CN204176891U - A kind of can the air conditioner support of Fast Installation - Google Patents
A kind of can the air conditioner support of Fast Installation Download PDFInfo
- Publication number
- CN204176891U CN204176891U CN201420521399.3U CN201420521399U CN204176891U CN 204176891 U CN204176891 U CN 204176891U CN 201420521399 U CN201420521399 U CN 201420521399U CN 204176891 U CN204176891 U CN 204176891U
- Authority
- CN
- China
- Prior art keywords
- hole
- affiliated
- air conditioner
- utility
- fast installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of can the air conditioner support of Fast Installation, comprise set square and wallboard, described set square is preset with some outstanding suspensions and is affiliated to portion and one first through hole, described wallboard is provided with a non-circular through hole and one with suspension the portion of being affiliated to coordinate be affiliated to hole, be equipped with check lock lever in described first through hole and non-circular through hole.Adopt the utility model of said structure by presetting some suspensions be affiliated to portion on set square and defaultly on wallboard being affiliated to hole and making the utility model carry out rapid-assembling, reduce work high above the ground time when using the utility model, reduction operating risk, the utility model structure is simple, Be very effective.
Description
Technical field
The utility model relate to a kind of can the air conditioner support of Fast Installation.
Background technology
Air-conditioning generally needs when being installed to house exterior wall to be arranged on exterior wall by air conditioner support in advance, and then air-conditioning is arranged on air conditioner support, existing air conditioner support has generally comprised set square and wallboard, therebetween be fixedly connected with by multiple bolt, need when the air conditioner support of this class formation is installed on exterior wall one by one bolt to be installed, expend the long period, now job content is work high above the ground, activity duration, longer danger was higher, for this reason the utility model provide a kind of can the air conditioner support of Fast Installation, can significantly reduce the work high above the ground time, reduce operating risk.
Utility model content
In order to solve the problem, the utility model provide a kind of can the air conditioner support of Fast Installation.
The utility model solves the technical scheme that its technical problem adopts:
A kind of can the air conditioner support of Fast Installation, comprise set square and wallboard, described set square is preset with some outstanding suspensions and is affiliated to portion and one first through hole, described wallboard is provided with a non-circular through hole and one with suspension the portion of being affiliated to coordinate be affiliated to hole, be equipped with check lock lever in described first through hole and non-circular through hole.
The described suspension portion of being affiliated to is set to a step rivet, this step rivet comprises head, the first bar portion and the second bar portion successively, first bar portion diameter is greater than the second bar portion, and this step rivet is riveted by the second bar portion and set square, and head and the first bar portion give prominence to outside set square.
Described second through hole and the third through-hole of being affiliated to hole and comprising two parts overlap, wherein the second through-hole diameter and head suitable, third through-hole diameter and the first bar portion diameter suitable.
The quantity that portion is affiliated in described suspension is set to two, and corresponding quantity of being affiliated to hole is set to two.
Described non-circular through hole is set to square hole.
Described check lock lever is set to CARRIAGE BOLTS.
The beneficial effects of the utility model are: adopt the utility model of said structure by presetting some suspensions be affiliated to portion on set square and defaultly on wallboard being affiliated to hole and making the utility model carry out rapid-assembling, reduce work high above the ground time when using the utility model, reduction operating risk, the utility model structure is simple, Be very effective.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated:
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is set square front view;
Fig. 3 is wallboard left view;
Fig. 4 is the A-A sectional view of Fig. 2;
Fig. 5 is the schematic diagram that portion and rivet are affiliated in suspension.
Detailed description of the invention
With reference to Fig. 1 ~ Fig. 5, the utility model be a kind of can the air conditioner support of Fast Installation, comprise set square 1 and wallboard 2, set square 1 is preset with two suspensions given prominence to and is affiliated to portion 3 and one first through hole, what wallboard 2 is provided with suspension, a non-circular through hole 4 and is affiliated to that portion 3 coordinates is affiliated to hole, is equipped with check lock lever 5 in the first through hole and non-circular through hole 4.Adopt the utility model of said structure by presetting some suspensions be affiliated to portion 3 on set square 1 and defaultly on wallboard 2 being affiliated to hole and making the utility model carry out rapid-assembling, reduce work high above the ground time when using the utility model, reduction operating risk, the utility model structure is simple, Be very effective.
As shown in the figure, suspension is affiliated to portion 3 and is set to a step rivet, this step rivet comprises head 31, first bar portion 32 and the second bar portion 33 successively, first bar portion 32 diameter is greater than the second bar portion 33, this step rivet is riveted with set square 1 by the second bar portion 33, and head 31 and the first bar portion 32 give prominence to outside set square 1; Be affiliated to the second through hole 61 and third through-hole 62 that hole comprises two parts overlap, wherein the second through hole 61 diameter and head 31 suitable, third through-hole 62 diameter and the first bar portion 32 diameter suitable.Adopt the suspension of said structure to be affiliated to portion 3 and be affiliated to the quick mounting that hole can realize between set square 1 and wallboard 2, and then fixed by check lock lever 5, concrete action first allows head 31 through the second through hole 61 as follows, and then set square 1 sinks, and makes the first bar portion 32 enter third through-hole 62.
As shown in the figure, non-circular through hole 4 is set to square hole; As shown in the figure, check lock lever 5 is set to CARRIAGE BOLTS.Certain non-circular through hole 4 also can be arranged to the through hole of triangle through hole, elliptical hole or other shape; The corresponding non-circular through hole 4 of check lock lever 5 is arranged.
Above-described embodiment is preferred version of the present utility model, and the utility model also can have other embodiments.Those skilled in the art also can make equivalent variations or replacement under the prerequisite without prejudice to the utility model spirit, and these equivalent modification or replacement are all included in the scope set by the application's claim.
Claims (6)
1. one kind can the air conditioner support of Fast Installation, it is characterized in that comprising set square and wallboard, described set square is preset with some outstanding suspensions and is affiliated to portion and one first through hole, described wallboard is provided with a non-circular through hole and one with suspension the portion of being affiliated to coordinate be affiliated to hole, be equipped with check lock lever in described first through hole and non-circular through hole.
2. a kind of as claimed in claim 1 can the air conditioner support of Fast Installation, it is characterized in that the described suspension portion of being affiliated to is set to a step rivet, this step rivet comprises head, the first bar portion and the second bar portion successively, first bar portion diameter is greater than the second bar portion, this step rivet is riveted by the second bar portion and set square, and head and the first bar portion give prominence to outside set square.
3. a kind of as claimed in claim 2 can the air conditioner support of Fast Installation, the second through hole and third through-hole that hole comprises two parts overlap is affiliated to described in it is characterized in that, wherein the second through-hole diameter and head suitable, third through-hole diameter and the first bar portion diameter suitable.
4. a kind of as claimed in claim 1 can the air conditioner support of Fast Installation, it is characterized in that the quantity that portion is affiliated in described suspension is set to two, corresponding quantity of being affiliated to hole is set to two.
5. a kind of as claimed in claim 1 can the air conditioner support of Fast Installation, it is characterized in that described non-circular through hole is set to square hole.
6. a kind of as claimed in claim 5 can the air conditioner support of Fast Installation, it is characterized in that described check lock lever is set to CARRIAGE BOLTS.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420521399.3U CN204176891U (en) | 2014-09-11 | 2014-09-11 | A kind of can the air conditioner support of Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420521399.3U CN204176891U (en) | 2014-09-11 | 2014-09-11 | A kind of can the air conditioner support of Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204176891U true CN204176891U (en) | 2015-02-25 |
Family
ID=52565699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420521399.3U Active CN204176891U (en) | 2014-09-11 | 2014-09-11 | A kind of can the air conditioner support of Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204176891U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104236061A (en) * | 2014-09-11 | 2014-12-24 | 陈均显 | Air conditioner support capable of being quickly installed |
-
2014
- 2014-09-11 CN CN201420521399.3U patent/CN204176891U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104236061A (en) * | 2014-09-11 | 2014-12-24 | 陈均显 | Air conditioner support capable of being quickly installed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204176891U (en) | A kind of can the air conditioner support of Fast Installation | |
CN204001930U (en) | The main material bracing means of electric power tower | |
CN203160689U (en) | Hole reserving device for building construction | |
CN205213627U (en) | Plastic film car that punches | |
CN104236061A (en) | Air conditioner support capable of being quickly installed | |
CN204163386U (en) | A kind of convenient disc type scaffold installed | |
CN205777785U (en) | A kind of for device at the bottom of the erosion control of verticallifting stereo garage | |
CN105058329A (en) | Multifunctional tool hammer | |
CN204819404U (en) | Multi -functional instrument hammer | |
CN204098367U (en) | Rhone installation component | |
CN204321006U (en) | For the spring product positioner of automobile drawing die | |
CN203939226U (en) | A kind of wall-connecting piece device for scaffold | |
CN204610453U (en) | A kind of nylon interval contiguous block | |
CN204805898U (en) | Touch -sensitive screen mounting structure | |
CN204227024U (en) | A kind of mass block being convenient to assemble | |
CN203977640U (en) | The column of curtain wall and the syndeton of crossbeam | |
CN204030314U (en) | A kind of power distribution cabinet beam structure | |
CN203062675U (en) | Screwdriver for disassembling and mounting screw spike in narrow slit | |
CN203335585U (en) | Integrated nut provided with reed | |
CN203716374U (en) | Ceiling of bus shelter | |
CN205173185U (en) | Elastic nut | |
CN204876192U (en) | Wall body in integrated house of assembled | |
CN106439016B (en) | A kind of corrosion-resistant boiler shell through hole sealing device | |
CN203769065U (en) | Novel cold-formed steel framework bearing structure with boundary beam | |
CN204812940U (en) | Bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |