CN204263342U - A kind of precast beam reinforced bar integral hoisting device for rapid - Google Patents
A kind of precast beam reinforced bar integral hoisting device for rapid Download PDFInfo
- Publication number
- CN204263342U CN204263342U CN201420703590.XU CN201420703590U CN204263342U CN 204263342 U CN204263342 U CN 204263342U CN 201420703590 U CN201420703590 U CN 201420703590U CN 204263342 U CN204263342 U CN 204263342U
- Authority
- CN
- China
- Prior art keywords
- main
- beams
- prefabricated
- parallel
- prefabricated beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种预制梁钢筋整体吊装装置,包括设置在预制梁钢筋整体上方纵向的两条平行的主梁,主梁上设有吊钩并连接主吊绳,所述主梁上设有若干个平行设置的横向分配梁,分配梁下方设有吊钩并经副吊绳连接预制梁钢筋骨架,所述主梁下方设有吊钩并经副吊绳连接预制梁钢筋骨架,两条平行的主梁之间设有若干个平行设置的横向支撑梁。实现了公路预制梁将钢筋固定绑扎,整体吊装,具有预制梁钢筋加工更加标准、施工效率高的特点。
An integral hoisting device for prefabricated beam steel bars, comprising two parallel main beams arranged longitudinally above the prefabricated beam steel bars, the main beams are provided with hooks and connected with main suspension ropes, and the main beams are provided with several parallel beams. The horizontal distribution beam, the distribution beam is provided with a hook below and connected to the prefabricated beam steel frame through the auxiliary lifting rope, the main beam is provided with a hook below and connected to the prefabricated beam steel skeleton through the auxiliary lifting rope, the two parallel main beams There are several horizontal support beams arranged in parallel. It realizes the fixing and binding of steel bars for highway prefabricated beams, and the overall hoisting, which has the characteristics of more standard processing of prefabricated beam steel bars and high construction efficiency.
Description
技术领域 technical field
本实用新型涉及一种预制梁钢筋整体吊装装置。 The utility model relates to a prefabricated beam reinforcement overall hoisting device.
背景技术 Background technique
目前,国内公路、铁路等工程,预制梁钢筋在固定台座上进行绑扎,其存在以下缺点: At present, in domestic highways, railways and other projects, prefabricated beam steel bars are bound on fixed pedestals, which has the following disadvantages:
(1)由于预制梁台座有限,在台座上绑扎钢筋占用时间,单片梁施工周期过长。 (1) Due to the limited prefabricated beam pedestal, it takes time to bind the steel bars on the pedestal, and the construction period of the single-piece beam is too long.
(2)钢筋在台座上绑扎,绑扎位置总在变化,很难保证钢筋横向水平钢筋及纵向钢筋间距,成品钢筋骨架尺寸和间距难以保证。 (2) The steel bars are bound on the pedestal, and the binding position is always changing. It is difficult to ensure the horizontal, horizontal and longitudinal steel bar spacing of the steel bars, and it is difficult to guarantee the size and spacing of the finished steel bar skeleton.
实用新型内容 Utility model content
本实用新型其目的就在于设计一种预制梁钢筋整体吊装装置,将预制梁钢筋在定位胎架上绑扎完成,将成品预制梁钢筋骨架整体吊装入模,实现公路预制梁钢筋在胎具上定型绑扎,整体吊装入模,具有效率高、钢筋绑扎更加规范的特点。 The purpose of this utility model is to design an integral hoisting device for prefabricated beam reinforcement, which binds the prefabricated beam reinforcement on the positioning tire frame, lifts the finished prefabricated beam reinforcement skeleton into the mold as a whole, and realizes the shaping of the highway prefabricated beam reinforcement on the mold Binding, overall hoisting and molding, has the characteristics of high efficiency and more standardized steel bar binding.
实现上述目的而采取的技术方案,包括设置在预制梁钢筋整体上方纵向的2条平行的主梁,主梁上设有吊钩并连接主吊绳,所述主梁上设有若干个平行设置的横向分配梁,分配梁下方设有吊钩并经副吊绳连接预制梁钢筋骨架,所述主梁下方设有吊钩并经副吊绳连接预制梁钢筋骨架,2条平行的主梁之间设有若干个平行设置的横向支撑梁。 The technical solution adopted to achieve the above purpose includes two parallel main girders arranged longitudinally above the overall prefabricated beam reinforcement, the main girders are provided with hooks and connected to the main suspension ropes, and the main girders are provided with several parallel beams. The horizontal distribution beam of the distribution beam is provided with a hook under the distribution beam and is connected to the prefabricated beam steel skeleton through the auxiliary lifting rope. There are several horizontal support beams arranged in parallel.
与现有技术相比本实用新型具有以下优点。 Compared with the prior art, the utility model has the following advantages.
1)本设计可将预制梁钢筋在固定的台架上绑扎,使钢筋绑扎更加规范准确,同时及时将绑扎好的骨架及时移走,使绑扎区域形成流水线作业,生产生产效率大大提高; 1) This design can bind the prefabricated beam steel bars on a fixed platform to make the steel bar binding more standardized and accurate. At the same time, the bound skeleton can be removed in time, so that the binding area can form an assembly line operation, and the production efficiency can be greatly improved;
2)本装置设计简单,易加工和操作,使各工序施工速度加快;且可单独在某一区域施工,不影响其他工序作业,确保了施工进度。 2) The design of this device is simple, easy to process and operate, so that the construction speed of each process is accelerated; and it can be constructed in a certain area alone without affecting other process operations, ensuring the construction progress.
附图说明 Description of drawings
下面结合附图对本实用新型作进一步详述。 Below in conjunction with accompanying drawing, the utility model is described in further detail.
图1为本装置结构示意主视图; Figure 1 is a schematic front view of the device structure;
图2为本装置结构示意俯视图; Figure 2 is a schematic top view of the structure of the device;
图3为本装置结构示意侧视图。 Figure 3 is a schematic side view of the structure of the device.
具体实施方式 Detailed ways
本装置包括设置在预制梁钢筋整体上方纵向的2条平行的主梁1,主梁1上设有吊钩并连接主吊绳5,如图1、图2、图3所示,所述主梁1上设有若干个平行设置的横向分配梁2,分配梁2下方设有吊钩并经幅吊绳6连接预制梁钢筋骨架,所述主梁1下方设有吊钩并经幅吊绳6连接预制梁钢筋骨架,2条平行的主梁1之间设有若干个平行设置的横向支撑梁4。 The device comprises two parallel main girders 1 arranged vertically above the whole prefabricated beam steel bars, and the main girders 1 are provided with hooks and connected with main suspension ropes 5, as shown in Fig. 1, Fig. 2 and Fig. 3 , the main girders 1 There are several horizontal distribution beams 2 arranged in parallel on the beam 1, a hook is provided under the distribution beam 2 and the prefabricated beam steel skeleton is connected by a suspender rope 6, and a hook is provided below the main beam 1 and a suspender rope is provided 6. Connect the prefabricated beam steel skeleton, and several parallel horizontal support beams 4 are arranged between the two parallel main beams 1 .
所述2条平行的主梁1之间设有若干个十字支撑梁3。 Several cross support beams 3 are arranged between the two parallel main beams 1.
实施例,结构包括主梁1,主梁1上分别设有分配梁2、十字支撑梁3、横向支撑梁4、主吊绳5、副吊绳6。 In an embodiment, the structure includes a main beam 1 on which a distribution beam 2 , a cross support beam 3 , a transverse support beam 4 , a main suspension rope 5 , and an auxiliary suspension rope 6 are arranged respectively.
工作原理 working principle
预制梁钢筋在固定区域设置钢筋绑扎胎架,检验合格后通过龙门吊整体吊装将预制梁钢筋骨架整体吊装至模板内。 The prefabricated beam reinforcement is provided with a reinforcement binding frame in a fixed area, and after passing the inspection, the prefabricated beam reinforcement framework is hoisted into the formwork as a whole by a gantry crane.
本装置是利用吊装原理,主吊绳5吊住主梁1,将力均匀分布在分配梁2上,传递给副吊绳6,通过副吊绳6整体受力起吊钢筋骨架。 This device utilizes the hoisting principle, the main lifting rope 5 hangs the main beam 1, distributes the force evenly on the distribution beam 2, transmits it to the auxiliary lifting rope 6, and lifts the steel frame through the auxiliary lifting rope 6 as a whole.
1、用20#工字钢加工2根主梁1,12#工字钢十字支撑梁3和横向支撑梁4与主梁1连接处需加强焊接,并保证主梁长30m,不弯曲;在主梁1上设置主吊绳5和吊钩; 1. Use 20# I-beam to process two main beams 1, 12# I-beam cross support beam 3 and transverse support beam 4 and the connection between main beam 1 need to strengthen welding, and ensure that the main beam is 30m long and does not bend; The main beam 1 is provided with a main suspension rope 5 and a suspension hook;
2、将12#工字钢分配梁2均匀布置在主梁1上,并在分配梁2上设置副吊钩; 2. Arrange the 12# I-beam distribution beam 2 evenly on the main beam 1, and set the auxiliary hook on the distribution beam 2;
3、在副吊钩上安装副吊绳6,副吊绳6一端固定在分配梁2上,一端固定在钢筋骨架上; 3. Install the auxiliary suspension rope 6 on the auxiliary hook, one end of the auxiliary suspension rope 6 is fixed on the distribution beam 2, and the other end is fixed on the steel frame;
4、两台龙门吊同时缓缓向上提升主吊绳5,在向上力的作用下主吊绳5将力全部分散在副吊绳6上,预制梁钢筋骨架整体上升; 4. The two gantry cranes lift the main hanging rope 5 upward slowly at the same time. Under the action of the upward force, the main hanging rope 5 disperses all the force on the auxiliary hanging rope 6, and the prefabricated beam steel skeleton rises as a whole;
5、通过龙门吊整体吊装,预制梁钢筋骨架由定位胎架整体吊装至模板内。 5. The gantry crane is integrally hoisted, and the prefabricated beam steel skeleton is hoisted into the formwork by the positioning tire frame as a whole.
将预制梁钢筋通过吊装架整体吊装,由原来在固定台座上绑扎钢筋,转成在定位胎架上将钢筋绑扎成型由吊装架整体吊装入模,大大缩短预制梁施工工期,增大施工效益。 The steel bars of the prefabricated beams are hoisted as a whole by the hoisting frame, instead of binding the steel bars on the fixed pedestal, the steel bars are bound and formed on the positioning tire frame, and the hoisting frame is integrally hoisted into the mold, which greatly shortens the construction period of the prefabricated beams and increases the construction efficiency.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420703590.XU CN204263342U (en) | 2014-11-21 | 2014-11-21 | A kind of precast beam reinforced bar integral hoisting device for rapid |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420703590.XU CN204263342U (en) | 2014-11-21 | 2014-11-21 | A kind of precast beam reinforced bar integral hoisting device for rapid |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204263342U true CN204263342U (en) | 2015-04-15 |
Family
ID=52798239
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420703590.XU Expired - Fee Related CN204263342U (en) | 2014-11-21 | 2014-11-21 | A kind of precast beam reinforced bar integral hoisting device for rapid |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204263342U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108582466A (en) * | 2018-06-11 | 2018-09-28 | 山西建工晋龙公路工程有限公司 | A kind of steel reinforcement cage of prefabricated box girder mould |
-
2014
- 2014-11-21 CN CN201420703590.XU patent/CN204263342U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108582466A (en) * | 2018-06-11 | 2018-09-28 | 山西建工晋龙公路工程有限公司 | A kind of steel reinforcement cage of prefabricated box girder mould |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205932941U (en) | A device for handling of precast box girder template | |
| CN105220619B (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
| CN201172574Y (en) | Precast beam reinforced bar hoisting rack | |
| CN102605720B (en) | Integrated construction equipment for binding and lifting continuous beam steel reinforcement framework and construction method | |
| CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
| CN204997807U (en) | Prefabricated little case roof beam centre form device | |
| CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
| CN204386615U (en) | A self-propelled tunnel inverted arch construction trolley | |
| CN202967849U (en) | Integral steel reinforcement cage lifting appliance | |
| CN205170161U (en) | Precast beam board framework of steel reinforcement hoist | |
| CN201511439U (en) | System for integrally binding and hoisting box girder steel reinforcement framework | |
| CN203795311U (en) | Multi-leg high pier and slip form construction device | |
| CN110217684A (en) | A tool for hoisting reinforcement of the bottom web of a box girder | |
| CN207484292U (en) | Bent cap bed die removes device | |
| CN202658867U (en) | Overhanging construction platform | |
| CN203613464U (en) | Slip form construction cargo transportation device | |
| CN206051351U (en) | Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form | |
| CN204057696U (en) | A kind of gate type portal gantry | |
| CN202967862U (en) | Lifting appliance for beam channel reinforcement cage | |
| CN102777036A (en) | Air reverse mechanical joint construction method of super-long vertical reinforcement cage | |
| CN208197158U (en) | A kind of reinforcing bar tire suspender of precast segment box beam | |
| CN205555868U (en) | A overhead hoist that is used for precasting yard roof beam, board side form | |
| CN204126237U (en) | A kind of elevator hoistway construction platform | |
| CN204607381U (en) | A kind of superimposed sheet Steel bar hanger | |
| CN210084714U (en) | Adjustable steel reinforcement cage hanger |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150415 Termination date: 20201121 |