CN204194694U - A kind of wind power principal axis ring flange just forger dress - Google Patents
A kind of wind power principal axis ring flange just forger dress Download PDFInfo
- Publication number
- CN204194694U CN204194694U CN201420656739.3U CN201420656739U CN204194694U CN 204194694 U CN204194694 U CN 204194694U CN 201420656739 U CN201420656739 U CN 201420656739U CN 204194694 U CN204194694 U CN 204194694U
- Authority
- CN
- China
- Prior art keywords
- forging
- wind power
- flange
- upsetting
- conical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005242 forging Methods 0.000 claims abstract description 46
- 238000000034 method Methods 0.000 abstract description 4
- 238000003825 pressing Methods 0.000 abstract description 2
- 238000010248 power generation Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Wind Motors (AREA)
Abstract
本实用新型提供一种风电主轴法兰盘初锻工装,包括锻模和锥面镦粗板,锥面镦粗板的锻压工作面呈向下凸起的去顶的圆锥面。锥面镦粗板的锻压工作面呈向下凸起的去顶的圆锥面,在风电主轴法兰盘初锻过程中,通过对锥面镦粗板施加压力,使锻件在该种锥面镦粗板工作面的作用下,被向外挤压,而不是像现有平面镦粗板工作面仅给锻件垂直下压力还有很大的摩擦力,使得风电主轴法兰盘初锻时间减少,提高了风电主轴法兰盘初锻效率。在初锻后,采用具有平工作面的上砧子继续镦粗模锻,最终完成风电主轴法兰盘模锻。
The utility model provides a preliminary forging tool for a flange of a wind power main shaft, which comprises a forging die and a conical upsetting plate. The forging working surface of the conical upsetting plate is a conical surface that protrudes downward and removes the top. During the initial forging process of the wind power spindle flange, by applying pressure to the conical upsetting plate, the forging is upsetting on the conical surface. Under the action of the working surface of the rough plate, it is extruded outward, instead of only exerting vertical downward pressure on the forging and having a large friction force like the existing flat upsetting plate working surface, which reduces the initial forging time of the wind power spindle flange. The initial forging efficiency of the flange of the wind power main shaft is improved. After the initial forging, the upper anvil with a flat working surface is used to continue the upsetting die forging, and finally complete the die forging of the wind power main shaft flange.
Description
技术领域 technical field
本实用新型涉及风力发电设备制造技术领域,具体涉及一种风电主轴法兰盘初锻工装。 The utility model relates to the technical field of wind power generation equipment manufacturing, in particular to a preliminary forging tool for a flange plate of a wind power main shaft.
背景技术 Background technique
风力发电是国家大力提倡的清洁能源发电,在我国正不断发展,主轴是风力发电设备的一个组件,随着风力能源的不断开发,主轴需求量也随之增加,如何在保证产品质量的情况下提高效率是目前锻造行业竞争的核心。因法兰盘薄,直径大,且轴身细,台阶差大,采用自由锻费时又费力。图1示出了现有的一种风电主轴法兰盘模锻工装,包括锻模2和上砧子1,上砧子的锻压工作面是平面,在风电主轴法兰盘镦粗锻造过程中,始终采用这种平工作面的上砧子对锻件进行锻压,耗时长,锻造效率低。 Wind power generation is a clean energy power generation strongly advocated by the country. It is developing continuously in our country. The main shaft is a component of wind power generation equipment. With the continuous development of wind energy, the demand for main shafts will also increase. How to ensure product quality? Improving efficiency is at the heart of competition in the forging industry today. Because the flange is thin, the diameter is large, the shaft body is thin, and the step difference is large, free forging is time-consuming and laborious. Fig. 1 shows an existing wind power main shaft flange die forging tool, including forging die 2 and upper anvil 1, the forging working surface of the upper anvil is plane, during the upsetting forging process of wind power main shaft flange , Always use the upper anvil with this flat working surface to forge the forging, which takes a long time and the forging efficiency is low.
发明内容 Invention content
本实用新型要解决的技术问题是提供一种风电主轴法兰盘初锻工装,提高了锻造效率。 The technical problem to be solved by the utility model is to provide a preliminary forging tool for the flange of the wind power main shaft, which improves the forging efficiency.
为了解决上述技术问题,本实用新型的技术方案为: In order to solve the problems of the technologies described above, the technical solution of the utility model is:
一种风电主轴法兰盘初锻工装,包括锻模和锥面镦粗板,锥面镦粗板的锻压工作面呈向下凸起的去顶的圆锥面。 A preliminary forging tool for a flange of a wind power main shaft includes a forging die and a conical upsetting plate.
上述风电主轴法兰盘初锻工装,圆锥面的锥角为145°-155°。 For the preliminary forging tooling for the flange of the wind power main shaft, the cone angle of the conical surface is 145°-155°.
上述风电主轴法兰盘初锻工装,圆锥面的锥角为150°。 For the preliminary forging tooling for the flange of the wind power main shaft, the cone angle of the conical surface is 150°.
上述风电主轴法兰盘初锻工装,锻模包括上模体和下模体,上模体呈环形,下模体中心具有漏轴通孔,上模体设置于下模体上端部与下模体共同围成模腔。 The above-mentioned wind power spindle flange preliminary forging tooling, the forging die includes an upper die body and a lower die body, the upper die body is in the shape of a ring, the center of the lower die body has a leaking shaft through hole, and the upper die body is arranged on the upper end of the lower die body and the lower die body The bodies together form a mold cavity.
锥面镦粗板的锻压工作面呈向下凸起的去顶的圆锥面,在风电主轴法兰盘初锻过程中,通过对锥面镦粗板施加压力,使锻件在该种锥面镦粗板工作面的作用下,被向外挤压,而不是像现有平面镦粗板工作面仅给锻件垂直下压力还有很大的摩擦力,使得风电主轴法兰盘初锻时间减少,提高了风电主轴法兰盘初锻效率。在初锻后,采用具有平工作面的上砧子继续镦粗模锻,最终完成风电主轴法兰盘模锻。 The forging working surface of the conical upsetting plate is a conical surface that protrudes downward and removes the top. During the initial forging process of the wind power spindle flange, by applying pressure to the conical upsetting plate, the forging is upsetting on the conical surface. Under the action of the working surface of the rough plate, it is extruded outward, instead of only exerting vertical downward pressure on the forging and having a large friction force like the existing flat upsetting plate working surface, which reduces the initial forging time of the wind power spindle flange. The initial forging efficiency of the flange of the wind power main shaft is improved. After the initial forging, the upper anvil with a flat working surface is used to continue the upsetting die forging, and finally complete the die forging of the wind power main shaft flange.
附图说明 Description of drawings
下面结合附图对本实用新型进一步详细的说明: Below in conjunction with accompanying drawing, the utility model is described in further detail:
图1为现有风电主轴法兰盘模锻工装的示意图。 Fig. 1 is a schematic diagram of the existing wind power spindle flange die forging tooling.
图2为本实用新型的结构示意图。 Fig. 2 is a structural schematic diagram of the utility model.
图中:1上砧子,2锻模,3锥面镦粗板,4锻模,5上模体,6下模体。 In the figure: 1 upper anvil, 2 forging die, 3 conical upsetting plate, 4 forging die, 5 upper die body, 6 lower die body.
具体实施方式 Detailed ways
如图2所示,一种风电主轴法兰盘初锻工装,包括锻模4和锥面镦粗板3,锥面镦粗板的锻压工作面呈向下凸起的去顶的圆锥面。 As shown in FIG. 2 , a preliminary forging tool for a flange of a wind power main shaft includes a forging die 4 and a conical upsetting plate 3 .
具体地,圆锥面的锥角为145°-155°。 Specifically, the cone angle of the conical surface is 145°-155°.
具体地,圆锥面的锥角为150°。 Specifically, the cone angle of the conical surface is 150°.
具体地,锻模包括上模体5和下模体6,上模体呈环形,下模体中心具有漏轴通孔,上模体设置于下模体上端部与下模体共同围成模腔。 Specifically, the forging die includes an upper die body 5 and a lower die body 6, the upper die body is ring-shaped, and the center of the lower die body has a leaking shaft through hole, and the upper die body is arranged on the upper end of the lower die body to form a mold cavity.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420656739.3U CN204194694U (en) | 2014-11-06 | 2014-11-06 | A kind of wind power principal axis ring flange just forger dress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420656739.3U CN204194694U (en) | 2014-11-06 | 2014-11-06 | A kind of wind power principal axis ring flange just forger dress |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204194694U true CN204194694U (en) | 2015-03-11 |
Family
ID=52652694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420656739.3U Expired - Lifetime CN204194694U (en) | 2014-11-06 | 2014-11-06 | A kind of wind power principal axis ring flange just forger dress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204194694U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111558681A (en) * | 2020-01-10 | 2020-08-21 | 宝鼎科技股份有限公司 | Application of spherical upsetting plate in forging large flange forging |
CN113369429A (en) * | 2021-04-22 | 2021-09-10 | 江阴振宏重型锻造有限公司 | Forming method of integral die section of long-shaft-shaped fan main shaft body |
-
2014
- 2014-11-06 CN CN201420656739.3U patent/CN204194694U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111558681A (en) * | 2020-01-10 | 2020-08-21 | 宝鼎科技股份有限公司 | Application of spherical upsetting plate in forging large flange forging |
CN113369429A (en) * | 2021-04-22 | 2021-09-10 | 江阴振宏重型锻造有限公司 | Forming method of integral die section of long-shaft-shaped fan main shaft body |
CN113369429B (en) * | 2021-04-22 | 2023-10-20 | 振宏重工(江苏)股份有限公司 | Forming method for integrally die forging of main shaft body of long-shaft-shaped fan |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105328020B (en) | Front ring punch forming frock and its method of work in burner inner liner | |
CN105344849B (en) | A kind of sheet material connection method of use riveting post oscillatory type riveting | |
CN107138589B (en) | A kind of plate hole forming device and forming method | |
CN102423790A (en) | Forging die and forging process for large-inclination conical hole forgings | |
CN203830627U (en) | Split type anvil machining device for forging tapering spindles | |
CN103707038A (en) | Device for maintaining and interfering joint | |
CN204194694U (en) | A kind of wind power principal axis ring flange just forger dress | |
CN204052602U (en) | A kind of mould producing semi-hollow self-pierce riveting rivet | |
CN202701244U (en) | Hot forging bend mould suitable for impeller cover plate with different inner bore diameters | |
CN206122374U (en) | Floating plug extrusion die structure of ring gear | |
CN203330293U (en) | Material stripping structure of compound die | |
CN204159810U (en) | The little pattern draft forging mold of aluminium alloy | |
CN204672880U (en) | A kind of large-scale flanged shaft forging one mould many forgings assembled tool | |
CN203635772U (en) | Flying wheel disc punch forming die | |
CN203711629U (en) | Steel pipe opening right-angle flanging die | |
CN104550589A (en) | Forging forming method of lower head forge piece for CAP1400 nuclear power pressurizer | |
CN204093966U (en) | A kind of gearbox body Drawing Die | |
CN204867896U (en) | Taper sleeve formula hole positioner | |
CN203817260U (en) | Combined type flange forming forging die | |
CN202606686U (en) | Mold capable of processing metal rubber materials with inner holes | |
CN201960071U (en) | Forming die for forging shaft type forged pieces | |
CN204449162U (en) | A kind of efficient forging mold that can improve pump housing model quality | |
CN206382443U (en) | A kind of tail pipe flare forming die | |
CN104307991A (en) | Tank wallboard shaping die | |
CN205270689U (en) | Closed mould of contact seat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Primary forging tool for wind power main shaft flange plate Effective date of registration: 20190227 Granted publication date: 20150311 Pledgee: Yucheng Branch of Agricultural Bank of China Ltd. Pledgor: TONGYU HEAVY INDUSTRY Co.,Ltd. Registration number: 2019990000162 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210304 Granted publication date: 20150311 Pledgee: Yucheng Branch of Agricultural Bank of China Ltd. Pledgor: TONGYU HEAVY INDUSTRY Co.,Ltd. Registration number: 2019990000162 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20150311 |
|
CX01 | Expiry of patent term |