CN204279195U - Metallurgy industry combination breakdown van - Google Patents
Metallurgy industry combination breakdown van Download PDFInfo
- Publication number
- CN204279195U CN204279195U CN201420767239.7U CN201420767239U CN204279195U CN 204279195 U CN204279195 U CN 204279195U CN 201420767239 U CN201420767239 U CN 201420767239U CN 204279195 U CN204279195 U CN 204279195U
- Authority
- CN
- China
- Prior art keywords
- case
- box
- combination
- tool
- side board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000015556 catabolic process Effects 0.000 title claims abstract description 17
- 238000005272 metallurgy Methods 0.000 title claims abstract description 11
- 238000003466 welding Methods 0.000 claims abstract description 16
- 230000006698 induction Effects 0.000 claims description 6
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 9
- 238000012423 maintenance Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000009865 steel metallurgy Methods 0.000 description 1
Landscapes
- Manufacture Of Motors, Generators (AREA)
Abstract
The utility model discloses a kind of metallurgy industry combination breakdown van, comprise car body, also comprise the combination box be arranged on rear side of car body, electric welding machine case is provided with in combination box, welding tool case, lifting gear case, parting tool case, switch box, bearing heater case, simmer pipe device case, tool box special, auxiliary facilities case, left side board inside upper part front-end and back-end are installed with electrical tool case and measuring instrument case respectively, bench working table is provided with in the middle part of left side board, right side board inside upper part is provided with plumber tool box from front to back successively, labour protection tool box and small tools case, its advantage is: on existing car body, fixedly mount combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation by utmost dispatch, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
Description
Technical field
The utility model relates to industry repairing equipment technology field, particularly relates to a kind of metallurgy industry combination breakdown van.
Background technology
Can be happened suddenly during iron and steel metallurgy enterprise production various kinds of equipment fault, and in view of smelter scale is large, equipment is many, circumstance complication, scope of work is large, and the tool kind of use is various.If each region arranges setting tool, consumption fund amount is very large, and Occupation coefficient is low.If it is few to arrange instrument amount, after breakdown of equipment occurs, the interim repairing instrument for preparing can consume the plenty of time, and delay emergency repair time, even can cause the accident extension, resumes production delayed, bring huge economic loss to enterprise.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of metallurgy industry combination breakdown van, existing car body fixedly mounts combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of metallurgy industry combination breakdown van, comprise car body, also comprise the combination box be arranged on rear side of car body, combination box comprises base plate, top board, left side board, right side board, front end-plate and back door, described combination box left side board bottom is provided with the electric welding machine case outwards opened the door from front to back successively, welding tool case, lifting gear case, parting tool case and switch box, described combination box right side board bottom is provided with the bearing heater case and stewing pipe device case that outwards open the door from front to back successively, tool box special is provided with on the downside of the tail end of described combination box base plate, described combination box front end-plate medial surface top-hung is provided with auxiliary facilities case, described left side board inside upper part front-end and back-end are installed with electrical tool case and measuring instrument case respectively, bench working table is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box from front to back successively, labour protection tool box and small tools case.
Described cover top surface corner is equipped with hanger.
In described electric welding machine case, welding generator is installed, in described lifting gear case, winch is installed, simmer in pipe device case to install and simmer pipe device, in bearing heater case, induction heater is installed, install switch board in described switch box, described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
The beneficial effect adopting technique scheme to produce is: on existing car body, fixedly mount combination box, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
Accompanying drawing explanation
Fig. 1 is the utility model left side structure schematic diagram;
Fig. 2 is the utility model right side structure schematic diagram;
Fig. 3 is the utility model rear structure schematic diagram;
Fig. 4 is the utility model combination box inner top structural representation;
In the accompanying drawings: 1, combination box; 2, hanger; 3, electric welding machine case; 4, welding tool case; 5, lifting gear case; 6, cabinet is cut; 7, switch box; 8, tool box special; 9, back door; 10, pipe device case is simmered; 11, bearing heater case; 12, measuring instrument case; 13, bench working table; 14, electrical tool case; 15, auxiliary facilities case; 16, corridor; 17, small tools case; 18, labour protection tool box; 19, plumber tool box.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Longer in order to solve interim preparation repairing tool time in current metallurgy industry repairing process, delay repairing work and production restoration time longer problem, the utility model provides a kind of a kind of metallurgy industry combination breakdown van as Figure 1-4, comprise car body, also comprise the combination box 1 be arranged on rear side of car body, combination box can be connected with car body bolt or mount, as permanent structure or the interim traction structure of car body, combination box 1 comprises base plate, top board, left side board, right side board, front end-plate and back door 9, described combination box left side board bottom is provided with the electric welding machine case 3 outwards opened the door from front to back successively, welding tool case 4, lifting gear case 5, cutting cabinet 6 and switch box 7, described combination box 1 right side board bottom is provided with the bearing heater case 11 and stewing pipe device case 10 that outwards open the door from front to back successively, tool box special 8 is provided with on the downside of the tail end of described combination box 1 base plate, described combination box 1 front end-plate medial surface top-hung is provided with to assist and arranges case 15, described left side board inside upper part front-end and back-end are installed with electrical tool case 14 and measuring instrument case 12 respectively, bench working table 13 is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box 19 from front to back successively, labour protection tool box 18 and small tools case 17, described cover top surface corner is equipped with hanger 2, in described electric welding machine case 3, welding generator is installed, in described lifting gear case 5, winch is installed, simmer in pipe device case 10 to install and simmer pipe device, in bearing heater case 11, induction heater is installed, install switch board in described switch box 7, described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
In concrete use procedure, combination box and permanent structure can be connected into car body, also can be connected by temporary fixing structure, when needs repairing, directly breakdown van can be reached repairing occasion to use, also combination box can be hung separately repairing occasion to use, simultaneously in order to save emergency repair time, special repairing instrument is placed in various tool boxes in advance in combination box, also can the special operating equipment of supporting installation, the instrument that may use in industry repairing process and equipment are prepared in advance, directly take from breakdown van in repairing process, that saves temporary plant or instrument organizes the time, improve first-aid repair efficiency, in a word, the utility model by fixedly mounting combination box on existing car body, the equipment and tool box that need to use are installed in combination box in repairing process, before use the various instrument that may need all is placed in tool box, need only to need breakdown van to put in place during maintenance and can directly carry out repairing operation, shorten emergency repair time and off-time, accident is reduced within the specific limits, reduce economic loss.
Claims (3)
1. a metallurgy industry combination breakdown van, comprise car body, it is characterized in that: also comprise the combination box (1) be arranged on rear side of car body, combination box (1) comprises base plate, top board, left side board, right side board, front end-plate and back door (9), described combination box left side board bottom is provided with the electric welding machine case (3) outwards opened the door from front to back successively, welding tool case (4), lifting gear case (5), cutting cabinet (6) and switch box (7), described combination box (1) right side board bottom is provided with the bearing heater case (11) and stewing pipe device case (10) that outwards open the door from front to back successively, tool box special (8) is provided with on the downside of the tail end of described combination box (1) base plate, described combination box (1) front end-plate medial surface top-hung is provided with to assist and arranges case (15), described left side board inside upper part front-end and back-end are installed with electrical tool case (14) and measuring instrument case (12) respectively, bench working table (13) is provided with in the middle part of described left side board, described right side board inside upper part is provided with plumber tool box (19) from front to back successively, labour protection tool box (18) and small tools case (17).
2. metallurgy industry combination breakdown van according to claim 1, is characterized in that: described cover top surface corner is equipped with hanger (2).
3. metallurgy industry combination breakdown van according to claim 2, it is characterized in that: in described electric welding machine case (3), welding generator is installed, in described lifting gear case (5), winch is installed, simmer in pipe device case (10) to install and simmer pipe device, in bearing heater case (11), induction heater is installed, install switch board in described switch box (7), described welder power end, winch power end, stewing pipe device power end are connected with switch board power output end with induction heater power end.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420767239.7U CN204279195U (en) | 2014-12-09 | 2014-12-09 | Metallurgy industry combination breakdown van |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420767239.7U CN204279195U (en) | 2014-12-09 | 2014-12-09 | Metallurgy industry combination breakdown van |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204279195U true CN204279195U (en) | 2015-04-22 |
Family
ID=52862383
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420767239.7U Expired - Fee Related CN204279195U (en) | 2014-12-09 | 2014-12-09 | Metallurgy industry combination breakdown van |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204279195U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111595522A (en) * | 2016-04-15 | 2020-08-28 | 大金工业株式会社 | Manufacturing equipment for pipeline parts |
-
2014
- 2014-12-09 CN CN201420767239.7U patent/CN204279195U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111595522A (en) * | 2016-04-15 | 2020-08-28 | 大金工业株式会社 | Manufacturing equipment for pipeline parts |
| CN111595522B (en) * | 2016-04-15 | 2021-11-19 | 大金工业株式会社 | Manufacturing equipment for pipeline parts |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204279195U (en) | Metallurgy industry combination breakdown van | |
| CN203260948U (en) | Special tool for replacing support insulator of 35 kV bus | |
| CN105244802A (en) | Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower | |
| CN204867925U (en) | Bridge crane end beam processing frock | |
| CN204449717U (en) | Frame numerical control cutting machine | |
| CN202997849U (en) | High-voltage motor rotor pump passing device | |
| CN203791344U (en) | Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill | |
| CN203306970U (en) | Jacking tool used for jacking heavy part in narrow space | |
| CN203843745U (en) | Assembling and disassembling fixture for electric generator of loader | |
| CN103395537A (en) | Convenient transport device for substations | |
| CN204295741U (en) | A kind of photovoltaic module splitting machine | |
| CN202572298U (en) | Auxiliary tool for mounting synchronizing wheel onto servomotor | |
| CN203418406U (en) | Polishing fixing device | |
| CN102699373A (en) | Intelligent machine special for boring and drilling main pin holes | |
| CN202910558U (en) | Device used for turning plates | |
| CN204621540U (en) | A kind of multistation shackle processing unit (plant) | |
| CN203031292U (en) | Motor support fixing tool | |
| CN203604597U (en) | Device facilitating overhaul | |
| CN204067965U (en) | A kind of transportation trolley | |
| CN206306043U (en) | A kind of auxiliary mould installed for Automobile air strut | |
| CN205572305U (en) | Capable retarder connection dish extracting tool is walked to door machine | |
| CN2837275Y (en) | Scissor type lifting cistern device | |
| CN201589841U (en) | Integral pressure resistance test device | |
| CN203542055U (en) | Ladder structure of double-column vertical lathe | |
| CN204997824U (en) | A manual automatic multi -use architecture equipment for processing building board |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: 067102 A block 520, Luanhe town finance square, Shuangluan District, Chengde, Hebei Patentee after: CHENGDE BRANCH OF HBIS Group Address before: 067102 Luanhe town finance square, Shuangluan District, Chengde, Hebei, Hebei iron and steel Limited by Share Ltd Chengde branch Patentee before: HEBEI IRON AND STEEL Co.,Ltd. CHENGDE BRANCH |
|
| CP03 | Change of name, title or address | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150422 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |