CN204139514U CN201420575965.9U CN201420575965U CN204139514U CN 204139514 U CN204139514 U CN 204139514U CN 201420575965 U CN201420575965 U CN 201420575965U CN 204139514 U CN204139514 U CN 204139514U
Authority
CN
China
Prior art keywords
keel
hard
foam polyurethane
polyurethane insulation
insulation layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420575965.9U
Other languages
Chinese (zh)
Inventor
周建中
曹浩
郁振东
艾伦辉
刘岩
潘鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN201420575965.9U priority Critical patent/CN204139514U/en
Application granted granted Critical
Publication of CN204139514U publication Critical patent/CN204139514U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of hard-foam polyurethane insulation keel exterior wall, comprise base course wall, described base course wall is also provided with insulation layer, keel frame, panel outward, described insulation layer is the hard-foam polyurethane insulation layer being sprayed on described base course wall surface, described keel frame comprises the U-shaped keel being fixed on ceiling and ground, and the shape of the mouth as one speaks centre keel be arranged between described U-shaped keel, described panel covers described keel frame surface.The utility model heat preservation energy-saving, easy construction, can solve the common quality defect in easy crack, conventional panels inside holding surface, anti-collision is good.

Description

Hard-foam polyurethane insulation keel exterior wall
Technical field
The utility model relates to building field, particularly relates to hard-foam polyurethane insulation keel exterior wall.
Background technology
Several years ago, domestic house is based on blank transfer, the problems such as the noise that resident family occurs at secondary decoration disturbs residents, environment pollution, potential safety hazard, the wasting of resources emerge in an endless stream day by day, finished product house is handed over and is avoided the problems referred to above, Jiangsu Province has put into effect " finished product home improvement technical standard " for 2010, provincial government is considering to subsidize to the resident buying finished product house in the recent period, and finished product develop house has good prospects.
The current more employing Surgery therapy form of exterior wall, high residential building should adopt A level heat insulating material, alternate material wretched insufficiency, and the on-site construction processes of outside wall heat preservation is various, the more difficult control of construction quality, affects by outdoor blast and harsh weather, has potential safety hazards such as coming off.
Summary of the invention
The purpose of this utility model is to provide the hard-foam polyurethane insulation keel exterior wall of a kind of heat preservation energy-saving, easy construction.
For achieving the above object, the technical solution adopted in the utility model is:
Hard-foam polyurethane insulation keel exterior wall, comprise base course wall, described base course wall is also provided with insulation layer, keel frame, panel outward, described insulation layer is the hard-foam polyurethane insulation layer being sprayed on described base course wall surface, described keel frame comprises the U-shaped keel being fixed on ceiling and ground, and the shape of the mouth as one speaks centre keel be arranged between described U-shaped keel, described panel covers described keel frame surface.
In technique scheme, panel can be gypsum plank or without asbestos fiber calcium silicate board or without asbestos fiber cement board, fixing by corresponding supporting auxiliary machinery.
Preferred technical scheme, is provided with the horizontal keel of the shape of the mouth as one speaks between described shape of the mouth as one speaks centre keel, described U-shaped keel are fixed on ground and ceiling by expansion bolt.
Preferred technical scheme, is provided with the air layer that 15cm is thick between described insulation layer and described keel frame.
Preferred technical scheme, is provided with pipeline aisle in described keel frame.
Preferred technical scheme, described panel is fixed on described keel frame by tapping screw.
Further technical scheme, described tapping screw spacing is 200mm-300mm.Tapping screw is not less than 10mm to panel edges distance.
Because technique scheme is used, the utility model compared with prior art has following advantages:
1, the utility model insulation layer adopts the hard-foam polyurethane material of spraying, safety non-toxic, fire-protection rating is B1 level, can ensure the safety under fire condition, and chemical stability, be sprayed on inner side of outer wall, bond firmly with base course wall, not by outside weather, simultaneously without blast, weather resisteant problem, can adapt to the normal deformation of body of wall and not produce crack or form hollowing and come off, corner, the process of special-shaped position are convenient, can seamlessly spray;
The heat bridge positions such as 2, the utility model polyurethane in-situ spraying, ensure that its globality, seamless, avoids cold-heat bridge phenomenon, floor process adopts end face, ground elongation technology, good with hard-cover ground, furred ceiling associativity, does not affect use;
3, the utility model keel frame and the contactless fixed point of metope, hydroelectric line is connected with shape of the mouth as one speaks keel, avoids heat bridge process problem;
4, the utility model adopts inside holding to avoid the common quality defect in easy crack, conventional panels inside holding surface in conjunction with shape of the mouth as one speaks lightgage steel joist framework and decoration panel, and anti-collision is good.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Wherein: 1, base course wall; 2, hard-foam polyurethane insulation layer; 3, keel frame; 4, panel; 5, air layer.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described:
Embodiment one:
As shown in Figure 1, hard-foam polyurethane insulation keel exterior wall, comprise base course wall 1, base course wall 1 is outer is also provided with insulation layer, keel frame 3, panel 4, insulation layer is the hard-foam polyurethane insulation layer 2 being sprayed on base course wall surface, keel frame 3 comprises the U-shaped keel being fixed on ceiling and ground, and is arranged on the shape of the mouth as one speaks centre keel between U-shaped keel, and panel 4 covers keel frame 3 surface.
Be provided with the horizontal keel of the shape of the mouth as one speaks between shape of the mouth as one speaks centre keel, U-shaped keel are fixed on ground and ceiling by expansion bolt.
Different parts hard-foam polyurethane insulation keel external wall structure:
Sitting room, bedroom, basic unit is base course wall 1, and insulation layer is foam-in-place polyurethane insulation coating 2, and keel frame 3 is shape of the mouth as one speaks lightgage steel joist, and panel 4 is gypsum plank, adopts tapping screw to fix, surperficial wallpaper facing;
Washroom, kitchen, basic unit is base course wall 1,1.5 thick JS polymer cement waterproof paints together, 1800 are turned over along surrounding being turned in 600(shower part), 12 thick 1:3 cement mortar screeding layers, insulation layer is foam-in-place polyurethane insulation coating 2, keel frame 3 is shape of the mouth as one speaks lightgage steel joist, panel 4 is calcium silicate board, adopts tapping screw to fix, skin wall decorating surface brick;
Window opening, basic unit is secondary window frame, and inner peripheral adopts foam-in-place polyurethane insulation coating, and keel frame 3 is shape of the mouth as one speaks lightgage steel joist, in conjunction with finished product window, finished product curtain box decoration technique.
Hard-foam polyurethane insulation keel external wall construction flow process is as follows.
The all holes of base course wall 1 comprise scaffold drawknot point, and base course wall 1 Screw arbor with nut at both-ends hole, window hole etc. need strengthen anti-seep measure, to guarantee base course wall 1 leakproof, meet inside holding construction requirement.
Scaffold adopts structure minimally-invasive scaffold fastenings technique, make the special band iron of pre-punched hole, be embedded in cast-in-place wallboard suitable for reading, fastener couples together scaffolding steel pipe and band iron through the pre-punched hole on band iron, meet the detailing requiments of scaffold specification, no longer need hole to be provided during secondary structure construction, ensure that the integrality of structure, avoid hidden leakage defect.
Base course wall 1 Screw arbor with nut at both-ends hole adopts rubber stopper in conjunction with blowing agent technique: with electrical drilling machine worn for about 20mm plastic pipe outside base course wall, rubber stopper firmly fills in inner 5-10mm, outside high grade 1:2.5 adds micro-expanding agent cement mortar and fills and leads up, dismiss infusion inside base course wall 1 to tamp, ensure that base course wall 1 hole is non-leakage.
Window opening is the main seepage place of base course wall 1, and set up one steel auxiliary frame, namely install after secondary structure completes, periphery gap waterproofing mortar is clogged, and brushes water-repellent paint together outside window, ensure that the waterproof quality of forms within the scope of the surrounding 20cm of side.
Door and window hole is protected, by room sealing as far as possible, calm in holding chamber, construct under the metastable state of temperature.
Before construction, reply spraying equipment is debugged, and sprays three pieces of 500mm × 500mm, test block that thickness is not less than 50mm, carries out material property detection, and strict implement " spray coating polyurethane rigid foam body heat insulating material " (JC/T998-2006) standard.
Lance head should adjust, no more than 1.5m according to the pressure of spraying equipment apart from the distance of the scope of operation; The speed of lance head movement during spraying is wanted evenly.In operation, after the hard polyurethane foam surface that last layer sprays is tack-free, lower one deck could be sprayed.Hard polyurethane foam insulation layer 2 after spraying fully after slaking 48h-72h, then should carry out the construction of next procedure.
Coating thickness needs priority control, and before construction is marched into the arena in insulation, it is stupefied that a wood strip is respectively carried out on top and ground.Before spraying polyurethane insulation layer 2 is constructed, overall interior wall is first hung control line according to wood is stupefied for benchmark by field worker, every root control line interval is no more than 1 meter, find out base course wall 1 peak part and do the polyurethane strips meeting design thickness requirement, a polyurethane strips is pasted in each square metre, control spraying polyurethane insulation layer 2 thickness with polyurethane strips, ensure that detecting a point in each square metre meets polyurethane inside holding design thickness.
In the middle of construction, gunman is after gunman has sprayed a face wall, the thickness that a point detects polyurethane insulation coating 2 is at least detected by the every square meter of calibrator, as exceeded allowed band, make mark, and using electric grinding machine by the polishing of super thick position to design thickness, the hard polyurethane foam insulation layer 2 surface finish allowable variation after spraying is not more than 5mm.
After wall surface spraying completes, install keel frame 3, be provided with the thick air layer of 15cm 5 between keel frame 3 and hard polyurethane foam insulation layer 2, after pipeline is buried underground, closure panel 4 is shaped.Panel 4 tapping screw is fixed on keel frame, and time fixing from the middle part of panel 4, tapping screw spacing is 300mm in middle part, and periphery is pressed 200mm and controlled.Attentional manipulation tapping screw should not be less than 10mm to panel 4 back gauge.When adjacent two pieces of panels 4 are installed, should ensure that panel 4 seam is positioned on keel frame, when panel 4 is mounted to inner corner trim and side body of wall should stay the gap of 3mm ~ 5mm.

Claims (6)

1. a hard-foam polyurethane insulation keel exterior wall, comprise base course wall, it is characterized in that: described base course wall is also provided with insulation layer, keel frame, panel outward, described insulation layer is the hard-foam polyurethane insulation layer being sprayed on described base course wall surface, described keel frame comprises the U-shaped keel being fixed on ceiling and ground, and the shape of the mouth as one speaks centre keel be arranged between described U-shaped keel, described panel covers described keel frame surface.
2. hard-foam polyurethane insulation keel exterior wall according to claim 1, is characterized in that: be provided with the horizontal keel of the shape of the mouth as one speaks between described shape of the mouth as one speaks centre keel.
3. hard-foam polyurethane insulation keel exterior wall according to claim 1, is characterized in that: be provided with the air layer that 15cm is thick between described insulation layer and described keel frame.
4. hard-foam polyurethane insulation keel exterior wall according to claim 1, is characterized in that: be provided with pipeline aisle in described keel frame.
5. hard-foam polyurethane insulation keel exterior wall according to claim 1, is characterized in that: described panel is fixed on described keel frame by tapping screw.
6. hard-foam polyurethane insulation keel exterior wall according to claim 5, is characterized in that: described tapping screw spacing is 200mm-300mm.
CN201420575965.9U 2014-09-30 2014-09-30 Hard-foam polyurethane insulation keel exterior wall Expired - Lifetime CN204139514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420575965.9U CN204139514U (en) 2014-09-30 2014-09-30 Hard-foam polyurethane insulation keel exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420575965.9U CN204139514U (en) 2014-09-30 2014-09-30 Hard-foam polyurethane insulation keel exterior wall

Publications (1)

Publication Number Publication Date
CN204139514U true CN204139514U (en) 2015-02-04

Family

ID=52416209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420575965.9U Expired - Lifetime CN204139514U (en) 2014-09-30 2014-09-30 Hard-foam polyurethane insulation keel exterior wall

Country Status (1)

Country Link
CN (1) CN204139514U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121032A (en) * 2016-07-20 2016-11-16 郭策 Constant temperature environment-friendlyhouse house
CN106121031A (en) * 2016-07-20 2016-11-16 郭策 Environmentally friendly house
CN106193273A (en) * 2016-07-20 2016-12-07 郭策 A kind of environmental protection and energy saving house
CN110607855A (en) * 2019-09-12 2019-12-24 深圳市旭生骏鹏建筑工程有限公司 Internal thermal insulation construction method for assembled external wall panel
CN110714539A (en) * 2019-12-10 2020-01-21 中苏控股有限公司 Rock wool board thin plastering external wall heat preservation system
CN114412006A (en) * 2022-02-14 2022-04-29 中建三局集团北京有限公司 Composite heat preservation system applied to refrigeration house

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121032A (en) * 2016-07-20 2016-11-16 郭策 Constant temperature environment-friendlyhouse house
CN106121031A (en) * 2016-07-20 2016-11-16 郭策 Environmentally friendly house
CN106193273A (en) * 2016-07-20 2016-12-07 郭策 A kind of environmental protection and energy saving house
CN106121031B (en) * 2016-07-20 2018-11-06 佛山市岭南建筑设计咨询有限公司 environment friendly house
CN106121032B (en) * 2016-07-20 2018-11-20 张玉芹 Constant temperature environment-friendlyhouse house
CN110607855A (en) * 2019-09-12 2019-12-24 深圳市旭生骏鹏建筑工程有限公司 Internal thermal insulation construction method for assembled external wall panel
CN110714539A (en) * 2019-12-10 2020-01-21 中苏控股有限公司 Rock wool board thin plastering external wall heat preservation system
CN114412006A (en) * 2022-02-14 2022-04-29 中建三局集团北京有限公司 Composite heat preservation system applied to refrigeration house
CN114412006B (en) * 2022-02-14 2024-03-12 中建三局集团北京有限公司 Be applied to compound heat preservation system of freezer

Similar Documents

Publication Publication Date Title
CN101158213B (en) Exterior outer-insulating system construction method for using direct-compress EPS inorganic clad plate
CN104018598B (en) A kind of exterior wall structure and construction installation method
CN104652740A (en) Installation method for thermal insulation and decoration integrated facade panels
CN202866029U (en) Composite thermal insulation system of external wall
CN104074434A (en) Structure and construction method of aluminum alloy window
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN104963474A (en) Fixed model quasi-non-combustible high thermal-resistance decoration integral composite template
CN101718132A (en) Heat-insulating external wallboard and manufacturing method thereof
CN103806655A (en) construction method for glass brick wall
CN202520153U (en) Door and window steel sub-frame installation and construction structure
CN204401814U (en) Light polyurethane heat preservation and decoration of outer wall system
CN202577792U (en) Foamed polycarbamate heat preservation waterproof roof
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN202936907U (en) Hydrophobic rock wool board heat preservation wall structure
CN107060120A (en) One kind injection rock wool composite integrated external wall insulation preparation method
CN204199585U (en) A kind of decoration of exterior wall integrated plate for heat insulation
CN204326275U (en) Polyurethane composite thermal insulation template
CN210257566U (en) Novel production of compound intergral template of heat preservation energy-saving device
CN204023953U (en) A kind of wallboard installation system
CN204199587U (en) A kind of ultra-thin exterior wall composite thermal insulation stone plate
CN208749042U (en) A kind of prefabricated thermal insulation edge list of built-in pipeline
CN209040320U (en) A kind of steel construction heat preservation mortar for outer wall retaining design with tension member
CN201649327U (en) fireproof insulation board for building
CN201635294U (en) Hollow steel-wire rack concrete heat-preserving outer wall board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150204

CX01 Expiry of patent term