CN204228911U - A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus - Google Patents

A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus Download PDF

Info

Publication number
CN204228911U
CN204228911U CN201420587398.9U CN201420587398U CN204228911U CN 204228911 U CN204228911 U CN 204228911U CN 201420587398 U CN201420587398 U CN 201420587398U CN 204228911 U CN204228911 U CN 204228911U
Authority
CN
China
Prior art keywords
main conductive
conductive system
turntable
fixing frame
moving contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420587398.9U
Other languages
Chinese (zh)
Inventor
潘红旗
郭自豪
曲欣
姚茂志
王红敏
王俊平
张宏涛
李宇鹏
吴锋
武文燕
崔子章
张辉
张九霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
State Grid Corp of China SGCC
Original Assignee
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pinggao Group Co Ltd, Henan Pinggao Electric Co Ltd, State Grid Corp of China SGCC filed Critical Pinggao Group Co Ltd
Priority to CN201420587398.9U priority Critical patent/CN204228911U/en
Application granted granted Critical
Publication of CN204228911U publication Critical patent/CN204228911U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本实用新型公开了一种单相开关调试单元及高压隔离开关调试装置,包括主导电系统固定架及设于主导电系统左右两侧的静触头固定架,主导电系统固定架上部转动设有动触头安装座,主导电系统固定架上还设有驱动动触头安装座转动的驱动机构,驱动机构连接有用于在主导电系统分合闸过程中测量力矩的扭力传感器装置。本实用新型的高压隔离开关调试装置在安装、调试过程中,主导电系统的安装可在地面完成,主导电系统固定架与静触头固定架之间的距离调节可通过地基轨道调整,安装、调试过程均在地面完成,克服了现有的高空作业的难度大、危险程度高的缺点。

The utility model discloses a single-phase switch debugging unit and a high-voltage isolating switch debugging device, which include a main conductive system fixing frame and static contact fixing frames arranged on the left and right sides of the main conductive system. The moving contact mounting seat and the main conductive system fixing frame are also provided with a driving mechanism that drives the moving contact mounting seat to rotate, and the driving mechanism is connected with a torque sensor device for measuring torque during the opening and closing process of the main conductive system. During the installation and debugging process of the high-voltage isolating switch debugging device of the present utility model, the installation of the main conductive system can be completed on the ground, and the distance between the main conductive system fixing frame and the static contact fixing frame can be adjusted through the foundation track. The debugging process is all completed on the ground, which overcomes the existing shortcomings of high-altitude operations that are difficult and dangerous.

Description

一种单相开关调试单元及高压隔离开关调试装置A single-phase switch debugging unit and a high-voltage isolating switch debugging device

技术领域 technical field

本实用新型涉及高压隔离开关设备的试验调试领域,具体涉及一种单相开关调试单元及高压隔离开关调试装置。  The utility model relates to the field of test and debugging of high-voltage isolating switch equipment, in particular to a single-phase switch debugging unit and a high-voltage isolating switch debugging device. the

背景技术 Background technique

现有的高压隔离开关的试验检测方法是模拟现场,将隔离开关所有零件按照现场的安装要求进行安装调试,然后检验其三相同步及其它机械性能。将隔离开关所有零部件模拟现场进行安装调试工作量大,效率低,特别对于主体部分较高的开关产品,在试验调试时,需要借用曲臂升降车进行高空调试,不仅调试难度大、效率低,而且高空作业危险程度高。  The existing testing method of the high-voltage isolating switch is to simulate the site, install and debug all the parts of the isolating switch according to the installation requirements of the site, and then check its three-phase synchronization and other mechanical properties. Installing and debugging all parts of the isolating switch by simulating the site is a lot of work and low efficiency, especially for switch products with a high main part, when testing and debugging, it is necessary to borrow a crank arm lift truck for high-altitude debugging, which is not only difficult to debug, but also low in efficiency , and high-altitude operations are highly dangerous. the

发明内容 Contents of the invention

本实用新型的目的在于提供一种单相开关调试单元,以解决现有高压隔离开关机械性能试验工作量大、危险程度高的问题;同时本实用新型还提供一种对高压隔离开关三相联动机械性能检测的高压隔离开关调试装置。 The purpose of this utility model is to provide a single-phase switch debugging unit to solve the problems of large workload and high risk in the mechanical performance test of the existing high-voltage isolating switch; at the same time, the utility model also provides a three-phase linkage for high-voltage isolating High-voltage isolating switch debugging device for mechanical performance testing.

为了实现上述目的,本实用新型采用如下技术方案:一种单相开关调试单元,所述单相开关调试单元包括主导电系统固定架及设于主导电系统左右两侧的静触头固定架,所述主导电系统固定架上部转动设有动触头安装座,所述主导电系统固定架上还设有驱动动触头安装座转动的驱动机构,所述驱动机构连接有用于在主导电系统分合闸过程中测量力矩的扭力传感器装置。 In order to achieve the above purpose, the utility model adopts the following technical solutions: a single-phase switch debugging unit, the single-phase switch debugging unit includes a main conductive system fixing frame and static contact fixing frames arranged on the left and right sides of the main conductive system, The upper part of the fixed frame of the main conductive system is provided with a moving contact mounting seat, and the fixed frame of the main conductive system is also provided with a driving mechanism for driving the moving contact mounting seat to rotate. Torque sensor device for measuring torque during opening and closing.

所述主导电系统固定架上转动设有转盘,所述动触头安装座设在转盘上,所述驱动机构通过传动机构与转盘连接。 A turntable is rotated on the fixed frame of the main conductive system, the moving contact mounting seat is set on the turntable, and the driving mechanism is connected with the turntable through a transmission mechanism.

所述转盘上设置有用于调整动触头安装座的高度、水平度的调节结构。 The turntable is provided with an adjustment structure for adjusting the height and level of the moving contact mounting seat.

所述调节结构为一端螺纹装配于转盘上的上下延伸的第一螺杆,所述第一螺杆的另一端螺旋装配在动触头安装座上。 The adjusting structure is a first screw threaded at one end and extending up and down on the turntable, and the other end of the first screw is threaded at the moving contact mounting seat.

所述静触头固定架包括立柱,所述立柱上部螺纹装配有用于安装静触头的第二螺杆。 The static contact fixing frame includes a column, and the upper part of the column is threaded with a second screw rod for installing the static contact.

一种高压隔离开关调试装置,包括三个前后并列设置的单相开关调试单元,所述单相开关调试单元包括主导电系统固定架及设于主导电系统左右两侧的静触头固定架,所述主导电系统固定架上部转动设有动触头安装座,所述主导电系统固定架上还设有驱动动触头安装座转动的驱动机构,所述驱动机构连接有用于在主导电系统分合闸过程中测量力矩的扭力传感器装置。 A high-voltage isolating switch debugging device, including three single-phase switch debugging units arranged side by side, the single-phase switch debugging unit includes a main conductive system fixing frame and static contact fixing frames arranged on the left and right sides of the main conductive system, The upper part of the fixed frame of the main conductive system is provided with a moving contact mounting seat, and the fixed frame of the main conductive system is also provided with a driving mechanism for driving the moving contact mounting seat to rotate. Torque sensor device for measuring torque during opening and closing.

所述主导电系统固定架上转动设有转盘,所述动触头安装座设在转盘上,所述驱动机构通过传动机构与转盘连接。 A turntable is rotated on the fixed frame of the main conductive system, the moving contact mounting seat is set on the turntable, and the driving mechanism is connected with the turntable through a transmission mechanism.

所述转盘上设置有用于调整动触头安装座的高度、水平度的调节结构。 The turntable is provided with an adjustment structure for adjusting the height and level of the moving contact mounting seat.

所述调节结构为一端螺纹装配于转盘上的上下延伸的第一螺杆,所述第一螺杆的另一端螺旋装配在动触头安装座上。 The adjusting structure is a first screw threaded at one end and extending up and down on the turntable, and the other end of the first screw is threaded at the moving contact mounting seat.

所述静触头固定架包括立柱,所述立柱上部螺纹装配有用于安装静触头的第二螺杆。 The static contact fixing frame includes a column, and the upper part of the column is threaded with a second screw rod for installing the static contact.

本实用新型的有益效果:在对高压隔离开关进行安装调试及检测各项机械性能时,单独进行主闸刀部分的三相联动机械性能试验,省去了将高压隔离开关总装的步骤,减轻了工人的劳动强度;而且在安装、调试过程中,主导电系统的安装可在地面完成,主导电系统固定架与静触头固定架之间的距离调节可通过地基轨道调整,安装、调试过程均在地面完成,克服了现有的高空作业的难度大、危险程度高的缺点。另外本调试装置不仅可以检测隔离开关的三相联动的性能,还可以检测各单相开关的机械性能,调试装置可以重复多次使用,从而节省了大量的试验费用。 The beneficial effects of the utility model: when installing and debugging the high-voltage isolating switch and testing various mechanical properties, the three-phase linkage mechanical performance test of the main switch blade part is carried out separately, which saves the step of assembling the high-voltage isolating switch and reduces The labor intensity of workers; and in the process of installation and commissioning, the installation of the main conductive system can be completed on the ground, and the distance between the main conductive system fixing frame and the static contact fixing frame can be adjusted through the foundation rail. It is completed on the ground, which overcomes the shortcomings of the existing high-altitude operations, which are difficult and dangerous. In addition, the debugging device can not only detect the three-phase linkage performance of the isolating switch, but also detect the mechanical properties of each single-phase switch. The debugging device can be used repeatedly, thereby saving a lot of test costs.

附图说明 Description of drawings

图1是本实用新型的单相开关调试单元实施例的主视图; Fig. 1 is the front view of the single-phase switch debugging unit embodiment of the present utility model;

图2 是图1的左视图; Fig. 2 is the left view of Fig. 1;

图3是本实用新型高压隔离开关调试装置的结构示意图。 Fig. 3 is a structural schematic diagram of a debugging device for a high-voltage isolating switch of the present invention.

具体实施方式 Detailed ways

本实用新型高压隔离开关调试装置的实施例,如图1-3所示:包括三个前后并列设置的单相开关调试单元,各单相开关调试单元包括主导电系统固定架1及设于主导电系统固定架1相对的左右两侧的静触头固定架2,主导电系统固定架1上部转动设有动触头安装座13,动触头安装座13通过上下方向延伸的螺杆14安装在设于主导电系统固定架1上部的转盘15上,转盘15可在水平面内转动,螺杆14一端螺纹装配在转盘15上,螺杆14另一端与动触头安装座13螺纹装配,动触头安装座13会随着转盘15一起转动。导电系统固定架1上还设有驱动转盘15转动的驱动机构10,驱动机构10通过传动机构12带动转盘15转动,驱动机构10和传动机构12之间还连接有用于在主导电系统3分合闸过程中测量力矩的扭力传感器装置11。静触头固定架2包括立柱,立柱的上部螺纹装配有螺杆21,螺杆21的上端与静触头22螺纹装配,两静触头22、23的开口朝向相反,螺杆21用于调节静触头22、23的高度。 The embodiment of the high-voltage isolating switch debugging device of the present invention is shown in Figure 1-3: it includes three single-phase switch debugging units arranged side by side in front and behind, and each single-phase switch debugging unit includes a main conductive system fixing frame 1 and a main The static contact fixing frame 2 on the left and right sides of the electrical system fixing frame 1 is opposite, and the upper part of the main electrical system fixing frame 1 is rotated to be provided with a moving contact mounting seat 13, and the moving contact mounting seat 13 is installed on the Set on the turntable 15 on the upper part of the main conductive system fixing frame 1, the turntable 15 can rotate in the horizontal plane, one end of the screw 14 is threaded on the turntable 15, the other end of the screw 14 is threaded with the moving contact mounting seat 13, and the moving contact is installed Seat 13 can rotate together with turntable 15. The conductive system fixed frame 1 is also provided with a driving mechanism 10 that drives the rotating disk 15 to rotate. The driving mechanism 10 drives the rotating disk 15 to rotate through the transmission mechanism 12. There is also a connection between the driving mechanism 10 and the transmission mechanism 12 for opening and closing the main conductive system 3. Torque sensor device 11 for measuring torque during braking. The static contact fixing frame 2 comprises a column, and the upper thread of the column is equipped with a screw rod 21, and the upper end of the screw rod 21 is threadedly assembled with the static contact 22, and the openings of the two static contacts 22, 23 are facing oppositely, and the screw rod 21 is used for adjusting the static contact. 22, 23 heights.

安装时,先将主导电系统固定架1及静触头固定架2安装在预埋的地基基座上并调整水平,然后将动触头安装座13安装在螺杆14上,将驱动机构10、传动机构12及扭力传感器装置11安装在主导电系统固定架1上,最后将高压隔离开关的动触头31、静触头22及23分别安装在动触头安装座13和静触头固定架2上,将各单相开关调试单元通过三相控制线5连接起来,并均与动态测试平台4相连接,组成三相联动调试装置。 During installation, first install the main conductive system fixing frame 1 and the static contact fixing frame 2 on the embedded foundation base and adjust the level, then install the moving contact mounting base 13 on the screw rod 14, and install the driving mechanism 10, The transmission mechanism 12 and the torque sensor device 11 are installed on the main conductive system fixing frame 1, and finally the moving contact 31, the static contacts 22 and 23 of the high-voltage disconnector are installed on the moving contact mounting seat 13 and the static contact fixing frame respectively 2, the single-phase switch debugging units are connected through the three-phase control line 5, and all of them are connected with the dynamic test platform 4 to form a three-phase linkage debugging device.

调试时,首先将主闸刀安装在调试装置的动触头安装座13和静触头固定架2上,调节螺杆14使主导电系统3中的主导电杆30处于水平位置,然后通过操作动态测试平台4上的控制按钮,将控制信号传送给主导电系统固定架1中的驱动机构10,驱动机构10通过传动机构12带动转盘15转动,并进一步带动主导电系统3中的主导电杆30转动,进而完成主导电系统3的分合闸操作。在主导电系统3的分合闸过程中,通过与驱动机构10连接的扭力传感器装置11把测量到的数值传送到动态测试平台4,经过转化后的力矩值通过数据软件分析得出主导电系统3的分合闸运动轨迹,根据其运动轨迹检验高压开关的机械性能。主导电系统3在合闸状态时,通过使用塞尺可进行动触头、静触指接触密实度的检测。 When debugging, first install the main switch knife on the moving contact mounting base 13 and the static contact fixing frame 2 of the debugging device, adjust the screw 14 to make the main conductive rod 30 in the main conductive system 3 be in a horizontal position, and then dynamically The control button on the test platform 4 transmits the control signal to the driving mechanism 10 in the main conductive system fixed frame 1, and the driving mechanism 10 drives the turntable 15 to rotate through the transmission mechanism 12, and further drives the main conductive rod 30 in the main conductive system 3 Rotate, and then complete the opening and closing operation of the main conductive system 3. During the opening and closing process of the main conduction system 3, the measured value is transmitted to the dynamic test platform 4 through the torque sensor device 11 connected to the drive mechanism 10, and the converted torque value is analyzed by data software to obtain the main conduction system 3, the opening and closing movement trajectory, according to its movement trajectory to test the mechanical properties of the high-voltage switch. When the main conductive system 3 is in the closing state, the contact density of the moving contact and the static contact finger can be detected by using the feeler gauge.

在本实施例中,转盘设置的用于调整动触头安装座的高度的调节结构为螺杆,通过螺杆调整动触头安装的高度及水平度,方便主导电杆的安装,同时也能提高在合闸时主导电杆与动触头及静触头的接触精度,使检测到的高压开关的机械性能数据更加准确;当然,在其它实施例中,也可采用通过螺栓将动触头安装座固定在转盘上,根据实际安装的需要,在动触头安装座底部和转盘之间插入调整垫片。 In this embodiment, the adjusting structure for adjusting the height of the moving contact mounting seat set on the turntable is a screw, and the height and level of the moving contact are adjusted through the screw, which is convenient for the installation of the main conductive rod, and can also improve the The contact accuracy between the main conductive rod and the moving contact and the static contact when closing the switch makes the detected mechanical performance data of the high-voltage switch more accurate; It is fixed on the turntable, and according to actual installation needs, an adjusting gasket is inserted between the bottom of the moving contact mounting base and the turntable.

本实用新型单相开关调试单元的实施例,如图1-2,单相开关调试单元的结构与上述高压隔离开关调试装置中使用的单相开关调试单元的结构相同,在此不再赘述。使用时,利用单相开关调试单元可以完成对单相高压隔离开关的机械性能的试验。  The embodiment of the single-phase switch debugging unit of the present invention is shown in Fig. 1-2. The structure of the single-phase switch debugging unit is the same as that of the single-phase switch debugging unit used in the above-mentioned high-voltage isolating switch debugging device, and will not be repeated here. When in use, the test of the mechanical performance of the single-phase high-voltage isolating switch can be completed by using the single-phase switch debugging unit. the

Claims (10)

1.一种单相开关调试单元,其特征在于:所述单相开关调试单元包括主导电系统固定架及设于主导电系统左右两侧的静触头固定架,所述主导电系统固定架上部转动设有动触头安装座,所述主导电系统固定架上还设有驱动动触头安装座转动的驱动机构,所述驱动机构连接有用于在主导电系统分合闸过程中测量力矩的扭力传感器装置。 1. A single-phase switch debugging unit, characterized in that: the single-phase switch debugging unit includes a main conductive system fixed mount and a static contact fixed mount located on the left and right sides of the main conductive system, and the main conductive system fixed mount The upper part is rotated with a moving contact mounting seat, and the main conductive system fixed frame is also provided with a driving mechanism for driving the moving contact mounting seat to rotate. torque sensor device. 2.根据权利要求1所述的单相开关调试单元,其特征在于:所述主导电系统固定架上转动设有转盘,所述动触头安装座设在转盘上,所述驱动机构通过传动机构与转盘连接。 2. The single-phase switch debugging unit according to claim 1, characterized in that: the fixed frame of the main conductive system is provided with a turntable, the moving contact mounting base is set on the turntable, and the driving mechanism is The mechanism is connected with the turntable. 3.根据权利要求2所述的单相开关调试单元,其特征在于:所述转盘上设置有用于调整动触头安装座的高度、水平度的调节结构。 3. The single-phase switch debugging unit according to claim 2, characterized in that: the turntable is provided with an adjustment structure for adjusting the height and level of the moving contact mounting seat. 4.根据权利要求3所述的单相开关调试单元,其特征在于:所述调节结构为一端螺纹装配于转盘上的上下延伸的第一螺杆,所述第一螺杆的另一端螺旋装配在动触头安装座上。 4. The single-phase switch debugging unit according to claim 3, characterized in that: the adjustment structure is a first screw threaded at one end and extending up and down on the turntable, and the other end of the first screw is screwed at the dynamic on the contact mount. 5.根据权利要求1-4中任意一项所述的单相开关调试单元,其特征在于:所述静触头固定架包括立柱,所述立柱上部螺纹装配有用于安装静触头的第二螺杆。 5. The single-phase switch debugging unit according to any one of claims 1-4, characterized in that: the static contact fixing frame includes a column, and the upper part of the column is threaded with a second screw for installing the static contact. screw. 6.一种高压隔离开关调试装置,其特征在于:包括三个前后并列设置的单相开关调试单元,所述单相开关调试单元包括主导电系统固定架及设于主导电系统左右两侧的静触头固定架,所述主导电系统固定架上部转动设有动触头安装座,所述主导电系统固定架上还设有驱动动触头安装座转动的驱动机构,所述驱动机构连接有用于在主导电系统分合闸过程中测量力矩的扭力传感器装置。 6. A high-voltage isolating switch debugging device, characterized in that: it includes three single-phase switch debugging units arranged side by side before and after, and the single-phase switch debugging unit includes a main conductive system fixing frame and a main conductive system. Static contact fixing frame, the upper part of the main conductive system fixing frame is rotated with a moving contact mounting seat, and the main conductive system fixing frame is also provided with a driving mechanism for driving the moving contact mounting seat to rotate, and the driving mechanism is connected to There are torque sensor devices for measuring torque during opening and closing of the main electrical system. 7.根据权利要求6所述的高压隔离开关调试装置,其特征在于:所述主导电系统固定架上转动设有转盘,所述动触头安装座设在转盘上,所述驱动机构通过传动机构与转盘连接。 7. The high-voltage isolating switch debugging device according to claim 6, characterized in that: a turntable is installed on the fixed frame of the main conductive system, the moving contact mounting seat is set on the turntable, and the driving mechanism The mechanism is connected with the turntable. 8.根据权利要求7所述的高压隔离开关调试装置,其特征在于:所述转盘上设置有用于调整动触头安装座的高度、水平度的调节结构。 8. The debugging device for high-voltage isolating switch according to claim 7, characterized in that: the turntable is provided with an adjustment structure for adjusting the height and level of the moving contact mounting seat. 9.根据权利要求8所述的高压隔离开关调试装置,其特征在于:所述调节结构为一端螺纹装配于转盘上的上下延伸的第一螺杆,所述第一螺杆的另一端螺旋装配在动触头安装座上。 9. The debugging device for high-voltage isolating switch according to claim 8, characterized in that: the adjusting structure is a first screw threaded at one end and extending up and down on the turntable, and the other end of the first screw is threaded at the movable on the contact mount. 10.根据权利要求6-9中任意一项所述的高压隔离开关调试装置,其特征在于:所述静触头固定架包括立柱,所述立柱上部螺纹装配有用于安装静触头的第二螺杆。 10. The high-voltage isolating switch debugging device according to any one of claims 6-9, characterized in that: the static contact fixing frame includes a column, and the upper part of the column is threaded with a second screw for installing the static contact. screw.
CN201420587398.9U 2014-10-11 2014-10-11 A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus Expired - Lifetime CN204228911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420587398.9U CN204228911U (en) 2014-10-11 2014-10-11 A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420587398.9U CN204228911U (en) 2014-10-11 2014-10-11 A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus

Publications (1)

Publication Number Publication Date
CN204228911U true CN204228911U (en) 2015-03-25

Family

ID=52926991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420587398.9U Expired - Lifetime CN204228911U (en) 2014-10-11 2014-10-11 A kind of single-phase switch debugging unit and high voltage isolator debugging apparatus

Country Status (1)

Country Link
CN (1) CN204228911U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105319501A (en) * 2015-11-12 2016-02-10 河南平高电气股份有限公司 Isolating switch test rack and test static contact thereof
CN109581000A (en) * 2018-12-26 2019-04-05 中山市明阳电器有限公司 A kind of experimental rig can be used for development equipment
CN110416904A (en) * 2019-07-25 2019-11-05 湖南长高高压开关集团股份公司 A kind of maintenance debugging tool of horizontal outdoor high-voltage alternating current isolating switch
CN112008670A (en) * 2020-07-17 2020-12-01 湖南长高高压开关集团股份公司 Double-column horizontal telescopic type disconnecting switch overhauling and debugging tool
CN115180550A (en) * 2022-08-22 2022-10-14 国网山东省电力公司菏泽供电公司 Smart power grids overhauls uses elevating gear

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105319501A (en) * 2015-11-12 2016-02-10 河南平高电气股份有限公司 Isolating switch test rack and test static contact thereof
CN105319501B (en) * 2015-11-12 2018-06-15 河南平高电气股份有限公司 A kind of disconnecting switch test stand and its test static contact
CN109581000A (en) * 2018-12-26 2019-04-05 中山市明阳电器有限公司 A kind of experimental rig can be used for development equipment
CN110416904A (en) * 2019-07-25 2019-11-05 湖南长高高压开关集团股份公司 A kind of maintenance debugging tool of horizontal outdoor high-voltage alternating current isolating switch
CN112008670A (en) * 2020-07-17 2020-12-01 湖南长高高压开关集团股份公司 Double-column horizontal telescopic type disconnecting switch overhauling and debugging tool
CN115180550A (en) * 2022-08-22 2022-10-14 国网山东省电力公司菏泽供电公司 Smart power grids overhauls uses elevating gear
CN115180550B (en) * 2022-08-22 2022-12-20 国网山东省电力公司菏泽供电公司 Smart power grids overhauls uses elevating gear

Similar Documents

Publication Publication Date Title
CN105242202B (en) A kind of detection device for circuit breaker
CN201464615U (en) A high-voltage isolating switch test device
CN203941232U (en) A kind of atomizer resistance on-line measuring device
CN103439045A (en) Detecting device for drum brake
CN103674377A (en) Method for detecting contact pressure between conductive slip ring and conductive brush wire
CN203298723U (en) Combined test tool for insulator geometric tolerance
CN103234834B (en) Loading device used in road seam filling material low-temperature performance test
CN204405036U (en) A kind of high precision switch over travel measurement mechanism
CN204882090U (en) Six station accelerator pedal durability test devices
CN107063856B (en) Apparatus for force testing of split bushings
CN104374355A (en) Device and method for measuring displacement of driver control gear
CN204255321U (en) A kind of device measuring the displacement of pilot control device
CN104655417A (en) Device for testing high and low temperature performance of certain indexing mechanism of space station
CN204831370U (en) A testing device for a relay
CN203772722U (en) Liquid-plastic limit combined tester
CN203881328U (en) Similar simulation test tunnel bottom drum monitoring device
CN205941815U (en) Test bench suitable for electric parameter acquisition of polymorphic type travel switch
CN204214639U (en) Breaker mechanic property proving installation
CN204189370U (en) Single-Rotational Inverted Pendulum experimental provision
CN203287388U (en) Speed measurement support of switch characteristic instrument
CN104977439B (en) Managing security tools and instruments whirling test stand
CN204940370U (en) A kind of well lid pressure test device
CN203929513U (en) A kind of low-pressure metering box metal insert axial load pick-up unit
CN203929054U (en) Automobile radiators pick-up unit
CN203587425U (en) Fine tuning type tension tester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150325