CN204125977U - 管桩桩头便捷连接装置 - Google Patents
管桩桩头便捷连接装置 Download PDFInfo
- Publication number
- CN204125977U CN204125977U CN201420513565.5U CN201420513565U CN204125977U CN 204125977 U CN204125977 U CN 204125977U CN 201420513565 U CN201420513565 U CN 201420513565U CN 204125977 U CN204125977 U CN 204125977U
- Authority
- CN
- China
- Prior art keywords
- steel bushing
- pile head
- tubular pile
- annular bottom
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420513565.5U CN204125977U (zh) | 2014-09-05 | 2014-09-05 | 管桩桩头便捷连接装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420513565.5U CN204125977U (zh) | 2014-09-05 | 2014-09-05 | 管桩桩头便捷连接装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204125977U true CN204125977U (zh) | 2015-01-28 |
Family
ID=52382345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420513565.5U Expired - Lifetime CN204125977U (zh) | 2014-09-05 | 2014-09-05 | 管桩桩头便捷连接装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204125977U (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108755670A (zh) * | 2018-07-19 | 2018-11-06 | 中国建筑第八工程局有限公司 | 桩头标高控制及保护装置、以及桩头施工方法 |
-
2014
- 2014-09-05 CN CN201420513565.5U patent/CN204125977U/zh not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108755670A (zh) * | 2018-07-19 | 2018-11-06 | 中国建筑第八工程局有限公司 | 桩头标高控制及保护装置、以及桩头施工方法 |
| CN108755670B (zh) * | 2018-07-19 | 2024-01-23 | 中国建筑第八工程局有限公司 | 桩头标高控制及保护装置、以及桩头施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10704286B2 (en) | Method and apparatus for erecting tower with hydraulic cylinders | |
| CN102505636A (zh) | 一种双薄壁墩连续刚构桥0号块施工方法 | |
| CN104110527B (zh) | 输油管道支撑装置 | |
| CN102589973A (zh) | 一种弯钩锚杆拉拔试验辅助装置及试验方法 | |
| CN102704412B (zh) | 桥梁断柱顶升施工方法 | |
| CN204402521U (zh) | 矿用液压临时支护装置 | |
| CN204125977U (zh) | 管桩桩头便捷连接装置 | |
| CN103510517A (zh) | 大吨位锚杆静压桩简易压桩架 | |
| CN202644531U (zh) | 锚杆静压桩预加压力封桩装置 | |
| CN205857040U (zh) | 一种用于对临时支座预压的装置 | |
| CN102704398B (zh) | 盖梁顶升施工方法 | |
| CN205421988U (zh) | 混凝土独立柱加固用plc智能同步顶升卸荷施工装置 | |
| CN204530501U (zh) | 一种便于施工时控制拱肋线形的支架支座 | |
| CN204151788U (zh) | 一种便捷式钢套管桩植入机 | |
| CN103728077A (zh) | 锚杆锚固力测试仿真综合实验装置 | |
| CN203321544U (zh) | 一种液压支架 | |
| CN203479511U (zh) | 铁路t梁静载试验台座 | |
| CN102587638A (zh) | 一种悬挑脚手架钢梁锚固装置 | |
| CN106522113B (zh) | 移动模架梁面整体连续后退方法 | |
| CN102900074B (zh) | 一种端部螺纹x形变截面预制管桩及其施工方法 | |
| CN102226343A (zh) | 锚杆静压组合桩 | |
| CN202383026U (zh) | 水平和竖向荷载耦合作用下柱性能测试装置 | |
| CN204850482U (zh) | 一种千斤顶反张拉预压工具 | |
| CN204080885U (zh) | 挂接式锚栓反力装置 | |
| CN204112325U (zh) | 一种用于锚杆静压桩压桩装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: CHINA ENERGY ENGINEERING GROUP SHANXI ELECTRIC POW Free format text: FORMER NAME: CEEC SHANXI ELECTRIC POWER EXPLORATION + DESIGN INSTITUTE |
|
| CP01 | Change in the name or title of a patent holder |
Address after: 030001 Yingze street, Shanxi, No. 255, No. Patentee after: CHINA ENERGY ENGINEERING GROUP, SHANXI ELECTRIC POWER ENGINEERING Co.,Ltd. Address before: 030001 Yingze street, Shanxi, No. 255, No. Patentee before: CEEC Shanxi Electric Power Exploration & Design Institute |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150128 |