CN204138192U - A kind of high tower crane operation room - Google Patents

A kind of high tower crane operation room Download PDF

Info

Publication number
CN204138192U
CN204138192U CN201420584187.XU CN201420584187U CN204138192U CN 204138192 U CN204138192 U CN 204138192U CN 201420584187 U CN201420584187 U CN 201420584187U CN 204138192 U CN204138192 U CN 204138192U
Authority
CN
China
Prior art keywords
side plate
front apron
tower crane
back shield
high tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420584187.XU
Other languages
Chinese (zh)
Inventor
柳劼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHA JULIYI INDUSTRIAL Co Ltd
Original Assignee
CHANGSHA JULIYI INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA JULIYI INDUSTRIAL Co Ltd filed Critical CHANGSHA JULIYI INDUSTRIAL Co Ltd
Priority to CN201420584187.XU priority Critical patent/CN204138192U/en
Application granted granted Critical
Publication of CN204138192U publication Critical patent/CN204138192U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of high tower crane operation room, comprise two relatively spaced first side plate and the second side plates, connect back shield and the front apron of described first side plate and the second side plate in turn, ceiling is coated with above the spatial accommodation of the operator's compartment that described first side plate, the second side plate, back shield and front apron surround, wherein: described ceiling is circular arc arch configuration, the edge of described arch configuration stretches out and is conducive to blocking the extension rib with draining, and described extension rib is connected with arc transition between described circular arc arch edge; Described front apron, back shield, the first side plate and the second side plate are all provided with transparent case hardened glass.This operator's compartment compact conformation, protective is good, long service life.

Description

A kind of high tower crane operation room
Technical field
The utility model relates to technical field of engineering machinery, particularly a kind of high tower crane operation room.
Background technology
High tower crane is a kind of hoisting and transporting tool being applied to the ground such as harbour, workshop, construction site; Particularly extensive in the application of real estate building field, the effect of the higher tower crane of floor is larger, and it can level be transported, also can vertical transport, and concrete operating process is completed in the operator's compartment of high tower crane by operating personal.Existing high tower crane is generally used for outdoor study, and expose to the sun and rain throughout the year, easily damage, service life is short; In addition, construction site stirs up a cloud of dust, and working environment is comparatively severe, and the safeguard procedures of existing operator's compartment are not in place, bring harm to the health of operating personal.
Utility model content
Technical problem to be solved in the utility model is: for the deficiencies in the prior art, and provide a kind of novel high tower crane operation room, sound construction, barrier propterty are good, can effectively resist the harsh environment exposing to the sun and rain and stir up a cloud of dust, increase the service life.
For solving the problems of the technologies described above, the utility model by the following technical solutions:
A kind of high tower crane operation room, comprise two relatively spaced first side plate and the second side plates, connect back shield and the front apron of described first side plate and the second side plate in turn, ceiling is coated with above the spatial accommodation of the operator's compartment that described first side plate, the second side plate, back shield and front apron surround, wherein: described ceiling is circular arc arch configuration, the edge of described arch configuration stretches out and is conducive to blocking the extension rib with draining, and described extension rib is connected with arc transition between described circular arc arch edge; Described front apron, back shield, the first side plate and the second side plate are all provided with transparent case hardened glass.
As to further improvement of the utility model:
The side of described front apron and being fixedly connected by welding between described first side plate and the second side plate; One side of described back shield is rotating to be articulated with on described first side plate or the second side plate.
Described ceiling is provided with several hooks for hanging.
Described first side plate is provided with near the part of back shield the guard plot, side prepared by steel plate, part near front apron is provided with viewing area, side, and viewing area, described side comprises the upper visible area being inlaid with transparent case hardened glass, middle visible area and lower visible area from top to bottom.
Described first side plate is identical with the structure of the second side plate.
Described back shield comprises the rear protecting district of being prepared by steel plate and the rear visible area of being prepared by transparent toughened glass, and described rear protecting district is provided with the keeper being beneficial to push-and-pull.
The top of described front apron is transparent toughened glass, and bottom is steel plate.
Compared with prior art, the utility model has the advantage of:
1. jointly surrounded by the first side plate, the second side plate, back shield and front apron and ceiling, compact conformation each other, solid and reliable;
2. front apron, back shield, the first side plate and the second side plate are all provided with transparent case hardened glass, protective is good, and the visual field is broad;
3. ceiling and extension rib thereof can reduce rainwater and the anticorrosion high tower crane of residue, can also realize better sealing simultaneously, for operator's compartment is keeped out wind and rain, and the effect increased the service life.
Accompanying drawing explanation
Fig. 1 is general assembly structural representation of the present utility model;
Fig. 2 is the ceiling structure schematic diagram of utility model;
Fig. 3 is the structural representation of the first side plate of utility model;
Fig. 4 is the structural representation of the back shield of utility model;
The structural representation of Fig. 5 is the first side plate top in Fig. 1 to be case hardened glass bottom be steel plate.
Marginal data:
10, the first side plate; 11, guard plot, side; 12, viewing area, side; 121, upper visible area; 122, middle visible area; 123, lower visible area; 20, the second side plate; 30, back shield; 31, rear protecting district; 32, rear visible area; 40, front apron; 50, ceiling; 52, extension rib; 53, link up with.
Detailed description of the invention
Below in conjunction with specific embodiment and accompanying drawing, the utility model is further described.
As depicted in figs. 1 and 2, the utility model relates to a kind of high tower crane operation room, it comprises two relatively spaced first side plate 10 and the second side plates 20, connect back shield 30 and the front apron 40 of the first side plate 10 and the second side plate 20 in turn, it is characterized in that: the first side plate 10, second side plate 20, ceiling 50 is coated with above the spatial accommodation of the operator's compartment that back shield 30 and front apron 40 surround, wherein: ceiling 50 is circular arc arch configuration, the edge of arch configuration stretches out and is conducive to blocking the extension rib 52 with draining, between extension rib 52 with circular arc arch edge, arc transition is connected, front apron 40, back shield 30, first side plate 10 and the second side plate 20 are all provided with transparent case hardened glass, and protective is good, and the visual field is broad.
It should be noted that, operating personal enters in operator's compartment by back shield 30, just to front apron 40 sitting, is observed the working environment of front, rear, left and right by the case hardened glass on front apron 40, back shield 30, first side plate 10 and the second side plate 20, compact conformation, practicality is good.The arc-shaped structure of ceiling 50 is beneficial to rainwater or dust to edge landing to extension rib 52, and then fallen by extension rib 52, clean, corrosion prevention, in addition, can also play better sealing function, for operator's compartment is keeped out wind and rain, increase the service life.
Particularly, front apron 40 side and be fixedly connected by welding between the first side plate 10 and the second side plate 20; One side of back shield 30 is rotating to be articulated with on the first side plate 10 or the second side plate 20.
Preferably, ceiling 50 is provided with several hooks 53 for hanging.
Particularly, see Fig. 3, first side plate 10 is provided with near the part of back shield 30 guard plot, side 11 prepared by steel plate, be provided with viewing area, side 12 near the part of front apron 40, viewing area, side 12 comprise from top to bottom be inlaid with transparent case hardened glass upper visible area 121, middle visible area 122 and lower visible area 123.Operating personal in different angles, can see the external environment that the visual field is larger.
Preferably, the first side plate 10 is identical with the structure of the second side plate 20.Convenient production and maintenance.
Preferably, see Fig. 4, back shield 30 comprises the rear protecting district 31 of being prepared by steel plate and the rear visible area 32 of being prepared by transparent toughened glass, and rear protecting district 31 is provided with the keeper being beneficial to push-and-pull, and handled easily personnel pass in and out.
Preferably, see Fig. 5, the top of front apron 40 is transparent toughened glass, and bottom is steel plate.
High tower crane operation room of the present utility model, is surrounded jointly by the first side plate 10, second side plate 20, back shield 30 and front apron 40 and ceiling 50, compact conformation each other, solid and reliable; Front apron 40, back shield 30, first side plate 10 and the second side plate 20 are all provided with transparent case hardened glass, and protective is good, and the visual field is broad.Ceiling 50 and extension rib 52 thereof can reduce rainwater and the anticorrosion high tower crane of residue, can also realize better sealing simultaneously, for operator's compartment is keeped out wind and rain, and the effect increased the service life.
The above is only preferred implementation of the present utility model, protection domain of the present utility model be not only confined to above-described embodiment, and all technical schemes belonged under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, not departing from the some improvements and modifications under the utility model principle prerequisite, protection domain of the present utility model all should be considered as.

Claims (7)

1. a high tower crane operation room, comprise two relatively spaced first side plate (10) and the second side plates (20), connect back shield (30) and the front apron (40) of described first side plate (10) and the second side plate (20) in turn, it is characterized in that: above the spatial accommodation of the operator's compartment that described first side plate (10), the second side plate (20), back shield (30) and front apron (40) surround, be coated with ceiling (50), wherein:
Described ceiling (50) is circular arc arch configuration, and the edge of described arch configuration stretches out and is conducive to blocking the extension rib (52) with draining, and described extension rib (52) is connected with arc transition between described circular arc arch edge;
Described front apron (40), back shield (30), the first side plate (10) and the second side plate (20) are all provided with transparent case hardened glass.
2. high tower crane operation room according to claim 1, is characterized in that: the side of described front apron (40) and being fixedly connected by welding between described first side plate (10) and the second side plate (20); One side of described back shield (30) is rotating to be articulated with on described first side plate (10) or the second side plate (20).
3. high tower crane operation room according to claim 2, is characterized in that: described ceiling (50) is provided with several hooks (53) for hanging.
4. high tower crane operation room as claimed in any of claims 1 to 3, it is characterized in that: described first side plate (10) is provided with near the part of back shield (30) guard plot, side (11) prepared by steel plate, be provided with viewing area, side (12) near the part of front apron (40), viewing area, described side (12) comprises from top to bottom and is inlaid with the upper visible area (121) of transparent case hardened glass, middle visible area (122) and lower visible area (123).
5. high tower crane operation room according to claim 4, is characterized in that: described first side plate (10) is identical with the structure of the second side plate (20).
6. high tower crane operation room as claimed in any of claims 1 to 3, it is characterized in that: described back shield (30) comprises the rear protecting district (31) of being prepared by steel plate and the rear visible area (32) of being prepared by transparent toughened glass, described rear protecting district (31) is provided with the keeper being beneficial to push-and-pull.
7. high tower crane operation room as claimed in any of claims 1 to 3, is characterized in that: the top of described front apron (40) is transparent toughened glass, and bottom is steel plate.
CN201420584187.XU 2014-10-11 2014-10-11 A kind of high tower crane operation room Expired - Fee Related CN204138192U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420584187.XU CN204138192U (en) 2014-10-11 2014-10-11 A kind of high tower crane operation room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420584187.XU CN204138192U (en) 2014-10-11 2014-10-11 A kind of high tower crane operation room

Publications (1)

Publication Number Publication Date
CN204138192U true CN204138192U (en) 2015-02-04

Family

ID=52414896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420584187.XU Expired - Fee Related CN204138192U (en) 2014-10-11 2014-10-11 A kind of high tower crane operation room

Country Status (1)

Country Link
CN (1) CN204138192U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111439674A (en) * 2020-04-28 2020-07-24 南京中船绿洲机器有限公司 Crane protective structure device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111439674A (en) * 2020-04-28 2020-07-24 南京中船绿洲机器有限公司 Crane protective structure device

Similar Documents

Publication Publication Date Title
CN204138192U (en) A kind of high tower crane operation room
CN204626361U (en) Novel water conservancy trash rake
CN203394569U (en) Underground coal mine dust-proof water curtain
CN201411913Y (en) Horizontal openable protective net
CN201461268U (en) Nacelle for wind turbines
CN203684635U (en) Safety protection hanging basket for building
CN205588483U (en) Buffering device for vertical concrete conveyance
CN201190423Y (en) Horizontal protection shed for tall building
CN201684333U (en) Fire facility room
CN204416823U (en) Construction elevator power dust keeper
CN206301735U (en) A kind of gas relay rain cover
CN206737541U (en) Bit platform is entered in a kind of angle steel tower high-altitude
CN204873680U (en) Portable portable building lifting machine device
CN103088952B (en) Method and panel point structure preventing high-cross falling objects from damaging low-cross steel roof
CN202430722U (en) Assembled-type manpower hole digging protection device
CN110056744B (en) Mud pump suction port and rotary pipe joint mechanism of trailing suction trolley
CN206707353U (en) A kind of coal yard purging system
CN204552131U (en) One can face bound defence rail by temporary traffic
CN206722228U (en) A kind of attachment means on Antiseismic building seam roof
CN202689007U (en) Lift type protective railing
CN202920876U (en) Fire equipment combined cabinet in construction site
CN203967697U (en) The visual cable channel cover plate of a kind of transformer station
CN2600398Y (en) Belt roof protection device
CN211344260U (en) Cross-layer pipeline protection device
CN204233055U (en) Device for cleaning dust

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20171011

CF01 Termination of patent right due to non-payment of annual fee