CN204279195U - Metallurgy industry combination breakdown van - Google Patents

Metallurgy industry combination breakdown van Download PDF

Info

Publication number
CN204279195U
CN204279195U CN201420767239.7U CN201420767239U CN204279195U CN 204279195 U CN204279195 U CN 204279195U CN 201420767239 U CN201420767239 U CN 201420767239U CN 204279195 U CN204279195 U CN 204279195U
Authority
CN
China
Prior art keywords
case
box
combination
tool
side board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420767239.7U
Other languages
Chinese (zh)
Inventor
刘文海
朱志军
李爱彬
李亚军
李雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HBIS Co Ltd Chengde Branch
Original Assignee
Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Co Ltd Chengde Branch filed Critical Hebei Iron and Steel Group Co Ltd Chengde Branch
Priority to CN201420767239.7U priority Critical patent/CN204279195U/en
Application granted granted Critical
Publication of CN204279195U publication Critical patent/CN204279195U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model discloses a kind of metallurgy industry combination breakdown van, comprise car body, also comprise the combination box be arranged on rear side of car body, electric welding machine case is provided with in combination box, welding tool case, lifting gear case, parting tool case, switch box, bearing heater case, simmer pipe device case, tool box special, auxiliary facilities case, left side board inside upper part front-end and back-end are installed with electrical tool case and measuring instrument case respectively, bench working table is provided with in the middle part of left side board, right side board inside upper part is provided with plumber tool box from front to back successively, labour protection tool box and small tools case, its advantage is: on existing car body, fixedly mount combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation by utmost dispatch, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.

Description

Metallurgy industry combination breakdown van
Technical field
The utility model relates to industry repairing equipment technology field, particularly relates to a kind of metallurgy industry combination breakdown van.
Background technology
Can be happened suddenly during iron and steel metallurgy enterprise production various kinds of equipment fault, and in view of smelter scale is large, equipment is many, circumstance complication, scope of work is large, and the tool kind of use is various.If each region arranges setting tool, consumption fund amount is very large, and Occupation coefficient is low.If it is few to arrange instrument amount, after breakdown of equipment occurs, the interim repairing instrument for preparing can consume the plenty of time, and delay emergency repair time, even can cause the accident extension, resumes production delayed, bring huge economic loss to enterprise.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of metallurgy industry combination breakdown van, existing car body fixedly mounts combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of metallurgy industry combination breakdown van, comprise car body, also comprise the combination box be arranged on rear side of car body, combination box comprises base plate, top board, left side board, right side board, front end-plate and back door, described combination box left side board bottom is provided with the electric welding machine case outwards opened the door from front to back successively, welding tool case, lifting gear case, parting tool case and switch box, described combination box right side board bottom is provided with the bearing heater case and stewing pipe device case that outwards open the door from front to back successively, tool box special is provided with on the downside of the tail end of described combination box base plate, described combination box front end-plate medial surface top-hung is provided with auxiliary facilities case, described left side board inside upper part front-end and back-end are installed with electrical tool case and measuring instrument case respectively, bench working table is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box from front to back successively, labour protection tool box and small tools case.
Described cover top surface corner is equipped with hanger.
In described electric welding machine case, welding generator is installed, in described lifting gear case, winch is installed, simmer in pipe device case to install and simmer pipe device, in bearing heater case, induction heater is installed, install switch board in described switch box, described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
The beneficial effect adopting technique scheme to produce is: on existing car body, fixedly mount combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
Accompanying drawing explanation
Fig. 1 is the utility model left side structure schematic diagram;
Fig. 2 is the utility model right side structure schematic diagram;
Fig. 3 is the utility model rear structure schematic diagram;
Fig. 4 is the utility model combination box inner top structural representation;
In the accompanying drawings: 1, combination box; 2, hanger; 3, electric welding machine case; 4, welding tool case; 5, lifting gear case; 6, cabinet is cut; 7, switch box; 8, tool box special; 9, back door; 10, pipe device case is simmered; 11, bearing heater case; 12, measuring instrument case; 13, bench working table; 14, electrical tool case; 15, auxiliary facilities case; 16, corridor; 17, small tools case; 18, labour protection tool box; 19, plumber tool box.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Longer in order to solve interim preparation repairing tool time in current metallurgy industry repairing process, delay repairing work and production restoration time longer problem, the utility model provides a kind of a kind of metallurgy industry combination breakdown van as Figure 1-4, comprise car body, also comprise the combination box 1 be arranged on rear side of car body, combination box can be connected with car body bolt or mount, as permanent structure or the interim traction structure of car body, combination box 1 comprises base plate, top board, left side board, right side board, front end-plate and back door 9, described combination box left side board bottom is provided with the electric welding machine case 3 outwards opened the door from front to back successively, welding tool case 4, lifting gear case 5, cutting cabinet 6 and switch box 7, described combination box 1 right side board bottom is provided with the bearing heater case 11 and stewing pipe device case 10 that outwards open the door from front to back successively, tool box special 8 is provided with on the downside of the tail end of described combination box 1 base plate, described combination box 1 front end-plate medial surface top-hung is provided with to assist and arranges case 15, described left side board inside upper part front-end and back-end are installed with electrical tool case 14 and measuring instrument case 12 respectively, bench working table 13 is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box 19 from front to back successively, labour protection tool box 18 and small tools case 17, described cover top surface corner is equipped with hanger 2, in described electric welding machine case 3, welding generator is installed, in described lifting gear case 5, winch is installed, simmer in pipe device case 10 to install and simmer pipe device, in bearing heater case 11, induction heater is installed, install switch board in described switch box 7, described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
In concrete use procedure, combination box and permanent structure can be connected into car body, also can be connected by temporary fixing structure, when needs repairing, directly breakdown van can be reached repairing occasion to use, also combination box can be hung separately repairing occasion to use, simultaneously in order to save emergency repair time, special repairing instrument is placed in various tool boxes in advance in combination box, also can the special operating equipment of supporting installation, the instrument that may use in industry repairing process and equipment are prepared in advance, directly take from breakdown van in repairing process, that saves temporary plant or instrument organizes the time, improve first-aid repair efficiency, in a word, the utility model by fixedly mounting combination box on existing car body, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.

Claims (3)

1. a metallurgy industry combination breakdown van, comprise car body, it is characterized in that: also comprise the combination box (1) be arranged on rear side of car body, combination box (1) comprises base plate, top board, left side board, right side board, front end-plate and back door (9), described combination box left side board bottom is provided with the electric welding machine case (3) outwards opened the door from front to back successively, welding tool case (4), lifting gear case (5), cutting cabinet (6) and switch box (7), described combination box (1) right side board bottom is provided with the bearing heater case (11) and stewing pipe device case (10) that outwards open the door from front to back successively, tool box special (8) is provided with on the downside of the tail end of described combination box (1) base plate, described combination box (1) front end-plate medial surface top-hung is provided with to assist and arranges case (15), described left side board inside upper part front-end and back-end are installed with electrical tool case (14) and measuring instrument case (12) respectively, bench working table (13) is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box (19) from front to back successively, labour protection tool box (18) and small tools case (17).
2. metallurgy industry combination breakdown van according to claim 1, is characterized in that: described cover top surface corner is equipped with hanger (2).
3. metallurgy industry combination breakdown van according to claim 2, it is characterized in that: in described electric welding machine case (3), welding generator is installed, in described lifting gear case (5), winch is installed, simmer in pipe device case (10) to install and simmer pipe device, in bearing heater case (11), induction heater is installed, install switch board in described switch box (7), described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
CN201420767239.7U 2014-12-09 2014-12-09 Metallurgy industry combination breakdown van Expired - Fee Related CN204279195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420767239.7U CN204279195U (en) 2014-12-09 2014-12-09 Metallurgy industry combination breakdown van

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420767239.7U CN204279195U (en) 2014-12-09 2014-12-09 Metallurgy industry combination breakdown van

Publications (1)

Publication Number Publication Date
CN204279195U true CN204279195U (en) 2015-04-22

Family

ID=52862383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420767239.7U Expired - Fee Related CN204279195U (en) 2014-12-09 2014-12-09 Metallurgy industry combination breakdown van

Country Status (1)

Country Link
CN (1) CN204279195U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111595522A (en) * 2016-04-15 2020-08-28 大金工业株式会社 Manufacturing equipment for pipeline parts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111595522A (en) * 2016-04-15 2020-08-28 大金工业株式会社 Manufacturing equipment for pipeline parts
CN111595522B (en) * 2016-04-15 2021-11-19 大金工业株式会社 Manufacturing equipment for pipeline parts

Similar Documents

Publication Publication Date Title
CN204279195U (en) Metallurgy industry combination breakdown van
CN203260948U (en) Special tool for replacing support insulator of 35 kV bus
CN105244802A (en) Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower
CN204867925U (en) Bridge crane end beam processing frock
CN204449717U (en) Frame numerical control cutting machine
CN202997849U (en) High-voltage motor rotor pump passing device
CN203791344U (en) Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill
CN203306970U (en) Jacking tool used for jacking heavy part in narrow space
CN203843745U (en) Assembling and disassembling fixture for electric generator of loader
CN103395537A (en) Convenient transport device for substations
CN204295741U (en) A kind of photovoltaic module splitting machine
CN202572298U (en) Auxiliary tool for mounting synchronizing wheel onto servomotor
CN203418406U (en) Polishing fixing device
CN102699373A (en) Intelligent machine special for boring and drilling main pin holes
CN202910558U (en) Device used for turning plates
CN204621540U (en) A kind of multistation shackle processing unit (plant)
CN203031292U (en) Motor support fixing tool
CN203604597U (en) Device facilitating overhaul
CN204067965U (en) A kind of transportation trolley
CN206306043U (en) A kind of auxiliary mould installed for Automobile air strut
CN205572305U (en) Capable retarder connection dish extracting tool is walked to door machine
CN2837275Y (en) Scissor type lifting cistern device
CN201589841U (en) Integral pressure resistance test device
CN203542055U (en) Ladder structure of double-column vertical lathe
CN204997824U (en) A manual automatic multi -use architecture equipment for processing building board

Legal Events

Date Code Title Description
GR01 Patent grant
CP03 Change of name, title or address

Address after: 067102 A block 520, Luanhe town finance square, Shuangluan District, Chengde, Hebei

Patentee after: CHENGDE BRANCH OF HBIS Group

Address before: 067102 Luanhe town finance square, Shuangluan District, Chengde, Hebei, Hebei iron and steel Limited by Share Ltd Chengde branch

Patentee before: HEBEI IRON AND STEEL Co.,Ltd. CHENGDE BRANCH

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

CF01 Termination of patent right due to non-payment of annual fee