CN204139124U - A kind of ecological health care type soil and slope protection - Google Patents
A kind of ecological health care type soil and slope protection Download PDFInfo
- Publication number
- CN204139124U CN204139124U CN201420588754.9U CN201420588754U CN204139124U CN 204139124 U CN204139124 U CN 204139124U CN 201420588754 U CN201420588754 U CN 201420588754U CN 204139124 U CN204139124 U CN 204139124U
- Authority
- CN
- China
- Prior art keywords
- area
- water
- slope protection
- health
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002689 soil Substances 0.000 title claims abstract description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 67
- 241000124033 Salix Species 0.000 claims abstract description 43
- 241000196324 Embryophyta Species 0.000 claims abstract description 25
- 239000011435 rock Substances 0.000 claims abstract description 21
- 239000004575 stone Substances 0.000 claims description 21
- 239000004567 concrete Substances 0.000 claims description 14
- -1 polyethylene Polymers 0.000 claims description 9
- 241000219793 Trifolium Species 0.000 claims description 6
- 244000174681 Michelia champaca Species 0.000 claims description 5
- 239000011150 reinforced concrete Substances 0.000 claims description 5
- 244000205574 Acorus calamus Species 0.000 claims description 3
- 241000201977 Agdestis clematidea Species 0.000 claims description 3
- 235000011996 Calamus deerratus Nutrition 0.000 claims description 3
- 235000005273 Canna coccinea Nutrition 0.000 claims description 3
- 240000008555 Canna flaccida Species 0.000 claims description 3
- 241000209082 Lolium Species 0.000 claims description 3
- 240000004658 Medicago sativa Species 0.000 claims description 3
- 235000017587 Medicago sativa ssp. sativa Nutrition 0.000 claims description 3
- 241001092090 Pittosporum Species 0.000 claims description 3
- 239000004698 Polyethylene Substances 0.000 claims description 3
- 239000004743 Polypropylene Substances 0.000 claims description 3
- 241000070183 Scirpus cyperinus Species 0.000 claims description 3
- 229920000573 polyethylene Polymers 0.000 claims description 3
- 229920001155 polypropylene Polymers 0.000 claims description 3
- DSSYKIVIOFKYAU-XCBNKYQSSA-N (R)-camphor Chemical compound C1C[C@@]2(C)C(=O)C[C@@H]1C2(C)C DSSYKIVIOFKYAU-XCBNKYQSSA-N 0.000 claims description 2
- 241000208140 Acer Species 0.000 claims description 2
- 241000723346 Cinnamomum camphora Species 0.000 claims description 2
- 244000111489 Gardenia augusta Species 0.000 claims description 2
- 241000218666 Metasequoia Species 0.000 claims description 2
- 241000219000 Populus Species 0.000 claims description 2
- 229960000846 camphor Drugs 0.000 claims description 2
- 229930008380 camphor Natural products 0.000 claims description 2
- 244000199671 umbrella grass Species 0.000 claims description 2
- 235000005468 umbrella grass Nutrition 0.000 claims description 2
- 244000020191 Salix babylonica Species 0.000 claims 1
- 235000002493 Salix babylonica Nutrition 0.000 claims 1
- 244000057114 Sapium sebiferum Species 0.000 claims 1
- 235000005128 Sapium sebiferum Nutrition 0.000 claims 1
- 241001138405 Taxodium distichum Species 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 3
- 239000003643 water by type Substances 0.000 abstract 1
- 239000002699 waste material Substances 0.000 description 6
- 244000025254 Cannabis sativa Species 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 229910052760 oxygen Inorganic materials 0.000 description 3
- 239000001301 oxygen Substances 0.000 description 3
- 241000894007 species Species 0.000 description 3
- 239000003039 volatile agent Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 244000005700 microbiome Species 0.000 description 2
- 239000003760 tallow Substances 0.000 description 2
- 240000001972 Gardenia jasminoides Species 0.000 description 1
- 241000994241 Sapium Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000011464 hollow brick Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004162 soil erosion Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于水岸水土保持和生态保护技术领域,具体涉及一种生态保健型固土护坡。 The utility model belongs to the technical field of water bank soil and water conservation and ecological protection, and in particular relates to an ecological health-care type soil fixing and slope protection. the
背景技术 Background technique
水岸包括各种水体、河流的岸边,由于受到水浪的冲击,泥土质地的水岸很容易塌陷,造成严重的水土流失。经过对现有技术检索发现,目前为了防止该情况的发生,常常使用混凝土、石块、镂空砖等砌筑,导致水岸生态环境破坏,人工痕迹过重等弊端。而且,以往树木的保健功能不被重视,保健树种得不到很好的应用和配置,使树木的保健功能没有很好的发挥出来。 Waterfronts include the banks of various water bodies and rivers. Due to the impact of water waves, muddy waterfronts are prone to collapse, causing serious soil erosion. After searching the existing technology, it is found that in order to prevent this situation, concrete, stones, hollow bricks, etc. are often used for masonry, which leads to the damage of the ecological environment of the waterfront and the excessive artificial traces. Moreover, the health care function of trees has not been taken seriously in the past, and the health care tree species have not been well applied and configured, so that the health care function of trees has not been brought into full play. the
发明内容 Contents of the invention
本实用新型所要解决的技术问题是提供一种生态保健型固土护坡,实现水岸整治的生态、水土保持、自然美观,并为行人提供休闲保健功能。 The technical problem to be solved by the utility model is to provide an ecological health-care type soil-fixing slope protection, which can realize the ecology of water bank regulation, water and soil conservation, natural beauty, and provide leisure and health care functions for pedestrians. the
为解决上述技术问题,本实用新型采用的技术方案如下: In order to solve the problems of the technologies described above, the technical scheme adopted in the utility model is as follows:
一种生态保健型固土护坡,其从水域至岸体方向依次由挺水植物积於区、镂空隐形挡土矮墙区、活体柳树桩区、深根耐水保健乔木根盘石区和健身区组成,所述的挺水植物积於区设置在高水位下方,所述的活体柳树桩区、深根耐水保健乔木根盘石区和健身区设置在高水位上方; An ecological health-care type soil-fixing slope protection, which is composed of emergent plant accumulation area, hollowed out invisible soil retaining low wall area, living willow stump area, deep-rooted water-resistant health-care arbor rock area and fitness area from the water area to the bank body. , the emergent plant accumulating area is set below the high water level, and the living willow stump area, the deep-rooted water-resistant health care tree root rock area and the fitness area are set above the high water level;
所述的高水位为一年中水位最高处。 The high water level mentioned is the highest water level in a year. the
其中,所述的挺水植物积於区内种植挺水植物; Wherein, the emergent plants are accumulated in the area to plant emergent plants;
其中,所述的镂空隐形挡土矮墙区内垂直设置镂空矮墙,镂空矮墙设置在护坡坡体内,镂空矮墙顶部覆土,矮墙对岸体土壤起到第一道紧固作用; Wherein, the hollow low wall is vertically set in the hollow invisible low wall area, the hollow low wall is arranged in the slope protection slope body, the top of the hollow low wall is covered with soil, and the low wall plays the first fastening effect on the bank soil;
其中,在镂空矮墙上方设置护栏,保护行人安全,也可供行人凭栏观景。 Among them, guardrails are set above the hollow low walls to protect the safety of pedestrians, and also allow pedestrians to lean on the railings to watch the scenery. the
其中,所述的活体柳树桩区内扦插直径5~8cm、高40~50cm活体柳树桩,柳树桩根系上方埋入生态袋,柳树桩不仅可以在长高后起到补充矮墙的高度的作用,还可以和生态袋共同作用,对岸体土壤起到第二道紧固作用; Wherein, the cuttage in the living willow stump area has a diameter of 5 to 8 cm and a height of 40 to 50 cm. The living willow stump is buried in an ecological bag above the root system of the willow stump, and the willow stump can not only supplement the height of the low wall after growing taller , it can also work together with the ecological bag to act as a second fastening effect on the bank soil;
其中,所述的深根耐水保健乔木根盘石区内种植耐水乔木,耐水乔木之间种植灌木,深根耐水保健乔木根盘石区内铺设一条鹅卵石小路; Wherein, water-resistant trees are planted in the root rock area of the deep-rooted water-resistant health care tree, shrubs are planted between the water-resistant trees, and a cobblestone path is laid in the root rock area of the deep-root water-resistant health care tree;
其中,所述的健身区设有碎石路面或木桩路面。 Wherein, the fitness area is provided with gravel pavement or wooden pile pavement. the
其中,所述的挺水植物为菖蒲、水烛、再力花、旱伞草和水生美人蕉中的任意一种或几种的组合。 Wherein, the emergent plants are any one or a combination of calamus, water candle, Zailihua, xylophyllum and aquatic canna. the
其中,所述的镂空矮墙为钢筋混凝土材质,所述的镂空矮墙包括底座、连接部和墙体,底座宽度大于连接部的宽度,连接部的宽度大于墙体的宽度,所述的墙体从水域至岸体方向上设置有通孔。 Wherein, the hollow low wall is made of reinforced concrete, and the hollow low wall includes a base, a connecting portion and a wall, the width of the base is greater than the width of the connecting portion, the width of the connecting portion is greater than the width of the wall, and the wall The body is provided with through holes in the direction from the water area to the shore body. the
其中,所述的通孔为方形通孔或圆形通孔。 Wherein, said through hole is a square through hole or a circular through hole. the
其中,所述的护栏的建造方法如下:在镂空矮墙的上方每隔1~1.5m将一根杉木桩打入地下,留高出地面部分0.8~1.3m作为栏杆柱,锯掉多余的部分制成直径8~15cm的横杆;横杆固定于栏杆柱的中部和上部。 Wherein, the construction method of the guardrail is as follows: a fir pile is driven into the ground every 1-1.5m above the hollowed-out low wall, and the part 0.8-1.3m above the ground is left as a railing post, and the excess part is sawed off Make crossbars with a diameter of 8-15cm; the crossbars are fixed on the middle and upper parts of the railing posts. the
其中,所述的柳树桩根部覆有直径为15~25cm卵石,随着柳树的生长,柳树根部与卵石交错盘踞。 Wherein, the root of the willow stump is covered with pebbles with a diameter of 15-25 cm, and as the willow grows, the willow stump and the pebbles are interlaced and entrenched. the
其中,所述的生态袋是由聚乙烯或聚丙烯制成的土工网袋,网袋内含有紫花苜蓿、羊毛草、黑麦草、三叶草和黄草木樨中任意一种或几种的组合的草籽,内填种植土。 Wherein, the ecological bag is a geonet bag made of polyethylene or polypropylene, and the mesh bag contains any one or a combination of alfalfa, wool grass, ryegrass, clover and sweet-scented clover. Seeds, filled with planting soil. the
其中,所述的耐水乔木为深根性、耐水湿、释放保健挥发物和负氧离子较多的树种,具体为水杉、落羽杉、池杉、香樟、深山含笑、枫杨、乌桕和柳树中的任意一种或者几种的组合;所述的灌木为耐水湿、释放保健挥发物和负氧离子较多的树种,具体为栀子、含笑和海桐中的任意一种或几种的组合;所述的鹅卵石小路由鹅卵石铺成,宽度为1~1.5m。 Wherein, the water-resistant tree is a tree species with deep roots, water and humidity resistance, and releases more health-care volatiles and negative oxygen ions, specifically Metasequoia, Bald Cedar, Pool Cedar, Camphor, Michelia Michelia, Maple Poplar, Chinese Sapium and Willow any one or a combination of several; the shrubs are resistant to water and humidity, release health-care volatiles and more negative oxygen ions, and are specifically any one or a combination of Gardenia, Michelia and Pittosporum ; The cobblestone path is paved with cobblestones, with a width of 1-1.5m. the
其中,所述的耐水乔木根部覆有直径为20~40cm废弃石块或混凝土块,随着乔木的生长,乔木根部与废弃石块或混凝土块交错盘踞。 Wherein, the root of the water-resistant tree is covered with discarded stones or concrete blocks with a diameter of 20-40 cm. As the tree grows, the roots of the tree and the discarded stones or concrete blocks intersect. the
其中,所述的鹅卵石路面由鹅卵石铺成,所述的树桩路面由杉木桩打入地下,锯掉高出地面的部分,与地面持平构建而成;所述的鹅卵石路面或木桩路面的宽度为1~3m。 Wherein, the cobblestone pavement is paved with cobblestones, and the tree stump pavement is driven into the ground by fir piles, and the part above the ground is sawed off, and is constructed flat with the ground; the width of the cobblestone pavement or the pile pavement is It is 1-3m. the
其中,在活体柳树桩区、深根耐水保健乔木根盘石区或健身区设置长椅。 Among them, set up benches in the living willow stump area, the deep-rooted water-resistant health care arbor rock area or the fitness area. the
上述生态保健型固土护坡的构建方法,它包括如下步骤: The construction method of above-mentioned ecological health-care type soil-fixing slope protection, it comprises the steps:
a在高水位附近的岸边挖沟,砌筑平行于岸体的镂空矮墙,再在镂空矮墙上覆土,直至与原来的岸体高度相平; a. Dig ditches on the bank near the high water level, build a hollow wall parallel to the bank, and then cover the hollow wall with soil until it is equal to the original bank height;
b在镂空矮墙8的上方每隔1~1.5m将一根杉木桩打入地下,留高出地面部分0.8~1.3m作为栏杆柱,锯掉多余的部分制成直径8~15cm的横杆;横杆固定于栏杆柱的中部和上部。 b. Drive a fir pile into the ground every 1-1.5m above the hollowed-out low wall 8, leave the part 0.8-1.3m above the ground as a railing post, saw off the excess part to make a crossbar with a diameter of 8-15cm ; The crossbar is fixed on the middle and upper parts of the railing post. the
c在镂空矮墙靠近水域的一侧种植挺水植物,构建挺水植物积於区(1); C plant emergent plants on the side near the water area of the hollow low wall, construct emergent plants to accumulate in the area (1);
d在镂空矮墙(8)靠近岸体的一侧散抛卵石(13),各卵石间留有空隙,填充泥土;冬季或春季时在卵石空隙间的泥土中插入活体柳树桩,构建活体柳树桩区(3);在柳树桩之间0.3~0.7m深处,埋入生态袋;柳树桩自然生根发芽,根系深入到卵石之间的泥土中,然后缠绕于卵石生长,与生态袋中的生长的草籽一起,起到紧固岸土的作用; d throw pebbles (13) loosely on the side of the hollowed-out low wall (8) near the bank body, leave a space between each pebble, fill the earth; insert living willow stumps in the soil between the pebbles during winter or spring, and build a living willow Stump area (3); bury the ecological bag at a depth of 0.3-0.7m between the willow stumps; the willow stumps will take root and sprout naturally, and the root system will go deep into the soil between the pebbles, and then grow around the pebbles, and grow with the ecological bags. Together with the growing grass seeds, it plays the role of fastening the shore soil;
e在活体柳树桩区(3)靠近岸体的一侧,在岸体向下1.5~2.0m深处,埋入废弃石块或混凝土块(14),废弃石块或混凝土块间留有10~20cm宽的间隙,间隙间填埋土,达到泥石混合的状态;石块埋入高度达到50~80cm后,于石块上覆土,直至与原来的河岸高度相平;在覆土后的河岸上栽植乔木,乔木之间栽植灌木,构建深根耐水保健乔木根盘石区(4),乔木成活后,其根系不断向下和周边扎入,逐渐缠绕在废弃石块或混凝土块上,树根包着石头越长越紧、越夹越紧,根系形成地下网,盘根交错,形成一张有生命的根系网,就像永远不会生锈的钢丝网缠绕着石头,牢牢地把岸体紧固在一起;再在深根耐水保健乔木根盘石区(4)中铺设一条宽为1~1.5m的鹅卵石小路,供游人行走。 e On the side of the living willow stump area (3) close to the shore body, bury waste stones or concrete blocks (14) at a depth of 1.5-2.0m downward from the shore body, and leave 10 holes between the waste stones or concrete blocks. ~20cm wide gap, fill the gap with soil to achieve the mixed state of mud and rock; after the stone is buried to a height of 50-80cm, cover the stone with soil until it is equal to the original river bank height; after the soil is covered, the river bank Arbors are planted on top, shrubs are planted between the arbors, and a deep-rooted water-resistant health-care arbor rock area (4) is constructed. After the arbor survives, its root system continues to penetrate downwards and around, and gradually wraps around waste stones or concrete blocks. The longer and tighter the stone wrapped, the tighter the clamp, the root system forms an underground network, and the intertwined roots form a living root system network, just like a steel wire mesh that will never rust around the stone, firmly holding the shore and then lay a cobblestone path with a width of 1 to 1.5m in the root rock area (4) of the deep-rooted water-resistant health care arbor for tourists to walk on. the
f在深根耐水保健乔木根盘石区靠近岸体的一侧铺设鹅卵石路;或者将杉木桩打入地下,锯掉高出地面的部分,与地面持平,作为步行路面,构建健身区; f Lay a cobblestone road on the side of the deep-rooted water-resistant health care arbor near the shore; or drive fir piles into the ground, saw off the part above the ground, and make it level with the ground as a walking path to build a fitness area;
g在活体柳树桩区、深根耐水保健乔木根盘石区或健身区设置长椅,供行人休息。 g Set up benches in the living willow stump area, the deep-rooted water-resistant health care arbor rock area or the fitness area for pedestrians to rest. the
有益效果:与现有技术相比,本实用新型具有如下优势: Beneficial effects: Compared with the prior art, the utility model has the following advantages:
(1)利用镂空矮墙来固岸护坡,减少大面积混凝土、石头等驳岸,避免了岸坡和水体的完全隔绝,有利于水体微生物的交流。 (1) Use the hollow low wall to stabilize the bank and slope protection, reduce the large area of concrete, stone and other revetments, avoid the complete isolation of the bank slope and the water body, and facilitate the exchange of microorganisms in the water body. the
(2)利用活体柳树桩护坡,实际是增加了矮墙的高度。 (2) The use of live willow piles for slope protection actually increases the height of the low wall. the
(3)利用深根乔木的根系缠绕石头来防止岸坡的泥土由于重力、雨水冲刷、侵蚀等原因向水体方向塌陷的后果,起到稳固岸坡的作用。 (3) Use the roots of deep-rooted trees to wrap around stones to prevent the soil on the bank slope from collapsing towards the water body due to gravity, rain erosion, erosion, etc., and play a role in stabilizing the bank slope. the
(4)利用保健型树种释放保健挥发物和负氧离子,为行人提供保健服务。 (4) Use health-care tree species to release health-care volatiles and negative oxygen ions to provide health care services for pedestrians. the
(5)铺设鹅卵石石路,方便行人的休闲健身,同时碎鹅卵石路有利于雨水的排除和渗透,具有生态功能。 (5) Laying cobblestone roads is convenient for pedestrians' leisure and fitness, while crushed cobblestone roads are conducive to the drainage and infiltration of rainwater, and have ecological functions. the
附图说明 Description of drawings
图1为河岸局部俯视图。 Figure 1 is a partial top view of the river bank. the
图2为图1的A-A方向剖面图。 Fig. 2 is a sectional view along the line A-A of Fig. 1 . the
图3a为方形通孔矮墙局部正立面图。 Fig. 3a is a partial elevational view of the square through-hole low wall. the
图3b为圆形通孔矮墙局部正立面图。 Fig. 3b is a partial front elevation view of the circular through-hole low wall. the
具体实施方式 Detailed ways
根据下述实施例,可以更好地理解本实用新型。然而,本领域的技术人员容易理解,实施例所描述的内容仅用于说明本实用新型,而不应当也不会限制权利要求书中所详细描述的本实用新型。 According to the following examples, the utility model can be better understood. However, those skilled in the art can easily understand that the content described in the embodiments is only for illustrating the utility model, and should not and will not limit the utility model described in the claims. the
实施例1 Example 1
由图1和图2可知本实用新型的生态保健型固土护坡,其从水域至岸体方向依次由挺水植物积於区1、镂空隐形挡土矮墙区2、活体柳树桩区3、深根耐水保健乔木根盘石区4和健身区5组成。 As can be seen from Fig. 1 and Fig. 2, the ecological health-care type soil-fixing slope protection of the present utility model is successively composed of emergent plants accumulating in area 1, hollowed out invisible soil retaining low wall area 2, living willow stump area 3, The deep-rooted water-resistant health care arbor is composed of rock area 4 and fitness area 5. the
所述的挺水植物积於区1设置在高水位6下方,所述的活体柳树桩区3、深根耐水保健乔木根盘石区4和健身区5设置在高水位6上方; Described emergent plant accumulating in area 1 is arranged below high water level 6, and described living willow stump area 3, deep-rooted water-resistant health-care arbor rock root area 4 and fitness area 5 are arranged above high water level 6;
所述的挺水植物积於区1内种植挺水植物7;所述的挺水植物7为菖蒲、水烛、再力花、旱伞草和水生美人蕉中的任意一种或几种的组合。 Emergent plants 7 are planted in zone 1 for the emergent plants; the emergent plants 7 are any one or a combination of calamus, water candle, Zailihua, dry umbrella grass and aquatic canna . the
所述的镂空隐形挡土矮墙区2内垂直设置镂空矮墙8,镂空矮墙8设置在护坡坡体内,镂空矮墙8顶部覆土;所述的镂空矮墙8为钢筋混凝土材质,所述的镂空矮墙8包括底座、连接部和墙体,底座宽度大于连接部的宽度,连接部的宽度大于墙体的宽度,所述的墙体从水域至岸体方向上设置有通孔。所述的通孔为方形通孔或圆形通孔(见图3a和图3b)。 A hollow low wall 8 is vertically set in the hollow invisible retaining low wall area 2, and the hollow low wall 8 is arranged in the slope protection body, and the top of the hollow low wall 8 is covered with soil; the hollow low wall 8 is made of reinforced concrete, and the hollow low wall 8 is made of reinforced concrete. The hollow low wall 8 includes a base, a connecting portion and a body of wall, the width of the base is greater than the width of the connecting portion, the width of the connecting portion is greater than the width of the wall, and the wall is provided with through holes from the water area to the bank. The said through hole is a square through hole or a circular through hole (see Fig. 3a and Fig. 3b). the
其中,在镂空矮墙的上方每隔1~1.5m将一根杉木桩打入地下,留高出地面部分0.8~1.3m作为栏杆柱,锯掉多余的部分制成直径8~15cm的横杆;横杆固定于栏杆柱的中部和上部,建造成护栏15。 Among them, a fir pile is driven into the ground every 1-1.5m above the hollowed-out low wall, and the part 0.8-1.3m above the ground is left as a railing post, and the excess part is sawed off to make a crossbar with a diameter of 8-15cm ; The crossbar is fixed on the middle and upper parts of the railing column, and is built into a guardrail 15. the
所述的活体柳树桩区3内扦插直径5~8cm、高40~50cm活体柳树桩9;所述的柳树桩9根部覆有直径为15~25cm卵石13,随着柳树桩的生长,柳树根部与卵石交错盘踞;所述的柳树桩9根系上方埋有生态袋16。 Cuttings in the living willow stump area 3 have a diameter of 5 to 8 cm and a height of 40 to 50 cm. The living willow stump 9; the roots of the willow stump 9 are covered with pebbles 13 with a diameter of 15 to 25 cm. Interlaced with pebbles; an ecological bag 16 is buried above the root system of the willow stump 9 . the
其中,所述的生态袋16是由聚乙烯或聚丙烯制成的土工网袋,网袋内含有紫花苜 蓿、羊毛草、黑麦草、三叶草和黄草木樨中任意一种或几种的组合的草籽,内填种植土。 Wherein, the ecological bag 16 is a geonet bag made of polyethylene or polypropylene, and the mesh bag contains any one or a combination of alfalfa, wool grass, ryegrass, clover and sweet-scented clover Grass seeds, filled with planting soil. the
所述的深根耐水保健乔木根盘石区4内种植耐水乔木10,耐水乔木10之间种植灌木11;所述的耐水乔木10为水杉、落羽杉、池杉、香樟、深山含笑、枫杨、乌桕和柳树中的任意一种或者几种的组合;所述的灌木11为栀子、含笑和海桐中的任意一种或几种的组合。所述的耐水乔木10根部覆有直径为20~40cm废弃石块或混凝土块14,随着乔木的生长,乔木根部与废弃石块或混凝土块交错盘踞。 Water-resistant trees 10 are planted in the root panshi area 4 of the deep-rooted water-resistant health-care trees, and shrubs 11 are planted between the water-resistant trees 10; Any one or a combination of several of Chinese tallow, tallow and willow; the shrub 11 is any one or a combination of gardenia, Michelia chinensis and Pittosporum. The roots of the water-resistant tree 10 are covered with discarded stones or concrete blocks 14 with a diameter of 20-40 cm. As the tree grows, the roots of the tree and the discarded stones or concrete blocks intersect and occupy. the
所述的深根耐水保健乔木根盘石区4内铺设一条鹅卵石小路,宽度为1~1.5m。 A cobblestone path is paved in the root rock area 4 of the deep-rooted water-resistant health-care arbor with a width of 1-1.5m. the
所述的健身区5设有鹅卵石石路面或木桩路面。所述的鹅卵石路面由鹅卵石铺成,所述的树桩路面由直径5~10cm、长40~60cm经防腐处理的干燥杉木桩打入地下,锯掉高出地面的部分,与地面持平构建成;所述的鹅卵石路面或木桩路面的宽度为1~3m。 Described fitness area 5 is provided with cobblestone pavement or stake pavement. The cobblestone pavement is paved with cobblestones, and the stump pavement is constructed of dry fir piles with a diameter of 5 to 10 cm and a length of 40 to 60 cm that have been treated with anticorrosion and are driven into the ground, and the part above the ground is sawed off to be level with the ground; The width of the cobblestone pavement or wooden pile pavement is 1-3m. the
在活体柳树桩区3、深根耐水保健乔木根盘石区4或健身区5设置长椅,供人休息。 Benches are set in living willow stump area 3, deep-rooted water-resistant health care arbor rock area 4 or fitness area 5 for people to have a rest. the
上述生态保健型固土护坡的构建一般选择在冬季水位较低的季节施工,它包括如下步骤: The construction of the above-mentioned ecological health-care type soil-fixing slope protection is generally selected in winter when the water level is low, and it includes the following steps:
a在高水位6附近的岸边挖沟,深度1.5~2m,宽度5~10m,砌筑平行于岸体的镂空矮墙8,沿水边岸坡夯实后建设110cm宽底座,底座上设置70cm宽连接部,然后在连接部上砌筑50~80cm高、30cm宽的矮墙,矮墙用钢筋混凝土现浇,矮墙的上部预留两排孔洞,便于墙体两侧渗水,土壤中的微生物来回活动,孔洞可以用圆形或方形的木柱模型平放于墙体中,木柱模型长度与墙体宽度相等。待钢筋混凝土墙体完全凝固后,再用工具把木柱模型从墙体中敲出来。这样5m一段地浇筑出连续的带有孔洞的矮墙。再在镂空矮墙8上覆土,直至与原来的岸体高度相平;使得从岸体表面看不见矮墙。 a. Dig trenches on the bank near the high water level 6, with a depth of 1.5-2m and a width of 5-10m, and build a hollow wall 8 parallel to the bank body. After compacting the bank slope along the water's edge, build a 110cm wide base, and set a 70cm wide base on the base. wide connection part, and then build a low wall with a height of 50-80cm and a width of 30cm on the connection part. The microorganisms move back and forth, and the hole can be placed flat in the wall with a circular or square wooden column model, and the length of the wooden column model is equal to the width of the wall. After the reinforced concrete wall is completely solidified, the wooden column model is knocked out from the wall with a tool. In this way, a continuous low wall with holes is poured in a section of 5m. Cover soil on the hollow low wall 8 again until it is equal to the height of the original bank; making the low wall invisible from the surface of the bank. the
b在镂空矮墙8的上方每隔1~1.5m将一根杉木桩打入地下,留高出地面部分0.8~1.3m作为栏杆柱,锯掉多余的部分制成直径8~15cm的横杆;横杆固定于栏杆柱的中部和上部。 b. Drive a fir pile into the ground every 1-1.5m above the hollowed-out low wall 8, leave the part 0.8-1.3m above the ground as a railing post, saw off the excess part to make a crossbar with a diameter of 8-15cm ; The crossbar is fixed on the middle and upper parts of the railing post. the
c在镂空矮墙8靠近水域的一侧覆土,种植挺水植物,构建挺水植物积於区1。 c Cover soil on the side of the hollow low wall 8 close to the water area, plant emergent plants, and build emergent plants to accumulate in area 1. the
d在镂空矮墙8靠近岸体的一侧挖出深1.5m,宽1m,和墙体等长的基础,在上面散抛平均直径为20cm的卵石13,各卵石间留有空隙,填充泥土;冬季或春季时在卵石空隙间的泥土中扦插直径为5~8cm,高40cm~50cm的活体柳树桩,然后在柳树桩之间0.3~0.7m深处,埋入生态袋,最后在周边填上土,构建活体柳树桩区3;柳树桩自然生 根发芽,根系深入到卵石之间的泥土中,然后缠绕于卵石生长,与生态袋中的生长的草籽一起,起到紧固岸土的作用。 d dig out a foundation with a depth of 1.5m, a width of 1m, and the same length as the wall on the side of the hollowed-out low wall 8 near the bank body, and throw pebbles 13 with an average diameter of 20cm on the top, leaving gaps between each pebble to fill with soil In winter or spring, live willow stumps with a diameter of 5 to 8 cm and a height of 40 cm to 50 cm are cut in the soil between the pebbles, and then buried in ecological bags at a depth of 0.3 to 0.7 m between the willow stumps, and finally filled in the surrounding area. Put on the soil and build the living willow stump area 3; the willow stumps will take root and germinate naturally, and the root system will go deep into the soil between the pebbles, and then grow around the pebbles, and together with the grass seeds growing in the ecological bag, they will fasten the shore soil role. the
e在活体柳树桩区3靠近岸体的一侧,挖5m宽,深度在2m左右的平沟,埋入废弃石块或混凝土块14,废弃石块或混凝土块间留有10~20cm宽的空隙,空隙间填埋土,达到泥石混合的状态;石块埋入高度达到50~80cm后,于石块上覆土,直至与原来的河岸高度相平;在覆土后的河岸上栽植乔木,乔木之间栽植灌木,构建深根耐水保健乔木根盘石区4,乔木成活后,其根系不断向下和周边扎入,逐渐缠绕在废弃石块或混凝土块上,根系形成地下网,盘根交错;再在深根耐水保健乔木根盘石区(4)中铺设一条宽为1~1.5m的鹅卵石小路,供游人行走。。 e On the side of the living willow stump area 3 close to the bank body, dig a flat trench with a width of 5m and a depth of about 2m, and bury waste stones or concrete blocks 14, leaving 10-20cm wide gaps between the waste stones or concrete blocks. Gaps and gaps are filled with soil to achieve the mixed state of mud and rocks; after the stones are buried to a height of 50-80 cm, the soil is covered on the stones until the height of the original river bank is equal; trees are planted on the river bank after the soil is covered. Plant shrubs between trees to build deep roots and water-resistant health-care tree root rock area 4. After the tree survives, its root system will continue to penetrate downwards and around, and gradually wrap around waste stones or concrete blocks. The root system forms an underground network, and the roots are intertwined ; Lay a cobblestone path with a width of 1 to 1.5m in the deep-rooted water-resistant health-care arbor rock area (4) for walking by tourists. . the
f在深根耐水保健乔木根盘石区4靠近岸体的一侧铺设鹅卵石路,鹅卵石的平均直径为2cm,路基厚度为30cm;或者将直径5~10cm、长40~60cm经防腐处理的干燥的杉木桩打入地下,锯掉高出地面的部分,与地面持平,作为步行路面,构建健身区5为行人休闲健身使用。 f Lay a cobblestone road on the side of the deep-rooted water-resistant health-care arbor rock area 4 close to the bank. The average diameter of the cobblestone is 2cm, and the thickness of the roadbed is 30cm; The fir piles are driven into the ground, and the part above the ground is cut off to be level with the ground. It is used as a walking path, and the fitness area 5 is constructed for pedestrians to use for leisure and fitness. the
g在活体柳树桩区3、深根耐水保健乔木根盘石区4或健身区5设置长椅12,供行人休息。 G set bench 12 in living willow stump area 3, deep root water-resistant health care arbor rock area 4 or fitness area 5, for pedestrians to have a rest. the
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420588754.9U CN204139124U (en) | 2014-10-11 | 2014-10-11 | A kind of ecological health care type soil and slope protection |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420588754.9U CN204139124U (en) | 2014-10-11 | 2014-10-11 | A kind of ecological health care type soil and slope protection |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204139124U true CN204139124U (en) | 2015-02-04 |
Family
ID=52415821
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420588754.9U Expired - Fee Related CN204139124U (en) | 2014-10-11 | 2014-10-11 | A kind of ecological health care type soil and slope protection |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204139124U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108708383A (en) * | 2018-08-30 | 2018-10-26 | 河北建筑工程学院 | A kind of plant-growing type eco-concrete bank protection and its construction method |
| CN110521447A (en) * | 2019-09-02 | 2019-12-03 | 李彬一 | A kind of ecological slope protection |
-
2014
- 2014-10-11 CN CN201420588754.9U patent/CN204139124U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108708383A (en) * | 2018-08-30 | 2018-10-26 | 河北建筑工程学院 | A kind of plant-growing type eco-concrete bank protection and its construction method |
| CN110521447A (en) * | 2019-09-02 | 2019-12-03 | 李彬一 | A kind of ecological slope protection |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101790931A (en) | Restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir | |
| CN208266847U (en) | Quickly repair structure in Gullied suitable for Canal in Loess Area | |
| CN102677682A (en) | Ecological slope protection structure and construction method thereof | |
| CN108589654A (en) | A kind of ecological brick and its ecological revetment system | |
| CN104264628B (en) | A kind of ecological health care type soil and slope protection and construction process thereof | |
| CN1943316A (en) | Anti-leakage, water conversion, water-saving fertilizer nutrition liquid irrigation planting method for thin film horizontal band ditch and bucket type bag | |
| JP7587835B2 (en) | Soil aeration, infiltration and drainage system and soil aeration, infiltration and drainage construction method | |
| CN207619930U (en) | A kind of high stable state ecoscape protective slope structure | |
| CN107165176A (en) | A kind of method for strengthening the native check dam in the slope collapse exit or entrance of a clitch or check dam sediment trapping retaining | |
| CN204139124U (en) | A kind of ecological health care type soil and slope protection | |
| CN105756015B (en) | A method for restoration of biodiversity dynamic landscape ecological composite system | |
| CN108668787B (en) | Ecological reconstruction structure of stereoplasm bank protection | |
| CN208441049U (en) | A kind of ecological brick and its ecological slope protection system | |
| Kravčík et al. | Projects implemented and lessons learnt from the new water paradigm | |
| CN206646448U (en) | It is a kind of to subtract dirty Riparian Zone suitable for rural area | |
| JP2023079214A (en) | Planting aeration and infiltration water vein system and construction method for planting aeration and infiltration water vein system | |
| CN111549720B (en) | Double-pile body cross-reinforced river channel ecological revetment | |
| JP4232960B2 (en) | Embedded solidified layer greening method | |
| CN205857209U (en) | A kind of soil and water conservation ecological bank protection | |
| CN205740521U (en) | The abrupt slope buffer strip step processing system of rain runoff collection and purification | |
| CN204385681U (en) | The ecological hybrid system of a kind of bio-diversity dynamic landscape | |
| CN109083250A (en) | A kind of massif class greenery patches method of construction based on sponge city | |
| CN202577237U (en) | Plant ecological ditch | |
| CN209652901U (en) | A kind of restoration of the ecosystem structure for building stones mining area | |
| CN106049226A (en) | Waterproof seepage ditch with three slope surfaces being added with HDPE films |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150204 Termination date: 20151011 |
|
| EXPY | Termination of patent right or utility model |