CN204229942U - A kind of light ice formation compact two V-type suspension string - Google Patents
A kind of light ice formation compact two V-type suspension string Download PDFInfo
- Publication number
- CN204229942U CN204229942U CN201420703441.3U CN201420703441U CN204229942U CN 204229942 U CN204229942 U CN 204229942U CN 201420703441 U CN201420703441 U CN 201420703441U CN 204229942 U CN204229942 U CN 204229942U
- Authority
- CN
- China
- Prior art keywords
- plate
- hanging
- string
- shaped
- suspension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Insulators (AREA)
Abstract
本实用新型提供一种轻冰区用紧凑型两联V型悬垂串,包括悬垂联板和呈“V”字型分布的两个悬垂串,悬垂串包括由复合绝缘子连接而成的复合绝缘子串,复合绝缘子串两端分别与铁塔横担和悬垂联板连接,其中一个两联悬垂串的复合绝缘子串与悬垂联板之间依次设有联板一和Z型直角挂板,另一个两联悬垂串的复合绝缘子串与悬垂联板之间依次设有联板二和直角挂板。和现有技术比,本实用新型提供的轻冰区用紧凑型两联V型悬垂串,提高了金具的结构强度以及悬垂串的整体强度,确保了输电线路的正常运行;同时,有效的缩短了悬垂串的长度,从而降低了输电铁塔的塔身高度,降低了金具和铁塔的制造、运输及施工成本。
The utility model provides a compact two-connected V-shaped hanging string for light ice areas, which includes a hanging connecting plate and two hanging strings distributed in a "V" shape. The hanging string includes a composite insulator string connected by composite insulators. , the two ends of the composite insulator string are respectively connected with the iron tower cross arm and the suspension connecting plate, one of the two hanging string composite insulator strings and the hanging connecting plate are successively provided with connecting plate one and Z-type right-angle hanging plate, and the other two-connected Between the composite insulator string of the suspension string and the suspension connection plate, the second connection plate and the right-angle hanging plate are arranged in sequence. Compared with the prior art, the utility model provides a compact two-connected V-shaped suspension string for light ice areas, which improves the structural strength of the fittings and the overall strength of the suspension string, and ensures the normal operation of the transmission line; at the same time, it effectively shortens the The length of the hanging string is reduced, thereby reducing the height of the transmission tower, and reducing the manufacturing, transportation and construction costs of fittings and towers.
Description
技术领域technical field
本实用新型涉及一种悬垂串,具体讲涉及一种轻冰区用紧凑型两联V型悬垂串。The utility model relates to a hanging string, in particular to a compact two-connected V-shaped hanging string for light ice areas.
背景技术Background technique
铁塔结构的直线塔广泛应用于特高压架空输电线路以支撑导线和地线的耐张段之间,是输电线路中使用数量较多的杆塔类型。悬垂绝缘子串是直线塔的一种连接导线与铁塔并保持输电导线与铁塔之间电气绝缘的重要部件。Straight line towers with iron tower structure are widely used in UHV overhead transmission lines to support the tension section between conductors and ground wires, and are the most widely used tower types in transmission lines. The suspension insulator string is an important part of the straight tower that connects the wire and the iron tower and maintains the electrical insulation between the transmission wire and the iron tower.
悬垂绝缘子串除具有输电导线与铁塔自身的电气绝缘性能外,还承受来自导线的重力荷载、水平风荷载、自身重力荷载。特高压输电线路的悬垂绝缘子串一般由连接金具与复合材料制成的复合绝缘子组成。经电气绝缘计算、力学计算并对安全性、经济性等综合比较后确定具体类型。In addition to the electrical insulation performance of the transmission wire and the iron tower itself, the suspension insulator string also bears the gravity load from the wire, the horizontal wind load, and its own gravity load. Suspended insulator strings of UHV transmission lines are generally composed of connecting fittings and composite insulators made of composite materials. The specific type is determined after electrical insulation calculation, mechanical calculation and comprehensive comparison of safety and economy.
输电线路悬垂绝缘子串有垂直安装的I串、倾斜安装的V型串,Y型串以及多串并联安装筹多种方式,不同的安装方式对绝缘子污闪特性会产生不同影响。目前国内外高压直流线路悬垂串绝大多数采用I串和V串两种方式,运行情况良好,I串及V串的设计及使用已有丰富的经验。Suspended insulator strings on transmission lines include vertically installed I strings, obliquely installed V-shaped strings, Y-shaped strings, and multi-string parallel installations. Different installation methods will have different effects on the pollution flashover characteristics of insulators. At present, most of the suspension strings of high-voltage DC lines at home and abroad adopt I string and V string, and the operation is good. The design and use of I string and V string have rich experience.
随着特高压的建设,电压等级越来越高,势必要加大导线截面和增加导线的分裂根数,这样势必增大了导线的使用量、金具串的吨位及金具的尺寸和吨位、铁塔的结构尺寸及线路走廊宽度等,从而加大了工程投资。With the construction of UHV, the voltage level is getting higher and higher, it is necessary to increase the cross section of the wire and the number of split wires, which will inevitably increase the use of wires, the tonnage of the fitting string, the size and tonnage of the fittings, and the iron tower. The structural size and the width of the line corridor, etc., thus increasing the project investment.
为此,申请人设计了一种紧凑型两联V型悬垂串,在保证工程要求的同时,优化悬垂串内金具的结构尺寸和连接形式,不仅降低了金具制造、运输及施工成本,还可以降低铁塔投资,具有很好的经济效益。For this reason, the applicant designed a compact two-connected V-shaped suspension string. While ensuring the engineering requirements, the structural size and connection form of the fittings in the suspension string were optimized, which not only reduced the manufacturing, transportation and construction costs of the fittings, but also It reduces the investment of the iron tower and has good economic benefits.
实用新型内容Utility model content
为了解决上述问题,本实用新型提供了一种轻冰区用紧凑型两联V型悬垂串,采用成熟的加工工艺,极大提高了金具的结构强度以及金具连接为悬垂串的整体强度,确保了输电线路的正常运行;同时,通过优化金具的结构及其连接方式,有效的缩短了悬垂串的长度,从而降低了输电铁塔的塔身高度,降低了金具和铁塔的制造、运输及施工成本,具有很好的经济效益。In order to solve the above problems, the utility model provides a compact two-connected V-shaped hanging string for light ice areas. It adopts mature processing technology, which greatly improves the structural strength of the fittings and the overall strength of the fittings connected as a hanging string, ensuring At the same time, by optimizing the structure and connection method of the fittings, the length of the hanging string is effectively shortened, thereby reducing the height of the transmission tower, and reducing the manufacturing, transportation and construction costs of fittings and iron towers , has good economic benefits.
本实用新型的目的是采用下述技术方案实现的:The purpose of this utility model is to adopt following technical scheme to realize:
本实用新型提供的一种轻冰区用紧凑型两联V型悬垂串,包括悬垂联板8和呈“V”字型分布的两个两联悬垂串,所述悬垂串包括由复合绝缘子4连接而成的复合绝缘子串,所述复合绝缘子串两端分别与铁塔横担和所述悬垂联板8连接;The utility model provides a compact two-connected V-shaped hanging string for light ice areas, which includes a hanging connecting plate 8 and two two-connecting hanging strings distributed in a "V" shape. The hanging string is composed of composite insulators 4 The connected composite insulator strings, the two ends of the composite insulator strings are respectively connected to the iron tower cross arm and the suspension connecting plate 8;
其改进之处在于:其中一个所述两联悬垂串的复合绝缘子串与悬垂联板8之间依次设有联板一6和Z型直角挂板7,另一个所述两联悬垂串的复合绝缘子串与悬垂联板8之间依次设有联板二13和直角挂板14。The improvement is that: one of the composite insulator strings of the two suspension strings and the suspension connection plate 8 are sequentially provided with a connection plate one 6 and a Z-shaped right-angle suspension plate 7, and the composite insulator string of the other two suspension strings is Between the insulator string and the hanging connecting plate 8, connecting plate 2 13 and right-angle hanging plate 14 are provided in sequence.
其中,所述联板一6为等腰三角形板状结构,其三个顶角分别设有孔一601、孔二602和孔三603,所述底角的孔二602和孔三603之间设有与顶角的孔一601位于同一悬垂线的孔四604;所述孔二602和孔三603的外侧分别设有孔五605。Wherein, the connecting plate one 6 is an isosceles triangular plate structure, and its three top corners are respectively provided with a hole one 601, a hole two 602 and a hole three 603, and the hole two 602 and the hole three 603 of the bottom corner Hole 4 604 is located on the same suspension line as Hole 1 601 at the top corner; Hole 5 605 is provided on the outside of Hole 2 602 and Hole 3 603 respectively.
其中,所述Z型直角挂板7两端分别设置凹槽,所述凹槽的开槽方向相互垂直,所述凹槽两侧壁沿同一水平线方向分别设有通孔。Wherein, the two ends of the Z-shaped right-angle hanging plate 7 are respectively provided with grooves, and the slotting directions of the grooves are perpendicular to each other, and the two side walls of the grooves are respectively provided with through holes along the same horizontal direction.
其中,所述联板一6设置在所述Z型直角挂板7一端的凹槽中,所述孔四604与凹槽的通孔通过螺栓连接,所述螺栓设有闭口销;所述悬垂联板8通过螺栓设置在所述Z型直角挂板7另一端的凹槽中。Wherein, the connecting plate one 6 is arranged in the groove at one end of the Z-shaped right-angle hanging plate 7, the hole four 604 is connected with the through hole of the groove by a bolt, and the bolt is provided with a closed pin; The connecting plate 8 is set in the groove at the other end of the Z-shaped right-angle hanging plate 7 through bolts.
其中,所述悬垂联板8设有与悬垂线夹9连接的沿同一圆周分布的线夹连接孔,所述悬垂联板8中心设有重锤片11。Wherein, the hanging connecting plate 8 is provided with connecting holes for connecting the hanging wire clamps 9 along the same circumference, and the center of the hanging connecting plate 8 is provided with a weight 11 .
其中,所述复合绝缘子4之间设有均压环5,所述均压环5分别与联板一6和联板二13通过螺栓连接,所述均压环5与联板一6和联板二13之间分别设有放松垫圈503和垫圈。Wherein, a pressure equalizing ring 5 is provided between the composite insulators 4, and the pressure equalizing ring 5 is respectively connected to the connecting plate 1 6 and the connecting plate 2 13 by bolts, and the pressure equalizing ring 5 is connected to the connecting plate 1 6 and the connecting plate 13 respectively. A loosening washer 503 and a washer are respectively provided between the plates 2 13 .
其中,两个所述两联复合绝缘子串与铁塔横担之间分别依次设有耳轴挂板1、ZBD型直角挂板2、PT调整板12和U型挂环3。Wherein, a trunnion hanging plate 1 , a ZBD type right-angle hanging plate 2 , a PT adjusting plate 12 and a U-shaped hanging ring 3 are arranged in sequence between the two double-connected composite insulator strings and the cross arm of the iron tower.
其中,所述耳轴挂板1为一端水平设有空心圆轴的板状结构,另一端水平设有开孔,所述开孔方向与空心圆轴的轴线方向垂直,所述空心圆轴中设置双头螺栓101,所述双头螺栓101两端由里至外依次设有垫圈、螺母和闭口销。Wherein, the trunnion hanging plate 1 is a plate-like structure with a hollow circular shaft horizontally provided at one end, and an opening is horizontally provided at the other end, and the direction of the opening is perpendicular to the axial direction of the hollow circular shaft. A stud bolt 101 is provided, and the two ends of the stud bolt 101 are sequentially provided with a washer, a nut and a dead pin from the inside to the outside.
其中,所述ZBD型直角挂板2为一端设有U型凹槽的板状结构,另一端水平设有圆孔;所述圆孔的开孔方向与U型凹槽的开槽方向一致,所述U型凹槽两侧壁沿同一水平线方向设有与所述圆孔开孔方向垂直的通孔。Wherein, the ZBD type right-angle hanging plate 2 is a plate-like structure with a U-shaped groove at one end, and a round hole at the other end; the opening direction of the round hole is consistent with the slotting direction of the U-shaped groove, The two side walls of the U-shaped groove are provided with through holes perpendicular to the opening direction of the circular hole along the same horizontal direction.
其中,所述耳轴挂板1通过螺栓设置在所述ZBD型直角挂板2的U型凹槽中,所述螺栓设有闭口销;所述ZBD型直角挂板2的另一端通过螺栓与PT调整板12连接。Wherein, the trunnion hanging plate 1 is arranged in the U-shaped groove of the ZBD-type right-angle hanging plate 2 through bolts, and the bolt is provided with a closed pin; the other end of the ZBD-type right-angle hanging plate 2 is connected to the PT adjustment plate 12 is connected.
其中,所述PT调整板12包括平行板1202和设置在所述平行板1202之间的单挂板1201,所述单挂板1201和平行板1202分别间隔设有调整螺孔,所述单挂板1201与平行板1202之间通过螺栓连接;所述PT调整板12与复合绝缘子串之间通过U型挂环3连接。Wherein, the PT adjustment plate 12 includes a parallel plate 1202 and a single hanging plate 1201 arranged between the parallel plates 1202, the single hanging plate 1201 and the parallel plate 1202 are respectively provided with adjusting screw holes at intervals, the single hanging The plate 1201 and the parallel plate 1202 are connected by bolts; the PT adjustment plate 12 and the composite insulator string are connected by a U-shaped hanging ring 3 .
其中,所述悬垂线夹9包括设置在其内部的压板901和设置在其顶部的UB挂板903;所述压板901和悬垂线夹9之间通过紧固螺栓902连接,所述压板901和紧固螺栓902之间设有平垫圈907和弹簧垫圈908;所述UB挂板903通过螺栓与悬垂联板(8)连接。Wherein, the suspension clamp 9 includes a pressing plate 901 arranged inside it and a UB hanging plate 903 arranged on its top; the pressing plate 901 and the suspension clamp 9 are connected by fastening bolts 902, and the pressing plate 901 and A flat washer 907 and a spring washer 908 are arranged between the fastening bolts 902; the UB hanging plate 903 is connected with the hanging connecting plate (8) through bolts.
其中,输电导线设置在所述压板901和悬垂线夹9构成的空腔内;所述输电导线表面设有导线包缠物10。Wherein, the power transmission wire is arranged in the cavity formed by the pressing plate 901 and the suspension wire clamp 9; the wire wrapping 10 is provided on the surface of the power transmission wire.
与最接近的现有技术比,本发明具有以下有益效果:Compared with the closest prior art, the present invention has the following beneficial effects:
1、本实用新型提供的轻冰区用紧凑型两联V型悬垂串,采用成熟的加工工艺,极大提高了金具的结构强度以及金具连接为悬垂串后的整体强度,确保了输电线路的正常运行。1. The compact two-connected V-shaped hanging string for light ice areas provided by the utility model adopts mature processing technology, which greatly improves the structural strength of the fittings and the overall strength after the fittings are connected into a hanging string, ensuring the safety of the transmission line. normal operation.
2、本实用新型提供的轻冰区用紧凑型两联V型悬垂串,通过优化金具的结构及其连接方式,有效的缩短了悬垂串的长度,从而降低了输电铁塔的塔身高度,降低了金具和铁塔的制造、运输及施工成本,具有很好的经济效益。2. The compact two-connected V-shaped suspension string for light ice area provided by the utility model effectively shortens the length of the suspension string by optimizing the structure of the fittings and its connection mode, thereby reducing the height of the transmission tower and reducing the It reduces the manufacturing, transportation and construction costs of hardware and iron towers, and has good economic benefits.
3、本实用新型提供的轻冰区用紧凑型两联V型悬垂串,采用新型结构的联板一,优化了悬垂串结构,减轻了悬垂串重量以及串长。3. The utility model provides a compact two-connected V-shaped hanging string for light ice areas, which adopts a new structure of connecting plate 1, optimizes the structure of the hanging string, and reduces the weight and length of the hanging string.
4、本实用新型提供的轻冰区用紧凑型两联V型悬垂串,提高了位于左侧悬垂串薄弱点的直角挂板的一个强度等级(即高于右侧同位置的Z型直角挂板一个强度等级),在施工时,将左侧悬垂串置于输电铁塔的塔身外侧,当悬垂串发生串断时,由于直角挂板的强度等级高于Z型直角挂板的强度等级,右侧悬垂串先断,保证了断串不会因撞击铁塔,而造成二次伤害。4. The compact two-connected V-shaped hanging string for light ice areas provided by the utility model improves a strength level of the right-angle hanging board located at the weak point of the hanging string on the left side (that is, it is higher than the Z-shaped right-angle hanging board at the same position on the right side). One strength level of the slab), during construction, the left hanging string is placed outside the tower body of the transmission tower. When the hanging string breaks, the strength level of the right-angle hanging slab is higher than that of the Z-shaped right-angle slab. The hanging string on the right is broken first to ensure that the broken string will not cause secondary damage due to hitting the iron tower.
附图说明Description of drawings
图1:本实用新型提供的轻冰区用紧凑型两联V型悬垂串的结构示意图;Figure 1: Schematic diagram of the structure of the compact two-connected V-shaped suspension string for light ice areas provided by the utility model;
图2:本实用新型提供的其中一个两联悬垂串的结构示意图;Fig. 2: a structural schematic diagram of one of the two hanging strings provided by the utility model;
图3:本实用新型提供的另一个两联悬垂串的结构示意图Figure 3: Structural schematic diagram of another two-link hanging string provided by the utility model
图4:本实用新型提供的悬垂线夹悬挂输电导线的结构示意图;Figure 4: Structural schematic diagram of the suspension wire clamp provided by the utility model to suspend the transmission wire;
图5:本实用新型提供的耳轴挂板的正视结构示意图;Fig. 5: a front view structural schematic diagram of the trunnion hanging plate provided by the utility model;
图6:本实用新型提供的耳轴挂板的侧视结构示意图;Figure 6: A schematic diagram of the side view structure of the trunnion hanging plate provided by the utility model;
图7:本实用新型提供的ZBD型直角挂板的正视结构示意图;Fig. 7: The schematic diagram of the front view structure of the ZBD type right-angle hanging board provided by the utility model;
图8:本实用新型提供的ZBD型直角挂板的侧视结构示意图;Figure 8: A schematic diagram of the side view structure of the ZBD type right-angle hanging board provided by the utility model;
图9:本实用新型提供的U型挂环的正视结构示意图;Fig. 9: a front view structural schematic diagram of the U-shaped hanging ring provided by the utility model;
图10:本实用新型提供的U型挂环的侧视结构示意图;Figure 10: a schematic diagram of the side view structure of the U-shaped hanging ring provided by the utility model;
图11:本实用新型提供的均压环的正视结构示意图;Figure 11: A schematic diagram of the front view structure of the pressure equalizing ring provided by the utility model;
图12:本实用新型提供的均压环的侧视结构示意图;Figure 12: A schematic diagram of the side view structure of the pressure equalizing ring provided by the utility model;
图13:本实用新型提供的联板一的正视结构示意图;Figure 13: a schematic diagram of the front view of the connecting plate 1 provided by the utility model;
图14:本实用新型提供的Z型直角挂板的正视结构示意图;Figure 14: a schematic diagram of the front view structure of the Z-shaped right-angle hanging board provided by the utility model;
图15:本实用新型提供的Z型直角挂板的侧视结构示意图;Figure 15: A schematic diagram of the side view structure of the Z-shaped right-angle hanging plate provided by the utility model;
图16:本实用新型提供的悬垂联板的正视结构示意图;Figure 16: a schematic diagram of the front view structure of the suspension connecting plate provided by the utility model;
图17:本实用新型提供的悬垂线夹的正视结构示意图;Figure 17: A schematic diagram of the front view structure of the suspension clamp provided by the utility model;
图18:本实用新型提供的悬垂线夹的侧视结构示意图;Figure 18: A schematic diagram of the side view structure of the suspension clamp provided by the utility model;
图19:本实用新型提供的导线包缠物的结构示意图;Figure 19: Schematic diagram of the structure of the wire wrap provided by the utility model;
图20:本实用新型提供的重锤片的正视结构示意图;Figure 20: a schematic diagram of the front structure of the hammer provided by the utility model;
图21:本实用新型提供的重锤片的侧视结构示意图;Figure 21: A schematic diagram of the side view structure of the hammer provided by the utility model;
图22:本实用新型提供的PT调整板的正视结构示意图;Figure 22: A schematic diagram of the front view structure of the PT adjustment plate provided by the utility model;
图23:本实用新型提供的PT调整板的侧视结构示意图;Figure 23: A schematic diagram of the side view structure of the PT adjustment plate provided by the utility model;
图24:本实用新型提供的PT调整板调整长度后的正视结构示意图;Figure 24: Schematic diagram of the front view structure of the PT adjustment plate provided by the utility model after the length is adjusted;
图25:本实用新型提供的PT调整板调整长度后的侧视结构示意图;Figure 25: A schematic diagram of the side view structure of the PT adjustment plate provided by the utility model after the length is adjusted;
其中:1、耳轴挂板;2、ZBD型直角挂板;3、U型挂环;4、复合绝缘子;5、均压环;6、联板一;7、Z型直角挂板;8、悬垂联板;9、悬垂线夹;10、导线包缠物;11、重锤片;12、PT调整板;13、联板二;14、直角挂板;101、双头螺栓;102、垫圈;103、螺母;104、闭口销;201、螺栓;202、螺母;203、闭口销;301、螺栓;302、螺母;303、闭口销;501、螺栓;502、螺母;503、放松垫圈;504、垫圈;601、孔一;602、孔二;603、孔三;604、孔四;605、孔五;701、螺栓;702、螺母;703、闭口销;901、压板;902、紧固螺栓;903、UB挂板;904、螺栓;905、螺母;906、闭口销;907、平垫圈;908、弹簧垫圈;909、螺栓;1201、单挂板;1202、平行板;1203、螺栓;1204、螺母;1205、闭口销。Among them: 1. Trunnion hanging plate; 2. ZBD type right-angle hanging plate; 3. U-shaped hanging ring; 4. Composite insulator; , hanging connecting plate; 9, hanging clamp; 10, wire wrapping; 11, heavy hammer; 12, PT adjustment plate; 13, connecting plate two; Washer; 103, nut; 104, closed pin; 201, bolt; 202, nut; 203, closed pin; 301, bolt; 302, nut; 303, closed pin; 501, bolt; 502, nut; 503, loosening washer; 504, washer; 601, hole one; 602, hole two; 603, hole three; 604, hole four; 605, hole five; 701, bolt; 702, nut; 703, closed pin; 901, pressure plate; 902, fastening Bolt; 903, UB hanging plate; 904, bolt; 905, nut; 906, closed pin; 907, flat washer; 908, spring washer; 909, bolt; 1201, single hanging plate; 1202, parallel plate; 1203, bolt; 1204, nut; 1205, closed pin.
具体实施方式Detailed ways
为使本实用新型的上述目的、特征和优点能够更加明显易懂,下面结合附图对本实用新型的具体实施方式做进一步的详细说明。In order to make the above purpose, features and advantages of the utility model more obvious and understandable, the specific implementation of the utility model will be further described in detail below in conjunction with the accompanying drawings.
本实施例提供的轻冰区用紧凑型两联V型悬垂串,如图1至25所示,包括:耳轴挂板1、ZBD型直角挂板2、U型挂环3、复合绝缘子4、均压环5、联板一6、Z型直角挂板7、悬垂联板8、悬垂线夹9、导线包缠物10、重锤片11、PT调整板12、联板二13、直角挂板14。呈“V”字型分布的两个两联悬垂串分别与铁塔横担和悬垂联板8连接,悬垂串包括由复合绝缘子4串接而成的复合绝缘子串,两个两联悬垂串的复合绝缘子串和铁塔横担之间均依次连接耳轴挂板1、ZBD型直角挂板2、PT调整板12和U型挂环3;其中一个两联悬垂串的复合绝缘子串与悬垂联板8之间依次设有联板一6和Z型直角挂板7,另一个两联悬垂串的复合绝缘子串与悬垂联板8之间依次设有联板二13和直角挂板14。The compact two-connected V-shaped suspension string for light ice areas provided in this embodiment, as shown in Figures 1 to 25, includes: trunnion hanging plate 1, ZBD-type right-angle hanging plate 2, U-shaped hanging ring 3, and composite insulator 4 , pressure equalizing ring 5, connecting plate 1 6, Z-type right-angle hanging plate 7, hanging connecting plate 8, hanging wire clip 9, wire wrapping 10, weight plate 11, PT adjusting plate 12, connecting plate 2 13, right angle Hanging board 14. The two two-connected suspension strings distributed in a "V" shape are respectively connected to the iron tower cross arm and the suspension connecting plate 8. The suspension strings include composite insulator strings connected in series by composite insulators 4, and the composite The insulator string and the iron tower cross arm are connected in sequence with the trunnion hanging plate 1, the ZBD type right-angle hanging plate 2, the PT adjustment plate 12 and the U-shaped hanging ring 3; one of the composite insulator strings with two hanging strings and the hanging connecting plate 8 The first connecting plate 6 and the Z-type right-angle hanging plate 7 are arranged in sequence, and the second connecting plate 13 and the right-angle hanging plate 14 are arranged between the composite insulator string of another two-connected suspension string and the hanging connecting plate 8 in sequence.
其中,如图5至6所示,耳轴挂板1为一端水平设有空心圆轴的板状结构,另一端水平设有开孔,开孔的方向与空心圆轴的轴线方向垂直,在空心圆轴中设置双头螺栓101,双头螺栓101两端设置垫圈102并通过螺母103紧固,在双头螺栓101的两端设置防止螺母103脱落的闭口销104。Wherein, as shown in Figures 5 to 6, the trunnion hanging plate 1 is a plate-shaped structure with a hollow circular shaft horizontally provided at one end, and an opening is horizontally provided at the other end, and the direction of the opening is perpendicular to the axial direction of the hollow circular shaft. A stud bolt 101 is arranged in the hollow circular shaft, and a washer 102 is arranged at both ends of the stud bolt 101 and is tightened by a nut 103 .
其中,如图7至8所示,ZBD型直角挂板2为一端设有U型凹槽的板状结构,另一端水平设有圆孔;圆孔的开孔方向与U型凹槽的开槽方向一致,U型凹槽两侧壁沿同一水平线方向设有与圆孔开孔方向垂直的通孔。耳轴挂板1通过螺栓201设置在ZBD型直角挂板2的U型凹槽中,螺栓201用螺母202紧固,并且在螺栓201端部设有防止螺母202脱落的闭口销203。Among them, as shown in Figures 7 to 8, the ZBD type right-angle hanging plate 2 is a plate structure with a U-shaped groove at one end, and a round hole at the other end; the opening direction of the round hole is consistent with the opening direction of the U-shaped groove. The direction of the groove is consistent, and the two side walls of the U-shaped groove are provided with through holes perpendicular to the direction of the opening of the round hole along the same horizontal line. The trunnion hanging plate 1 is arranged in the U-shaped groove of the ZBD type right-angle hanging plate 2 through bolts 201. The bolts 201 are fastened with nuts 202, and the ends of the bolts 201 are provided with closed pins 203 to prevent the nuts 202 from falling off.
其中,如图9至10所示,U型挂环3与PT调整板12通过螺栓301连接,螺栓301通过螺母302紧固,螺栓301端部设有防止螺母302脱落的闭口销303;U型挂环3另一端与复合绝缘子串连接。Wherein, as shown in Figures 9 to 10, the U-shaped hanging ring 3 and the PT adjustment plate 12 are connected by bolts 301, and the bolts 301 are fastened by nuts 302, and the ends of the bolts 301 are provided with closed pins 303 to prevent the nuts 302 from falling off; The other end of the hanging ring 3 is connected in series with composite insulators.
其中,如图11至12所示,均压环5位于复合绝缘子之间,设置在其中一个两联复合绝缘子串中的均压环5通过螺栓501与联板一6的孔五605连接,螺栓501在设置放松垫圈503和垫圈504之后通过螺母502紧固;设置在另一个两联复合绝缘子串中的均压环5与联板二13通过螺栓连接。Among them, as shown in Figures 11 to 12, the voltage equalizing ring 5 is located between the composite insulators, and the voltage equalizing ring 5 set in one of the two-connected composite insulator strings is connected to the hole five 605 of the connecting plate one 6 through the bolt 501, and the bolt 501 is tightened by nuts 502 after loosening the washers 503 and 504; the equalizing ring 5 set in another two-connected composite insulator string is connected with the connecting plate 2 13 by bolts.
其中,如图13所示,联板一6为等腰三角形板状结构,其三个顶角分别设有孔一601、孔二602和孔三603,位于底角的孔二602和孔三603之间设有与顶角的孔一601位于同一悬垂线的孔四604;在孔二602和孔三603的外侧分别设有与均压环5连接的孔五605。悬垂串分别与孔二602和孔三603连接。Among them, as shown in Figure 13, the connecting plate 1 6 is an isosceles triangular plate-shaped structure, and its three top corners are respectively provided with a hole 1 601, a hole 2 602 and a hole 3 603, and holes 2 602 and 3 at the bottom corner Between 603 there is hole 4 604 located on the same suspension line as hole 1 601 at the top corner; on the outside of hole 2 602 and hole 3 603 are respectively provided holes 5 605 connected with pressure equalizing ring 5 . The hanging strings are connected to the second hole 602 and the third hole 603 respectively.
其中,如图14至15所示,Z型直角挂板7两端分别设置凹槽,凹槽的开槽方向相互垂直,凹槽两侧壁沿同一水平线方向分别设有通孔,Z型直角挂板7一端通过螺栓701与孔四604连接,螺栓701用螺母702紧固后安装防止螺母702脱落的闭口销703;另一端通过螺栓与悬垂联板8连接。Among them, as shown in Figures 14 to 15, the two ends of the Z-shaped right-angle hanging plate 7 are respectively provided with grooves, the grooves are perpendicular to each other, and the two side walls of the groove are respectively provided with through holes along the same horizontal direction. Hanging plate 7 one ends are connected with hole 4 604 by bolt 701, and the closed pin 703 that prevents nut 702 from falling off is installed after bolt 701 tightens with nut 702;
其中,如图16所示,悬垂联板8设有与用于悬挂输电导线的悬垂线夹9连接的沿同一圆周分布的线夹连接孔,在悬垂联板8中心设有用于控制悬垂串的摆动角度的重锤片11。Wherein, as shown in Figure 16, the suspension connecting plate 8 is provided with the line clamp connecting holes distributed along the same circumference that are connected with the suspension clamp 9 for suspending the power transmission conductor, and the center of the suspension connecting plate 8 is provided with a hole for controlling the suspension string. The heavy hammer plate 11 of swing angle.
其中,如图17至18所示,悬垂线夹9包括位于其内部的压板901和位于其顶部的UB挂板903;压板901和悬垂线夹9之间放置输电导线并通过紧固螺栓902固定,在紧固螺栓902上安装平垫圈907和弹簧垫圈908后用螺母905紧固;UB挂板903通过螺栓904与悬垂联板8连接,螺栓904用螺母905紧固后安装防止螺母905脱落的闭口销906。Wherein, as shown in Figures 17 to 18, the suspension clamp 9 includes a pressure plate 901 located inside it and a UB hanging plate 903 located on its top; a power conductor is placed between the pressure plate 901 and the suspension clamp 9 and fixed by fastening bolts 902 After installing flat washers 907 and spring washers 908 on the fastening bolts 902, fasten them with nuts 905; the UB hanging plate 903 is connected with the suspension connecting plate 8 through bolts 904, and after the bolts 904 are fastened with nuts 905, install them to prevent the nuts 905 from falling off Shutter pin 906.
其中,如图19所示,在输电导线表面包裹导线包缠物10,防止输电导线因外部压力过大而受损。Wherein, as shown in FIG. 19 , the wire wrapping 10 is wrapped on the surface of the power transmission wire to prevent the power transmission wire from being damaged due to excessive external pressure.
其中,如图22至25所示,PT调整板12包括平行板1202和设置在平行板1202之间的单挂板1201,单挂板1201和平行板1202均间隔设有调整螺孔,根据现场实际情况通过调整单挂板1201与平行板1202的相对位置,实现PT调整板12长度的调整,单挂板1201与平行板1202之间通过螺栓1203连接,螺栓1203用螺母1204紧固,在螺栓1203端部设置防止螺母1204脱落的闭口销1205。Wherein, as shown in Figures 22 to 25, the PT adjustment plate 12 includes a parallel plate 1202 and a single hanging plate 1201 arranged between the parallel plates 1202, and the single hanging plate 1201 and the parallel plate 1202 are both provided with adjustment screw holes at intervals. In the actual situation, the adjustment of the length of the PT adjustment plate 12 is realized by adjusting the relative position of the single hanging plate 1201 and the parallel plate 1202. The single hanging plate 1201 and the parallel plate 1202 are connected by bolts 1203. The end of 1203 is provided with a closed pin 1205 to prevent the nut 1204 from falling off.
实施例1Example 1
如图1所示,呈“V”字型分布的左右两个两联悬垂串,其左侧悬垂串与悬垂联板8之间通过联板二13和直角挂板14连接,其右侧悬垂串与悬垂联板8之间通过联板一6和Z型直角挂板7连接。联板一6采用如图13所示的结构,优化了悬垂串结构,减轻了悬垂串重量以及串长;同时,选用的直角挂板14的强度等级高于Z型直角挂板7一级。在施工时,将左侧悬垂串置于输电铁塔的塔身外侧,当悬垂串发生串断时,由于直角挂板14的强度等级高于Z型直角挂板7的强度等级,右侧悬垂串先断,保证了断串不会因撞击铁塔,而造成二次伤害。As shown in Figure 1, there are two left and right hanging strings distributed in the shape of a "V". Connect by connecting plate one 6 and Z type right-angle hanging plate 7 between string and hanging connecting plate 8. Connecting plate 16 adopts the structure shown in Figure 13, which optimizes the hanging string structure, reduces the weight and string length of the hanging string; at the same time, the strength level of the selected right-angle hanging plate 14 is higher than that of the Z-shaped right-angle hanging plate 7. During construction, place the left hanging string outside the tower body of the power transmission tower. When the hanging string breaks, because the strength grade of the right-angle hanging plate 14 is higher than that of the Z-shaped right-angle hanging plate 7, the right hanging string Break first to ensure that the broken string will not cause secondary damage due to hitting the iron tower.
最后应当说明的是:以上实施例仅用以说明本实用新型的技术方案而非对其限制,所属领域的普通技术人员应当理解,参照上述实施例可以对本实用新型的具体实施方式进行修改或者等同替换,这些未脱离本实用新型精神和范围的任何修改或者等同替换均在申请待批的权利要求保护范围之内。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model rather than to limit them. Those of ordinary skill in the art should understand that the specific implementation of the present utility model can be modified or equivalent with reference to the above examples. Replacement, any modification or equivalent replacement that does not depart from the spirit and scope of the present utility model is within the protection scope of the pending claims.
Claims (13)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420703441.3U CN204229942U (en) | 2014-11-20 | 2014-11-20 | A kind of light ice formation compact two V-type suspension string |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420703441.3U CN204229942U (en) | 2014-11-20 | 2014-11-20 | A kind of light ice formation compact two V-type suspension string |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204229942U true CN204229942U (en) | 2015-03-25 |
Family
ID=52928009
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420703441.3U Expired - Lifetime CN204229942U (en) | 2014-11-20 | 2014-11-20 | A kind of light ice formation compact two V-type suspension string |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204229942U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104376935A (en) * | 2014-11-20 | 2015-02-25 | 国家电网公司 | Compact type dual-connection V-shaped suspension string for light-ice area |
-
2014
- 2014-11-20 CN CN201420703441.3U patent/CN204229942U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104376935A (en) * | 2014-11-20 | 2015-02-25 | 国家电网公司 | Compact type dual-connection V-shaped suspension string for light-ice area |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104376935B (en) | A kind of light ice formation compact two V-type suspension string | |
| CN107706871A (en) | Overhead distribution | |
| CN205046909U (en) | Compound cross arm and contain transmission tower of this complex cross arm | |
| CN204326669U (en) | A kind of direct current transportation steel tower | |
| CN110159051B (en) | Power transformation framework | |
| CN104361958B (en) | A kind of 5-linked double hanging point insulator resistant string | |
| CN201260056Y (en) | Distributed anti-dancing spacing rod | |
| CN204691378U (en) | An end fixing piece for composite cross arm | |
| CN210074720U (en) | Wire hanging plate and insulating beam | |
| CN204229941U (en) | A kind of light ice formation compact three V-type suspension string | |
| CN204229942U (en) | A kind of light ice formation compact two V-type suspension string | |
| CN104376934B (en) | A kind of light ice formation V-type suspension string of compact three | |
| CN101931195B (en) | Turn buckle typed steplessly adjustable phase-to-phase spacer bracket | |
| CN201438396U (en) | A double I-type and V-type tension insulator string for UHV substation | |
| CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
| CN203690017U (en) | Annularly-connected composite insulator chain of +-800 kV extra-high voltage DC line | |
| CN204793957U (en) | Pair is two hangs six division leveling on some L types cluster that dangles | |
| CN204230831U (en) | A kind of wear-resistant ground wire string based on trench structure | |
| CN109494025B (en) | A triple I-type hanging string | |
| CN204167018U (en) | A kind of 5-linked double hanging point insulator strain string | |
| CN105743040B (en) | A kind of wire is arranged vertically transmission tower | |
| CN204230837U (en) | A kind of multiple fission conductor wind damping anti-galloping device | |
| CN104929410B (en) | A kind of overhead transmission line | |
| CN204424843U (en) | One prevents stockbridge damper positioning device | |
| CN209016657U (en) | A kind of 10kV wire jumper compound inslation support rod connecting cleat |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150325 |