- CN204081348U CN204081348U CN201420531171.2U CN201420531171U CN204081348U CN 204081348 U CN204081348 U CN 204081348U CN 201420531171 U CN201420531171 U CN 201420531171U CN 204081348 U CN204081348 U CN 204081348U
- Authority
- CN
- China
- Prior art keywords
- frame
- leveling
- thermal insulation
- wall
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004321 preservation Methods 0.000 title claims abstract description 10
- 238000005034 decoration Methods 0.000 title abstract description 11
- 238000009413 insulation Methods 0.000 claims abstract description 61
- 239000000463 material Substances 0.000 claims abstract description 19
- 238000009434 installation Methods 0.000 claims description 27
- 239000004568 cement Substances 0.000 claims description 16
- 239000012774 insulation material Substances 0.000 claims description 15
- 239000010438 granite Substances 0.000 claims description 12
- 239000011491 glass wool Substances 0.000 claims description 11
- 239000002131 composite material Substances 0.000 claims description 8
- 239000004579 marble Substances 0.000 claims description 6
- 239000000919 ceramic Substances 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 239000011490 mineral wool Substances 0.000 claims description 4
- 239000002245 particle Substances 0.000 claims description 4
- 239000010451 perlite Substances 0.000 claims description 4
- 235000019362 perlite Nutrition 0.000 claims description 4
- BPQQTUXANYXVAA-UHFFFAOYSA-N Orthosilicate Chemical compound [O-][Si]([O-])([O-])[O-] BPQQTUXANYXVAA-UHFFFAOYSA-N 0.000 claims description 3
- PNEYBMLMFCGWSK-UHFFFAOYSA-N aluminium oxide Inorganic materials [O-2].[O-2].[O-2].[Al+3].[Al+3] PNEYBMLMFCGWSK-UHFFFAOYSA-N 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 8
- 230000002265 prevention Effects 0.000 abstract description 3
- 238000005253 cladding Methods 0.000 abstract 1
- 238000010792 warming Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 30
- 239000010959 steel Substances 0.000 description 30
- UHOVQNZJYSORNB-UHFFFAOYSA-N Benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 9
- 238000010276 construction Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 8
- 239000010410 layer Substances 0.000 description 8
- 239000003292 glue Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000004364 calculation method Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 5
- 238000010079 rubber tapping Methods 0.000 description 5
- 239000002344 surface layer Substances 0.000 description 5
- 238000011161 development Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 229920001296 polysiloxane Polymers 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 description 3
- WSFSSNUMVMOOMR-UHFFFAOYSA-N Formaldehyde Chemical compound O=C WSFSSNUMVMOOMR-UHFFFAOYSA-N 0.000 description 3
- 229910001335 Galvanized steel Inorganic materials 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 238000002485 combustion reaction Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 3
- 238000004134 energy conservation Methods 0.000 description 3
- 239000003063 flame retardant Substances 0.000 description 3
- 239000008397 galvanized steel Substances 0.000 description 3
- 239000003973 paint Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 238000004078 waterproofing Methods 0.000 description 3
- 238000010521 absorption reaction Methods 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 239000003086 colorant Substances 0.000 description 2
- 238000009422 external insulation Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 238000010422 painting Methods 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 229920003023 plastic Polymers 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000004698 Polyethylene Substances 0.000 description 1
- 239000004793 Polystyrene Substances 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 239000011464 hollow brick Substances 0.000 description 1
- 239000012943 hotmelt Substances 0.000 description 1
- 230000002209 hydrophobic effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 229920002223 polystyrene Polymers 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 238000009436 residential construction Methods 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 239000000741 silica gel Substances 0.000 description 1
- 229910002027 silica gel Inorganic materials 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
- Building Environments (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及建筑外墙防火、保温、装饰领域,即建筑外墙A级防火保温装饰一体组合挂板。 The utility model relates to the fields of fire prevention, heat preservation and decoration of building exterior walls, namely a class A fireproof heat preservation decoration integrated hanging board for building exterior walls.
背景技术 Background technique
在现有技术中,随着我国住宅建设的节能工作不断深入,节能标准不断的提高,所以建筑墙体改革与墙体节能技术的发展是建筑节能技术的一个重要环节。发展外墙保温技术及节能材料则是建筑节能的主要实现方式。现多数墙体节能做法是采用外贴保温材料的做法,进行外墙保温。因部分外墙保温材料阻燃效果不尽理想,存在一些消防隐患。因此2009年国家公安部住房城乡建设部颁布了公通字【2009】46号文件,关于印发《民用建筑外墙保温系统及外墙装饰防火暂行规定》。2010年吉林省住房和城乡建设厅和吉林省质量技术监督局联合发布了《吉林省民用建筑外保温工程防火技术规程》DB22496-2010。以上两个文件根据建筑的功能及建筑物高度对现阶段我国及吉林省新建和改造的民用建筑外保温工程的具体情况,针对居住建筑和公共建筑防火构造提出了具体和明确的要求。 In the existing technology, with the deepening of energy-saving work in residential construction in my country and the continuous improvement of energy-saving standards, the reform of building walls and the development of energy-saving technology for walls are an important link in building energy-saving technology. The development of external wall insulation technology and energy-saving materials is the main way to achieve building energy conservation. Most of the existing energy-saving methods for walls are to use external insulation materials for external wall insulation. Due to the unsatisfactory flame retardant effect of some external wall insulation materials, there are some fire hazards. Therefore, in 2009, the Ministry of Housing and Urban-Rural Development of the Ministry of Public Security promulgated Gongtongzi [2009] No. 46 document, about printing and distributing the "Interim Regulations on Fire Protection of Civil Building Exterior Wall Thermal Insulation System and Exterior Wall Decoration". In 2010, Jilin Provincial Department of Housing and Urban-Rural Development and Jilin Provincial Bureau of Quality and Technical Supervision jointly issued "Jilin Province Civil Building External Thermal Engineering Fire Protection Technical Regulations" DB22496-2010. The above two documents put forward specific and clear requirements for the fire protection structure of residential buildings and public buildings based on the function of the building and the height of the building to the specific situation of the external insulation engineering of new and renovated civil buildings in my country and Jilin Province at this stage.
建筑外墙保温常采用粘贴苯板、铺网、抹水泥面、刷涂料。缺点是苯板多为B级防火材料,即便A级防火苯板其材质也为热熔性材料,防火效果也不理想。 Building exterior wall insulation often adopts pasting benzene board, laying mesh, plastering cement surface, and brushing paint. The disadvantage is that most of the benzene boards are B-class fireproof materials. Even if the material of the A-class fireproof benzene boards is also a hot-melt material, the fireproof effect is not ideal.
建筑外墙保温也有采用墙面贴A级防火的保温材料、用大型整体骨架安装的幕墙板,缺点是大型整体骨架体积大、钢结构原材料多,同时A级防火保温材料与幕墙板之间有缝隙,一旦失火有串火现象,失去阻燃效果,并影响保温性能。 Building exterior wall insulation also adopts A-class fire-proof insulation materials on the wall and curtain wall panels installed with large-scale overall framework. The disadvantage is that the large-scale overall framework is bulky and has many raw materials for steel structures. If there is a gap, once there is a fire, there will be a fire phenomenon, which will lose the flame retardant effect and affect the thermal insulation performance.
实用新型内容 Utility model content
本实用新型的目的是针对上述不足而提供一种体积小、重量轻、成本低、防火效果好的建筑外墙A级防火保温装饰一体组合挂板。 The purpose of this utility model is to provide a class A fire-proof, heat-preservation and decoration integrated hanging board for building exterior walls with small size, light weight, low cost and good fire-proof effect.
本实用新型的技术解决方案是:建筑外墙A级防火保温装饰一体组合挂板,包括中间框架,在框架外面连接有面板,在框架里面连接有保温板;每个框架通过可调节固定件与外墙面固定挂接;所述的面板为水泥压力板、大理石板、花岗岩板或瓷砖;所述的保温板3是A级幕墙保温专用玻璃棉毡、岩棉毡、氧化铝保温毡、复合硅酸盐保温板或超细玻璃棉保温毡。 The technical solution of the utility model is: a class-A fireproof and thermal insulation decoration integrated hanging board on the outer wall of the building, including a middle frame, a panel connected to the outside of the frame, and a thermal insulation board connected to the inside of the frame; The outer wall is fixedly articulated; the panels are cement pressure boards, marble boards, granite boards or ceramic tiles; the insulation boards 3 are glass wool felts, rock wool felts, alumina insulation felts, composite Silicate insulation board or ultra-fine glass wool insulation blanket.
所述的可调节固定件包括与墙面连接的直角托架,连接板两端分别与直角托架4横面和框架上面通过螺栓或螺钉连接;每个框架配有固定件为一套、两套或三套。 The adjustable fixing piece includes a right-angled bracket connected to the wall, and the two ends of the connecting plate are respectively connected with the cross-plane of the right-angled bracket 4 and the frame by bolts or screws; each frame is equipped with a set of fixing pieces, two sets or three sets.
挂板与挂板间用凸、凹调平件插接;即框架1四周边上设有可确保每块挂板安装后的平整度的凸调平件或供凸调平件插入的凹调平件。用于调整每块挂板面层的平整度。 Convex and concave leveling parts are inserted between the hanging boards; that is, there are convex leveling parts on the periphery of the frame 1 to ensure the flatness of each hanging board after installation or concave adjustment parts for the insertion of the convex leveling parts. flat pieces. Used to adjust the flatness of each siding surface.
框架1边框内空心腔填充保温材料边条或膨胀珍珠岩颗粒。 The hollow cavity in the frame of frame 1 is filled with edge strips of thermal insulation material or expanded perlite particles.
在工厂内集成的组装成小单元独立承重结构的单片挂板、现场采用干挂的方式进行安装的新型外墙防火、保温、装饰组合型材料。 The single-piece hanging board assembled into a small unit independent load-bearing structure integrated in the factory, and the new exterior wall fireproof, heat preservation and decorative composite material installed on site by dry hanging.
本实用新型的优点是:1、采用工厂式集成组装进行制作、自带轻型薄壁热镀锌钢管骨架、小单元独立承重、现场采用干挂方式安装,安装简单快捷。可采用A级阻燃的保温材料,且用料普通,规格统一、制作、生产方便,省工、省料、造价低、质量可靠。2、现场安装对外墙面的要求简单(因用可调节固定件调整面板与基面的距离),现场安装简便、快捷、可靠、小单元固定安全可靠、外表面平整、美观,且无空鼓、无脱落层、无硬伤,施工速度快且为干法施工,不受北方冬季寒冷气候的影响。3、从计算的Km值看,保温情况好于聚苯乙烯板为保温材料的保温效果。因设在外墙外侧保温混凝土构件处可更好的解决混凝土梁作为热桥所带来的散失热量大的问题。可完全满足《规程》对保温墙体防火的防火要求。4、根据现场情况和建筑立面设计的要求,在工厂即可将面层装饰要求的饰面涂装工作一并完成,现场安装完成后,用硅胶密封板缝,满足防水的要求,可一次性的完成外墙防火、保温、饰面涂装、饰面防水等多道工序的施工。5、经测算建设投资低于同类产品的价格。且施工简单。 The advantages of the utility model are: 1. It is produced by factory-style integrated assembly, comes with a light-duty thin-walled hot-dip galvanized steel pipe skeleton, and the small unit is independently load-bearing. It is installed by dry hanging on site, and the installation is simple and fast. Class A flame-retardant insulation materials can be used, and the materials are common, the specifications are uniform, the production is convenient, labor-saving, material-saving, low-cost, and reliable in quality. 2. The on-site installation has simple requirements on the external wall surface (because the distance between the panel and the base surface is adjusted by the adjustable fixing parts), the on-site installation is simple, fast and reliable, the small unit is fixed safely and reliably, the outer surface is smooth and beautiful, and there is no hollowing , no peeling layer, no hard damage, fast construction speed and dry construction, not affected by the cold climate in northern winter. 3. Judging from the calculated Km value, the thermal insulation effect is better than that of polystyrene board as thermal insulation material. Because it is installed at the thermal insulation concrete component on the outside of the outer wall, it can better solve the problem of large heat loss caused by the concrete beam as a thermal bridge. It can fully meet the fire protection requirements of the "Regulations" on the fire protection of thermal insulation walls. 4. According to the site conditions and the requirements of the building facade design, the finishing coating work required by the surface layer decoration can be completed in the factory. After the site installation is completed, the joints of the boards are sealed with silica gel to meet the waterproof requirements. Complete the multi-process construction of exterior walls such as fire protection, heat preservation, finish painting, and finish waterproofing. 5. The estimated construction investment is lower than the price of similar products. And the construction is simple.
下面将结合附图对本实用新型的实施方式作进一步详细描述。 Embodiments of the utility model will be further described in detail below in conjunction with the accompanying drawings. the
附图说明 Description of drawings
图1是本实用新型结构简图。 Fig. 1 is a schematic diagram of the structure of the utility model.
图2是本实用新型安装结构简图。 Fig. 2 is a schematic diagram of the installation structure of the utility model.
图3是图2俯视示意图。 FIG. 3 is a schematic top view of FIG. 2 .
图4是凸调平件7结构简图。 FIG. 4 is a schematic structural diagram of the convex leveling member 7 .
图5是凹调平件8结构简图。 FIG. 5 is a schematic structural diagram of the concave leveling member 8 .
图6是本实用新型墙面铺设结构示意图。 Fig. 6 is a schematic diagram of the wall laying structure of the utility model.
图7是框架上设置凸、凹调平件结构示意图。 Fig. 7 is a schematic diagram of the structure of the convex and concave leveling parts arranged on the frame.
具体实施方式 Detailed ways
参见图1-7,零部件名称如下:框架1,面板2,保温板3,直角托架4,连接板5,螺栓6,凸调平件7,凹调平件8,接受口垫板9,接受口封板10,框架位置11,框架位置12,框架位置13,框架位置14,框架位置15,外墙面16,定值L。 See Figure 1-7, the names of parts are as follows: frame 1, panel 2, insulation board 3, right-angle bracket 4, connecting plate 5, bolt 6, convex leveling piece 7, concave leveling piece 8, socket backing plate 9 , to accept the mouth seal plate 10, the frame position 11, the frame position 12, the frame position 13, the frame position 14, the frame position 15, the outer wall surface 16, and the fixed value L.
参见图1,建筑外墙A级防火保温装饰一体组合挂板包括中间框架1(长方形中空骨架,材料镀锌方钢管),框架1边框内空心腔填充保温边条或膨胀珍珠岩颗粒等保温材料。在框架1外面连接有面板2(图中右面),面板2为高密度水泥压力板(可以直接刷各种外墙涂料形成外墙表面。北京三乐建材有限公司、北京纤维水泥压力板厂商售产品)、大理石板、花岗岩板或瓷砖等外墙装饰块材,根据用户的要求可采用各种外墙涂料进行涂装。达到色彩丰富的目的。在框架1里面粘贴有保温板3(图中左面),保温板3可用A级幕墙保温专用玻璃棉板(欧文斯科宁(中国)投资有限公司商售产品)、岩棉毡、氧化铝保温毡、复合硅酸盐保温板或超细玻璃棉保温毡。如产品规格宽长为:600 mm×1200mm(不限于此)。每个挂板通过可调节固定件与外墙面16固定挂接。施工中大面积提供标准板,遇工程中门、窗可制作异型板(非长方形,让出门、窗台位置)。 Refer to Figure 1, the building exterior wall A-class fire insulation and decoration integrated hanging board includes the middle frame 1 (rectangular hollow frame, material galvanized square steel pipe), the hollow cavity in the frame 1 frame is filled with thermal insulation edge strips or expanded perlite particles and other thermal insulation materials . Panel 2 is connected to the outside of frame 1 (the right side in the figure). Panel 2 is a high-density cement pressure plate (it can be directly painted with various exterior wall paints to form the exterior wall surface. Beijing Sanle Building Materials Co., Ltd., Beijing Fiber Cement Pressure Plate Manufacturer Sold Products), marble slabs, granite slabs or ceramic tiles and other exterior wall decoration blocks can be painted with various exterior wall coatings according to user requirements. To achieve the purpose of rich colors. Insulation board 3 is pasted inside frame 1 (the left side in the figure), and insulation board 3 can be used for A-grade curtain wall insulation special glass wool board (commercially sold by Owens Corning (China) Investment Co., Ltd.), rock wool felt, and alumina insulation Felt, composite silicate insulation board or ultra-fine glass wool insulation blanket. For example, the product specification width and length are: 600mm×1200mm (not limited to this). Each hanging board is fixedly connected with the outer wall surface 16 by an adjustable fixture. Large-area standard boards are provided during construction, and special-shaped boards can be made for doors and windows in the project (non-rectangular, give way to the door and window sill).
参见图2、3,为单个挂板固定示意图。面板2、框架1、保温板3及专用固定件、专用调平件在工厂做成一体挂板。每个挂板的框架1通过专用可调节固定件与外墙面16固定挂接。专用可调节固定件包括与外墙面16连接的直角托架4(用膨胀螺栓或穿墙螺栓与墙体固定),直角托架4两直角边上有安装螺栓用的腰型孔,便于螺栓位置调整、找正。连接板5(钢板条)两端分别与直角托架4横面和框架上面通过螺栓6或螺钉连接;每块组合挂板用三套专用固定件与外墙固定,确保每块挂板安装后的稳定性牢固可靠。专用调平件的使用,保证了定值L,使得实现板与板之间面层平整度的调平。 Refer to Figures 2 and 3, which are schematic diagrams of fixing a single hanging board. Panel 2, frame 1, insulation board 3, special fixing parts and special leveling parts are made into one hanging board in the factory. The frame 1 of each hanging board is fixedly articulated with the outer wall surface 16 through a special adjustable fixture. The special adjustable fixing parts include the right-angle bracket 4 connected with the outer wall surface 16 (fixed with the wall by expansion bolts or through-wall bolts), and there are waist-shaped holes for installing bolts on the two right-angle sides of the right-angle bracket 4, which is convenient for bolts Position adjustment and alignment. The two ends of the connecting plate 5 (steel strips) are respectively connected to the transverse surface of the right-angle bracket 4 and the top of the frame through bolts 6 or screws; each combined hanging plate is fixed to the outer wall with three sets of special fixing parts to ensure that each hanging plate is installed The stability is firm and reliable. The use of special leveling parts ensures the fixed value L, so that the leveling of the flatness of the surface layer between the plates can be realized.
参见图2、3和图4,挂板与挂板间用专用凸、凹调平件7、8用插接的方式调整墙面的平整度。凸调平件7是个一段钢板。 Referring to Fig. 2, 3 and Fig. 4, the flatness of the metope is adjusted with the mode of plugging with special-purpose convex and concave leveling parts 7, 8 between the hanging board and the hanging board. The convex leveling part 7 is a section of steel plate.
参见图2、3和图5,凹调平件8由间隔的两个接受口垫板9和搭在其上的接受口封板10组成,在接受口垫板9之间形成供凸调平件7插入的空腔。 Referring to Fig. 2, 3 and Fig. 5, the concave leveling member 8 is composed of two spaced receiving port backing plates 9 and a receiving port sealing plate 10 on them, forming a convex leveling plate between the receiving port backing plates 9. Piece 7 is inserted into the cavity.
参见图6,是挂板在外墙面16上铺设结构示意图。 Referring to FIG. 6 , it is a schematic diagram of the structure of hanging panels laid on the outer wall surface 16 .
参见图7,排在里面框架位置13处的挂板,其框架1下边和一个侧边带有两个凸调平件7,框架1上边和另一个侧边带有供凸调平件7插入的两个凹调平件8。 Referring to Fig. 7, the hanging boards arranged at position 13 of the inner frame have two convex leveling parts 7 on the lower side and one side of the frame 1, and have two convex leveling parts 7 on the upper side and the other side of the frame 1 for insertion of the convex leveling parts 7 The two concave leveling parts 8.
参见图6,排在框架位置14处的挂板,其框架1一个侧边(右边)带有两个凸调平件7,框架1上边有供凸调平件7插入的两个凹调平件8(图略)。 Referring to Figure 6, the hanging boards arranged at frame position 14 have two convex leveling parts 7 on one side (right side) of the frame 1, and two concave leveling parts for the insertion of the convex leveling parts 7 on the frame 1 Part 8 (figure omitted).
参见图6,排在框架位置15处的挂板,其框架1一个侧边(左边)带有两个凹调平件8,框架1上边带有两个凹调平件8(图略)。 Referring to Fig. 6, the hanging plate arranged at frame position 15 has two concave leveling parts 8 on one side (left side) of its frame 1, and two concave leveling parts 8 on the frame 1 (figure omitted).
参见图6,排在框架位置11处的挂板,其框架1下边和一个侧边(右边)分别带有两个凸调平件7(图略)。 Referring to FIG. 6 , the hanging boards arranged at the frame position 11 have two convex leveling parts 7 (not shown) on the lower side and one side (right side) of the frame 1 respectively.
参见图6,排在框架位置12处的挂板,其框架1一个侧边(左边)带有两个凹调平件8,框架1下边带有两个凸调平件7(图略)。 Referring to Fig. 6, the hanging plate arranged at the frame position 12 has two concave leveling parts 8 on one side (left side) of its frame 1, and two convex leveling parts 7 (figure omitted) on the lower side of the frame 1.
即框架1四周边上设有可确保每块挂板安装后的平整度的凸调平件7或供凸调平件7插入的凹调平件8。 That is, the frame 1 is provided with a convex leveling piece 7 or a concave leveling piece 8 for inserting the convex leveling piece 7 which can ensure the flatness of each hanging board installed on the periphery of the frame 1 .
依次实现安装,现场安装完成后,用耐候型硅酮胶密封板缝,满足防水和密封的要求,可一次性的完成外墙防火、保温、饰面涂装、饰面防水等多道工序的施工。 The installation is realized in sequence. After the on-site installation is completed, the seams of the boards are sealed with weather-resistant silicone glue to meet the requirements of waterproofing and sealing. It can complete multiple processes such as exterior wall fire protection, heat preservation, decorative surface coating, and decorative surface waterproofing at one time. construction.
专用调平件是在已安装完的挂板框架上四角安装有供插件插入的接受口(有接受口垫板9和接受口封板10两件形成接受口,在待安装的挂板框架1上安装有插入接受口内的插接板,框架1四角(相对与接受口处)均安装与比邻框架上受插口内的插接板10。实现板与板之间面层平整度的调平 The special leveling piece is installed on the four corners of the installed hanging board frame for the insertion of the plug-in opening (there are two pieces of the receiving opening pad 9 and the receiving opening sealing plate 10 to form the receiving opening, and the hanging board frame to be installed 1 A plug-in board inserted into the receiving port is installed on the top, and the four corners of the frame 1 (opposite to the receiving port) are installed and adjacent to the plug-in board 10 in the receiving socket on the frame. Realize the leveling of the flatness of the surface between the boards
具体可以是: Specifically, it can be:
1、用热镀锌轻型方钢管焊接(焊接后焊口处重新做防腐处理)做外墙组合型挂板的骨架(框架); 1. Weld with hot-dip galvanized light square steel pipes (after welding, the welded joints will be treated again for anticorrosion) as the skeleton (frame) of the combined hanging board of the outer wall;
2、用自钻自攻螺钉,将高密度水泥压力板固定在轻型方钢管骨架上做面材,使其能随意进行涂装,或根据用户要求,用专用干挂件,将花岗岩板及大理石板和瓷砖等块材,固定在轻型方钢管骨架上。使其安装后达到,安全、可靠、平整、美观、色彩丰富的效果。 2. Use self-drilling and self-tapping screws to fix the high-density cement pressure plate on the light square steel pipe frame as surface material, so that it can be painted at will, or according to user requirements, use special dry hangers to fix the granite plate and marble plate Block materials such as tiles and tiles are fixed on the light square steel pipe skeleton. After installation, it can achieve the effect of safety, reliability, smoothness, beauty and rich colors.
3、内用不干胶将A级防火的、轻质松软的、保温性能较好的保温材料粘贴在面材的背面。安装时使其能较好的与外墙面贴紧、压实,不产生空鼓和缝隙,提高保温墙体的防火和保温性能。 3. Use self-adhesive inside to paste Class A fireproof, light and soft insulation material with good thermal insulation performance on the back of the surface material. During installation, it can be better adhered to and compacted with the outer wall surface, without hollowing and gaps, and improves the fireproof and thermal insulation performance of the thermal insulation wall.
4、现场用可调节式的固定件和膨胀螺栓(或穿墙螺栓及涨塞),将组合型挂板,安全、牢固、可靠、方便、快捷的干挂固定在外墙体上。 4. Use adjustable fixing parts and expansion bolts (or through-wall bolts and expansion plugs) on site to fix the combined hanging board on the outer wall in a safe, firm, reliable, convenient and fast dry-hanging manner.
5、最后用耐候型硅酮胶,将块材间的缝隙封闭,起到防水和密闭的作用。 5. Finally, use weather-resistant silicone glue to seal the gaps between the blocks to play a waterproof and airtight role.
6、组合型块材规格初步确定为600mm*1200mm做各项分析的标准组合挂板;尺寸不限于此,可做成多种规格。 6. The size of the combination block is initially determined to be 600mm*1200mm for various analysis of the standard combination hanging board; the size is not limited to this, and can be made into various specifications.
材料选择: material selection:
1、为了保证轻型钢骨架具有一定的强度、刚度及制作、安装时固定件和调节件在空间上满足要求,同时满足规范《冷弯薄壁型钢结构技术规范》GB50018-2002的要求,及制作、安装和使用时的安全性、可靠性、耐久性、耐候性等要求。选用材质为:Q235,规格为:25mm*25mm*1.5mm的热镀锌方钢管做骨架材料(需经强度验算后确定)。其性能见下表 1. In order to ensure that the light-weight steel skeleton has a certain strength, rigidity, and the fixing and adjusting parts meet the requirements in terms of space during production and installation, and at the same time meet the requirements of the specification "Technical Specifications for Cold-Formed Thin-walled Steel Structures" GB50018-2002, and production , Safety, reliability, durability, weather resistance and other requirements during installation and use. The selected material is: Q235, and the specification is: 25mm*25mm*1.5mm hot-dip galvanized square steel pipe as the skeleton material (determined after strength checking). Its performance is shown in the table below
25mm*25mm*1.5mm热镀锌方钢管性能表 25mm*25mm*1.5mm hot-dip galvanized square steel pipe performance table
表内参数由《规范》查得。 The parameters in the table are obtained from the "Specification". the
2、为保证选用的面材满足规范《金属与石材幕墙技术规范》JGJ133-2001对干挂面材的要求,和满足安装和使用时面材的安全性、可靠性、耐候性、耐久性的要求,面材选用h=10mm厚高密度压力水泥板,或20mm~25mm厚花岗岩板。性能见下表: 2. In order to ensure that the selected surface materials meet the requirements of JGJ133-2001 for dry-hanging surface materials in the "Technical Specifications for Metal and Stone Curtain Walls", and meet the requirements of safety, reliability, weather resistance and durability of surface materials during installation and use , The surface material is h=10mm thick high-density pressure cement board, or 20mm~25mm thick granite board. The performance is shown in the table below:
10mm厚高密度水泥压力板主要物理性能及执行标准表 10mm thick high-density cement pressure plate main physical properties and implementation standard table
参数由北京三乐建材有限公司提供。 The parameters are provided by Beijing Sanle Building Materials Co., Ltd.
花岗岩物理技术性能 Physical and technical properties of granite
福建(国产)花岗岩技术参数。 Fujian (domestic) granite technical parameters.
3、为满足国家规范《严寒和寒冷地区居住建筑节能设计标准》JGJ26-2010对保温材料,保温性能和防火性能同时保证保温材料与墙体贴实、紧密,不产生空腔提高保温材料的保温性能、和防火性能、环保性能的要求。选用具有一定的可压缩性的,容重为12~24kg/m3厚度为100mm(实际用90mm)的,燃烧性能为A级的幕墙保温专用玻璃棉板。 3. In order to meet the national standard "Design Standards for Energy Conservation of Residential Buildings in Severe Cold and Cold Regions" JGJ26-2010 on thermal insulation materials, thermal insulation performance and fireproof performance, at the same time ensure that the thermal insulation material and the wall are close and close, and no cavity is generated to improve the thermal insulation of the thermal insulation material Performance, and fire performance, environmental protection performance requirements. Choose glass wool boards with certain compressibility, bulk density of 12~24kg/m3, thickness of 100mm (actually 90mm), and A-level combustion performance for curtain wall insulation.
幕墙保温专用玻璃棉板性能表: Performance table of special glass wool board for curtain wall insulation:
参数由欧文斯科宁(中国)投资有限公司提供 Parameters provided by Owens Corning (China) Investment Co., Ltd.
4、为了保证固定件,具有一定的强度和刚度,同时保证其在制作过程中和安装完及使用时具有一定的可靠性、安全性、耐久性和耐候性,并满足规范《金属与石材幕墙技术规范》JGJ133-2001规定的构造要求,采用3~7mm厚,Q235钢板(镀锌或不锈钢板)制作固定件和可调节前后、左右位置的固定件和连接件,一端与方钢骨架固定连接,一端与墙体固定连接。 4. In order to ensure that the fixing parts have a certain strength and rigidity, and at the same time ensure that they have certain reliability, safety, durability and weather resistance during the production process, installation and use, and meet the specification "Metal and Stone Curtain Wall According to the structural requirements stipulated in the Technical Specification JGJ133-2001, 3~7mm thick, Q235 steel plate (galvanized or stainless steel plate) is used to make the fixing parts and the fixing parts and connecting parts that can adjust the front and rear, left and right positions, and one end is fixedly connected with the square steel frame. , one end is fixedly connected to the wall.
5、为保证安装后组合挂板墙面的水平度、垂直度、平整度,采用 2mm 厚,Q235钢板(镀锌或用不锈钢板)制作用于调节平整的专用调平件,分别安装在相邻框架上(用自钻自攻螺钉安装在框架方钢管内侧,工厂内组装制作时,保证框架方钢管内表面到面板外表面的距离为定值L)。 5. In order to ensure the levelness, verticality and flatness of the wall surface of the combined hanging board after installation, special leveling parts for adjusting the leveling are made of 2mm thick Q235 steel plate (galvanized or stainless steel plate), and installed on the corresponding Adjacent to the frame (use self-drilling and self-tapping screws to install on the inner side of the square steel pipe of the frame. When assembling and manufacturing in the factory, ensure that the distance from the inner surface of the square steel pipe of the frame to the outer surface of the panel is a fixed value L).
6、为保证组合挂板面板与骨架紧固的安全可靠,并满足《金属与石材幕墙技术规范》JGJ133-2001要求,高密度水泥板与骨架采用M4.2mm自钻自攻螺丝紧固。花岗岩、大理石、瓷砖等块材与骨架连接,采用 3mm 厚,不锈钢板制作的干挂件进行连接和固定。 6. In order to ensure the safety and reliability of the fastening between the panel of the composite hanging board and the framework, and meet the requirements of JGJ133-2001 of the "Technical Specifications for Metal and Stone Curtain Walls", the high-density cement board and the framework are fastened with M4.2mm self-drilling and self-tapping screws. Granite, marble, ceramic tile and other blocks are connected to the skeleton, and are connected and fixed by dry hanging parts made of stainless steel plates with a thickness of 3mm.
7、为保证组合挂板与墙体连接和固定具有一定的安全性、可靠性,同时满足《规范》的要求,并方便施工,方钢骨架上的固定件与墙体连接采用M8mm膨胀螺栓(非固定件也可采用M8mm塑料胀钉)或M8mm穿墙螺栓进行连接和固定。M8mm膨胀螺栓性能见下表: 7. In order to ensure the safety and reliability of the connection and fixation between the composite hanging board and the wall, meet the requirements of the "Code" and facilitate construction, M8mm expansion bolts ( Non-fixed parts can also be connected and fixed by M8mm plastic expansion nails) or M8mm wall-through bolts. The performance of M8mm expansion bolts is shown in the table below:
M8mm膨胀螺栓性能表 M8mm expansion bolt performance table
《规范》查得。 "Specification" check.
固定于不同基(砌)体的M8mm膨胀螺栓性能表 Performance table of M8mm expansion bolts fixed on different foundations (masonry)
《规范》查得。 "Specification" check.
8、为保证涂装后的高密度水泥压力板和花岗岩板,在运输和安装时面板保持板面清洁,组合挂板出厂时,需外贴一层聚乙烯塑料保护膜。待安装完毕,撕下即可。 8. In order to ensure the high-density cement pressure plate and granite plate after painting, the panel surface should be kept clean during transportation and installation. When the combined hanging plate leaves the factory, a layer of polyethylene plastic protective film should be attached to the outside. After the installation is complete, just tear it off.
9、为保证组合挂板在安装过程中简便、并可调节间隙,和在使用时不因热胀冷缩,引起挤压损坏面板,安装时挂板间需留有5~8mm的间隙,在安装完毕后,先用玻璃丝面塞填缝隙,最后采用耐候型硅酮胶嵌缝,达到防水和密封的效果。 9. In order to ensure that the combined hanging board is easy to install and the gap can be adjusted, and that the panel will not be squeezed and damaged due to thermal expansion and contraction during use, a gap of 5~8mm should be left between the hanging boards during installation. After installation, first fill the gaps with glass fiber surface plugs, and finally use weather-resistant silicone glue to caulk to achieve waterproof and sealing effects.
10、为保证门、窗口细部安装的牢固、可靠,且施工方便。门、窗口板前端与方钢骨架用M4.2自钻自攻螺丝连接固定,后端用常用发泡胶粘贴。 10. In order to ensure that the door and window details are installed firmly and reliably, and the construction is convenient. The front end of the door and window panel is connected to the square steel skeleton with M4.2 self-drilling and self-tapping screws, and the rear end is pasted with common foam glue.
保温墙体热工验算: Thermal checking calculation of thermal insulation wall:
1、墙体结构确定(以单位平方米计算) 1. Determine the wall structure (calculated in unit square meters)
⑴20mm厚混合砂浆面层 传热系数λ1=0.087W/(m.K) (1) 20mm thick mixed mortar surface heat transfer coefficient λ1=0.087W/(mK )
热阻R1=0.02/0.87=0.023 (m2.K)/W Thermal resistance R1=0.02/0.87=0.023 (m2.K)/W
⑵190mm厚混凝土空心砖 ⑵190mm thick concrete hollow brick
热阻R2=0.163 (m2.K)/W Thermal resistance R2=0.163 (m2.K)/W
⑶90mm厚幕墙保温专用玻璃棉板λ3=0.036W/(m.K) (3) Glass wool board for 90mm thick curtain wall insulation λ3=0.036W/(mK )
热阻R3=0.09/0.036=2.5 (m2.K)/W Thermal resistance R3=0.09/0.036=2.5 (m2.K)/W
⑷10mm厚高密度水泥压力板λ4=0.087W/(m.K) ⑷10mm thick high-density cement pressure plate λ4=0.087W/(mK )
热阻R4=0.01/0.087=0.011 (m2.K)/W Thermal resistance R4=0.01/0.087=0.011 (m2.K)/W
⑸外表面对流影响系数R5=0.11 (m2.K)/W ⑸External convection influence coefficient R5=0.11 (m2.K)/W
⑹内表面对流影响系数R6=0.04 (m2.K)/W。 ⑹Inner surface convection influence coefficient R6=0.04 (m2.K)/W.
2、单元墙体传热系数 2. Unit wall heat transfer coefficient
Kp=1/ΣR Kp=1/ΣR
=1/(R1+R2+R3+R4+R5+G6)=1/(0.023+0.163+2.5+0.011+0.11+0.04)=0.35W/(m2.K)∠0.45 W/(m2.K) =1/(R1+R2+R3+R4+R5+G6)=1/(0.023+0.163+2.5+0.011+0.11+0.04)=0.35W/(m2.K)∠0.45 W/(m2.K)
因此首先通过保温墙体热工验算,组合挂板在热工性能方面满足吉林省《居住建筑节能设计标准(节能65%)》DB22/450-2007要求节能65%时,保温墙体传热系数标准值0.45 W/(m2.K)的要求。 Therefore, firstly through the thermal engineering calculation of the thermal insulation wall, the thermal performance of the composite hanging board meets the requirements of DB22/450-2007 in Jilin Province's "Design Standard for Energy Conservation of Residential Buildings (65% Energy Saving)" DB22/450-2007. The standard value is 0.45 W/(m2.K).
构、配件强度验算: Structure and accessories strength check:
1、方钢管骨架验算 1. Check calculation of square steel pipe skeleton
面板采用25mm厚花岗岩板,容重取2.7g/cm3。骨架为25mm*25mm*1.5mm方钢管,每米重为1.31kg/m。配件重取2kg。保温层为100mm厚幕墙专用玻璃棉板,容重为24kg/m3。 The panels are made of 25mm thick granite slabs with a bulk density of 2.7g/cm3. The skeleton is 25mm*25mm*1.5mm square steel pipe, and the weight per meter is 1.31kg/m. Accessories weigh 2kg. The insulation layer is a 100mm thick curtain wall special glass wool board with a bulk density of 24kg/m3.
按《规范》的构造要求及从构件的耐久性方面考虑采用25mm*25mm*1.5mm热镀锌方钢管做骨架从强度和刚度上均满足要求。 According to the structural requirements of the "Specification" and considering the durability of the components, 25mm*25mm*1.5mm hot-dip galvanized square steel pipes are used as the skeleton to meet the requirements in terms of strength and rigidity.
2、固定件可调节过渡板验算 2. The fixed parts can be adjusted to check the transition plate
采用-50*50*5 钢板为固定件可调节过渡板,可同时满足抗弯、抗剪、抗拉强度的需要。 The -50*50*5 steel plate is used as the fixed part to adjust the transition plate, which can meet the needs of bending resistance, shear resistance and tensile strength at the same time.
3、固定件验算 3. Fixing part checking
采用L50*65*7 角钢为固定件,可同时满足抗弯、抗剪、抗拉强度的需要。 L50*65*7 angle steel is used as the fixing part, which can meet the needs of bending resistance, shear resistance and tensile strength at the same time.
4、膨胀螺栓验算 4. Check calculation of expansion bolts
采用M8膨胀螺栓,钻孔直径为12mm,埋深为>50mm。 经验算M8膨胀螺栓满足强度及抗拔、抗剪要求。 M8 expansion bolts are used, the drilling diameter is 12mm, and the buried depth is >50mm. According to experience, M8 expansion bolts meet the requirements of strength, pull-out resistance and shear resistance.
5、花岗岩干挂件验算 5. Check calculation of granite dry pendant
采用30mm*3mm钢板制作,满足强度及构造要求。 It is made of 30mm*3mm steel plate to meet the strength and structure requirements.
实施方案: implementation plan:
1、首先根据建筑的立面尺寸和具体要求,进行板型设计。再按产品的具体规格,技术要求,利用专用的钢结构件制作的胎具,对挂板轻型钢框架1进行下料、焊接及钢管内填充保温材料和防锈处理,保证规格统一、误差小、质量可靠。 1. First of all, according to the facade size and specific requirements of the building, carry out the plate design. Then according to the specific specifications and technical requirements of the product, use the tire mold made of special steel structure parts to carry out blanking, welding, and filling of insulation materials and anti-rust treatment on the light steel frame 1 of the hanging plate, so as to ensure uniform specifications and small errors ,reliable quality.
2、按产品的具体规格,根据技术要求,利用专用设备对面板2(水泥面板、花岗岩板、大理石板、瓷砖等面材)进行下料、加工。保证规格统一、误差小、质量可靠。 2. According to the specific specifications of the product and according to the technical requirements, the panel 2 (cement panel, granite panel, marble panel, ceramic tile and other surface materials) is blanked and processed by special equipment. Ensure uniform specifications, small errors, and reliable quality.
3、将轻型钢框架1和水泥面板2在专用安装胎具内进行安装。保证规格统一、误差小、质量可靠。 3. Install the light steel frame 1 and the cement panel 2 in the special installation mould. Ensure uniform specifications, small errors, and reliable quality.
4、 根据建筑立面的要求,对挂板的面板(面层)用专用胶泥腻平安装钉孔,进行装饰面层的涂装,再贴装装饰面保护层。 4. According to the requirements of the building facade, the panel (surface layer) of the hanging board is smoothed with special glue to install the nail holes, the decorative surface layer is painted, and then the decorative surface protective layer is pasted.
5、按产品的具体规格,根据技术要求,在挂板面板的内表面粘贴、固定保温板。 5. According to the specific specifications of the product and according to the technical requirements, paste and fix the insulation board on the inner surface of the hanging board panel.
6、对出厂的产品进行严格的质量检查,确保合格的产品出厂。检查合格后,对产品进行包装。保证运输、存放时的产品质量。 6. Carry out strict quality inspection on the products leaving the factory to ensure that qualified products leave the factory. After passing the inspection, the product is packaged. Ensure product quality during transportation and storage.
7、安装时需先检查墙体基面的平整、空鼓、脱落情况,满足安装条件后进行放线、定位,用电锤钻出涨塞的孔洞(每块三个孔),利用专用可调节固定件,调整装饰面安装的平整,同时还需保证保温板与外墙基面间贴实、压紧、无空腔。调整合格后用膨胀螺栓(或涨塞)固定,以下依次进行安装。最后用专用密封胶对防火隔离带之间的缝隙进行密封防水。拆除面层保护层。 7. When installing, it is necessary to check the flatness, hollowing and falling off of the base surface of the wall first. After the installation conditions are met, the wires are set out and positioned. Adjust the fixing parts to adjust the installation level of the decorative surface. At the same time, it is necessary to ensure that the insulation board and the base surface of the outer wall are tightly bonded, compacted, and free of cavities. After the adjustment is qualified, fix it with expansion bolts (or expansion plugs), and install it in sequence as follows. Finally, use a special sealant to seal and waterproof the gaps between the fire barriers. Remove the surface protection layer.
实施例1Example 1
1、产品规格为600 mm×1200mm。 1. The product specification is 600mm×1200mm.
2、轻钢框架1采用25 mm×25mm×1.5mm方钢管,内填充容重为24kg/m3岩棉板边条,根据安装需要对钢框架1进行钻孔,开槽,除锈防锈等工序处理。 2. The light steel frame 1 is made of 25mm×25mm×1.5mm square steel pipe, and the inner filling density is 24kg/m3 rock wool board side strips. According to the installation requirements, the steel frame 1 is drilled, slotted, rust-removed and anti-rust and other processes deal with.
3、面板2采用δ=10mm厚高密度水泥压力板,用自攻螺丝与轻钢框架1连接固定,用水泥胶将钉孔腻平(外观不见钉顶)。 3. Panel 2 is made of δ=10mm thick high-density cement pressure plate, connected and fixed with light steel frame 1 with self-tapping screws, and the nail holes are smoothed with cement glue (the top of the nail is not visible from the outside).
4、保温层3的保温材料采用容重为12~24kg/m3,导热系数为0.034~0.036W/m2.K,厚度为10mm(实用90mm),保温材料燃烧性能为A级的幕墙保温专用玻璃棉板。用不干胶与面板2水泥板背面粘牢。 4. The insulation material of insulation layer 3 adopts special glass wool for curtain wall insulation with a bulk density of 12~24kg/m3, a thermal conductivity of 0.034~0.036W/m2.K, a thickness of 10mm (practical 90mm), and a combustion performance of the insulation material. plate. Use self-adhesive to stick firmly to the back of panel 2 cement board.
5、根据现场实际要求和建筑立面设计的要求涂装装饰面。 5. Paint the decorative surface according to the actual requirements of the site and the requirements of the building facade design.
6、最后贴膜保护、包装。至此外墙保温防火组合挂板工厂制作阶段工作完成。 6. Finally, film protection and packaging. So far, the production stage of the external wall thermal insulation and fireproof composite hanging board factory has been completed.
7、到现场根据实际情况首先对保温墙面的基层进行检查、处理、放线、定位准备安装。 7. Go to the site and check, process, lay out and position the base layer of the thermal insulation wall according to the actual situation and prepare for installation.
8、按定位情况首先将第一块组合挂板成品板,用固定构件与成品板按准确的位置连接固定好,用电锤(钻)在外墙面16上钻出安装固定膨胀螺栓用孔(或涨塞孔),再用专用可调节固定件调整好板面及与基面的距离和安装位置,保证组合挂板面层与主体保温层平整,同时要保证保温层与基面压实贴紧,不留空腔,最后用膨胀螺栓将组合挂板与墙体固定牢靠。依次安装其他挂板,最后耐候性硅酮胶密封板缝,拆去保护膜,至此安装工作完成。 8. According to the positioning situation, firstly connect and fix the first finished board of the combined hanging board with the fixed member and the finished board according to the accurate position, and use an electric hammer (drill) to drill holes for installing and fixing expansion bolts on the outer wall surface 16 ( or expansion plug holes), and then use special adjustable fixing parts to adjust the distance between the board surface and the base surface and the installation position to ensure that the surface layer of the combined hanging board and the main insulation layer are flat, and at the same time ensure that the insulation layer and the base surface are compacted. Tight, without leaving a cavity, and finally use expansion bolts to fix the combined hanging plate and the wall firmly. Install other hanging boards in sequence, and finally seal the board seams with weather-resistant silicone glue, remove the protective film, and the installation work is completed.
上面描述,只是本实用新型的具体实施方式,各种举例说明不对本实用新型的实质内容构成限制。 The above description is only a specific implementation of the utility model, and various illustrations do not limit the essential content of the utility model.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420531171.2U CN204081348U (en) | 2014-09-17 | 2014-09-17 | Building exterior-wall A-class fireproof heat-preservation decoration integrated combination link plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420531171.2U CN204081348U (en) | 2014-09-17 | 2014-09-17 | Building exterior-wall A-class fireproof heat-preservation decoration integrated combination link plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204081348U true CN204081348U (en) | 2015-01-07 |
Family
ID=52174081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420531171.2U Expired - Lifetime CN204081348U (en) | 2014-09-17 | 2014-09-17 | Building exterior-wall A-class fireproof heat-preservation decoration integrated combination link plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204081348U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196192A (en) * | 2014-09-17 | 2014-12-10 | 国家电网公司 | Grade-A fireproofing, insulation and decoration integrated combined hanging board of building exterior wall |
CN110258833A (en) * | 2019-05-23 | 2019-09-20 | 上海日兆建设工程有限公司 | A kind of construction method of external wall insulation |
CN114673268A (en) * | 2022-03-23 | 2022-06-28 | 四川尧顺建设集团有限公司 | Heat-preservation and heat-insulation green building |
-
2014
- 2014-09-17 CN CN201420531171.2U patent/CN204081348U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196192A (en) * | 2014-09-17 | 2014-12-10 | 国家电网公司 | Grade-A fireproofing, insulation and decoration integrated combined hanging board of building exterior wall |
CN110258833A (en) * | 2019-05-23 | 2019-09-20 | 上海日兆建设工程有限公司 | A kind of construction method of external wall insulation |
CN114673268A (en) * | 2022-03-23 | 2022-06-28 | 四川尧顺建设集团有限公司 | Heat-preservation and heat-insulation green building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071754B (en) | Building exterior wall heat-insulation decorative fireproof isolation plate and building construction method thereof | |
CN106760348A (en) | A kind of insulation and decoration acoustic wall board and its construction method of installation | |
CN204475586U (en) | A kind of enclosure wall | |
CN103452262A (en) | Vacuum fireproof thermal-insulating and decorating integrated wall board | |
CN103147524A (en) | Heat-insulating wall | |
CN204081348U (en) | Building exterior-wall A-class fireproof heat-preservation decoration integrated combination link plate | |
CN108331173A (en) | A kind of prefabricated buildings of fast demountable | |
CN104196192B (en) | Grade-A fireproofing, insulation and decoration integrated combined hanging board of building exterior wall | |
CN206957099U (en) | A kind of insulation and decoration acoustic wall board | |
CN111733992A (en) | External wall external thermal insulation system containing rock sliver composite board and construction process | |
CN108894456A (en) | Prefabricated foamed ceramic frame exterior wall cladding and manufacturing method thereof | |
CN101168993A (en) | Outside thermal insulation construction method for anchoring composite thermal insulation plate pouring polyurethane outside wall | |
CN105155730A (en) | Outer wall building module and application thereof | |
CN110670765B (en) | Indoor seamless splicing secondary light partition wall system and rapid construction method of partition wall | |
CN201908369U (en) | External heat insulation structure for polystyrene board external walls | |
CN204370748U (en) | A kind of assembled architecture wallboard | |
CN201190369Y (en) | Facade panel | |
CN208685979U (en) | A kind of decoration integrated heat-insulation wall plate of separate assembling | |
CN202866196U (en) | Energy-saving rock wool heat insulation and decoration integrated board | |
CN1314870C (en) | Method of dry construction of energy saving walls with 3D adjustment | |
CN205000492U (en) | Outer wall body building module | |
CN204456543U (en) | Carry keel assembling curtain wall circuit board | |
CN205153413U (en) | Assembled external wall insulation decorates integration unit | |
CN202108195U (en) | Fireproof and decorative integrated self-heat-insulating wallboard for peripheral guide wall of building | |
CN209397858U (en) | Prefabricated foam ceramic frame exterior wall hanging panels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |