CN204156423U - 500kV jumper string wire clamp thread-lifting hook - Google Patents
500kV jumper string wire clamp thread-lifting hook Download PDFInfo
- Publication number
- CN204156423U CN204156423U CN201420672485.4U CN201420672485U CN204156423U CN 204156423 U CN204156423 U CN 204156423U CN 201420672485 U CN201420672485 U CN 201420672485U CN 204156423 U CN204156423 U CN 204156423U
- Authority
- CN
- China
- Prior art keywords
- shaped
- portal frame
- tools
- hook
- mountain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012212 insulator Substances 0.000 abstract description 20
- 229910000831 Steel Inorganic materials 0.000 abstract description 6
- 238000005452 bending Methods 0.000 abstract description 6
- 239000010959 steel Substances 0.000 abstract description 6
- 239000002184 metal Substances 0.000 abstract description 3
- 239000004020 conductor Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
500kV跳线串线夹提线钩,包括有由一根金属杆弯折形成的山形尖顶门式框架受力件(1)、设置于受力件门式框架内山形底部的横向支撑杆(2)、受力件门式框架两侧的侧杆底部一段向外弯曲360°形成的U型钩(6)、套装在U型钩(6)上的保险销(3)、安装于U型钩(6)自由端止挡于保险销(3)上的螺母(4)。本实用新型结构简单、轻便小巧,操作使用时,与紧线丝杆和绝缘子卡具配合简单,不需要钢套、滑车、起吊绳索等工具配合,只需2人就能将所需工具携带上塔和完成绝缘子更换工作,可减少大量工具和3名作业人员。
The 500kV jumper line hook, including a mountain-shaped pointed-top portal frame force-bearing part (1) formed by bending a metal rod, and a horizontal support rod (2) set at the bottom of the mountain-shaped frame in the force-bearing part , U-shaped hook (6) formed by bending 360° outward at the bottom of the side bar on both sides of the portal frame of the force-bearing part (6), safety pin (3) set on the U-shaped hook (6), installed on the U-shaped hook ( 6) The free end stops against the nut (4) on the safety pin (3). The utility model has the advantages of simple structure, light weight and small size. When operating and using, it is easy to cooperate with the tightening screw rod and the insulator fixture. It does not need steel sleeves, pulleys, lifting ropes and other tools to cooperate, and only two people can carry the required tools. tower and complete the insulator replacement work, which can save a lot of tools and 3 operators.
Description
技术领域 technical field
本实用新型涉及输电线路中更换跳线绝缘子用的工具技术领域,尤其是更换500kV跳线串导线侧第一片绝缘子的工具。 The utility model relates to the technical field of tools for replacing jumper insulators in power transmission lines, in particular to a tool for replacing the first insulator on the side of a 500kV jumper string conductor.
背景技术 Background technique
现有技术中,更换500kV跳线串导线侧第一片绝缘子时,通常是用链条葫芦将跳线串、重锤和导线整体提升,当跳线串松弛时进行更换,目前还没有专门用于更换跳线串导线侧第一片绝缘子的专用工具。现有技术中由于使用链条葫芦,需要上下钢套、上下滑车、起吊绳索(塔头至地面高度)等工具配合,工具较多,重约28kg,不便于山路运输和更换工作,也会消耗作业人员大量体力;基于工具较多,导致各受力点、转向滑车、绳索布置复杂,作业准备时间长;由于链条葫芦需要将跳线串(500kV跳线串一般为34片绝缘子、长约5米)、重锤和导线整体提升,链条行程长,无论是收紧和放松,都需要较多时间;起吊绳索需要地面人员3人控制,加上高空人员2人,所以该项作业至少需要5人。总之由于该方法工具较多较重、准备和操作时间长、耗时耗力、需要人员较多等等,在更换跳线串导线侧第一片绝缘子时显得非常麻烦,不利于更换工作和高空作业。 In the prior art, when replacing the first insulator on the wire side of a 500kV jumper string, a chain hoist is usually used to lift the jumper string, the weight and the wire as a whole, and replace it when the jumper string is loose. Special tool for replacing the first insulator on the conductor side of a jumper string. Due to the use of chain hoists in the prior art, tools such as upper and lower steel sleeves, upper and lower cars, and lifting ropes (tower head to ground height) are required. There are many tools, weighing about 28kg, which is not convenient for mountain road transportation and replacement work, and will also consume Workers have a lot of physical strength; due to the large number of tools, the layout of each force point, steering block, and rope is complicated, and the work preparation time is long; because the chain hoist needs to string jumpers (500kV jumper strings are generally 34 pieces of insulators, about 5 meter), the weight and the wire are lifted as a whole, and the chain has a long stroke. Whether it is tightening or loosening, it takes a lot of time; the lifting rope needs to be controlled by 3 people on the ground, plus 2 people in the sky, so this operation requires at least 5 people. people. In short, due to the large number of heavy tools, long preparation and operation time, time-consuming and labor-consuming, and many personnel required, it is very troublesome to replace the first insulator on the wire side of the jumper string, which is not conducive to replacement work and high-altitude operation. Operation.
发明内容 Contents of the invention
本实用新型的目的正是为了克服上述现有技术的不足而提供一种轻便、小巧、快捷、高效的500kV跳线串导线侧第一片绝缘子更换工具,具体为500kV跳线串线夹提线钩。 The purpose of this utility model is to overcome the shortcomings of the above-mentioned prior art and provide a light, small, fast and efficient tool for replacing the first insulator on the side of the 500kV jumper string wire, specifically a 500kV jumper wire string clip lifting hook .
本实用新型的目的是通过如下技术方案实现的。 The purpose of this utility model is achieved through the following technical solutions.
500kV跳线串线夹提线钩,包括有由一根金属杆弯折形成的山形尖顶门式框架受力件、设置于受力件门式框架内山形底部的横向支撑杆、受力件门式框架两侧的侧杆底部一段向外弯曲360°形成的U型钩、套装在U型钩上的保险销、安装于U型钩自由端止挡于保险销上的螺母。 The 500kV jumper line clamp hook includes a mountain-shaped pointed-top portal frame force-bearing part formed by bending a metal rod, a horizontal support rod set at the bottom of the mountain-shaped frame in the force-bearing portal frame, and a force-bearing portal frame. A section of the bottom of the side bars on both sides of the frame is a U-shaped hook formed by bending 360° outward, a safety pin set on the U-shaped hook, and a nut installed on the free end of the U-shaped hook to stop on the safety pin.
本实用新型受力件山形尖顶的夹角α为120°,山形尖顶的斜坡段与门式框架的侧杆之间的内夹角β为120°。 The included angle α of the mountain-shaped spire of the force-bearing part of the utility model is 120°, and the inner angle β between the slope section of the mountain-shaped spire and the side bar of the portal frame is 120°.
本实用新型结构简单、轻便小巧,操作使用时,与紧线丝杆和绝缘子卡具配合简单,不需要钢套、滑车、起吊绳索等工具配合,只需2人就能将所需工具携带上塔和完成绝缘子更换工作,可减少大量工具和3名作业人员。 The utility model has the advantages of simple structure, light weight and small size. When operating and using, it is easy to cooperate with the tightening screw rod and the insulator fixture. It does not need steel sleeves, pulleys, lifting ropes and other tools to cooperate, and only two people can carry the required tools. tower and complete the insulator replacement work, which can save a lot of tools and 3 operators.
下面将结合附图和实施例对本实用新型作进一步的阐述。 The utility model will be further elaborated below in conjunction with the accompanying drawings and embodiments.
附图说明 Description of drawings
图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2为图1的左视图; Fig. 2 is the left view of Fig. 1;
图3为本实用新型中保险销的俯视图; Fig. 3 is the top view of safety pin in the utility model;
图4为本实用新型组装在紧线丝杆上的示意图; Fig. 4 is the schematic diagram that the utility model is assembled on the tightening screw rod;
图5是利用本实用新型更换500kV跳线串导线侧第一片绝缘子时的示意图。 Fig. 5 is a schematic diagram when the utility model is used to replace the first insulator on the wire side of the 500kV jumper string.
具体实施方式 Detailed ways
如图1、图2、图3所示,本实用新型包括有由一根金属杆弯折形成的山形尖顶门式框架受力件1、设置于受力件门式框架内山形底部的横向支撑杆2、受力件门式框架两侧的侧杆底部一段向外弯曲360°形成的U型钩6、套装在U型钩6上的保险销3、安装于U型钩6自由端止挡于保险销3上的螺母4。受力件山形尖顶的夹角α为120°,山形尖顶的斜坡段与门式框架的侧杆之间的内夹角β为120°。 As shown in Fig. 1, Fig. 2 and Fig. 3, the utility model includes a mountain-shaped pointed-top portal frame stress member 1 formed by bending a metal rod, and a lateral support arranged at the bottom of the mountain-shaped frame in the stress-carrying member portal frame. Rod 2, the U-shaped hook 6 formed by bending the bottom section of the side rod on both sides of the portal frame of the force-bearing part 360° outward, the safety pin 3 set on the U-shaped hook 6, and the free end stopper installed on the U-shaped hook 6 Nut 4 on safety pin 3. The included angle α of the mountain-shaped spire of the stress member is 120°, and the inner angle β between the slope section of the mountain-shaped spire and the side bar of the portal frame is 120°.
本实用新型可按如下方式制作。首先将直径16mm、长120cm的高强度圆钢中间弯曲成∠120°,形成山形尖顶的夹角α,再将中间向两边12cm处弯曲成∠120°,即夹角β,接着将两端头向内13cm处弯曲成直径为10cm的U型钩6,作为主受力件1,然后把直径16mm的高强度圆钢焊接在主受力件1的门式框架内作为支撑杆2,用厚度为4mm钢板切割成两个保险销并在上面打2个Ф17.5mm眼孔5,将保险销3穿入主受力件1,最后将螺母4紧固即可。 The utility model can be made in the following manner. First, bend the high-strength round steel with a diameter of 16mm and a length of 120cm to ∠120° in the middle to form the angle α of the mountain-shaped spire, and then bend the middle to 12cm from both sides to ∠120°, which is the angle β. Bend inward at 13cm to form a U-shaped hook 6 with a diameter of 10cm as the main stress member 1, and then weld a high-strength round steel with a diameter of 16mm in the portal frame of the main stress member 1 as the support rod 2. Cut a 4mm steel plate into two safety pins and punch two Ф17.5mm eyelets 5 on them, insert the safety pin 3 into the main stress member 1, and finally tighten the nut 4.
采用本实用新型更换500kV跳线串导线侧第一片绝缘子时,如图4、图5所示,将两个本实用新型的U型钩部分别固定在两根上子导线的线夹7上,并将保险销紧固,然后将绝缘子卡具8和紧线丝杆9安装就位,再将本实用新型上端山形尖顶处与紧线丝杆连接,各部连接好后收紧紧线丝杆,直到导线侧第一片绝缘10与连接碗头11间有活动间隙,此时就能取下旧绝缘子。同理,新绝缘子进位时,用相同方法操作。 When the utility model is used to replace the first insulator on the wire side of the 500kV jumper string, as shown in Figure 4 and Figure 5, the two U-shaped hooks of the utility model are respectively fixed on the clamps 7 of the two upper sub-wires, And fasten the safety pin, then install the insulator clamp 8 and the tightening screw rod 9 in place, then connect the mountain-shaped top of the utility model with the tightening screw rod, tighten the tightening screw rod after each part is connected, Until there is a movable gap between the first sheet insulation 10 of the wire side and the connecting bowl head 11, the old insulator can be taken off this moment. In the same way, when the new insulator is carried, operate in the same way.
采用本实用新型,只需2人就能将所需工具携带上塔和完成绝缘子更换工作,可减少大量工具和3名作业人员。由于紧线丝杆所需提升的绝缘子仅为4片,与原先葫芦提升34片相比,大大减小了作业范围,能大幅缩短作业时间。最为关键的是该方法作业范围小,仅为4片绝缘子,从而有效保证了安全电气间隙,可用于开展带电作业,填补目前没有专门用于更换跳线串导线侧第一片绝缘子专用工具的空白。 By adopting the utility model, only 2 people can carry the required tools to the tower and complete the insulator replacement work, which can reduce a large number of tools and 3 operators. Since only 4 pieces of insulators need to be lifted to tighten the wire rod, compared with the original hoist lifting 34 pieces, the working range is greatly reduced and the working time can be greatly shortened. The most important thing is that the working range of this method is small, only 4 pieces of insulators, thus effectively ensuring the safety electrical clearance, which can be used for live work, and fills the gap that there is currently no special tool for replacing the first piece of insulator on the wire side of the jumper string .
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420672485.4U CN204156423U (en) | 2014-11-12 | 2014-11-12 | 500kV jumper string wire clamp thread-lifting hook |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420672485.4U CN204156423U (en) | 2014-11-12 | 2014-11-12 | 500kV jumper string wire clamp thread-lifting hook |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204156423U true CN204156423U (en) | 2015-02-11 |
Family
ID=52514512
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420672485.4U Expired - Lifetime CN204156423U (en) | 2014-11-12 | 2014-11-12 | 500kV jumper string wire clamp thread-lifting hook |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204156423U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106711839A (en) * | 2015-08-23 | 2017-05-24 | 王明强 | Electric spreading jumper tool of 110-kV strain tower |
-
2014
- 2014-11-12 CN CN201420672485.4U patent/CN204156423U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106711839A (en) * | 2015-08-23 | 2017-05-24 | 王明强 | Electric spreading jumper tool of 110-kV strain tower |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
| CN103979403B (en) | Cable terminations head is used to promote the method for jig lifting cable | |
| CN104022459A (en) | 10 KV distribution line pole-mounted wire suspension device | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN203850726U (en) | Wire lifter on 10 kV power distribution telegraph pole | |
| CN204156423U (en) | 500kV jumper string wire clamp thread-lifting hook | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN203607750U (en) | Suspension ring device for loosening-tightening line pulley | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN203439984U (en) | Handjack for pole | |
| CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
| CN202967922U (en) | Simple hoisting device for mounting steel structural bridge | |
| CN202737386U (en) | Insulator string fixing traction tool | |
| CN104283156A (en) | Wire lifting device for power distribution line | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN105305316B (en) | A kind of mountain region effort-saving circuit line lifter | |
| CN203754232U (en) | Simple steel rail lifting tool | |
| CN207339070U (en) | A Light Duty Replacement Insulator String Tool | |
| CN204030507U (en) | A kind of steel pipe pole cross-arm escape way device | |
| CN207926066U (en) | A kind of simple replacement gold utensil string devices | |
| CN204118597U (en) | A kind of line lifter for distribution line | |
| CN204167796U (en) | A kind of pulley-type tower head jig | |
| CN104444767A (en) | Special hanging tool for equalizing beam | |
| CN205172015U (en) | High strength steel stranded conductor tractor | |
| CN203151001U (en) | A power cable lifting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150211 |
|
| CX01 | Expiry of patent term |