CN204266228U - 深基坑大面积混凝土侧墙可移动模板 - Google Patents
深基坑大面积混凝土侧墙可移动模板 Download PDFInfo
- Publication number
- CN204266228U CN204266228U CN201420770015.1U CN201420770015U CN204266228U CN 204266228 U CN204266228 U CN 204266228U CN 201420770015 U CN201420770015 U CN 201420770015U CN 204266228 U CN204266228 U CN 204266228U
- Authority
- CN
- China
- Prior art keywords
- formwork
- deep foundation
- side wall
- universal wheels
- universal wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型公开了一种深基坑大面积混凝土侧墙可移动模板,其特征是:设置侧墙模板竖向为通长、纵向分节段,形成各节段模板,在每一节段模板的三角支撑底部横梁上设置有万向轮,利用万向轮将各节段模板在自上一结构段沿纵向移动至下一结构段完成纵向拼装。本实用新型通过在钢模结构底部设置万向轮控制模板的移动,便于模板平移,减少模板吊装的安全风险,节省机械费用,为深基坑侧墙混凝土使用大块钢模板提供了便利,降低了施工安全风险、提高施工进度。
Description
技术领域
本实用新型涉及一种模板,更具体地说是深基坑大面积混凝土侧墙施工中模板。
背景技术
现有技术中,深基坑大面积混凝土侧墙施工时侧墙钢模板需要多次吊装移动,模板准确就位难度大,耗费大量的施工机械费用,增加了施工安全风险。
在深基坑大面积混凝土侧墙施工中,其分段侧墙混凝土浇筑长度达到27m,高度达到6.0m,需一次性整体浇筑。侧墙模板需多块拼装而成,模板分节吊装、运输存在较大安全隐患,同时影响总体的施工进度。
实用新型内容
本实用新型是为避免上述现有技术所存在的不足之处,提供一种深基坑大面积混凝土侧墙可移动模板,以期利用钢模板自身的可移动性,通过小型机械的牵引即可实现模板拼装,减少钢模板施工中的吊装作业、降低风险。
本实用新型为解决技术问题采用如下技术方案:
本实用新型深基坑大面积混凝土侧墙可移动模板,其特征是:设置侧墙模板竖向为通长、纵向分节段,形成各节段模板,在每一节段模板的三角支撑底部横梁上设置有万向轮,利用所述万向轮将各节段模板在自上一结构段沿纵向移动至下一结构段完成纵向拼装。
本实用新型深基坑大面积混凝土侧墙可移动模板,其特征是:所述万向轮在三角支撑底部横梁上沿所述三角支撑底部横梁至少有间隔设置的两组。
本实用新型深基坑大面积混凝土侧墙可移动模板,其特征是:设置所述万向轮在三角支撑底部横梁上为可拆式安装,拆卸的万向轮是以钢马镫替换;移动的模板是以万向轮为支撑,施工中的模板是以钢马镫作为支撑。
本实用新型深基坑大面积混凝土侧墙可移动模板,其特征是:在所述三角支撑底部横梁的端部设置竖向可调丝杆,伸长的丝杆能够对所述模板形成支撑,并使万向轮抬高离地以利完成万向轮与钢马镫的互换。
与已有技术相比,本实用新型有益效果体现在:
1、本实用新型将模板按纵向分节段,并为各节段设置万向轮,其以合理的分节段形式使模板只需要采用小型牵引机具进行牵引的方式即可完成移动和拼装,过程简单、快捷,不仅降低了施工风险,同时也极大地提高了工效。
2、本实用新型将万向轮设置模板背部的三角支撑底部横梁上,并沿横向间隔设置多组,不仅使模板移动更加平稳,同时也因多组设置大大降低了万向轮的所受压力,使万向轮的使用更加可靠,可有效降低万向轮的受损率。
3、本实用新型中以竖向可调丝杆作为临时支撑,极大地方便了万向轮和钢马镫之间的替换,易于实施。
附图说明
图1为本实用新型模板移动状态示意图;
图2为本实用新型模板施工状态示意图;
图中标号:1模板,2三角支撑底部横梁,3万向轮,3a万向轮滑动腿,4钢马镫,5丝杆,6精轧螺纹钢,7为M16螺栓,8为Φ40钢管,9连接件,10底板混凝土,11侧墙混凝土。
具体实施方式
参见图1、图2,本实施例中深基坑大面积混凝土侧墙可移动模板的结构形式是:设置侧墙模板1竖向为通长、纵向分节段,形成各节段模板,在每一节段模板的三角支撑底部横梁2上设置有万向轮3,利用万向轮3将各节段模板在自上一结构段沿纵向移动至下一结构段完成纵向拼装。
具体实施中,万向轮3在三角支撑底部横梁2上沿三角支撑底部横梁至少有间隔设置的两组,使模板移动更加平稳,同时也大大降低了万向轮的所受压力,使万向轮的使用更加可靠,可有效降低万向轮的受损率。
设置万向轮3在三角支撑底部横梁2上为可拆式安装,拆卸的万向轮3是以钢马镫4替换;移动的模板1是以万向轮3为支撑,施工中的模板1是以钢马镫4作为支撑。
为了便于调整,在三角支撑底部横梁2的端部设置竖向可调丝杆5,伸长的丝杆5能够对模板形成支撑,并使万向轮3抬高离地以利完成万向轮3与钢马镫4的互换。
本实用新型利用小型牵引机具进行牵引,使分节段设置的模板得到移动,满足模板平移就位的需要,减少模板重复垂直吊装,加快模板拼装速度。
施工过程:
步骤1,在进行侧墙混凝土施工前,在已浇筑的底板混凝土10的倒角处安装Φ25mm精轧螺纹钢6以固定模板1的横向移动,同时在模板背后三角支撑横梁2的底部预留两个万向轮滑动腿3a,并在万向轮滑动支腿3a的底部安装万向轮3。
步骤2、分块从上部吊运各节段模板至基坑底部,通过人工及小型机具使得第一节段钢模板定位成功,依次吊入剩余各节段钢模板并完成拼装;利用处在三角支撑底部横梁2端部的Φ60mm精轧螺纹钢丝杆5进行上下调节,完成模板整体线性的调整,Φ60mm精轧螺纹钢丝杆5提供支撑反力。
步骤3、解除三角支架底部的万向轮3,替换以钢马镫4下垫,在混凝土浇筑过程中,混凝土侧向压力过大,两个万向轮及Φ60mm精轧螺纹钢丝杆无法满足支撑反力要求,本实施例中故解除万向轮,替换为钢马镫,牢固可靠。
步骤4、通过钢模板自身的M16螺栓7、Φ40钢管8及连接件9加固整体模板,并整体浇筑大面积侧墙混凝土11,待混凝土强度达到要求的75%时,将钢马镫4重新更换为万向轮3,依次分解并拆除各节段模板,利用小型牵引机具将各节段模板沿纵向移动至下一个结构区段。
本实用新型利用万向轮作为临时支点,通过机械牵引,达到钢模板平移就位,有效减少钢模板多次垂直吊装。
Claims (4)
1.一种深基坑大面积混凝土侧墙可移动模板,其特征是:设置侧墙模板(1)竖向为通长、纵向分节段,形成各节段模板,在每一节段模板的三角支撑底部横梁(2)上设置有万向轮(3),利用所述万向轮(3)将各节段模板在自上一结构段沿纵向移动至下一结构段完成纵向拼装。
2.根据权利要求1所述的深基坑大面积混凝土侧墙可移动模板,其特征是:所述万向轮(3)在三角支撑底部横梁(2)上沿所述三角支撑底部横梁至少有间隔设置的两组。
3.根据权利要求2所述的深基坑大面积混凝土侧墙可移动模板,其特征是:设置所述万向轮(3)在三角支撑底部横梁(2)上为可拆式安装,拆卸的万向轮(3)是以钢马镫(4)替换;移动的模板(1)是以万向轮(3)为支撑,施工中的模板(1)是以钢马镫(4)作为支撑。
4.根据权利要求3所述的深基坑大面积混凝土侧墙可移动模板,其特征是:在所述三角支撑底部横梁(2)的端部设置竖向可调丝杆(5),伸长的丝杆(5)能够对所述模板形成支撑,并使万向轮(3)抬高离地以利完成万向轮(3)与钢马镫(4)的互换。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420770015.1U CN204266228U (zh) | 2014-12-08 | 2014-12-08 | 深基坑大面积混凝土侧墙可移动模板 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420770015.1U CN204266228U (zh) | 2014-12-08 | 2014-12-08 | 深基坑大面积混凝土侧墙可移动模板 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204266228U true CN204266228U (zh) | 2015-04-15 |
Family
ID=52801100
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420770015.1U Expired - Fee Related CN204266228U (zh) | 2014-12-08 | 2014-12-08 | 深基坑大面积混凝土侧墙可移动模板 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204266228U (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105113536A (zh) * | 2015-08-16 | 2015-12-02 | 腾达建设集团股份有限公司 | 一种移动式地下结构侧墙支模系统及其施工方法 |
| CN105672655A (zh) * | 2016-04-07 | 2016-06-15 | 中国电建集团铁路建设有限公司 | 侧墙自行式三角桁架及其施工方法 |
| CN108239997A (zh) * | 2018-03-28 | 2018-07-03 | 中铁十七局集团第三工程有限公司 | 现浇混凝土墙体单侧模板系统 |
| CN116335086A (zh) * | 2023-05-12 | 2023-06-27 | 中交(南京)建设有限公司 | 一种重力式护岸墙身施工工艺 |
-
2014
- 2014-12-08 CN CN201420770015.1U patent/CN204266228U/zh not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105113536A (zh) * | 2015-08-16 | 2015-12-02 | 腾达建设集团股份有限公司 | 一种移动式地下结构侧墙支模系统及其施工方法 |
| CN105672655A (zh) * | 2016-04-07 | 2016-06-15 | 中国电建集团铁路建设有限公司 | 侧墙自行式三角桁架及其施工方法 |
| CN108239997A (zh) * | 2018-03-28 | 2018-07-03 | 中铁十七局集团第三工程有限公司 | 现浇混凝土墙体单侧模板系统 |
| CN116335086A (zh) * | 2023-05-12 | 2023-06-27 | 中交(南京)建设有限公司 | 一种重力式护岸墙身施工工艺 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103669655B (zh) | 变形缝两侧墙体混凝土浇筑施工工艺 | |
| CN103195450B (zh) | 液压隧道仰拱作业台车及仰拱施工方法 | |
| CN203022024U (zh) | 一种管廊现浇施工整体移动式模架 | |
| CN102635369B (zh) | 栈桥配合顶模整体浇筑仰拱混凝土施工方法 | |
| CN204266228U (zh) | 深基坑大面积混凝土侧墙可移动模板 | |
| CN204221936U (zh) | 坐便器自动注浆机 | |
| CN103726511A (zh) | 一种用于大体积隧道沉管整体浇筑的模板系统 | |
| CN103770218B (zh) | 大型标准构件的节段匹配预制方法 | |
| CN103419279A (zh) | T梁模板整体拆除及纵向滑移施工方法 | |
| CN205936655U (zh) | 一种水工隧洞自行栈桥式仰拱滑模施工装置 | |
| CN204476416U (zh) | 一种竖井混凝土衬砌简易滑模装置 | |
| CN204386615U (zh) | 一种自行式隧道仰拱施工台车 | |
| CN104695979A (zh) | 一种利用高大台车整体横移高大模板的方法 | |
| CN204725644U (zh) | 一种预制箱梁内模整体抽拔装置 | |
| CN108005684A (zh) | 分离式钢模台车及其施工方法 | |
| CN204455737U (zh) | 高速铁路路基侧沟整体施工组件 | |
| CN207878302U (zh) | 一种箱涵施工用便于安装的模板 | |
| CN104405417A (zh) | 一种自行式隧道仰拱施工台车 | |
| CN202946193U (zh) | 一种隧道中心水沟模板 | |
| CN201884034U (zh) | 陡坡斜井中隔墙混凝土施工台车 | |
| CN110714480A (zh) | 管廊的施工方法 | |
| CN204139466U (zh) | 一种混凝土预制垫块 | |
| CN104060819B (zh) | 利用定型模板施工剪力墙的方法及所用的定型模板 | |
| CN201730626U (zh) | 隧洞平洞混凝土浇筑滑模 | |
| CN205295849U (zh) | 机械化水沟模板 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150415 |