CN204254100U - Universal active joint - Google Patents
Universal active joint Download PDFInfo
- Publication number
- CN204254100U CN204254100U CN201420499280.0U CN201420499280U CN204254100U CN 204254100 U CN204254100 U CN 204254100U CN 201420499280 U CN201420499280 U CN 201420499280U CN 204254100 U CN204254100 U CN 204254100U
- Authority
- CN
- China
- Prior art keywords
- end connector
- medium
- pipeline
- connecting pipe
- joints
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Joints Allowing Movement (AREA)
Abstract
The utility model discloses a kind of universal active joint, comprise two joints be connected with pipeline, one is medium inflow end connector, and another is that medium flows out end connector, flows out end connector side be provided with connecting pipe hoop at described medium.Connecting pipe hoop is first enclosed within medium outflow end pipeline, and medium flows out end connector and is contained in it in side ducts, and opposite side Pipe installing medium flows into end connector, adopts connecting pipe hoop to be linked together by two joints, in the middle of two joints, is provided with pad.The utility model a kind ofly not easily to leak ensureing union function while, can reduce and just cause constructional difficulties even the reinstalling of pipeline because pipeline concentricity is slightly overproof, reduce labour cost, save the universal active joint of engineering time.
Description
Technical field
The utility model relates to a kind of union, particularly a kind of universal active joint being applicable to application when pipeline connects.
Background technique
At home in pipeline construction, mostly adopt old-fashioned standard union now.Owing to needing the pipeline concentricity requirement of connection high to two when old-fashioned standard union is installed, two need the pipeline concentricity of connection slightly overproof, installation difficulty will be caused even cannot to install, so adopt old-fashioned standard union constructional difficulties, union is easily caused to be leaked, even cause unnecessary pipeline to reinstall, increase labour cost again simultaneously.
Model utility content
The technical problem that the utility model solves is to provide a kind of construction and simply, not easily leaks, can reduce just to cause because pipeline pipeline concentricity is slightly overproof constructional difficulties even pipeline reinstall, reduce labour cost, save the universal active joint of engineering time.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of universal active joint, comprises two joints be connected with pipeline, and one is medium inflow end connector, another is medium outflow end connector, flows out end connector side be provided with connecting pipe hoop at described medium.Connecting pipe hoop is first enclosed within medium outflow end pipeline, medium flows out end connector and is contained in it in side ducts, opposite side Pipe installing medium flows into end connector, and connecting pipe hoop entangles medium and flows out end connector and medium and flow into end connector and link together, and is provided with pad two joints centres.
Adopt the universal active joint of technique scheme, medium flows into end connector and medium and flows out end connector and form 360 ° of bias and dock, while guarantee union function, not easily leak, can reduce and just cause constructional difficulties even the reinstalling of pipeline because pipeline pipeline concentricity is slightly overproof, reduce labour cost, save the engineering time.
In sum, the utility model is a kind of ensureing union function while, not easily leak, can reduce and just cause constructional difficulties even the reinstalling of pipeline because pipeline pipeline concentricity is slightly overproof, reduce labour cost, save the universal active joint of engineering time.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model sectional view;
Fig. 3 is connecting pipe hoop structural representation;
Fig. 4 is connecting pipe hoop sectional view;
Fig. 5 is that medium flows out end connector structural representation;
Fig. 6 is that medium flows out end connector sectional view;
Fig. 7 is that medium flows into end connector structural representation;
Fig. 8 is that medium flows into end connector sectional view;
Fig. 9 is the structural representation of pad.
Figure 10 is pad sectional view;
Embodiment
See Fig. 1 and Fig. 2, flow out end connector (2) (see Fig. 5 and Fig. 6) side at medium to be provided with connecting pipe hoop (1) (see Fig. 3 and Fig. 4), connecting pipe hoop (1) and medium flow into end connector (3) (see Fig. 7 and Fig. 8) and are connected, medium outflow end connector (2) is clipped in connecting pipe hoop (1) and flows in the middle of end connector (3) with medium, is provided with pad (4) (see Fig. 9 and Figure 10) in the middle of two joints.
Connecting pipe hoop (1) is provided with Internal Pipe Thread G, medium flows out end connector (2) and is provided with Internal Pipe Thread G1, and medium flows into end connector (3) and is provided with external pipe thread G and Internal Pipe Thread G1.Medium flows out end connector (2), medium is flowed into end connector (3) and is connected with two side ducts respectively by Internal Pipe Thread G1, connecting pipe hoop (1) flows into joint (3) by pipe thread G with medium and is connected, in the middle of two joints, be provided with pad (4).While guarantee union function, not easily leak, can reduce and just cause constructional difficulties even the reinstalling of pipeline because pipeline pipeline concentricity is slightly overproof, reduce labour cost, save the engineering time.
Claims (1)
1. a universal active joint, comprise two joints be connected with pipeline, one is medium inflow end connector (2), another is medium outflow end connector (3), it is characterized in that: flow out end connector (3) side at described medium and be provided with connecting pipe hoop (1), connecting pipe hoop (1) is first enclosed within medium outflow end pipeline, medium flows out end connector (3) and is contained in it in side ducts, opposite side Pipe installing medium flows into end connector (2), connecting pipe hoop (1) entangles medium and flows out end connector (2) and flow into end connector (3) link together with medium, pad (4) is provided with in the middle of two joints.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420499280.0U CN204254100U (en) | 2014-08-25 | 2014-08-25 | Universal active joint |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420499280.0U CN204254100U (en) | 2014-08-25 | 2014-08-25 | Universal active joint |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204254100U true CN204254100U (en) | 2015-04-08 |
Family
ID=52958405
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420499280.0U Expired - Fee Related CN204254100U (en) | 2014-08-25 | 2014-08-25 | Universal active joint |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204254100U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105371032A (en) * | 2014-08-25 | 2016-03-02 | 李光玉 | Universal movable joint |
-
2014
- 2014-08-25 CN CN201420499280.0U patent/CN204254100U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105371032A (en) * | 2014-08-25 | 2016-03-02 | 李光玉 | Universal movable joint |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203375030U (en) | Detachable water supplying pipeline connecting assembly | |
| CN205745740U (en) | A kind of conduit coupling of good airproof performance | |
| CN204756206U (en) | PE pipe with leak protection function | |
| CN209557837U (en) | A kind of drainage system pipe that air-tightness is good | |
| CN105371032A (en) | Universal movable joint | |
| CN105570589B (en) | A kind of more logical hydraulic fitting connection structures | |
| CN105570591A (en) | Hydraulic pipe connector capable of changing from two ways to multiple ways | |
| CN204785211U (en) | Seal for pipe joints connection structure | |
| CN204829019U (en) | Novel flange joint structure | |
| CN205101268U (en) | Novel flange structure for pump | |
| CN203517054U (en) | Connection structure of inclined connection pipes of H pipes | |
| CN203147131U (en) | Four-way pipe connector with inner threads | |
| CN202371350U (en) | Oil tube joint seal connection structure | |
| CN202360951U (en) | Connecting joint for pipes with different diameters | |
| CN203068009U (en) | Retractable joint pipe | |
| CN203131266U (en) | Unidirectional-circulation sealing connector | |
| CN204477572U (en) | A kind of hot melting connector | |
| CN205136885U (en) | Flanged disc | |
| CN202852247U (en) | Pipeline anti-leakage connection structure | |
| CN203273106U (en) | Embedded type high-pressure petroleum transportation pipeline | |
| CN205001718U (en) | Three -way joint | |
| CN202674668U (en) | Sealing washer | |
| CN204829052U (en) | With connecing formula magnetic force pipe and magnetic force to connect soon in saline -alkali soil improvement | |
| CN203549256U (en) | Throttle pipe sleeve and refueling pipeline with throttle pipe sleeve | |
| CN202629389U (en) | Planar sealing joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150408 Termination date: 20170825 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |