CN204101426U - Sea tidal zone environment speeding-up simulation system - Google Patents

Sea tidal zone environment speeding-up simulation system Download PDF

Info

Publication number
CN204101426U
CN204101426U CN201420423912.5U CN201420423912U CN204101426U CN 204101426 U CN204101426 U CN 204101426U CN 201420423912 U CN201420423912 U CN 201420423912U CN 204101426 U CN204101426 U CN 204101426U
Authority
CN
China
Prior art keywords
tidal zone
simulation system
speeding
sea tidal
temperature control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420423912.5U
Other languages
Chinese (zh)
Inventor
徐强
丁小富
徐秉政
泽龙
盛建松
潘崇根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Heli Haike new materials Limited by Share Ltd
Original Assignee
ZHEJIANG HELI NEW TYPE BUILDING MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HELI NEW TYPE BUILDING MATERIAL CO Ltd filed Critical ZHEJIANG HELI NEW TYPE BUILDING MATERIAL CO Ltd
Priority to CN201420423912.5U priority Critical patent/CN204101426U/en
Application granted granted Critical
Publication of CN204101426U publication Critical patent/CN204101426U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to marine environment simulation system, aims to provide a kind of sea tidal zone environment speeding-up simulation system.The utility model comprises sea tidal zone environmental simulation system and temperature control accelerating system, sea tidal zone environmental simulation system comprises cement based test platform, drainage arrangement and several tide analog devices, and temperature control accelerating system comprises temperature control equipment and temperature monitoring system; Described sea tidal zone environment speeding-up simulation system is sealed cabin structure, and several tide analog devices described are arranged on the bottom surface of closed cabin successively.The beneficial effects of the utility model are: the marine corrosion behavior of speeding-up simulation material and component in the multiple marine corrosion factor environment such as the coupling of described sea tidal zone environment accelerating system tide, salt leaching, salt fog, conveniently carry out material and member the carries out corrosion regularity evaluation etc. with endurance quality of probing in sea tidal zone.

Description

Sea tidal zone environment speeding-up simulation system
Technical field
The utility model relates to marine environment simulation system, particularly relates to a kind of sea tidal zone environment speeding-up simulation system.
Background technology
China accounts for about 3% of GDP because corroding the loss caused every year, and wherein marine corrosion accounts for important proportion.In order to carry out probing into and the evaluation of endurance quality of marine corrosion rule, China has built relevant marine environment exposure test base.But material and member is longer in the true military service cycle in marine environment exposure test base, it is higher that all samples all carries out marine environment then expense cost of being on active service, and first should carry out the experiment of indoor marine environment speeding-up simulation to sample.At present, traditional salt air corrosion instrument, salt leaching corrosion tester etc., because of the single and geo-stationary of simulated marine corrosion factor, has larger gap with true sea tidal zone environmental characteristic, still can not for ocean exposure test provide rationally early stage desk research Data support.
Utility model content
The technical problems to be solved in the utility model is, overcomes deficiency of the prior art, provides a kind of sea tidal zone environment speeding-up simulation system.
For technical solution problem, solution of the present utility model is:
A kind of sea tidal zone environment speeding-up simulation system is provided, comprise sea tidal zone environmental simulation system and temperature control accelerating system, sea tidal zone environmental simulation system comprises cement based test platform, drainage arrangement and several tide analog devices, and temperature control accelerating system comprises temperature control equipment and temperature monitoring system; Described sea tidal zone environment speeding-up simulation system is sealed cabin structure, and several tide analog devices described are arranged on the bottom surface of closed cabin successively; Be arranged on the bottom surface of closed cabin bottom described stepped cement based test platform, and three of this test platform side corresponding three side inner walls abutting against described closed cabin respectively; Described drainage arrangement is arranged on the inwall lower end, another side of cement based test platform and runs through that to extend to this lower end, side by this side inner walls lower end outside, closed cabin side inner walls upper end is installed in described import and export, and is positioned at cement based test platform highest point; Described temperature control equipment is arranged on the both sides inwall of cement based test platform, and both sides inwall thermostatic above be separately installed with temperature monitoring system, be electrically connected to each other between described temperature control equipment and temperature monitoring system.
Improve as one, described temperature monitoring system is PT100 temperature digital display sensor.
Improve as one, described temperature control equipment titanium alloy electrical heating type well heater.
Improve as one, described tide analog device is air blast wave producer.
Improve as one, described drainage arrangement is seawater corrosion resistance water pump.
Improve as one, described sealed cabin structure is by interior and form airtight cube structure outward, and its inwall is Corrosion Resistant Frp material.
Compared with prior art, the beneficial effects of the utility model are:
Implement the technical solution of the utility model, the marine corrosion behavior of speeding-up simulation material and component in the multiple marine corrosion factor environment such as the environment accelerating system coupling of described sea tidal zone tide, salt leaching, salt fog can be made, conveniently carry out material and member the carries out corrosion regularity evaluation etc. with endurance quality of probing in sea tidal zone.
Accompanying drawing explanation
Fig. 1 is the structural representation of sea tidal zone environment speeding-up simulation system;
Fig. 2 is the vertical view of sea tidal zone environment speeding-up simulation system;
Reference numeral: 1, temperature monitoring system, 2, temperature control equipment, 3, cement based test platform, 4, import and export, 5, drainage arrangement, 6, closed cabin, 7, tide analog device.
Embodiment
Following embodiment can make the technician of this professional skill field more fully understand the utility model, but limits the utility model never in any form.
As shown in Fig. 1 ~ 2, the utility model provides the specific embodiment of a kind of sea tidal zone environment speeding-up simulation system, described sea tidal zone environment speeding-up simulation system comprises sea tidal zone environmental simulation system and temperature control accelerating system, described sea tidal zone environmental simulation system comprises cement based test platform 3, drainage arrangement 5 and two tide analog devices 7, and temperature control accelerating system comprises temperature control equipment 2 and temperature monitoring system 1; Described sea tidal zone environment speeding-up simulation system is sealed cabin structure, and described closed cabin 6 adopts prior art structure, and its structure is interior and form completely airtight cube structure outward, and inwall is Corrosion Resistant Frp material.
Described two tide analog devices 7 are arranged on the bottom surface of closed cabin 6 successively, and described tide analog device 7 is air blast wave producer, for controlling height and the travelling speed of wave, thus carry out the tide analog of seawater.
Be arranged on the bottom surface of closed cabin 6 bottom described stepped cement based test platform 3, three sides corresponding three side inner walls abutting against closed cabin 6 respectively of described cement based test platform 3.When sea tidal zone environment speeding-up simulation system is applied, described cement based test platform 3 half is exposed in seawater, for simulating sea tidal zone environment.
Described drainage arrangement 5 is arranged on inwall lower end, another side and runs through and extends to this outside, lower end, side by this side inner walls lower end, closed cabin 6 one side inner walls upper ends are installed in described import and export 4, and be positioned at cement based test platform 3 highest point, be convenient to researchist enter and pick and place laboratory sample, described drainage arrangement 5 is seawater corrosion resistance water pump, regulates sea height for discharging seawater.
Described temperature control equipment 2 is arranged on the both sides inwall of cement based test platform 3, and is separately installed with temperature monitoring system 1 above the temperature control equipment 2 of this both sides inwall, is electrically connected to each other between described temperature control equipment 2 and temperature monitoring system 1,
Described temperature monitoring system is PT100 temperature digital display sensor.
Described temperature control equipment titanium alloy electrical heating type well heater.
Described temperature control accelerating system is for regulating and controlling ocean temperature, thus the bulk temperature of control system, reach the object of speeding-up simulation.
Therefore, actual range of the present utility model not only comprises the disclosed embodiments, be also included under claims implement or perform all equivalents of the present utility model.

Claims (6)

1. a sea tidal zone environment speeding-up simulation system, comprise sea tidal zone environmental simulation system and temperature control accelerating system, it is characterized in that, sea tidal zone environmental simulation system comprises cement based test platform, drainage arrangement and several tide analog devices, and temperature control accelerating system comprises temperature control equipment and temperature monitoring system;
Described sea tidal zone environment speeding-up simulation system is sealed cabin structure, and several tide analog devices described are arranged on the bottom surface of closed cabin successively; The stepped structure of described cement based test platform, and be arranged on the bottom surface of closed cabin bottom this stepped cement based test platform, and three of this cement based test platform side corresponding three side inner walls abutting against closed cabin respectively; Described drainage arrangement is arranged on the inwall lower end, another side of cement based test platform and runs through and extend to this lateral outer by this side inner walls, and closed cabin side inner walls upper end is provided with import and export, and these import and export are positioned at cement based test platform highest point;
Described temperature control equipment is arranged on the both sides inwall of cement based test platform, and both sides inwall thermostatic above be separately installed with temperature monitoring system, be electrically connected to each other between described temperature control equipment and temperature monitoring system.
2., according to the sea tidal zone environment speeding-up simulation system described in claim 1, it is characterized in that, described tide analog device is air blast wave producer.
3., according to the sea tidal zone environment speeding-up simulation system described in claim 1, it is characterized in that, described drainage arrangement is seawater corrosion resistance water pump.
4. according to the sea tidal zone environment speeding-up simulation system described in claim 1, it is characterized in that, described temperature monitoring system is PT100 temperature digital display sensor.
5. according to the sea tidal zone environment speeding-up simulation system described in claim 1, it is characterized in that, described temperature control equipment titanium alloy electrical heating type well heater.
6. according to the sea tidal zone environment speeding-up simulation system described in claim 1, it is characterized in that, described sealed cabin structure is by interior and form airtight cube structure outward, and its inwall is Corrosion Resistant Frp material.
CN201420423912.5U 2014-07-30 2014-07-30 Sea tidal zone environment speeding-up simulation system Expired - Fee Related CN204101426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420423912.5U CN204101426U (en) 2014-07-30 2014-07-30 Sea tidal zone environment speeding-up simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420423912.5U CN204101426U (en) 2014-07-30 2014-07-30 Sea tidal zone environment speeding-up simulation system

Publications (1)

Publication Number Publication Date
CN204101426U true CN204101426U (en) 2015-01-14

Family

ID=52269845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420423912.5U Expired - Fee Related CN204101426U (en) 2014-07-30 2014-07-30 Sea tidal zone environment speeding-up simulation system

Country Status (1)

Country Link
CN (1) CN204101426U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106018739A (en) * 2016-05-18 2016-10-12 河海大学 Physical model testing system and method for landform evolution of tidal flat-tidal creek system
CN107560821A (en) * 2017-10-10 2018-01-09 重庆交通大学 A kind of wind-tunnel and its method of work for studying coastal periphery pollutant diffusion
CN109283078A (en) * 2018-09-07 2019-01-29 山西大学 A kind of marine environment and power load coupling experiment analog machine
CN112033882A (en) * 2020-09-02 2020-12-04 湘潭大学 Method and device for testing microbial corrosion of ocean tidal zone

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106018739A (en) * 2016-05-18 2016-10-12 河海大学 Physical model testing system and method for landform evolution of tidal flat-tidal creek system
CN107560821A (en) * 2017-10-10 2018-01-09 重庆交通大学 A kind of wind-tunnel and its method of work for studying coastal periphery pollutant diffusion
CN109283078A (en) * 2018-09-07 2019-01-29 山西大学 A kind of marine environment and power load coupling experiment analog machine
CN112033882A (en) * 2020-09-02 2020-12-04 湘潭大学 Method and device for testing microbial corrosion of ocean tidal zone

Similar Documents

Publication Publication Date Title
CN204101426U (en) Sea tidal zone environment speeding-up simulation system
CN204945001U (en) A kind of test unit of lab simulation rainfall infiltration
CN101482482B (en) Marine corrosion simulated acceleration test apparatus
CN103808648B (en) Atmospheric environment corrosion testing device for high sulfur natural gas purification plant
CN112557293A (en) Ecological experiment cabin for small marine corrosion research
CN103823040B (en) A kind of soil body of simulating is by the device of extreme climate effect and the method using this device to test
CN202700511U (en) Simulation environment test chamber
CN203838033U (en) Salt spray corrosion testing box
CN202126785U (en) Tester for Faraday's electromagnetic induction law
CN203037540U (en) Tester for simulating influence of whole root system on shearing strength of soil
CN104977239A (en) Experimental device for accelerating aging of paint
CN203408819U (en) Artificial rainfall experimental device
CN206161496U (en) Automatic tester of thermal shock
CN205538181U (en) Testing arrangement of engine blade fatigue degree
CN203849152U (en) Device for simulating influence of acid rain on critical humidity of atmospheric corrosion
CN205645042U (en) Archimedes principle demonstrates appearance
CN204883440U (en) Survival rate of fish fry's automatic experimental apparatus under test natural condition
CN207472876U (en) Self-loopa river ecological simulates monitoring device and system
CN203433711U (en) Demonstration apparatus for measuring buoyancy by utilizing balance method
CN207689472U (en) A kind of ground wetting-drying circular tester of simulating ocean environment and acid and alkali corrosion
CN107067932B (en) Simulation experiment device for aeration effect
CN102721434B (en) Intelligent control testing system for researching intertidal benthos based on wireless network
CN205280639U (en) Monitoring of apparent crack of concrete material and detecting system
CN204924878U (en) Constant temperature gold utensil test box
CN206281631U (en) Flexible etting spatiotemporal motion optics non-contact type experiment measurement system under wave action

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 321100 Zhejiang city of Jinhua province Lanxi city Xi Yin Sealand Road No. 8

Patentee after: Zhejiang Heli Haike new materials Limited by Share Ltd

Address before: 321100, Zhejiang City, Jinhua province Lanxi Ling hole Township Gong Village

Patentee before: Zhejiang Heli New Type Building Material Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20180730

CF01 Termination of patent right due to non-payment of annual fee