affect the product quality of plastic pipe finished product.
Adopt air-heater to control the hot blast air quantity that enters in raw material preheating storehouse, and adopt air-cooler to be mixed into cold wind comprehensively to control the thermal temperature entered in raw material preheating storehouse, it is overheated to prevent.
Raw material preheating storehouse is provided with Charge level measurer and acoustic-optic alarm; When the raw material in storehouse too much or very few time give the alarm in time.
The utility model is by having discharged production line waste heat gives effective utilization originally, reach energy-saving effect, eliminate the electrical heating energy consumption in raw material preheating storehouse, calculate by existing electrical heating preheating method, can power saving 30% in the production line unit interval, calculate by 60 yuan of power consumptions per ton, meter annual output 20000 tons of plastic pipes, year power cost saving about 1,200,000 yuan.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Detailed description of the invention
The utility model offers heat recovery hole on core 12, and heat recovery hole is directly connected to core inside, and after opening negative-pressure air fan 9, the waste heat in core is discharged from inside, enters in heat recovery pipe 11.By the temperature detected in core real during the first temperature-detecting device 10, too high or too low for temperature in core, or in core, temperature fluctuation range is too large, does not utilize the production of plastic pipe.Temperature value in detected core returns and is fed to master control borad by the first temperature-detecting device, master control borad regulates the running parameter of negative-pressure air fan according to temperature in current core, that is: when temperature in core is too high, then open large negative-pressure air fan air output with the more heats of sucking-off, otherwise then turn down.
What load in raw material preheating storehouse is plastic grains, and the effect in raw material preheating storehouse mainly preheats the plastic grains entering core, and is discharged the moisture content comprised in plastic grains by heating.The preheat temperature of plastic grains can not be too high, certainly can not be too low, its draining too low and pre-heat effect not good, affect finished product quality; The too high plastic rubber material particle that can use of preheat temperature dissolves, and lumps in raw material cabin.Generally control, below 80 degree, to be not less than 70 degree to the preheat temperature of plastic grains.
The utility model adopts air-heater to control to send into the hot blast air quantity in raw material preheating storehouse, and adopts air-cooler to be mixed into cold wind, regulates the gas flow temperature finally entered in storehouse, makes the temperature entered in raw material preheating storehouse meet 70 ~ 80 DEG C of degree interval.Be specially: production line has multiple raw material preheating storehouse, according to scheduling of production, enable different raw material preheating storehouses, when this raw material preheating storehouse is enabled in plan, namely to the air-heater 8 started corresponding to this raw material preheating storehouse, hot blast is imported from heat recovery pipe, the real hot blast temperature value detecting importing during the second temperature-detecting device 5, when detecting that imported temperature value is too high, master control borad turns down air-heater air output, and corresponding open cold blower fan 6 is mixed into cold wind, the import volume of configuration hot blast and cold wind, until the temperature detected by the second temperature-detecting device reaches required temperature.When the hot blast temperature sent into is too low, directly close air-cooler, strengthen the hot blast import volume of air-heater.Cooling gas check valve prevents the hot blast imported from the inside and outside row of cold wind arm 7.
Charge level measurer is provided with the upper, middle and lower each position of raw material preheating storehouse inwall, and acoustic-optic alarm is arranged on raw material cabin full position.
Status displays can be display floater, also can show for indicator lamp.

Claims (2)

1. the heat recovery of plastic pipe production line and control system, comprises control device, waste-heat recovery device, residual heat using device, exhaust apparatus;
Described control device comprises master control borad and status displays; Master control borad is for the information of collecting and send instruction, and status displays is for showing current system running status;
Described waste-heat recovery device comprises plastic cement extruding core (12), and the heat recovery pipe (11) that core is arranged, and heat recovery pipe is provided with negative-pressure air fan (9), for being extracted by the waste heat in core; Heat recovery pipe is provided with the first temperature detector (10); Negative-pressure air fan (9) and the first temperature-detecting device (10) are connected with master control borad respectively;
Described residual heat using device comprises raw material preheating storehouse (1), and raw material preheating storehouse is connected with heat recovery pipe (11) by hot blast manifold (13); Hot blast manifold is provided with air-heater (8), for the heat in heat recovery pipe is imported raw material cabin; Hot blast manifold is connected with cold wind arm (7), and air-cooler (6) is set on cold wind arm; Hot blast manifold is provided with the second temperature detector (5); Air-heater, air-cooler and the second temperature-detecting device are connected with master control borad respectively;
Described exhaust apparatus comprises the exhaust branch pipe (14) being arranged on top, raw material preheating storehouse, and exhaust branch pipe is connected on exhaust main (2);
Be provided with Charge level measurer (4) in described raw material preheating storehouse, raw material preheating storehouse be provided with acoustic-optic alarm (3); Charge level measurer and acoustic-optic alarm are connected with master control borad respectively.
2. plastic pipe production line heat recovery as claimed in claim 1 and control system, is characterized in that, cold wind arm is provided with cooling gas check valve.
CN201420782576.3U 2014-12-13 2014-12-13 The heat recovery of plastic pipe production line and control system Expired - Fee Related CN204295993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420782576.3U CN204295993U (en) 2014-12-13 2014-12-13 The heat recovery of plastic pipe production line and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420782576.3U CN204295993U (en) 2014-12-13 2014-12-13 The heat recovery of plastic pipe production line and control system

Publications (1)

Publication Number Publication Date
CN204295993U true CN204295993U (en) 2015-04-29

Family

ID=53101571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420782576.3U Expired - Fee Related CN204295993U (en) 2014-12-13 2014-12-13 The heat recovery of plastic pipe production line and control system

Country Status (1)

Country Link
CN (1) CN204295993U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107618169A (en) * 2017-09-29 2018-01-23 安徽优丽普科技股份有限公司 A kind of afterheat utilizing system of plastics extrusion die
CN107756754A (en) * 2017-09-29 2018-03-06 安徽优丽普科技股份有限公司 A kind of heat circulation controlling method of plastic extrusion facility
CN111687228A (en) * 2020-05-27 2020-09-22 嘉兴市名人电器有限公司 Waste heat recovery device for profile extrusion line
CN117644635A (en) * 2022-10-19 2024-03-05 南通海蓝德机械有限公司 Plastic production device with raw material preheating pipeline
CN118700496A (en) * 2024-03-22 2024-09-27 广东中宝电缆有限公司 A three-layer co-extrusion device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107618169A (en) * 2017-09-29 2018-01-23 安徽优丽普科技股份有限公司 A kind of afterheat utilizing system of plastics extrusion die
CN107756754A (en) * 2017-09-29 2018-03-06 安徽优丽普科技股份有限公司 A kind of heat circulation controlling method of plastic extrusion facility
CN111687228A (en) * 2020-05-27 2020-09-22 嘉兴市名人电器有限公司 Waste heat recovery device for profile extrusion line
CN117644635A (en) * 2022-10-19 2024-03-05 南通海蓝德机械有限公司 Plastic production device with raw material preheating pipeline
CN118700496A (en) * 2024-03-22 2024-09-27 广东中宝电缆有限公司 A three-layer co-extrusion device
CN118700496B (en) * 2024-03-22 2025-02-07 广东中宝电缆有限公司 Three-layer co-extrusion device

Similar Documents

Publication Publication Date Title
CN204295993U (en) The heat recovery of plastic pipe production line and control system
CN203470883U (en) Cooling water control device for casting mold
CN204451163U (en) The cooling of a kind of collection plastic strip and drying integrated device
CN104527013A (en) Waste heat recovering and utilizing system and method of plastic pipe production line
CN201989312U (en) Residual heat drying device of main machine of plastic film extruding machine
CN204275915U (en) A kind of cooling device for paste mixing machine
CN201573327U (en) Water cooling control device for charging barrel of injection molding machine
CN207028051U (en) A kind of automatic water-blowing device of plastic mould
CN202215516U (en) Airflow wire dryer fan bearing cooling system
CN203527867U (en) Novel material extruder for manufacturing stone paper
CN204295992U (en) A kind of plastic pipe production line waste heat recycling system
CN104368269B (en) A kind of cooling device for paste mixing machine
CN204295912U (en) Pipe production line waste heat is utilized to carry out the raw material cabin of preheating
CN204095109U (en) Large-scale PPR pipe continous way cooling structure
CN203460343U (en) Water circulation system of pelletizer
CN203221649U (en) System for monitoring PPR tube cooling water tank
CN203075911U (en) A batching tank water circulation system for soft capsule workshop
CN203258910U (en) Energy-saving bin of solar water heater
CN203518670U (en) Cold water circulating system of vacuum setting box
CN107345016A (en) A kind of HDPE steel band reinforced spiral ripple pipes and its production technology
CN202306362U (en) Device for adjusting humiture of seed-wool stack
CN204944248U (en) A kind of oil product residual heat using device
CN105240823B (en) A kind of station boiler air flash vessel exhaust steam recycling system
CN204998304U (en) Utilize intelligent heavy architectural equipment of heat radiation water tank heating driver's cabin
CN204460789U (en) Intelligent temperature-difference backwater energy-saving control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180918

Granted publication date: 20150429

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20181123

Granted publication date: 20150429

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20191213