CN204152178U - A kind of steel structure construction roof beam structure - Google Patents

A kind of steel structure construction roof beam structure Download PDF

Info

Publication number
CN204152178U
CN204152178U CN201420541157.0U CN201420541157U CN204152178U CN 204152178 U CN204152178 U CN 204152178U CN 201420541157 U CN201420541157 U CN 201420541157U CN 204152178 U CN204152178 U CN 204152178U
Authority
CN
China
Prior art keywords
support
transverse slat
swash plate
riser
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420541157.0U
Other languages
Chinese (zh)
Inventor
马路平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xichang city construction and Installation Engineering Company Limited
Original Assignee
Wenzhou Hongchengxiang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hongchengxiang Technology Co Ltd filed Critical Wenzhou Hongchengxiang Technology Co Ltd
Priority to CN201420541157.0U priority Critical patent/CN204152178U/en
Application granted granted Critical
Publication of CN204152178U publication Critical patent/CN204152178U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel structure construction roof beam structure, comprise a support riser, be arranged at the support baseboard supporting riser lower end, described support riser side upper and lower side is equipped with a catching groove, described support baseboard both sides are provided with a buckle, the buckle that passes on left of described support baseboard is arranged in the catching groove of support riser, between support riser and support baseboard, install one support swash plate, the upper end of described support swash plate arranges a buckle, the lower end of described support swash plate arranges a catching groove, the upper end supporting swash plate is arranged at by buckle in the catching groove of support riser, the lower end supporting swash plate is fixedly connected with the buckle on the right side of support baseboard by catching groove, be positioned to support riser and support swash plate middle and be provided with the first transverse slat and the second transverse slat, the utility model is built by two scaffolds, can carry out many people and construct simultaneously, and also can be used alone a scaffold, and constructor can step on pedal, selects the pedal of proper height according to construction height.

Description

A kind of steel structure construction roof beam structure
Technical field
The utility model relates to a kind of steel structure construction roof beam structure.
Background technology
During site construction, for the constructing operation of eminence metope, need to use scaffold, obtain the height of needs with this, existing scaffold is in I-shaped mostly, highly often only has one, poor selectivity, and whole support body is non-dismountable, carries Department of Transportation conveniently.
Summary of the invention
Technical problem to be solved in the utility model is to provide one and is built by two scaffolds, many people can be carried out construct simultaneously, also can be used alone a scaffold, and constructor can step on pedal, selects the steel structure construction roof beam structure of proper height according to construction height.
The utility model is achieved through the following technical solutions: a kind of steel structure construction roof beam structure, comprise a support riser, be arranged at the support baseboard supporting riser lower end, orthogonal between described support riser and support baseboard, described support riser side upper and lower side is equipped with a catching groove, described support baseboard both sides are provided with a buckle, the buckle that passes on left of described support baseboard is arranged in the catching groove of support riser, between support riser and support baseboard, install one support swash plate, the upper end of described support swash plate arranges a buckle, the lower end of described support swash plate arranges a catching groove, the upper end supporting swash plate is arranged at by buckle in the catching groove of support riser, the lower end supporting swash plate is fixedly connected with the buckle on the right side of support baseboard by catching groove, be positioned to support riser and support swash plate middle and be provided with the first transverse slat and the second transverse slat, described first transverse slat is positioned at the upper surface of the second transverse slat, the length of the first transverse slat is less than the length of the second transverse slat, the front end face being positioned at the first transverse slat and the second transverse slat is provided with the first gripper shoe and the second gripper shoe, described first gripper shoe is movably set in the first transverse slat front end by a bearing pin, described second gripper shoe is movably set in the front end of the second transverse slat by a bearing pin.
As preferred technical scheme, the upper surface of described support swash plate is provided with even-even groove, and arrange a pedal in every two grooves, described pedal is L-shaped.
As preferred technical scheme, the upper end of corresponding first transverse slat of described first gripper shoe, the second gripper shoe, the second transverse slat is provided with an open slot.
As preferred technical scheme, described first transverse slat and the second transverse slat form by a upper plate and a lower plate, the upper end of lower plate is provided with two chutes, is just provided with slide block to the upper plate lower end of chute, and upper plate is arranged in chute by slide block and realizes being flexibly connected between upper plate with lower plate.
As preferred technical scheme, described support riser, support baseboard and support swash plate are made by steel structure material.
The beneficial effects of the utility model are: the utility model is built by two scaffolds, can carry out many people and construct simultaneously, and also can be used alone a scaffold, and constructor can step on pedal, selects the pedal of proper height according to construction height.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is another structural representation of the present utility model;
Fig. 3 is assembling schematic diagram of the present utility model.
Detailed description of the invention
All features disclosed in this manual, or the step in disclosed all methods or process, except mutually exclusive feature and/or step, all can combine by any way.
Arbitrary feature disclosed in this manual (comprising any accessory claim, summary and accompanying drawing), unless specifically stated otherwise, all can be replaced by other equivalences or the alternative features with similar object.That is, unless specifically stated otherwise, each feature is an example in a series of equivalence or similar characteristics.
As Fig. 1, shown in Fig. 2 and Fig. 3, a kind of steel structure construction roof beam structure of the present utility model, comprise a support riser 1, be arranged at the support baseboard 13 supporting riser 1 lower end, orthogonal between described support riser 1 and support baseboard 13, described support riser 1 side upper and lower side is equipped with a catching groove, described support baseboard both sides are provided with a buckle 4, the buckle 4 that passes on left of described support baseboard 13 is arranged in the catching groove of support riser 1, between support riser 1 and support baseboard, install one support swash plate 2, the upper end of described support swash plate 2 arranges a buckle 4, the lower end of described support swash plate 2 arranges a catching groove, the upper end supporting swash plate 2 is arranged at by buckle in the catching groove of support riser 1, the lower end supporting swash plate 2 is fixedly connected with the buckle on the right side of support baseboard 13 by catching groove, be positioned to support riser 1 and support swash plate 2 middle and be provided with the first transverse slat 5 and the second transverse slat 6, described first transverse slat 5 is positioned at the upper surface of the second transverse slat 6, the length of the first transverse slat 5 is less than the length of the second transverse slat 6, the front end face being positioned at the first transverse slat 5 and the second transverse slat 6 is provided with the first gripper shoe 8 and the second gripper shoe 9, described first gripper shoe 8 is movably set in the first transverse slat 5 front end by a bearing pin, described second gripper shoe 9 is movably set in the front end of the second transverse slat 6 by a bearing pin.
As preferred embodiment, the upper surface supporting swash plate 2 is provided with even-even groove, and arrange a pedal 3 in every two grooves, described pedal 3 is L-shaped.
As preferred embodiment, the upper end of corresponding first transverse slat 5, second transverse slat 6 of described first gripper shoe 8, second gripper shoe 9 is provided with an open slot 7.
As preferred embodiment, first transverse slat 5 and the second transverse slat 6 form by a upper plate 10 and a lower plate 11, the upper end of lower plate 11 is provided with two chutes 12, is just provided with slide block to the upper plate lower end of chute 12, and upper plate 10 is arranged in chute by slide block and realizes being flexibly connected between upper plate with lower plate 11.
As preferred embodiment, support riser 1, support baseboard 13 and support swash plate 2 and make by steel structure material.
During construction, constructor's pedal is on pedal 3, pedal 3 is in height shape, need to select suitable height according to practice of construction, when many people construct, can make that two scaffolds are parallel to each other to be laid, middlely to build with the first transverse slat 5 and the second transverse slat 6, upper end first transverse slat 5 and the second transverse slat 6 are constructed, increases constructor's number.
The beneficial effects of the utility model are: the utility model is built by two scaffolds, can carry out many people and construct simultaneously, and also can be used alone a scaffold, and constructor can step on pedal, selects the pedal of proper height according to construction height.
The beneficial effects of the utility model are: the above; be only detailed description of the invention of the present utility model; but protection domain of the present utility model is not limited thereto, any change of expecting without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.

Claims (5)

1. a steel structure construction roof beam structure, it is characterized in that: comprise a support riser, be arranged at the support baseboard supporting riser lower end, orthogonal between described support riser and support baseboard, described support riser side upper and lower side is equipped with a catching groove, described support baseboard both sides are provided with a buckle, the buckle that passes on left of described support baseboard is arranged in the catching groove of support riser, between support riser and support baseboard, install one support swash plate, the upper end of described support swash plate arranges a buckle, the lower end of described support swash plate arranges a catching groove, the upper end supporting swash plate is arranged at by buckle in the catching groove of support riser, the lower end supporting swash plate is fixedly connected with the buckle on the right side of support baseboard by catching groove, be positioned to support riser and support swash plate middle and be provided with the first transverse slat and the second transverse slat, described first transverse slat is positioned at the upper surface of the second transverse slat, the length of the first transverse slat is less than the length of the second transverse slat, the front end face being positioned at the first transverse slat and the second transverse slat is provided with the first gripper shoe and the second gripper shoe, described first gripper shoe is movably set in the first transverse slat front end by a bearing pin, described second gripper shoe is movably set in the front end of the second transverse slat by a bearing pin.
2. steel structure construction roof beam structure according to claim 1, it is characterized in that: the upper surface of described support swash plate is provided with even-even groove, arrange a pedal in every two grooves, described pedal is L-shaped.
3. steel structure construction roof beam structure according to claim 1, is characterized in that: the upper end of corresponding first transverse slat of described first gripper shoe, the second gripper shoe, the second transverse slat is provided with an open slot.
4. steel structure construction roof beam structure according to claim 1, it is characterized in that: described first transverse slat and the second transverse slat form by a upper plate and a lower plate, the upper end of lower plate is provided with two chutes, just be provided with slide block to the upper plate lower end of chute, upper plate is arranged in chute by slide block and realizes being flexibly connected between upper plate with lower plate.
5. steel structure construction roof beam structure according to claim 1, is characterized in that: described support riser, support baseboard and support swash plate are made by steel structure material.
CN201420541157.0U 2014-09-19 2014-09-19 A kind of steel structure construction roof beam structure Expired - Fee Related CN204152178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420541157.0U CN204152178U (en) 2014-09-19 2014-09-19 A kind of steel structure construction roof beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420541157.0U CN204152178U (en) 2014-09-19 2014-09-19 A kind of steel structure construction roof beam structure

Publications (1)

Publication Number Publication Date
CN204152178U true CN204152178U (en) 2015-02-11

Family

ID=52510304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420541157.0U Expired - Fee Related CN204152178U (en) 2014-09-19 2014-09-19 A kind of steel structure construction roof beam structure

Country Status (1)

Country Link
CN (1) CN204152178U (en)

Similar Documents

Publication Publication Date Title
CN106514747A (en) PVC pipeline cutting platform
CN205085859U (en) Tray processing tool
CN204152178U (en) A kind of steel structure construction roof beam structure
CN204690531U (en) The road surface stepped plate in building site
CN204126239U (en) A kind of building operations roof beam structure
CN204238556U (en) Adjustable overhanging type discharging platform
CN204897335U (en) Novel hanging flower basket for engineering
CN104668873A (en) Processing die for reinforcement cage
CN204235540U (en) With the bender stock shelf of setting-out structure
CN204726817U (en) Metal stack plate
CN204456804U (en) A kind of construction steel structure construction roof beam structure
CN208514714U (en) Reinforcing steel bar-binding bench
CN105083747A (en) Goods shelf with adjustable length
CN204042403U (en) A kind of section bar
CN204868790U (en) Operation panel
CN203257022U (en) Gypsum board surface protecting paper with construction square grid and gypsum plaster board
CN204059996U (en) The Handling device of construction formwork group
CN204676856U (en) A kind of removable steel builds builds scaffold
CN205206172U (en) Slide adjusting's stair
CN204867984U (en) Fixed frock of flange welding side
CN204893330U (en) Just fixed frock of flange welding
CN204899210U (en) Construction formwork is fixed to recess formula stair
CN103192521A (en) Basin-shaped insulator leveling device
CN204519230U (en) A kind of ginkgo nut treatment bench
CN203849112U (en) Pipe fitting feeding device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIU GUANGZHONG

Effective date: 20150427

Free format text: FORMER OWNER: LIU GUANGZHONG

Effective date: 20150427

Owner name: SU SHAOMENG

Free format text: FORMER OWNER: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Effective date: 20150427

Owner name: XICHANG YUECHENG CONSTRUCTION AND INSTALLATION ENG

Free format text: FORMER OWNER: SU SHAOMENG

Effective date: 20150427

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Su Shaomeng

Inventor after: Liu Guangzhong

Inventor before: Ma Luping

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325000 WENZHOU, ZHEJIANG PROVINCE TO: 615000 LIANGSHAN YI AUTONOMOUS PREFECTURE, SICHUAN PROVINCE

Free format text: CORRECT: INVENTOR; FROM: MA LUPING TO: SU SHAOMENG LIU GUANGZHONG

TR01 Transfer of patent right

Effective date of registration: 20150427

Address after: 615000 No. 1, unit 3, building 2, No. 3, new market, Sichuan, Xichang

Patentee after: Su Shaomeng

Patentee after: Liu Guangzhong

Address before: Longwan Waterfront Street Wenzhou city Zhejiang province 325000 Sand Street No. 228 second floor

Patentee before: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Effective date of registration: 20150427

Address after: Wen Hui District of Xichang city 615000 Sichuan Yi Autonomous Prefecture in Liangshan Province

Patentee after: Xichang city construction and Installation Engineering Company Limited

Address before: 615000 No. 1, unit 3, building 2, No. 3, new market, Sichuan, Xichang

Patentee before: Su Shaomeng

Patentee before: Liu Guangzhong

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Su Shaomeng

Inventor after: Liu Guangzong

Inventor before: Su Shaomeng

Inventor before: Liu Guangzhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SU SHAOMENG LIU GUANGZHONG TO: SU SHAOMENG LIU GUANGZONG

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

Termination date: 20150919

EXPY Termination of patent right or utility model