CN204175245U - Three-pipe wellhead device - Google Patents

Three-pipe wellhead device Download PDF

Info

Publication number
CN204175245U
CN204175245U CN201420606790.3U CN201420606790U CN204175245U CN 204175245 U CN204175245 U CN 204175245U CN 201420606790 U CN201420606790 U CN 201420606790U CN 204175245 U CN204175245 U CN 204175245U
Authority
CN
China
Prior art keywords
string
wellhead
steam injection
test
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420606790.3U
Other languages
Chinese (zh)
Inventor
孔祥一
陈鹏
张涵淇
张成宇
王颖
吴爽
纪承
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201420606790.3U priority Critical patent/CN204175245U/en
Application granted granted Critical
Publication of CN204175245U publication Critical patent/CN204175245U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control Of Turbines (AREA)

Abstract

The utility model provides a tee pipe wellhead assembly, include: the first cross joint is internally provided with a cross-shaped and communicated transverse channel and a longitudinal channel; the conversion device body is connected above the first four-way joint, and an oil production channel, a steam injection channel and a test channel are longitudinally arranged in the conversion device body, and are parallel to each other, and the oil production channel, the steam injection channel and the test channel are communicated with the longitudinal channel. The three-pipe wellhead device of the utility model can effectively avoid the top edge phenomenon when the coiled tubing is put into the testing channel; because the protective pipe is added into the test hole, the coiled tubing is arranged in the protective pipe, the coiled tubing can be righted, and the phenomenon that the coiled tubing is mutually wound with the sucker rod when the coiled tubing is put into a certain depth can be effectively prevented.

Description

Three wellhead
Technical field
The utility model relates to the wellhead assembly in field of petroleum exploitation, particularly relates to a kind of three wellhead for thickened oil recovery.
Background technology
For improving thick oil recovery ratio, generally apply thermal recovery technology at present.Wherein, as the wellhead assembly demand fulfillment production of crucial well control facility, steam injection, test, the technological requirement such as sand washing and well-flushing, adopt three wellhead, can avoid thermal recovery handle up well produce time repeatedly play lower tubular column, but in existing three wellhead, steam injection passage, oil recovery passage and test channel are each other at an angle, through reliable theory calculate and field demonstration, due to the dimension constraint of big four, test channel is with main logical in any angle, when entering test channel under coiled tubing, all easily there is top margin problem.
Utility model content
The purpose of this utility model is to provide a kind of three wellhead, with solve prior art exist coiled tubing under enter test channel time there is top margin problem.
For achieving the above object, the utility model proposes a kind of three wellhead, comprising: the first four-way, offer in cross-shaped and the interconnection be connected and vertical passage in it; Conversion equipment body, be connected to above described first four-way, oil recovery passage, steam injection passage and test channel is longitudinally offered in described conversion equipment body, and described oil recovery passage, described steam injection passage and described test channel are parallel to each other, described oil recovery passage, described steam injection passage are all connected with described vertical passage with described test channel.
Three wellhead as above, wherein, are connected with I-shaped flange above described conversion equipment body, and the top of flow string is connected in described I-shaped flange, and described flow string runs through the vertical passage of described oil recovery passage and described first four-way.
Three wellhead as above, wherein, be connected with main valve, be connected with the second four-way above described main valve above described I-shaped flange, be connected with gate valve above described second four-way, described gate valve is blind rod type Wedge Gate Valves.
Three wellhead as above, wherein, be connected with steam injection string in the steam injection passage of described conversion equipment body, described steam injection string runs through the vertical passage of described first four-way.
Three wellhead as above, wherein, described conversion equipment body is connected with testing tube hanger, described testing tube hanger is connected with the top of test string, and described test string runs through the vertical passage of described test channel and described first four-way.
Three wellhead as above, wherein, are provided with test cable in described test string, and described test cable top is provided with slip-type hanger, and described slip-type hanger is installed in described test channel.
Three wellhead as above, wherein, have coiled tubing in described test string, are arranged with pillar outside described coiled tubing.
Three wellhead as above, wherein, described flow string is 2-7/8 " type oil pipe, described steam injection string is 3-1/2 " type steam inject tube, described test string is 1.900 " type testing tube.
Three wellhead as above, wherein, described flow string and described test string lay respectively at the both sides of described steam injection string.
Three wellhead as above, wherein, the sidewall of the described conversion equipment body outside described steam injection passage is transversely provided with control valve, and described control valve is provided with dial plate, and described control valve and described dial plate are all positioned at perpendicular.
Feature and the advantage of three wellhead of the present utility model are:
1, the utility model is a kind of by oil recovery, steam injection, test integrated multi-functional three wellhead, it produces the axis being parallel of passage, steam injection passage and test channel, thus flow string, steam injection string and test string are be arranged in parallel, the top margin phenomenon occurred when entering test channel under can effectively avoiding coiled tubing;
2, three wellhead of the present utility model, pillar is added in instrument connection, coiled tubing is installed in pillar, centralizing function can be played to coiled tubing, when entering certain depth under can effectively preventing coiled tubing again and between sucker rod, mutual wrapping phenomena occurs;
3, three wellhead of the present utility model, its steam injection passage is axially vertical with big four, and horizontal control valve is parallel with operating personnel, makes observation data more directly reliable;
4, three wellhead of the present utility model adopt the design of one multidigit, mechanism is reasonable, reliable operation, the requirement that the production of heavy crude heat extraction, steam injection and test technology carry out simultaneously can be met, avoid thermal recovery to handle up when well is produced and repeatedly play lower tubular column, simultaneously for the Operating Pressures such as follow-up well workover and sand washing provide device support, improve underground work safety and efficiency of construction, reduce labour intensity, save production cost.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the utility model and explain, does not limit scope of the present utility model.Wherein:
Fig. 1 is the front view of three wellhead of the present utility model;
Fig. 2 is flow string, steam injection string and the test string top view in sleeve pipe in three wellhead of the present utility model.
Critical element label declaration:
1 oil recovery passage 11 flow string
2 steam injection passages
21 steam injection string 22 control valve 23 control valves install passage
31 test string 32 testing tube hanger 33 annulus logging gate valves
4 first four-way 5 conversion equipment body 6 I-shaped flanges
7 main valve 8 second four-way 9 gate valves
10 sleeve pipes
Detailed description of the invention
In order to there be understanding clearly to technical characteristic of the present utility model, object and effect, now contrast accompanying drawing and detailed description of the invention of the present utility model is described.
As shown in Figure 1, the utility model provides a kind of three wellhead, comprises the first four-way 4 and conversion equipment body 5, wherein, offers in cross-shaped and the interconnection be connected and vertical passage in the first four-way 4; Conversion equipment body 5 is connected to above the first four-way 4, longitudinally offering oil recovery passage 1, steam injection passage 2 and test channel in conversion equipment body 5 (schemes not shown, be arranged in the back side of Fig. 1 steam injection passage 2), and the passage 1 that recovers the oil, steam injection passage 2 and test channel are parallel to each other, oil recovery passage 1, steam injection passage 2 and test channel are all connected with the vertical passage of the first four-way 4.Wherein, the first four-way 4 is big four.
Three wellhead of the present utility model, are designed to axis being parallel by oil recovery passage 1, steam injection passage 2 and test channel, enter test channel, there will not be top margin phenomenon under coiled tubing is vertical.In the present embodiment, be vertical under enter 1.9 cun of integral joint tubings.
In a specific embodiment, be connected with I-shaped flange 6 above conversion equipment body 5, the top of flow string 11 is connected in I-shaped flange 6, and flow string 11 runs through the vertical passage of oil recovery passage 1 and the first four-way 4.Namely the top of flow string 11 is connected with I-shaped flange 6, and seat is on conversion equipment body 5.
Wherein, be connected with main valve 7 above I-shaped flange 6, be connected with above main valve 7 above second four-way 8, second four-way 8 and be connected with gate valve 9, gate valve 9 is blind rod type Wedge Gate Valves.Wherein the handwheel of blind rod type Wedge Gate Valves is left-handed for opening, and dextrorotation is for closing; Second four-way 8 is little four-way.
This gate valve blocks air-flow, oil stream use in producing as steam injection oil recovery, in operational use, should use and be in standard-sized sheet or complete shut-down two kinds of positions, not allow to make adjustments flow use, otherwise can affect sealing performance and the application life of valve.Valve in use, regularly should add lubricating grease in bearing support.
In the embodiment shown in fig. 1, be connected with steam injection string 21 in the steam injection passage 2 of conversion equipment body 5, steam injection string 21 runs through the vertical passage of the first four-way 4.Namely the top of steam injection string 21 is connected with conversion equipment body 5, and seat is on the first four-way 4.
Wherein, the sidewall of the conversion equipment body 5 outside steam injection passage 2 is transversely provided with control valve 22, and control valve 22 is provided with dial plate, and control valve 22 and dial plate are all positioned at perpendicular.
Specifically, between the side tube wall of conversion equipment body 5 and steam injection passage 2, laterally offering control valve installs passage 23, control valve 22 is installed on control valve and installs on passage 23, and control valve 22 is installed passage 23 by control valve and can be stretched in steam injection passage 2, to control conducting or the cut-off of steam injection passage 2.Namely control valve 22 is vertical with the axis (i.e. vertical passage) of big four, dial plate is parallel with the vertical passage of big four, control valve 22 is horizontal control valve, control valve 22 is axially parallel with operating personnel, make the dial plate digital independent at control valve 22 place more directly reliable, and steam injection hole and flange shaft are to becoming a fixed angle of altitude in existing three wellhead, in a certain angle with the axis, it is very inconvenient that this makes control valve place read dial plate data to control valve.
In another specific embodiment, conversion equipment body 5 is connected with testing tube hanger 32, the corresponding test channel of testing tube hanger 32, testing tube hanger 32 is connected with the top of test string 31, and test string 31 runs through the vertical passage of test channel and the first four-way 4.Namely the top of test string is connected with testing tube hanger 32, and seat is on conversion equipment body 5.
Wherein, in test string 31, there is coiled tubing, outside coiled tubing, be arranged with pillar.In common three wellhead, coiled tubing in test string, under enter certain depth time, coiled tubing easily and sucker rod generation wrapping phenomena, consequence is difficult to the imagination, the utility model adds pillar in instrument connection, can play the effect of righting, effectively can prevent the mutual wrapping phenomena of down-hole oil tube again.
In addition, be provided with test cable in test string 31, test cable top is provided with slip-type hanger, and slip-type hanger is installed in test channel.
As shown in Figure 2, in a feasible technical scheme, flow string 11 is 2-7/8 " oil pipe, steam injection string 21 is 3-1/2 " steam inject tube, and test string 31 is 1.900 " testing tube.Be sheathed on flow string 11, the sleeve pipe of steam injection string 21 and test string 31 outside be 9 " sleeve pipe.
As shown in Figure 2, in the present embodiment, flow string 11 and test string 31 lay respectively at the both sides of steam injection string 21, the center arrangement triangular in shape of flow string 11, test string 31 and steam injection string 21.
Three wellhead of the present utility model, 3-1/8 " gate valve 9 is seated on the second four-way 8 (little four-way), little four-way is seated at 3-1/8 " and on main valve 7,3-1/8 " main valve 7 connects I-shaped flange 6.The other connecting test pipe hanger 32 of the main reduction of fractions to a common denominator of changing device body 5, I-shaped flange 6 and steam injection valve.First four-way 4 (big four) is communicated with 2-9/16 " annulus logging gate valve 33, the effect of annulus logging gate valve is test and reads data.Casing flange is connected with big four 7.
The installation process of three wellhead of the present utility model is as follows:
Conversion equipment body 5 is loaded on the first four-way 4 (big four).First be connected with casing flange by big four during assembling, then descend steam injection string 21 (installing starting taper bottom), steam injection string 21 is finally connected with conversion equipment body 5, and seat is on big four.
Then I-shaped flange 6 is arranged on conversion equipment body 5.Flow string 11 installs starting taper bottom, enters casing space by the oil recovery passage on conversion equipment body 5, and flow string 11 is topmost connected with I-shaped flange 6, and seat is on conversion equipment body 5.
Production tree is arranged on I-shaped flange 6, the 3-1/8 main valve 7 below production tree is connected with I-shaped flange 6.
Finally test string 31 is arranged on conversion equipment body 5.Test string 31 installs starting taper bottom, and the test channel through conversion equipment body 5 enters casing annulus, and test string 31 is topmost connected with testing tube hanger 32, and seat is on conversion equipment 6.
Multi-functional three wellhead of the present utility model, steam injection string, flow string, test string three pipe parallel construction effectively can solve test coiled tubing because of top margin and cannot enter down precalculated position and the coiled tubing problem such as winding at down-hole and flow string; Cyclic preheat can be realized, accompany hot lifting, water filling cooling and dynamic monitoring, thus make the techniques such as production, steam injection and test become simple efficient.
The foregoing is only the schematic detailed description of the invention of the utility model, and be not used to limit scope of the present utility model.Any those skilled in the art, the equivalent variations done under the prerequisite not departing from design of the present utility model and principle and amendment, all should belong to the scope of the utility model protection.And it should be noted that, each ingredient of the present utility model is not limited in above-mentioned overall applicability, the each technical characteristic described in manual of the present utility model can select one to adopt separately or select the multinomial use that combines according to actual needs, therefore, the utility model covers other relevant with this case inventive point in the nature of things and combines and embody rule.

Claims (10)

1. three wellhead, is characterized in that, described three wellhead comprise:
First four-way, offers in cross-shaped and the interconnection be connected and vertical passage in it;
Conversion equipment body, be connected to above described first four-way, oil recovery passage, steam injection passage and test channel is longitudinally offered in described conversion equipment body, and described oil recovery passage, described steam injection passage and described test channel are parallel to each other, described oil recovery passage, described steam injection passage are all connected with described vertical passage with described test channel.
2. three wellhead as claimed in claim 1, it is characterized in that, be connected with I-shaped flange above described conversion equipment body, the top of flow string is connected in described I-shaped flange, and described flow string runs through the vertical passage of described oil recovery passage and described first four-way.
3. three wellhead as claimed in claim 2, is characterized in that, be connected with main valve, be connected with the second four-way above described main valve above described I-shaped flange, are connected with gate valve above described second four-way, and described gate valve is blind rod type Wedge Gate Valves.
4. three wellhead as claimed in claim 2, is characterized in that, are connected with steam injection string in the steam injection passage of described conversion equipment body, and described steam injection string runs through the vertical passage of described first four-way.
5. three wellhead as claimed in claim 4, it is characterized in that, described conversion equipment body is connected with testing tube hanger, and described testing tube hanger is connected with the top of test string, and described test string runs through the vertical passage of described test channel and described first four-way.
6. three wellhead as claimed in claim 5, is characterized in that, are provided with test cable in described test string, and described test cable top is provided with slip-type hanger, and described slip-type hanger is installed in described test channel.
7. three wellhead as claimed in claim 5, is characterized in that, have coiled tubing in described test string, are arranged with pillar outside described coiled tubing.
8. three wellhead as claimed in claim 5, is characterized in that, described flow string is 2-7/8 " type oil pipe, described steam injection string is 3-1/2 " type steam inject tube, and described test string is 1.900 " type testing tube.
9. three wellhead as claimed in claim 5, is characterized in that, described flow string and described test string lay respectively at the both sides of described steam injection string.
10. three wellhead as claimed in claim 1, it is characterized in that, the sidewall of the described conversion equipment body outside described steam injection passage is transversely provided with control valve, and described control valve is provided with dial plate, and described control valve and described dial plate are all positioned at perpendicular.
CN201420606790.3U 2014-10-20 2014-10-20 Three-pipe wellhead device Expired - Fee Related CN204175245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420606790.3U CN204175245U (en) 2014-10-20 2014-10-20 Three-pipe wellhead device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420606790.3U CN204175245U (en) 2014-10-20 2014-10-20 Three-pipe wellhead device

Publications (1)

Publication Number Publication Date
CN204175245U true CN204175245U (en) 2015-02-25

Family

ID=52564062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420606790.3U Expired - Fee Related CN204175245U (en) 2014-10-20 2014-10-20 Three-pipe wellhead device

Country Status (1)

Country Link
CN (1) CN204175245U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790907A (en) * 2015-03-16 2015-07-22 宝鸡石油机械有限责任公司 Tubing head blocking isolating valve for fracture wellhead device
CN104963634A (en) * 2015-07-02 2015-10-07 中国石油天然气股份有限公司 Method for tripping sucker rod
CN106812493A (en) * 2015-12-02 2017-06-09 中国石油天然气股份有限公司 Multi-pipe thermal recovery wellhead device
CN110757056A (en) * 2019-09-24 2020-02-07 张洪伟 Assembly welding device of Christmas tree guide frame

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790907A (en) * 2015-03-16 2015-07-22 宝鸡石油机械有限责任公司 Tubing head blocking isolating valve for fracture wellhead device
CN104963634A (en) * 2015-07-02 2015-10-07 中国石油天然气股份有限公司 Method for tripping sucker rod
CN104963634B (en) * 2015-07-02 2017-06-13 中国石油天然气股份有限公司 Method for tripping sucker rod
CN106812493A (en) * 2015-12-02 2017-06-09 中国石油天然气股份有限公司 Multi-pipe thermal recovery wellhead device
CN110757056A (en) * 2019-09-24 2020-02-07 张洪伟 Assembly welding device of Christmas tree guide frame

Similar Documents

Publication Publication Date Title
CN102979495B (en) Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof
US20130000918A1 (en) Flow module placement between a subsea tree and a tubing hanger spool
CN204175245U (en) Three-pipe wellhead device
CN103089199A (en) Depleted oil-gas reservoir underground gas storage injection-production string and operating method thereof
CN204703876U (en) Bridge type concentric separate injection pipe column
CA2873712A1 (en) Methods and systems for performance of subterranean operations using dual string pipes
CN201810286U (en) Separate mining mixed pumping pipe column suitable for two-layer mining
CN104481484A (en) Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN202900175U (en) Pressure measuring well completion pipe string for suspension pressure gauge of gas storage
CN203441440U (en) Thickened oil recovery system for horizontal well
CN203626759U (en) Production pipe column with electric submersible pump and jet pump jointly lifted
CN103790542B (en) Coiled tubing suspension sealing device for testing under high-temperature belt pressure and using method
CN203239303U (en) Exploitation device for injection and production in the same well
CN204386576U (en) Horizontal well in segments Intermittent cyclic steam stimulation note adopts integrated pipe column
CN104818972A (en) Offshore thick oil heat injection and oil extraction pipe column and method
CN204782960U (en) Integrated tubular column of water water injection sand control is adopted to individual well
CN204200150U (en) A kind of wellhead tree tree device for the anticorrosion water filling of multitube
CN203394451U (en) Leakage-sealing water-plugging oil production pipe column for thickened oil horizontal well
CN204899857U (en) Geothermal well is with high temperature resistant multi -functional floating valve
CN203603775U (en) Segmented mining process pipe column for rapidly recovering productivity of horizontal sand prevention failure well
CN102465693A (en) Underground coal gasification drilling well body structure and construction method thereof
CN206668217U (en) Annulus logging well hydraulic oil drain device
CN203948064U (en) A kind of eccentric testing wellhead assembly
CN203515533U (en) Adjustable steam injection pipe column of horizontal well
CN2851546Y (en) Leak proof packer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225